Loading...
HomeMy WebLinkAbout4.09 Annual Slurry Seal Programor 19 82 /ii � 111 DATE: TO: FROM: SUBJECT STAFF REPORT CITY COUNCIL July 15, 2014 CITY CLERK File #600 -35 Honorable Mayor and City Councilmembers Christopher L. Foss, City Manager " Award of Bid — Contract No. 14 -09, 2014 Annual Slurry Seal Program Prepared by Ananthan Kanagasundaram, Associate Civil Engineer EXECUTIVE SUMMARY: The Annual Slurry Seal Program (CIP No. ST5114) will resurface several City streets and the Civic Center parking lot with a slurry seal that will prolong the life of the existing pavement surface. As pavement begins showing wear and stress cracking, it is important to seal the cracks to keep water from getting under the pavement. FINANCIAL IMPACT: The adopted FY 2013 -14 Budget includes $655,734 in Gas Tax and Measure B Bike and Ped funding for the FY 2013 -14 Slurry Seal Maintenance Project (CIP No. ST5114). The total project funding includes $77,334 for project design, inspection and administration; and $578,400 for improvements. In addition to the streets, resurfacing of the Civic Center parking lot has been included as part of the contract bid (G14099 — Civic Center Modification Design & Construction). The $100,000 of improvements for the Civic Center parking lot resurfacing and striping is funded by the General Fund. The total amount of the base bid is $647,013. Allowing for a 10% contingency would increase total contract costs to $711,715, which is above the amount budgeted. Staff recommends that an additional $33,315 in State Gas Tax funds be authorized and added to the project budget to pay the increased costs. Page 1 of 3 ITEM NO. 4.9 Budget For Improvements Low Bid With 104/6 Contingency Gas Tax 2201 & Measure B Bike and Ped Fund 2205 Improvements (Slurry Seal ; Traffic $5787400 $6127764.41 Striping) General Fund 1001 G14099 — Civic Center Modification $1007000 $987950.17 Design & Construction TOTAL IMPROVEMENT $678,400 $711,715 (rounded) (CONTRACT): Page 1 of 3 ITEM NO. 4.9 RECOMMENDATION: Staff recommends that that the City Council: 1) Adopt the Resolution awarding Contract No. 14- 09, 2014 Annual Slurry Seal Program and G14099 — Civic Center Modification Design & Construction, to Graham Contractors Inc., and authorizing the City Manager or his designee to approve Change Orders for the project up to the contingency amount of $33,315; and 2) Approve the Budget Change. Submitted By Public Works Director DESCRIPTION: (ice Reviewed By Administrative Services Director dr '\ Reviewed By Assistant City Manager Slurry seal is a preventative maintenance technique used to prolong the life of asphalt concrete surfacing. As streets begin showing wear and stress cracks, it is important to seal the cracks to keep water from getting under the roadway pavement. Slurry consists of a sand /oil mixture which seals cracks and provides a new uniform wearing surface. Village Parkway, Amador Valley Boulevard, Stagecoach Road, Wildwood Road, and the Civic Center parking lot (as shown on the Location Map — Attachment 1) are scheduled to be slurry sealed as part of the 2014 Annual Slurry Seal Program. Pavement base repairs are included at these locations and also on portions of Dougherty Road. The total project includes approximately