HomeMy WebLinkAbout4.04 Accept Work 96-04 CITY CLERK Fi,e # c ll -L l I AGENDA STATEMENT CITY COUNCIL MEETING DATE: June 17, 1997 SUBJECT: Acceptance of Work- Contract 96-04 Dougherty Hills Slope Repair P?oject - Phase I Report Prepared by: Lee S. Thompson, Public Works Director EXHIBITS ATTACHED: Budget Transfer Form RECOMMENDATION: i) Accept improvements under Contract 96-04; authorize payment to Gordon N. Ball, Inc. for release of retention in the amount of $29,034.32 after 35 days if there are no subcontractor claims. 2) Authorize budget appropriation from unallocated General Fund Reserves in the amount of $41,476 to this project. FIN.~CIAL STATEMENT: Total cost of contract items and Change Orders, exclusive of pending contractor claim, is $290,342.23. Prelim. Soils Testing Design Construction Contract Silt Erosion Clean-Up Staff/Contract Admin. Contract Inspection Soils Inspection/Reporting Survey Staking Payment for Private Landscaping Misc. (Printing/Legal) BUDGET TOTAL ACTUAL COST TOTAL I 1995_96 I 1996_97 IBUDOETI 1995-96 I 1996-97I COST I $ 42,000 $ 0 $ 42,000 $ 34,561 $ 0 ~ 34,561 19,000 0 19,000 2,956 3,019 5,975 0 304,089 304,089 0 290,343 290,343 0 0 0 0 10,311 10,311 5,000 6,100 11,100 1,725 10,554 12,279 0 40,000 40,000 0 32,904 32,904 0 47,000 47,000 0 43,135 43,135 0 8,000 8,000 0 12,136 12,136 0 0 0 44,495 44,495 550 550 4 318 322 $ 66.000 $405.739 $471,739 $ 39.246 $ 447,215 $486,~ ITEM NO. ~ g:\miscpr oj\xridge\agstacpt Staffhas applied for, and believes that the City will receive, FEMA funds in the amount of $13,537 for winter flood damage to the newly-graded slopes. The project is overbudget by $14,722 for the two years, was underbudget by $26,754 in 1995-96, and overbudget by $41,476 for Fiscal Year 1996-97. This is primarily due to the unbudgeted need to purchase landscaping improvements and the repair to slopes eroded in last winter's heavy rains. This will require a budget transfer from unallocated General Fund Reserves in the amount of $41,476 for Fiscal Year 1996-97. DESCRIPTION: On August 13, 1996, the City Council awarded the Dougherty Hills Slope Repair Project to Gordon N. Bail, Inc. The Slope Repair Project reconstructed landslide areas in the Dougherty Hills Open Space. Cause of the damage was apparently a combination of heavy rains and weak soil conditions. Locations of the project were: The northeast and southeast comers of Topaz Circle; the northeast and southeast comers of Jade Circle; and the southwest end of Crossridge Drive. The bid documents for this project had the contractor remove unstable slope areas, install subdrains, replace Vee Ditches, remodel a drainage inlet and replace excavated soil with more structuraily stable material. The work included removal of private landscaping along the privately owned slopes behind homes along Crossridge Road. The contractor, Gordon N. Ball, Inc., has filed claim against the City for extra work in the amount of $130,000. This claim is unresolved at this time. The City's position is that this extra work is not justified, and the dispute will go to arbitration under the terms of the contract. At this time, Staff recommends that Council accept the contract with Gordon N. Ball, Inc. as complete, subject to a claim for additional compensation by the contractor and approve a budget allocation to complete funding of the project. 2 CITY OF DUBLIN BUDGET CHANGE FORM CHANGE FORM # New Appropriations (City Council Approval Required): X From Unappropriated Reserves From New Revenues Budget Transfers: From Budgeted Contingent Reserve (1080-799.000) Within Same DeparUnent Activity Between DeparUnents (City Council Approval Required) Other Name: Name: Dougherty Hills Slope Repair, Phase I $29,747 Account#: Account#: 9405-750-050 Fund 001 Name: Name: Dougheny Hills Slope Repair, Phase I $8,405 Account~: Account #: 9405-740-000 Fund 001 Name: Name: Dougher~' Hills Slope Repair, Phase 1 $3,324 Account#: Account#: 9405-740-080 Fund 001 City Manager: Signature Date: REASON FOR BUDGET CHA~GE ENTRY: Additional costs to project for purchasing landscaping and for heavy storm erosion clean-up. Mayor: Date: Signature Posted By: Signature Date: