Loading...
HomeMy WebLinkAbout4.6 AdverstiseCntract 85-6AGENDA STATEMENT CITY COUNCIL MEETING DATE: September 9, 1985 SUBJECT: Contract 85-6 Annual Slurry Seal Program EXHIBITS ATTACHED: RECOMMENDATION: FINANCIAL STATEMENT: 1) List of streets to be slurried; specifications will be available at the City Council meeting. Authorize Staff to advertise Contract 85-6. The Engineers estimate for the slurry seal improvements is $35,000, and $4,000 for design and inspection. Sufficient funds have been included in 1985-86 street maintenance budget. DESCRIPTION: The City Council allocated $50,000 for the slurry seal of City streets as part of the adopted 1985-86 street maintenance budget. The Engineers estimate for this project is broken down as follows: Slurry Seal $35,000.00 Design and Inspection 4,000.00 TOTAL $39,000.00 The patching which will be required prior to the slurry seal installation has been included as part of the annual street overlay contract. Slurry seal is a preventive maintenance technique used to prolong the life of a street. It consists of a sand/oil mixture which seals cracks and provides a new uniform wearing surface. The City streets are presently on a 5 to 7 year cycle depending on the level of wear. It is Staff's recommendation that the City Council authorize Staff to advertise Contract 85-6. STREET NAME Dublin Boulevard Rhoda Ave. Rhoda Ct. Zandol Ct. W. Vomac Rd. Peppertree Ct. Los Ranchitos Ct. Murrieta Ct. Regio Dr. Alto Way Serra Ct. Solana Dr. Peppertree Rd. Amarillo Rd. Estrella Ct. Luna Ct. Ladera Ct. Ladera Dr. Casa Linda Ct. San Sabana Rd. Calle Verde Rd. _Plata Way lolb Place Manzanita Way Silvergate Dr. Tina Place Dillon Way Cresta Lane Prow Way Corto Ct. Mancini Ct. 1985-86 SLURRY SEAL AREA T__O approx. Alamo Canal approx. Dublin Ct. Rhoda Ct. W. Vomac Rd. Zandol Ct. San Ramon Rd. Silvergate Hansen Drive Ladera Dr. Dublin Blvd. For all streets shown without limits of work the entire street will be slurry sealed. ~