one million square feet of slurry seal and approximately 63,500 square feet of pavement base repairs. The project also includes restoration of existing bike lanes on Amador Valley Boulevard and Stagecoach Road. The bike lanes on Village Parkway will be upgraded to buffered bike lanes as part of the project. Buffered bike lanes are wider than typical bike lanes and include a two- to four -foot striped buffer between the motor vehicle lane and the area for bicycles. The upgrade to buffered bike lanes on Village Parkway is possible because the existing pavement width accommodates the buffer. This upgrade is consistent with the City of Dublin Complete Streets Policy. A total of three bids were received on June 26, 2014 and a summary of the bids is provided as Attachment 2. The low bid of $647,013.25 was submitted by Graham Contractors Inc. Staff has reviewed the bid results, checked references and necessary licenses, and recommends that the City Council adopt the Resolution (Attachment 3) awarding Contract No. 14 -09, 2014 Annual Slurry Seal Program and G14099 — Civic Center Modification Design & Construction to Graham Contractors Inc. as the lowest responsive bidder. To facilitate the approval of contract change orders and to avoid construction delay, it is requested that the City Manager be authorized to approve change orders up to the contingency amount of $33,315. The Resolution (Attachment 3) will authorize this change as it relates to this Project. Attachment 4 is the requested Budget Change. Staff expects the project to begin August 2014 and anticipates completion of the majority of the improvements by end of September 2014. Page 2 of 3 NOTICING REQUIREMENTS /PUBLIC OUTREACH: As required by the specification, the Contractor will notify all affected residents and businesses one week in advance of the slurry seal improvements. ATTACHMENTS: 1. Location Map 2. Bid Results 3. Resolution Awarding Contract 14 -09, 2013 Annual Slurry Seal Program, and G14099 — Civic Center Modification Design & Construction to Graham Contractors Inc. 4. Budget Change Page 3 of 3 LOCATION MAP BID RESULTS - 2014 ANNUAL SLURRY SEAL, CONTRACT NO. 14 -09 BID OPENING DATE - JUNE 26, 2014 Page 1 of 2 GRAHAM CONTRACTORS VSS INTERNATIONAL AMERICAN ASPHALT BID ITEM ITEM DESCRIPTION OF MEAS. QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 Slurry Seal, Type 11 SF 1,020,350 $ 0.220 $ 224,477.00 $ 0.250 $ 255,087.50 $ 0.280 $ 285,698.00 2 3" Pavement Failure Repair SF 63500 $ 3.15 $ 200, 025.00 $ 3.05 $ 193, 675.00 $ 4.50 $ 285, 750.00 3 Remove Existing Striping /Markings LS 1 $ 50,000.00 $ 50,000.00 $ 29,400.00 $ 29,400.00 $ 44,000.00 $ 44,000.00 4 Rubber Tire Rolling LS 1 $ 10,000.00 $ 10,000.00 $ 10,300.00 $ 10,300.00 $ 5,000.00 $ 5,000.00 5 Crack Sealing LS 1 $ 38, 700.00 $ 38, 700.00 $ 49, 875.00 $ 49, 875.00 $ 50, 300.00 $ 50, 300.00 6 Replace Detector Loops EA 10 $ 500.00 $ 5,000.00 $ 525.000 $ 5,250.00 $ 660.000 $ 6,600.00 7 New Bicycle Detector Loops EA 8 $ 1,000.00 $ 8,000.00 $ 1,000.00 $ 8,000.00 $ 660.00 $ 5,280.00 8 Bicycle Detector Loop Lead -in- Cables LF 1,210 $ 5.00 $ 6,050.00 $ 1.50 $ 1,815.00 $ 2.75 $ 3,327.50 9 Centerline (Detail 8) LF 360 $ 0.35 $ 126.00 $ 1.00 $ 360.00 $ 0.35 $ 126.00 10 Centerline (Detail 10) LF 