Loading...
HomeMy WebLinkAboutReso 005-84 BldgPermitFees RESOLUTION NO. 05 - 84 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN FEE SCHEDULE FOR BUILDING REGULATION PERMITS WHEREAS, Section 12.14 of the Ordinance requires this City Council to adopt a Schedule of Fees for permits, reinspections, code compliance surveys, moved building inspections, plan and specification storage fees, additional plan checking, and hourly rates for inspection services not covered by specific fees; and WHEREAS, it is necessary to adopt a new fee schedule to recover those costs presently being incurred in the processing of the aforesaid items; and NOW THEREFORE BE IT RESOLVED that this City Council hereby adopts the following schedule of fees in accordance with Section 12.14 of the aforesaid Ordinance Code. SCHEDULE OF FEES PART 1. For Permits for construction of, or for additions and/or alterations to buildings or structures, the permit fee shall be determined as follows: TOTAL VALUATION * FEE ** $1 to $200 201 to 400 401 to 600 601 to 800 801 to 1,000 1,001 to 2,000 $25 36 47 58 69 69 for the first $1,000 plus $7 for each additional $200 or fraction thereof to and including $2,000. 2,001 to 4,000 104 for the first 2,000 plus $20 for each additional 1,000 or fraction thereof to and including $4,000. 4,001 to 10,000 144 for the first $4,000 plus $16 for each additional $1,000 or fraction thereof to and including $10,000. 10,001 to 50,000 240 for the first $10,000 plus $7 for each additional $1,000 or fraction thereof to and including $50,000. 50,001 to 100,000 520 for the first $50,000 plus $6 for each additional $1,000 or fraction thereof to and including $100,000. 100,001 to 500,000 820 for the first $100,000 plus $3 for each additional $1,000 or fraction thereof to and including $500,000. 500,001 and up 2,020 for the first $500,000 plus $2 for each. additional $1,000 or fraction thereof. For permits with a value up to $6,000 the fee may be reduced by the amount listed in Table I when no electrical, plumbing, or mechanical work is installe For permits with a value up to $4,000 the fee may be reduced by two-thirds the amount listed in Table I when the work involves only one of the following: electrical work; plumbing work; mechanical work. For permits with a value up to $2,500 the fee may be reduced by one-third of the amount listed in Table i when the work involves any combination of two of the following: electrical work; plumbing work; mechanical work. TABLE I Valuation* Reduction 0-200 9 201-400 15 401-600 18 601-1000 24 1001-1600 27 1601-3000 30 3001-4000 24 4001-5000 18 5001-6000 9 Over 6000 0 * The determination of the valuation shall be made by the Building Official. ** Fees for solar installations and demolitions shall be 50% of the calculated fee. However, the minimum fee shall be $25.00. Part 2. Fees for electrical, plumbing, and mechanical work where no work 'regulated by the Building Code is proposed. For installation, alteration, relocation or repair of each electrical service including one meter. 600 Volts or Less Over 600 Volts 1st 100 ampere capacity $20.00 1st 200 KVA capacity $3~.00 Each additional 100 ampere Each additional 200 KVA capacity or fraction thereof 3.00 capacity or fraction Each additional meter 1.00 thereof 10.00 For installation, relocation or replacement of each motor (not an integral part of an electrical appliance, fan, heating appliance, cooling appliance), generator, heater, electrical furnace, welding machine, transformer, and rectified (includes all necessary circuits, outlets, fixtures, switches, controls). RATING IN HP, KVA OR KW 0 to 1 $ 7.00 i to 2 9.00 2 to 5 12.00 5 to 15 20.00 15 to'SO 30.00 50 to 100 35.00 100 and over 40.00 For motor generator sets add 50%. EACH ADDITIONAL $2 50 2 50 2 50 2 50 2 50 2 50 2 50 C. For the installation, alteration or replacement of each electrical circuit (includes all necessary outlets, switches, receptacles and lighting fixtures). FIRST CIRCUIT EACH ADDITIONAL (a) 1 to 20 ampere capacity circuit $5.00 $2 50 (b) 21 to 30 ...... 6.00 2 50 (c) 31 to 40 " " " 7.00 2 50 (d) 41 to 50 ...... 8.00 2 50 (e) 51 to 70 ...... 9.00 2 50 (f) 71 to 100 ...... 10.00 2 50 (g) Over 100 ampere capacity $10.00 plus $2.00 per 100 ampere capacity or fraction thereof. For installation, relocation or replacement of each fixed or stationary electrical appliance (includes all necessary circuits, outlets, switches, receptacles, fixtures). 6.00 (a) For each electrical appliance which requires plumbing installation such as garbage disposal, dishwasher, etc., (includes all necessary circuits, outlets, switches, receptacles, fixtures, water piping, and waste and vent piping). (b) For the installation, relocation or replacement of each plumbing fixture or trap (includes all necessary water, drainage and vent piping). 15.00 15.00 3., 4., 5., & 6. For each installation or alteration of each water piping system, gas piping system, oD refrigerant piping system or portion thereof where fixtures or appliances are not installed. (a) One to three outlets (b) Over three outlets, per additional outlet Pn~ ~r~ of each system '7.00 1.00 15.00 7. For the repair of each ventilating duct system. 15.00 8. For each gas meter. 4.00 9. For each lawn sprinkler or irrigation sprinkling s~stem on one central valve. 6.00 10. For each alteration or relocation of a ventilation duct system or portion thereof (not including fire dampers). (a) One to three registers 7.00 (b) Over three registers, per additional register 1.00 !1. For each installation, alteration, relocation or replacement of fire dampers. (a) One to three fire dampers 10.00 (b) Over three fire dampers, per additional damp'er 2.00 12. (a) For the installation, relocation or replacement of each heating, cooling or refrigeration appliance (includes all necessary electrical circuits, outlets, fixtures, switches, receptacles, gas piping vents, water piping) but does not include motors subject to Item 3 of this schedule and does not include duct work subject to Items 10 and 11 of this schedule. RATING IN BTU HORSEPOWER 0 to 100,000 $20.00 0 to 3 $20.00 Over 100,000 to 500,000 30.00 Over 3 to 15 30.00 Over 500,000 45.00 Over 15 45.00 13. 14. 15. 16. (b) For the installation, relocation, or replacement for each heating, cooling or refrigeration appliance not connected to a duct system (including all necessary electrical circuits, outlets, fixtures, switches, receptacles, gas piping and vents) but does not include motors subject to Item 3 of this schedule. For the installation, relocation or replacement of each boiler (includes all necessary electrical circuits, outlets, fixtures, switches, receptacles, gas piping ~ents) but does not include motors subject to Item 3 of this schedule and does not include vents or chimneys for solid or liquid fuel burning appliances subject to Item 22 of this schedule. RATING IN BTU HORSEPOWER O to 100,000 $25.00 0 to 3 Over 100,000 to 500,000 40.00 Over 3 to 15 Over 500,000 55.00 Over 15 15.00 $25.00 40.00 55.00 (a) For the installation, relocation or replacement of each gas fired water heater (includes all necessary water and gas piping and vents). (b) For the installation, relocation or replacement of each electrical water heater (includes all necessary water piping, electrical circuits, outlets, fixtures, receptacles, and switches). For the installation, relocation, or replacement of each incinerator or kiln (includes all necessary gas piping) but does not include vents or chimneys for solid fuel burning appliances subject to Item 22 of this schedule. COMMERCIAL INCINERATORS 0 to 100,000 BTU Over 100,000 to 500,000 BTU Over 500,000 BTU Domestic incinerators 35.00 40.00 45.00 20.00 For the installation, relocation or replacement of other fuel burning appliances not listed in this schedule (in- cludes all necessary gas piping and vents, electrical circuits, outlets, switches, receptacles, and fixtures) but does not include motors subject to Item 3 of this schedule and vents or chimneys for solid-fuel burning appliances subject to Item 22 of this schedule. Domestic Appliances OTHER APPLIANCES 0 to 100,000 BTU Over 100,000 BTU to 500,000 BTU Over 500,000 BTU 17. For the installation, relocation or replacement of ventilation fans connected to a single duct or outlet (includes all necessary electrical circuits, outlets, switches, receptacles, fixtures and duct work), but does not include motors subject to Item 3 of this schecule. 0 to 5,000 CFM Over 5,000 CFM 18. For installation, relocation or replacement of fans or air handling units connected to a duct system (includes all necessary electrical circuits, outlets, switches, receptacles, fixtures) but does not include motors subject to Item 3 of this schedule. O to 5,000 CFM Over 5,000 CFM 19. 20. 21. 22. (a) For installation, relocation, or replacement for each heating, or cooling coils or element in a duct system (includes all necessary electrical circuits, outlets, switches, receptacles, fixtures, and piping for the heating or cooling media). 0 to 100,000 BTU Over 100,000 to 500,000 BTU Over 500,000 BTU (b) For the installation, relocation, repair or replacement of each radiant heating panels, radiators, or convectors (includes all necessary piping). One to Three Over 3, per additional unit For the installation, relocation or replacement of each dust collection system (includes all necessary electrical circuits, outlets, switches, receptacles, fixtures, duct Work but does not include motors subject to Item 3 of this schedule). For each cyclone One to Three outlets Each additional outlet For the installation, relocation or replacement of each commercial range hood and/or exhaust duct (includes all necessary duct work, electrical circuits, outlets, switches, receptacles, and fixtures) but does not include motors subject to Item 3 of this schedule. (a) For the installation, relocation or replacement of each vent or chimney for: Gas fired appliance Masonry or concrete chimneys and/or fireplaces SOLID LIQUID FUEL BURNING APPLIANCES RATING IN BTU ~ORSEPOWER 0 to 100,000 0 to 3 Over 100,000 to 500,000 Over 3 to 15 Over 500,000 Over 15 (b) For the installation, relocation or replacement of each factory built fireplace (includes vent but not a masonry or concrete chimney). 23. For the installation, relocation or replacement of each light standard (includes each electrical circuit, Outlet, switch, receptacle, fixtures and fo~ndations)o 1st standard 2 to 4 standards Over 4 standards, per additional standard 24. For the installation, relocation or replacement of each dry chemical fire extinguishing system. One to'three outlets Over three outlets, per additional outlet '$15.00 20.00 30.00 4~ ~ 8.00 12.00 25.00 30.00 10.00 20.00 35.00 15.00 1.00 30.00 5.00 2.00 30.00 10.00 35.00 20.00 30.00 .45.00 30.00 30.00 ] 0 ,0 20.00 2.00 25. For the installation, relocation or replacement of a fire alarm system (does not apply to individual detectors not part of a system). One to three detectors Over three detectors 26. $30.00 40.00 For the installation of individual fire alarm detectors not part of a system. One to three detectors Each additional detector 27. 10.00 1.00 For the installation, relocation or replacement of each fuel tank less than 1,000 gallons capacity. The fee for tanks over 1,000 gallons capacity shall be based upon the valuation, but the fee calculated from Part A of this schedule shall be divided by 2. For correction of violations in any electrical, plumbing, or mechanical installation which is required as the result of a code compliance survey, lockout inspection, or other special investigation. This fee shall be in addition to the fees for any new installation made as part of the correction. 25.00 The minimum fee regardless of the amount determined by this schedule shall be $20.00. 25.00 Part 3. Where the proposed work is not covered by the items listed in this schedule, or where special investigations, evaluations or insp- ections are requested or required, the fee shall be based upon the estimated time for processing, checking and inspecting using the hourly rate set forth in Item H of this schedule. 1. For moved building inspection fee: $4.00 for each 100 square feet. 2. For code compliance survey: $4.00 for each 100 square feet or portion thereof. 3. Reinspection fee: $20.00 for each reinspection. 4. Fee for additional plan checking: The hourly rate set forth in Item H with a minimum of $25.00° 5. Fee for plan check revisions: The hourly rate set forth in Item H with a minimum of $25.00. 6. For services where there is no specific fee: An hourly rate based on actual cost plus overhead rounded up to the nearest dollar. When services are outside of regular working hours, the rate shall be double with a minimum of 4 hours 7. In-plant inspections: The hourly rate set forth in Item H plus all costs of meals, lodging, and transportation. 8. Plan storage fee: $10.00 (applies to plans required to be prepared by a professional engineer or architect). 9. Fees for reviewing geologic reports required by the Alquist- Priolo Special Studies Zones Act: Actual cost. 10. Energy Conservation Surcharge: For all buildings subject to the California Energy Conservation Regulations add a surcharge of 25%. BE IT FURTHER RESOLVED that this Schedule of Fees shall become effective JanuarV 9, 1984 PASSED, APPROVED AND ADOPTED THIS January , 1984 9 th day of AYES: NOES: Councilmembers Drena, Hegarty, Jeffery, Moffatt and Mayor Snyder None ABSENT: None