HomeMy WebLinkAbout4.09 Annual Street Overlayor 19 82 /ii � 111 DATE: TO: FROM: STAFF REPORT CITY COUNCIL December 17, 2013 Honorable Mayor and City Councilmembers Joni Pattillo City Manager""' CITY CLERK File #600 -35 SUBJECT: Approve Contract Change Order No. 4 and Acceptance of Work — Contract No. 13 -07, 2013 Annual Street Overlay Program Prepared by Steven Yee, Public Works Manager EXECUTIVE SUMMARY: The 2013 Annual Street Overlay Program (CIP No. 969104) resurfaced various City streets with asphalt concrete (AC) overlay on top of existing pavement. FINANCIAL IMPACT: The adopted total appropriations in CIP No. 969104 are $921,600, including design and improvements. Of this amount, $74,600 has been allocated for design /inspections and $847,000 for improvements. The improvements budget includes $297,000 in federal earmark funds for the pavement rehabilitation of Dublin Boulevard between Dougherty Road and Scarlett Drive and $550,000 for the 2013 Annual Street Overlay Program. Dublin Boulevard resurfacing improvement was completed under a separate contract. The total cost of improvements under this contract is $477,546, which includes Contract Change Order No. 4 for the resurfacing of Davona Drive in partnership with Dublin San Ramon Services District ( DSRSD). The City will be reimbursed 75% of the $62,541 cost of Contract Change Order No. 4 by DSRSD plus an administrative fee. Fund rrr,rovement Budget* Actual Gash ACTC Measure B Funds $550,000 $477,546 #2204 * Improvement budget of $550,000 is for the 2013 Annual Street Overlay Program only. RECOMMENDATION: Staff recommends that the City Council approve Contract Change Order No. 4 and accept improvements under Contract No. 13 -07, 2013 Annual Street Overlay Program, and release retention after 35 days if there are no subcontractor claims. Page 1 of 2 ITEM NO. 4.9 Submitted By Director of Public Works DESCRIPTION: Reviewed By Assistant City Manager The 2013 Annual Street Overlay Program consisted of removing and replacing failed asphalt concrete (AC) pavement to a minimum depth of 4 inches, resurfaced the street with a minimum 1 -1/2 -inch overlay of AC, and re- striped pavement markings. Major cracks were sealed prior to resurfacing in order to prevent the cracks from reflecting through the new AC overlay. This year's program resurfaced the following streets (Attachment 1): Tassajara Road (North City Limits to Moller Creek) Brighton Drive (Amador Valley Boulevard to Tamarack Drive) Tamarack Drive (Brighton Drive to Village Parkway) Tamarack Drive (Village Parkway to Firethorn Way) Village Parkway (Dublin Blvd to Clark Avenue) Lisa Court In addition to the above streets, a portion of Davona Drive between Lucania Street and Chatam Street was also resurfaced as part of an agreement with DSRSD. As a cost savings measure, DSRSD requested Davona Drive to be repaved as part of the City's annual street overlay program. The District had recently installed a recycled water pipeline on Davona Drive and damaged the existing pavement. It was agreed that DSRSD will reimburse the City 75% of the actual improvement cost plus an 11.5% administrative fee. The agreed 75% ratio is derived from the remaining service life of the existing pavement before DSRSD's project. The total cost for the Davona Drive improvements is $62,541.39, which DSRSD will reimburse the City $46,906.04 with $7,192.26 in administrative cost managing the improvements. Contract Change Order No. 4 (Attachment 2) is for the Davona Drive improvements. Staff has reviewed the work as part of Contract No. 13 -07, 2013 Annual Street Overlay Program, and determined the work is complete. NOTICING REQUIREMENTS /PUBLIC OUTREACH: None. ATTACHMENTS: 1. Location Map 2. Contract Change Order No. 4 Page 2 of 2 CITY OF DUBLIN 100 Civic Plaza Dublin, CA 94568 ORDER NO. 4 DATE: October 23, 2013 CONTRACT CHANGE ORDER STATE: California CONTRACT FOR: City of Dublin 2013 Annual.Street Overlay Program COUNTY: CONTRACT NO: 13 -07 Alameda OWNER: City of Dublin CONTRACTOR: C.F. Archibald Paving, Inc. CURRENT CONTRACT PRICE: $373,045.52 CURRENT CONTRACT TIME OF COMPLETION: CURRENT NO. WORKING DAYS: TO: C.F. Archibald Pavinq, Inc. (Contractor) You are herebv reauested to comoly with the followino chances from to the contract nuns ,nprifiirtA inns or nthar rnntrnrP rinrumcnte Description of Changes (Supplemental Plans and Specifications Attached) DECREASE in Contract Price INCREASE In Contract Price Furnish all materials, equipment and labor to 1) grind the entire overlay area 1.5 ", 2) replace 1.5" of AC and 3) replace striping in kind and refresh striping as noted on Davona Drive between Chatham St and Bonniewood Ln. The extra work was not covered on the original contract price. Grinding and paving shall be at contract unit prices, $ 62,541.39 i i TOTALS $ $ 62,541 .39 NET CHANGE IN CONTRACT PRICE $62,541.39 pus i Prtl.A P tvn: Acaiuonai overiay worK as requesiea oy me cuy to repair toe areas attectea Dy the recent underground work performed by DSRSD. The amount of the Contract will be Increased By The Sum Of C:\ Users\ patrick\ AppData\Local \,Microsoft\Windows\Teinporary Internet Ftles\Content.0utlook\R3YDOFi RCC04 - Davona Drive.doc $62,541.39 The Contract Total Including this and previous Change Orders Will Be: The Contract Period Provided for Completion Will Be Increased: 0 Working Days Upon execution by representatives authorized to bind the parties, this Change Order will become a part of the contract. The consideration specified in this Change Order (whether an adjustment of the contract price, an adjustment of time, andlor other consideration) is the full and sole compensation owed to the contractor as a result of the changes and Issues described in this Change Order. Such consideration includes, but is not limited to, any and all direct and indirect costs incurred by the contractor as a result of the changes and issues described in this Change Order for any labor, equipment, materials, overhead (additional, extended, field and home office), profit, or time adjustments. By signing this Change Order the contractor waives and releases the owner from any and all claims for additional compensation concerning any of the changes and issues specified in this Change Order. . The undersigned, being the c. rz (Title) of the Contractor, by signing this Changer Order declares under penalty of perjury under the laws of the State of California, and does personally certify and attest that the undersigned has thoroughly reviewed the attached request for change order and knows its contents, and said request for change order is made In good faith; that it is supported by truthful and accurate data; that the amount requested and the additional time requested accurately reflect the allowable expenses that would be incurred, and the time necessary, to perform the change order; and further, that the undersigned is familiar with Califomia Penal Code Section 72 and California Government Code Section 12650 et seq., pertaining to false claims, and further knows and understands that the submission or certification of a false claim may lead to fines, imprisonment, or other severe legal consequences. Accepted (Contractor) Approved by Agency 925984 (Joni Pattillo, City Manager) ` - °S'i j C:\ Userslpatrick lAppData\LocaMlicrosoft\Windovrs \Temporary Internet Files \Content.0uttookUZ3YDOFiI\CCO4 - Davona Drive.doc (Date) fDate) (Date) (Date) �I J 4i �J V �j f E m 0 a` T c_ R a > �O O i U CDC C Q M N M M T 0 � M M � Er \ M E m o � � C a is m N ❑ ._ ❑ d CO O Vi O O0 > ' y > b Z` a` � ❑ v O O O 0 r N M M M M O M M N h f N ;� f f V V (NO cN0 cN0 oq M V7 407 N C N rn N N O @ � j O p N Q O o N E a o m Q a C > N of N @ O N t cy N U N O N f o c>o`ao�o���`❑ UU U E CL u. C C Y N N N o O) L O O O O O "O N E OUF� 0) -all Q JQ m m > > 2 O CL Q Q v 0 0 0 0 c0 m C O M 4) 0 0 0 c0 M 0 c6 H M r eN- r- r O O O O M 00 N E❑ Q _ h M C N V m 69 69 V> E9 69 f9 c9 H> V O O O (D N M M 4) O O O 47 M C C V1 O O M N 7 O M 4) r 0 0 co h V co N O C N U Q CO r 04 cA fA fA c9 fA 69 V> c9 N � 0 0 0 0 0 0 0 0 0 0 0 0 m v r m 0 LO 00 `r gy O N C 0 0 0 0 0 0 0 0 0 0 0 0 N C V 0 n c0 4 V 0O V U � � N N p 0 0 0 0 0 0 0 0 0 0 0 � '+—.. 0 > C — 0 0 0 0 0 0 N (6 m O O O O c0 m M V) O O O N M c O = co M _ 47 r O 0 O Co c+0 C -0 0 V .— 4J O 0 O N tj N co O LO 04 V Q c9 E9 E9 cf> cf> v> 59 U � N � o U Q O 0 0 0 0 to V O O N U1 O O O N a` a o 'IT C) o :3 o co C C) O 0c00 N F C fn N CO 69. 0 H> E9 69 ff> V LO V r 00 V V 4) N Z In U) In In cn J J J J Uco O o N N N U O` C Q C O C O •N U o U ._ m t U .- O O ,N Y c�t•Q`k= a o CL m 0 a c O Q~ 2 p Y Il c0 76 N cp N C C l6 O N f•' C > C >O C O> , 0 'O O i5 Q m W O Q Q U d O O O 0 r N M M M M O M M N h f N ;� f f V V (NO cN0 cN0 oq M V7 407 N C N rn N N O @ � j O p N Q O o N E a o m Q a C > N of N @ O N t cy N U N O N f o c>o`ao�o���`❑ UU U E CL u. C C Y N N N o O) L O O O O O "O N E OUF� 0) -all Q JQ m m > > 2 O CL Q Q