12,185 $ 0.35 $ 4,264.75 $ 0.42 $ 5,117.70 $ 0.35 $ 4,264.75 11 No Passing Zone (Detail 21) LF 2,180 $ 1.00 $ 2,180.00 $ 1.22 $ 2,659.60 $ 1.00 $ 2,180.00 12 No Passing Zone (Detail 22) LF 2,805 $ 1.20 $ 3,366.00 $ 1.46 $ 4,095.30 $ 1.20 $ 3,366.00 13 Right Edgeline (Detail 27B) LF 16,980 $ 0.50 $ 8,490.00 $ 0.61 $ 10,357.80 $ 0.50 $ 8,490.00 14 Median Island (Detail 29) LF 1,485 $ 2.20 $ 3,267.00 $ 2.68 $ 3,979.80 $ 2.20 $ 3,267.00 15 Lane Drop (Detail 37B) LF 985 $ 1.00 $ 985.00 $ 1.22 $ 1,201.70 $ 1.00 $ 985.00 16 Channelizing Line (Detail 38) LF 3715 $ 1.00 $ 3715.00 $ 1.22 $ 4532.30 $ 1.00 $ 3715.00 17 Channelizing Line (Detail 38A) LF 11770 $ 0.80 $ 9,416.00 $ 0.97 $ 11,416.90 $ 0.80 $ 9,416.00 18 Bike Lane (Detail 39) LF 12535 $ 0.60 $ 7521.00 $ 0.73 $ 9,150.55 $ 0.60 $ 7521.00 19 Bike Lane Intersection (Detail 39A) LF 1565 $ 0.50 $ 782.50 $ 0.61 $ 954.65 $ 0.50 $ 782.50 20 Crosswalk /Limit Line (White) LF 1,440 $ 3.00 $ 4,320.00 $ 3.66 $ 5,270.40 $ 3.00 $ 4,320.00 21 Crosswalk /Limit Line (Yellow) LF 1,260 $ 3.00 $ 3780.00 $ 3.66 $ 4,611.60 $ 3.00 $ 3780.00 22 Crosswalk Ladder (White) LF 105 $ 6.00 $ 630.00 $ 7.32 $ 768.60 $ 6.00 $ 630.00 23 Crosswalk Ladder (Yellow) LF 55 $ 6.00 $ 330.00 $ 7.32 $ 402.60 $ 6.00 $ 330.00 24 4" White Stripe (Non Thermoplastic) LF 8,280 $ 0.60 $ 4,968.00 $ 0.74 $ 6,127.20 $ 0.60 $ 4,968.00 25 Type 1 10' Arrow (A24A) EA 4 $ 55.00 $ 220.00 $ 97.00 $ 388.00 $ 55.00 $ 220.00 26 Type 1 24' Arrow (A24A) EA 7 $ 120.00 $ 840.00 $ 147.00 $ 1,029.00 $ 120.00 $ 840.00 27 Type II Arrow (L) and (R) (A24B) EA 1 $ 180.00 $ 180.00 $ 220.00 $ 220.00 $ 180.00 $ 180.00 28 Type III Arrow (L) and (R) (A24B) EA 24 $ 160.00 $ 3,840.00 $ 196.00 $ 4704.00 $ 160.00 $ 3,840.00 SUB -TOTAL BID: $ 605,473.25 $ 630750.20 $ 749,176.75 Page 2 of 2 GRAHAM CONTRACTORS VSS INTERNATIONAL AMERICAN ASPHALT BID ITEM ITEM DESCRIPTION UNIT OF MEAS. QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 29 Type VI Arrow (A24A) EA 56 $ 160.00 $ 8)960.00 $ 195.00 $ 10, 920.00 $ 160.000 $ 8)960.00 30 Type VII Arrow (A24A) EA 3 $ 100.00 $ 300.00 $ 122.00 $ 366.00 $ 100.00 $ 300.00 31 Bike Lane w/ Person - (A24C) EA 25 $ 50.00 $ 1,250.00 $ 61.00 $ 1525.00 $ 50.00 $ 1,250.00 32 Bike Lane Arrow (A24A) EA 25 $ 25.00 $ 625.00 $ 31.00 $ 775.00 $ 25.00 $ 625.00 33 "AHEAD" (A24D) EA 16 $ 100.00 $ 1)600.00 $ 122.00 $ 1)952.00 $ 100.00 $ 1)600.00 34 "CLEAR" (A24E) EA 2 $ 100.00 $ 200.00 $ 122.000 $ 244.00 $ 100.000 $ 200.00 35 "KEEP" (A24E) EA 2 $ 80.00 $ 160.00 $ 98.00 $ 196.00 $ 80.00 $ 160.00 36 "PED" (A24D) EA 11 $ 60.00 $ 660.00 $ 74.00 $ 814.00 $ 60.00 $ 660.00 37 "SCHOOL" (A24D) EA 2 $ 120.00 $ 240.00 $ 146.00 $ 292.00 $ 120.00 $ 240.00 38 "SIGNAL" (A24D) EA 5 $ 120.00 $ 600.00 $ 147.00 $ 735.00 $ 120.00 $ 600.00 39 "SLOW" (A24D) EA 5 $ 80.00 $ 400.00 $ 98.00 $ 490.00 $ 80.00 $ 400.00 40 "STOP" (A24D) EA 24 $ 80.00 $ 1)920.00 $ 97.00 $ 2)328.00 $ 80.00 $ 1)920.00 41 "XING" (A24D) EA 13 $ 80.00 $ 1,040.00 $ 98.00 $ 1,274.00 $ 80.00 $ 1,040.00 42 I SA MARKING EA 11 $ 150.00 $ 1)650.00 $ 183.00 $ 2)013.00 $ 150.00 $ 1)650.00 43 1110" (A24C) EA 7 $ 75.00 $ 525.00 $ 92.00 $ 644.00 $ 75.00 $ 525.00 44 1120" (A24C) EA 2 $ 75.00 $ 150.00 $ 91.00 $ 182.00 $ 75.00 $ 150.00 45 112511 (A24C) EA 2 $ 75.00 $ 150.00 $ 92.00 $ 184.00 $ 75.00 $ 150.00 46 113011 (A24C) EA 5 $ 75.00 $ 375.00 $ 91.00 $ 455.00 $ 75.00 $ 375.00 47 113511 (A24C) EA 9 $ 75.00 $ 675.00 $ 92.00 $ 828.00 $ 75.00 $ 675.00 48 Bicycle Detector Loop Markings EA 8 $ 75.00 $ 600.00 $ 91.00 $ 728.00 $ 75.00 $ 600.00 49 Blue Hydrant Markers EA 35 $ 20.00 $ 700.00 $ 18.30 $ 640.50 $ 15.00 $ 525.00 50 Miscellaneous Parking Lot Markings" LS 1 $ 2500.00 $ 2500.00 $ 2,257.00 $ 2,257.00 $ 1,850.00 $ 1,850.00 51 Bicycle Buffer Zone Striping' LF 10700 $ 0.80 $ 8560.00 $ 0.97 $ 10,379.00 $ 0.80 $ 8560.00 52 Bicycle Conflict Zone Coating SF 500 $ 10.00 $ 5,000.00 $ 12.20 $ 6,100.00 $ 10.00 $ 5,000.00 53 Install Stop Signs w/ Post EA 6 $ 350.00 $ 2,100.00 $ 396.50 $ 2,379.00 $ 325.00 $ 1,950.00 54 Replace "Yield" Sign with "Stop" Sign (Panel Only) EA 3 $ 200.00 $ 600.00 $ 183.00 $ 549.00 $ 150.00 $ 450.00 SUB -TOTAL BID: $ 41540.00 $ 49,249.50 $ 40,415.00 TOTAL BID: $ 647, 013.25 $ 679)999.70_ $ 789, 591.75 * amount adjusted after verification of calculation RESOLUTION NO. - 14 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 14 -09, 2014 ANNUAL SLURRY SEAL PROGRAM AND G14099 — CIVIC CENTER MODIFICATION DESIGN & CONSTRUCTION, TO GRAHAM CONTRACTORS INC. WHEREAS, the City of Dublin did, on June 26, 2014, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 14 -09, 2014 Annual Slurry Seal Program and G14099 — Civic Center Modification Design & Construction, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the Public Works Director, who has recommended that the bid hereinafter is the lowest and best bid for doing said work; NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby award Contract No. 14 -09, 2014 Annual Slurry Seal Program and G14099 — Civic Center Modification Design & Construction, to the lowest responsible bidder therefore, to wit, Graham Contractors Inc., at a bid of Six Hundred Forty Seven Thousand, Thirteen Dollars and Twenty Five Cents ($647,013.25), the particulars of which bid are on file in the Office of the Public Works Director. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager or his designee to approve the project Contract Change Orders based on the appropriated funds designated for Contract No. 14 -09 up to the contingency amount of $33,315. BE IT FURTHER RESOLVED that the City Manager is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 15th day of July, 2014, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ATTEST: Mayor City Clerk From Un- Appropriated Reserves From Designated Reserves Account CITY OF DUBLIN FISCAL YEAR 2013 -14 BUDGET CHANGE FORM Budget Change Reference #: X Budget Transfer Between Funds Amount Account Other Amount Budget adjustment allows 10% contingency for contract costs allocated to Slurry Program FY 13 -14 Posted By: CAUsers \agenda \Desktop \4.9 attch 4 4.9 attch 4 As Presented at the City Council Meeting 7/15/2014 Date: EXPENDITURES: Gas Tax (2201) - Slurry Seal FY 13 -14 - Improvements -Not Bldg st5114.9400.9401 $33)315 Transfer In 3600.9601.49999 $337315 Transfer Out 2201.9601.89101 $33, 315 Budget adjustment allows 10% contingency for contract costs allocated to Slurry Program FY 13 -14 Posted By: CAUsers \agenda \Desktop \4.9 attch 4 4.9 attch 4 As Presented at the City Council Meeting 7/15/2014 Date: