Loading...
HomeMy WebLinkAbout4.04 Accept Work 93-11 CITY OF DUBLIN AGE~A STATEMENT City Council Meeting Date: December 13, 1993 SUBJECT: Acceptance of Work - Contract 93-11 NPDES Pilot Project Report by: Public Works Director Lee Thompson EXHIBITS ATTACHED: 1) 2) Location Sketch Agreement Modification RECOMMENDATION: 1) Accept work constructed under Contract 93-11 and authorize payment of retention in the amount of $2,858 to Harris & Harris. Authorize an additional appropriation of $9,265.50 from new revenues. FINANCIAL STATEMENT: Design/Inspection/Testing Improvements Total: Budqeted by Year 92-93 93-94 94-95 Total $ 1,000.00 $ 4,100.00 $ 3,600.00 $ 8,700.00 24,900.00 24,900.00 $ 1,000.00 $29,000.00 $ 3,600.00 $33,600.00 Expected Expenditures By Year Design/Inspection/Testing Improvements Total: 92-93 634.50 $ 634.50 ~3-94 94-95 Total $ 9,681.91 (max.) 0.00 $10,316.41 28,583.59 0.00 28,583.59 $ 38,265.50 0.00 $38,900.00 The amount of the NPDES grant is $38,900.00 The approved CIP budget anticipated spending $1,000 in Fiscal Year 1992-93, $29,000 in 1993-94, and $3,600 for testing in 1994-95. In 1992-93, $645.50 was actually spent, and it appears that all the testing can be done this fiscal year. Dublin has also been allotted an additional $5,300 for a professional outside consulting firm to perform the tests on the ability of the project to remove the parking lot pollutants from the storm water runoff. It is therefore necessary to appropriate an additional $9,265.50 to the 1993-94 Capital Improvement budget to complete the project. All costs will be offset by NPDES grant money. DESCRIPTION: The Alameda County Urban Runoff Clean Water Program (ACURCWP) set aside $300,000 to encourage agencies to propose pilot projects to improve the storm water quality in a cost effective way. The pervious concrete/sand filter project for the Shannon Community Center parking lot (as shown in Exhibit 1) was one of the pilot projects chosen to be fully funded by the ACURCWP. Through a contract with Harris ahd Harris, which was awarded by the City Council on Septen%ber 13, 1993, the City of Dublin Public Works Department constructed two (2) concrete filter structures 1 1/2 feet wide by 2 feet deep. These concrete channels were filled with filter sand and covered with 5-foot long pervious concrete covers. The channels will act as a filter to remove some of the hazardous material from storm water which now flows down the creek to San Francisco Bay. ITEM NO. ~ COPIES TO: Harris & Harris I CITY CLERK ..... FILE Pervious concrete is a mixture of gravel and cement with air voids that allows storm water to pass through and still allows light vehicle traffic to pass over the top. The sand is a mixture of sand particles that are blended to filter out the heavy metal particles found in our storm water. The sand that becomes saturated with pollutants can later be disposed of by mixing it in with base rock for roadway construction. Work on Contract 93-11 has been completed according to approved plans and specifications and to the satisfaction of the City Engineer. Staff recommends that the City Council (1) accept work constructed under Contract 93-11 and authorize payment of retention in the amount of $2,858 to Harris & Harris; and (2) Authorize transfer of $9,265.50 from unallocated reserves to this project. The additional funds will be offset by grant fund revenues. a:(contracts)~pervious~agstacpt Page 2 Shannon Cenf er Pervious Conc Sand R'lf er 20Hang PVC Parking Lof p¢~vieus Cone Sand ,', 35'long ' Sf 'Drain Shannon Ave. CITY OF DUBLIN ~PROVED DATE ';; ' ' bP, AW~ ':~ " PUBLIC WORKS DEPARTMENT p ERVIOUS CONCRETE SAND FILTER LOOATION EXHIBIT ~Z COUNTY OF ALAMEDA PUBLIC WORKS AGENCY 399 Elmhu~st Stxeet · Hayward, CA 94544-1395 (510) 670-5480 October 28, 1993 Mehran Sepehri Senior Civil Enginee~ City of Dublin PO Box 2340 Dublin, Ca. 94568 Dear Mr. Sepehri: Subj: Agreement Modification for Pervious Concrete Pilot Study Proposed for the City of Dublin's consideration is this agreement modification for the City Manager's execution in order for the City to continue the subject project. This modification, per your request, consists of an additional $5300.00 to allow continuation of water quality monitoring of the subject project. The new "not to exceed cap"will now be $38,900.00. As provided in the agreement, the Management Committee of the Alameda County Urban Runoff Clean Water Program, recommeCded approval of this additional funding. This action was taken at their October 26, 1993 meeting. No other changes in the agreement, dated July 20, 1993, are made. The Agreement modification as stipulated in paragraph 2, page 2 of the original agreement (Contract # C-93-748) is contained herein for the City's consideration. If the enclosed modification meets with your approval, please return four executed originals to this office so that we may proceed with processing invoices. If you have any questions, please contact Gary Shawley at 510-670- 5582. Sincerely, Donald J. LaBelle Director of Public Works Dated City Manager --4J .... Dated GWS:A89919 Enc. page one of two AGREEMENT THIS AGREEMENT, made and entered into this ~day of ~, 19_~ by and between the ALAMEDA COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT, State of California, hereinafter called DISTRICT, and CITY OF DUBLIN hereinafter called DUBLIN. WITNESSETH: That DUBLIN for and in consideration of the covenants, conditions, agreements, and stipulations of DISTRICT hereinafter expressed, does hereby agree to furnish services and materials to DISTRICT, as follows, and/or as described on exhibits attached to and incorporated herein. EXHIBITS ATTACHED: DUBLIN shall furnish services as described in Exhibit A of this Agreement. Terms and conditions for payment are attached in Exhibit B. DUBLIN as a City is self-insured as to any requirements under this Agreement. No policies or bonds are required of either.party as to any provisions of this Agreement. CONTRACT PERIOD will be from through June 30. 1994 COMPENSATION: DISTRICT agrees to pay DUBLIN for services performed hereunder as described in Exhibit B - Payment Schedule. The total amount paid by DISTRICT to DUBLIN under this agreement shall not exceed the sum of $33,600.00. ADDITIONAL PROVISIONS set forth in suceeding pages hereof constitute a part of this agreement. IN WITNESS WHEREOF, the parties hereto have executed this agreement as of the day and year first above written. ~/~') DISTRIQT / ,~_~DUBLIN -A~A ' BOARD OF SUPERVISORS MAYOR COUNTY FLOOD CONTROL AND WATER CONSERVATION DISTRICT Approved as to Form KELVIN H. BOOT.~ JR., County Counsel by ~'~ CITY OF DUBLIN Approved as to FOrm ELIZABETH SILVER, City Attorney l~/' ' ~ '·2, page two of two FEDERAL AND STATE AUDITS. Until the expiration of five years after the furnishing of any services pursuant to this Agreement, DUBLIN shall.make available, upon written request, to the federal/State government.o~ any of their duly authorized representatives, this Agreement, and such books, documents, and records of DUBLIN that are necessary to certify the nature and extent of the reasonable cost of services to DISTRICT. If DUBLIN enters into any Agreement with any related organization to provide services pursuant to this Aoreement with a value or cost of $10,000 or more over a twelve-month period, such Agreement shall contain a clause to the effect that until the expiration of five years after the furnishing of sergices pursuant to such subcontract, the related oroanization shall make available, upon written request, to the federal/State government or any of their duly authorized representatives, the subcontract, and books, documents a~d records of such o~anization that are necessary to verify nature and extent of such costs.