Loading...
HomeMy WebLinkAbout4.11 Award of Bid 96-04 CITY CLERK File # l~l-~][--~-~[~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: August 13, 1996 SUBJECT: Award of Bid - Contract 96-04 Dougherty Hills Slope Repair Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: 1) Resolution of Award 2) Bid Results ?)//Adopt resolution awarding bid to Gordon N. Ball Inc. subject to RECOMMENDATION: ~d~ staff obtaining the remainder of the rights of entry FINANCIAL STATEMENT: Budget for construction including Landscape Replacement: $ 300,000 Low bid: $ 258,300 It is expected that the landscape replacement will be in the neighborhood of $ 45,000. DESCRIPTION: On July 9, 1996, the City Council authorized Staffto solicit bids for Contract 96-04, Dougherty Hills Slope Repair Project. _ The Slope Repair Project will reconstruct landslide areas suffered by the Dougherty Hills Open Space. Damage to the open space was apparently caused by a combination of heavy rains and weak soil conditions. Locations of the project are: The northeast and southeast comers of Topaz Circle; the northeast and southeast comers of Jade Circle; and the southwest end of Crossridge Drive. The bid documents for this project will have Gordon N. Ball Inc. (contractor) remove unstable slope areas, install subdrains, replace Vee Ditches, remodel a drainage inlet and replace excavated soil with more structurally sound material. The work includes removal of private landscaping along the privately owned slopes behind homes along Crossridge Road. Slaff has had an appraisal made of the private landscaping to be removed and will be in negotiation with the affected property owners for compensation. Some rights of entry for work on private property have been obtained and others are waiting for the resolution of the landscaping appraisals and negotiations. It ....................... 5'b-:- aS; ........................... ITEM NO. 4'a~ g:\miscprojkxridge\agstawrd is hoped that these negotiations can be resolved within the next two weeks so as not to postpone the project. A total of 6 bids were received for this project. The low bidder was Gordon N. Ball Inc. with a bid of $258,300. Staff has reviewed the bid results, checked with references, and recommends that the City Council adopt the resolution awarding the bid to Gordon N. Ball Inc. subject to staff obtaining the remainder of the rights of entry. Page 2 RESOLUTION NO. -96 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT 96-04 DOUGERTY HILLS SLOPE REPAIR TO GORDON N. BALL INC. WHEREAS, the City of Dublin did, on August 6, 1996, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract 96-04 DOUGHERTY HILLS SLOPE REPAIR authorized by the City Council on JULY 9, 1996, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does . ~ hereby award City of Dublin Contract 96-04 to the lowest responsible bidder therefor, to wit Gordon N. :' Ball Inc. with a bid of Two Hundred and Fifty-Eight Thousand Three Hundred Dollars and No Cents ($258,300.00), the particulars of which bid are on file in the Office of the City Engineer, PASSED, APPROVED AND ADOPTED this 13th day of August, 1996. AYES: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk g:tmiscprojLxridgelresoawrd BID RESULTS - DOUGHERTY HILLS SLOPE REPAIR CONTRACT 96-04 ENGINEERS EST. GORUON N. BALL BRAVA, INC. GRANITE EXCAVATION ITEM DESCRIPTION UNIT QTY. UNIT TOTAL UNIT TOTAL UNIT TOTAL UNIT TOTAL NO. MEAS. PRICE PRICE PRICE PRICE PRICE PRICE PRICE PRICE CLEARANDGRUB LS I $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 10,000.00 $ 6,000.00 $ 8,000.00 $ 1,800.o0 $ 1,800.00 CONSTRUCTION FENCING LF 1,000 ;$ 15.00 $ 15,000.00 $ 10.00 $ 10,000.00 $ 2.00 5 2,000.00 $ 17.00 $ 17,000.00 SITE PREP & GrLa. DIN G: $ $ $ a) CROSSRIDGE ROAD LS 1 $120,000.00 $120,000.00 $ 90,000.00 $ 00,000.00 $145,000.00 $145,000,00 $134,200.00 $ 134,200.00 b) JADECIRCLE LS I $ 40,000.00 $ 40,000.00 $ 25,000.00 $ 25,000.00 $ 26,825.00 $ 26.825,00 $ 26,825.00 $ 26,525.00 c~) TOPAZ CIRCLE L$ I $ 20,000.00 $ 20,000.00 $ 12,000.00 $ 12,000.00 $ 13,412.00 $ 13,412.00 $ 13,875.00 $ 13,875.00 CONCRETEVEEDITCH LF 600 $ 33.00 $ 19,800.00 $ 25.00 $ 15,000,00=$ 28.00 $ 16,800.00 5 30,00 $ 18,000,O0 REMODEL DRAINAGE INLET EA 1 $ 2,000.00 $ 2,000.00 $ 3,000,00 $ 3,000.00 $ 650.00 $ 650.00 $ BO0.00 $ 800.00 SUBDRAIN LF 4,50015 11.00 $ 49,500.00 $ 15.00 $ 67,500.00 $ 11.00 S 49,500.00 $ 14.00 $ 63~000.00 HYDROSEED LS 1 ! S 5~00000 $ 5,000.00 $ 3,000,00 $ 3,000.00 $ 12,000.00 $ 12,000.00 $ 2,500.00 S 2,500.00 CONSTRUCTIONAREASIGN EA 4 $ 500.00 $ 2,000.00 $ 500.00 $ 2,000.00 $ 500.00 $ 2,000.00 $ 1,000.00 $ 4,000.00 STRAWBALEDIKE LF 500 $ 10.00 $ 5,000.00 $ 12.00 $ 8,000.00 $ 3.75 $ 1,875.00 $ 4.00 $ 2,000.00 1( SILTFENCES L}: 6OO $ 0.50 $ 3,900.00 $ 8.00 $ 4,500.00 $ 2.OO $ 1,200.00 $ 1.75 $ 1,050.00 :~EMOVE & REPLACE CATCH BASIN SOUTH END 11 3FCROSSRIDGEVEEDITCH EA 1 $ 3,000.00 $ 3,000,00 $ 3,000.00 $ 3,000.00 $ E00.O0 $ 900.00 $ 2,500.00 $ 2,500.00 IREMOVE & REPLACE 18" DIA. RCP AT SOUTH 12 -:NDOFCROSSRIDGESLOPEREPAIR LF 110 $ 30.00 $ 3,300.00 $ 50.00 $ 5,500.00 $ 30.00 $ 3,300.00 $ 3200 iS 3,520.00 1.,!=LACE~OLB. POSTHOLECONCRETESACKS EA 100 $ 15.00 $ 1,500.00 $ 15.00 $ 1,500.00 $ 15.00 $ 1,500.00 $ 8.00 $ 500.00 FOTAL BID: $ 300,000.00 $ 258,300.00 $ 282,962.00 $ 291,870.00 *' Amoun[ adjusted al~er veriScation ol multiplication, I NRA CONSTRUCTION SAROTT CONST. FANFA~ INC. NO. DESCRIPTION UNIT UNIT TOTAL UNIT TOTAL UNIT TOTAL ITEM MEAS. QTY. PRICE PRICE PRICE PRICE PRICE PRICE I 3LEARANDGRUB LS I $ 17,112.00 $ 17,112.00 $ 7,500.00 $ 7,500.00 $ 24,200.00 $ 24,260.00 2 3ONSTRUCTIONFENCING LF 1,000 $ 13.50 $ 13,500.00 $ 24.00 $ 24,000.00 $ 3.30 $ 3,300.00 3 SITE PREP & GRADING: $ $ $ a) DROSSRIDGE ROAD LS 1 $135,000.00 $ 135.000.00 $I50,000.00 $ 150,000.00 $205,405,00 $ 205,405.00 )} JADE CIRCLE LS 1 $ 24,975.00 $ 24.875.00 $ 28,000.00 $ 28,000.00 $ 38,000.00 $ 38,000.00 :) TOPAZCIRCLE LS S 12,487.50 $ 12,487.50 ! $ 14,000.00 $ 14,000.00 $ 21,925.00 $ 21,925.00 4 ~.ONCRETEVEEDITCH LF 600 $ 33.00 $ 19,800.00 = $ 32.00 $ lg,200.00 $ 34.00 $ 20,400.00 5 REMODELDRAINAGEINLET EA $ 1,650.00 $ 1,650.00 $ 3,000.00 $ 3,000.00 $ 935.00 $ 935.00 6 ___SU8DRAIN LF 4,500 $ 22.00 $ 98,000.00 $ 17.00 $ 76,500.00 $ 20.00 $ g0,o00.00 7 HYDROSEED LS $ 3,300.00 $ 3,300.~ $ 15,000.00 $ 15,000,00 $ 13,125.00 $ 13,125.00 8 ~'*ONSTRUCTIONAREASlGN EA 4 $ 225.00 $ g00.00 $ 200.00 $ 500.00 $ 275.00 $ 1,100.00 g STRAWBALE DIKE LF 50O $ 11.00 $ 5,500.00 $ 12.00 $ 6,0OD.00 $ 5.25 $ 2,625.00 10 S[LTFENCE$ LF 000 $ 11.00 $ 6,600.00 $ 10.00 $ 6,000.00 $ 5,50 $ 3,300.00 REMOVE & REPLACE CATCH BASIN SOUTH ENO 11 DFCROSSRIDGEVEEDITCH EA $ 2,200,00 $ 2,200.00 $ 3,500.00 $ 3,500.00 $ 2,260,00 $ 2,260.00 REMOVE & REPLACE 18" omA. RCP AT SOUTH 12 END OF CROSSRIDGE SLOPE REPAIR LF 110 $ 66.00 $ 7,280.00 $ 81.00 $ 8,910.00 $ 58.00 $ 6.380.00 ~3 PLACE 60 LB. POST HOLE CONCRETE SACKS EA 100 $ 20,00 $ 2,000,00 $ 50.00 $ 5,000.00 $ 35.00 $ 3.500.00 TOTAL BIB: $ 351,284.50 $ 367,41000 $ 436,455.00