-' This paragraph shall b'e of no force and effect when and if it is not required by law. MODIFICATION. No alteration or variation of the terms of this Agreement · shall be valid unless made' in writing and signed by Dublin's City Manaaer and {he District's Public Works Director.'Any modification to increase the total amount to be paid by DISTRICT to DUBLIN shall require the recommendation of the Management Committee of the Alameda County Urban Runoff Clean'Water Program. Modification to increase the total amount paid to DUBLIN by DISTRICT by no more than twentyfive percent (254) shall be valid when made in writing and signed by DUBLIN's City Man'ager and the DISTRICT's Public Works Director. HOLD HARMLESS/INDEMNIFICATION. DUBLIN shal~l"indemnify DISTRICT, its offic6rs and employees against liability for injury or damage caused by a negligent act or omission of DUBLIN in the performance of this Agreement and shall hold DISTRICT harmless ~rom any loss occasioned as a result of the performance of this Agreement by DUBLIN. DISTRICT shall indemnify DUBLIN, its officers and employees'against liability for injury or damage caused by a negligent ~ct or omission of DISTRICT in the performance of this Agreement and shall.hold DUBLIN harmless from any loss occasioned as a result o~ the performance of this Agreement by DISTRICT. PAYMENT.. Payment to DUBLIN'W~ll be ~ade only upon presentation of proper claim by DUBLIN subject to the approval of DISTRICT for which the services have been completed. A79376 sCOFF OF 'vVORK PERVIOUS CONCRETE & SAND FILTER PtLOT STUDY TASKS The work will be conducted according to the City 6f Dublin's conceptual proposal to develop and demonstrate the performance of a pervious concrete · and sand filter system. The proposal Pervious Concrete & Sand Filter Pilot ' Study Prooosal dated August 1992 is incorporated into this agreement by reference. The work described in this proposal will be completed and twenty (20) copies of the final report submitted within the term of this agreement. 'F'~NAL REPORT FORMAT The following report format is recommended to describe the study and its results. The seven main sec.¢ions of the report are indicated by the headings numbered I thru VII. Additional subsections may be added to the reoort provided they fit within one of the main headings. Recommended Report Format : ExecuTive SummaW Introduction '.~ackground Methodology 'V. P, esuIis Discusslon · A. EvMu~don of the effectiveness of polluzan-Z removal ~chieved by the p.o~ project zechnology(ies)-; ' " , ' Ev~lu~tion of the spplicsbi~ity of~he techno,Ogy[~es] use~ to other conditions ~ollowing type of crkeria .. ' "'' · CounW situ~¢ons ~ound wt=n n 'A]amed~ Cobmy - D~scribe the ~or use of the technologY ss may pem~in~zo use in o~hsr Ai~mea~ situations: sp~ce requirements; flow qd~mt]ti~s ~nd qu$1iW requ[rem~m~s; · [equiremems; ~mounts end ty2eS relt~bll ~, operation end m~n~en~nce wastes generated; =~ ~?'~,- of th- technoloay(ies) used comp~reo Evs~uat]on of the cos~-e~iecdbeness = C, , : ~ch~ev[ng po[luZ~q( ~aductlons other me~hods o} Vii. SummeEy' and ConclUsion . . The Three items listed under the Disc. Oss~on hea~tng -select the project forimp~ement~d°n~ ~hesac~heda shs~i be ~u~her evslusted~ndd8scr~bed in the repo~. Aqy deficiencies ininformatl°n needed included in the rapo~ so that the limlzations c.f the study results are clearly descrlbed. .:... EXHIBIT B Payment Schedule DISTRICT will pay DUBLIN for conduct of the pervious concrete pilot study upon submission of a completed statement at the conclusion of each.phase of the pilot study. Each statement shall include the agreement number, details of tasks performed for the corresponding phase, personnel (staff or contractor) performing the task, and total amount of dollars to be p~id by DISTRICT for each task. DISTRICT wilt pay DUBLIN within thirty (30) working days of receipt by' DISTRICT of an invoice from DUBLIN. It is agreed and understood that the line item costs for each project phase are estimates. PROJECT PHASES AND COSTS 1. DESIGN ..................... ' ............... $ 1,000.00 2. CONSTRUCTION .................. ~ ........... 27,000.00 3. SAMPLE COLLECTiON/ANALYSIS .... ~ ............ 4,600.00 4. FINAL REPORT ..................... ' .......... 1.000.00 ' $33.600.00, TOTAL NOT TO EXCEED ......... ... ...... A79360