Loading...
HomeMy WebLinkAbout4.10 TopGrade Awd #03-06 CI'TY CLERK File # AGENDA STATEMENT C'rTY COUNCtL MEET'rNG DATE: May 2003 SUBJECT: Award of Bid - Contract No. 03-06, 2002-2003 Annual Street Overlay Project Report Prepared by: Lee S. Thompson, Public Works Director ATTACHMENTS: 1) Resolution of Award 2) Bid Results 3) Location map of Overlay Streets RECOMMENDATION: ~/g~ Adopt resolution awarding Contract No. 03-06, 2002-2003 Annual  Street Overlay Project, to Top Grade Construction FINANCIAL STATEMENT: FY 2002-2003 Budget Low Bid 2002-2003 Annual Street Overlay: Salaries/Inspections/Miscellaneous $ 28,760 Improvements - Overlay $630,740 $379,731.70 Subtotal: $659,500 Improvements - Slurry seal pavement repairs $ 25,000* $ 7,129.00 TOTAL: $684,500 $386,860.70 * Pavement repairs for slurry seal streets have been included in this contract as a cost-savings measure and are funded through the Gas Tax in the Annual Slurry Seal Program. The budget amount is approximate and the remainder of funds will be used for the Annual Slurry Seal project. The FY 2002-2003 Annual Overlay budget includes funding from the General Fund ($28,760), Measure B Local Streets & Roads Fund ($219,000), Gas Tax ($312,740) and Traffic Congestion Relief Program (TCRP) funds ($99,000). However, it is anticipated that the TCRP funds available for this project will be less than budgeted due to State budget cuts. The low bid of $386,860.70 for the 2002-2003 Annual Street Overlay is $243,879.70 less than the original amount budgeted for improvements, which is $630,740. Due to the current construction climate for asphalt concrete (AC) work, bids were lower than anticipated, even though oil and gas prices have increased substantially this year. As a result, Staff will work with the low bidder to include additional streets in the project area for pavement repair and overlay, as allowed, with a revised budget accounting for the reduced TCRP funds. COPIES TO: Top Grade Construction ITEM NO. ~ g:\overlay\2003kAS award DESCRIPTION: On April 1, 2003, the City Council authorized Staff to solicit bids for Contract No. 03-06, 2002-2003 Annual Street Overlay Project. The Am~ual Street Overlay project consists of removing and replacing failed asphalt concrete pavement to a minimum depth of 4 inches, resurfacing the street with a 1-1/2-inch overlay of asphalt concrete, and re- striping pavement markings. Major cracks will be sealed prior to resurfacing in order to prevent the cracks from reflecting through the new overlay. Pavement fabric will be placed on major arterial and collector streets such as Village Parkway to control cracks and further pavement base failure. Pavement repair for slurry seal streets is also included in this Overlay contract as this type of work is not normally performed by contractors specializing in slurry seal. A reduced cost to the City is achieved by incorporating the repairs with the Overlay project. The annual slurry seal project will follow shortly after completion of the overlay project. Notices have been sent out to advise residents and schools of the work to be performed. The 2002-2003 overlay project will repair and overlay the following streets: Countess Court Longford Way Countess Street Chatam Street Valencia Street Limerick Court Deervale Court Limerick Street Cavalier Lane Diana Lane Cavalier Court Ardmore Street Ferncliff Court Bonniewood Court Shamrock Place Bonniewood Lane Beverly Court Sharon Court Wexford Court Kilrush Avenue Firethom Way Elgin Lane (southernmost leg only) Portion of San Ramon Road Bike Path 200' north of Vomac Road This contract will also repair the pavement for the following streets in preparation for the Annual Slurry Seal Program: Amarillo Road Tory Way Rolling Hills Drive Ann Arbor Way Mansfield Avenue Eden Street Emerald Avenue Hemlock Street Burton Street Ebensburg Lane Betlen Drive (Hansen Drive to Las Palmas Court) San Ramon Road (North City Limit to Silvergate Drive) A total of eleven bids were received (Attachment 2). The low bidder is Top Grade Construction with a bid of $368,860.70. Staff has reviewed the bids and determined that the low bid contractor has satisfactorily performed similar jobs. Staff recommends that the City Council adopt the resolution awarding Contract No. 03-06, 2002-2003 Annual Street Overlay Project, to Top Grade Construction. Page 2 RESOLUTION NO. - 03 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN AWARDING CONTRACT NO. 03-06 2002-2003 ANNUAL STREET OVERLAY PROJECT TO TOP GRADE CONSTRUCTION WHEREAS, the City of Dublin did, on April 22, 2003, publicly open, examine, and declare all sealed bids for doing the work described in the approved Plans, Specifications, and Modifications for Contract No. 03-06, 2002-2003 Annual Street Overlay Project, authorized by the City Council on April 1, 2003, which Plans, Specifications, and Modifications are hereby expressly referred to for a description of said work and for all particulars relative to the proceedings under the request for bids; and WHEREAS, said bids were submitted to the City Engineer, who has recommended that the bid hereinafter mentioned is the lowest and best bid for doing said work; NOW, THEREFORE, BE .IT RESOLVED that the City Council of the City of Dublin does hereby award City of Dublin Contract No. 03-06 to the lowest responsible bidder therefor, to wit, Top Grade Construction, at a bid of Three Hundred Eighty-Six Thousand, Eight Hundred Sixty Dollars and Seventy Cents ($386,860.70), the particulars of ~vhich bid are on file in the Office of the City Engineer. BE IT FURTHER RESOLVED that the Mayor is authorized to execute the Agreement. PASSED, APPROVED AND ADOPTED this 6th day of May, 2003. AYES: NOES: ABSENT: ABSTAINING: Mayor ATTEST: City Clerk G: 10 VERLA Iq2003 t reso award, doc SUMMARY OF BID RESULTS - Apr 22, 2003 .. ~ CONTRACT 03-06, ANNUAL STREET OVERLAY PROJECT ....... ..... ENGINEER'S ESTIMATE TOP GRADE SILICON VALLEY PAVING REDGWICK CONSTR. C.F. ARCHIBALD MCK SERVICES BID .......... UNIT ........ T ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE 1 _ .Stripi_ng & Marking Rem ~-al L§' ~._ _ 1 ~$ 5,0"00~0 ~ 5 0_0_"0.p0 i $ 24~)0.0(~ ~$ 2,4~0-0.00 .............. $ 2.000.00 $ 2.000.00 $ 2.500.O0 ' $ - -2,500.00 ~ ' 2.500.00 ' $ 2,500.00 $ 2.000.00 $ 2.000.00 2 Plane AC Pavement12' Wide LF 1,560 $ 3.._0."0_ 4,680:0_0.$. 2.50-$ 3,900.00_$ 1.00._$ _1.._5.6_(~._00 _$ .1_.70.$ 2,652.00 $ 2.40 $ 3,744.005__ _1.40 $ 2.184.00 ~-'Pl~n~ACPavemer~'~'Wide LF 24,499 $ 1.50 36,748.50 $ 1.00 $ 24.499.00 $ 0.50 $ 12,249.50 $ 0.80 $ 19,599.20 $ 0.80 $ 19.599.20 $ 0.79 $ 19,354.21 4a 'Failure Repairs 3" (~)_ver~a-~;) - ~ 104,419 ......................... '$ 1.85 $ 193 175.15 :$- - '1.~3~"' $ 135.74~.~0--$ 1.35 $ 140,965.65 $ 1.45 $~-5'~2,~$ '1.;~5 ' $ 140.96-~-' $ 1.80 ~ $ 187,954.20 4b-FaiiL~mRepairs3"(SlurryS_~_al) SF 875 $ 1.85 $ 1,618.75_$ __.2..0(~0_ $ 1,750.00 $ 2.00 $ 1,750.00 $ 3.00 $ 2.625.00 $ 1.50 $ 1,312.50 $ 1.98 $ 1,732.50 4_c...~ai!_u_reRepairs4"(SanRamonRd) "-S-F .... : 3,586'$ _!~_85.$ 6,63410. $ 1.500 $ 5,379.00 $ 2.00 _$ _7,172.q0._ $ 2.6015-- ~i~2-3760_~$ 2.80 $ 10,040.805 . 2_.20 _$ 7,889:20 5 Crack Sealing .... L~_ __ 1 $ 10,000.00 $ 10,000.00 $ !0,~0(~.0"0. $ 10,500.00 $ 9.000.00 ~ $ 9.000.00 $ 6.200.00 $__ _.6=200.00 $ 5.000.00 $ 5.000.00 $ 8.000.00 $ 8,000.00 6a Install1 1/2" AC overlay _ SF 383,324_$ 0.60. 229,994.40 $ 0.45 $ 172,495.80 $ 0.50 ........ $ 191.662.00 $ 0.48 $ 183,995.52 $ 0.50 $ 191,662.00 $ 0.39 $ 149.496.36 ~b 'Install 1 1/2"AC overlay(Woodrose_) SF 650 $ 0.60 390.00 $ 3.00 $ 1.950.00 $ 10.00 $ 6,500.00 $ 1.40 $ 910.00 $ 5.00 $ 3,250.00 $ 0.41 $ 266.50 7 Adjust Monuments to Grade EA 30 $ 300.00 $ 9 000.00 ' ~ '~ 200.00 ~ 6~000 00 $ 75 00 $ 5,250.00 $ 200~-0"~ ' -~,000.00 $ '-"240.00~ 7,200.00 $ 250.00 $ 7,500.00 8 12"StopBar V~i~i~e, Therm~)--___~ LF . _ 218 _ $ 3~0- 65400 $ - ~:~'~$ 436.0_0. $ 2.0_0 '$_ 436.00 .... ~ 2.00- $ 4-36.~)~) $ 2.50 $ 545.00 $ 2.00 '$ -'436.00 9 12" Stop Bar, Yellow, Thermo. LF .... 388 $ 2.50_ 970.00 $ 2.00 $ 776.00 ..... $ 2.00 $ 776.00 $ 2.00 $ 776.00 $ 2.50 ' ......... $- - 970.00 $ 2.00 $ 776.00 "1'0'" D~i~ 21, Yel ow, Thermo. LF 1,054 $ 1.50 1,581.00 . $ 1.30 $ 1,370.20 $ 1.40 $ 1,475.60 $ 1.50 $ 1.581.00 $ 1.50 $ 1,581.00 $ 1.40 $ 1.475.60 l~"~'EL~DL~gend, The~pl-astic _ _~,~._ , ~i~.$ 125.0-d"-~; 125.00- $ 100.00 $ 100.00_$ 125.00 $ 1~.'(~_0' $ 100.0--(~'"'$- 100.0~.-$- i!_0.00_-$ _11.0:0_0_$ 100.00 $ 100.00 12 STOP Legend, Thermoplastic ! EA 12 $ 100.00 1,200.00 $ 100.00 $ 1,200.00 $ 100.00 ............ $ 1,200.00 $ 100.00 $ 1.200.00 $ 110.00 $ 1,320.00 .__$. 100.00 ........ $ 1.200.00 13 Reflective Markers (Blue) i EA 30-~ 18.00 i $-" 540.00 $ 1~:0(~ j $ 360.00 $ 10.00 _ $ 300.00 $ 10.00 $ 30.0.00 . $ 11.00 $ 330.00 $ 11.00 $ 330.00 - TOTAL: : i $ 502,310.90' i'~; 368,86~.~70 $ 3.82_,42'1.75 $ 389,60,~.8~ $ 390,130.15 $ 390,694:5.7 -:.' ~ .... ' : :_ - . ~' Amou,t c~rrected after ver_ifi_ca~i_o.n of calculation .... DESILVA GATES O'GRADY PAVING EL CAMINO PAVING BAY CITIES PAVING GALEDRIGE CONSTR. GRANITE CONSTR. BID .... UNIT .... ~ ITEM ITEM DESCRIPTION MEASURE QTY UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE TOTAL PRICE UNIT PRICE ............ TOTAL PRICE UNIT PRICE TOTAL PRICE I rSti'iping& ~a~ki~g Remova! LS '~ · ~" 3,700.00 ~ $ 3,700.00 .~$ 2 600.0_0 . $ 2 600.00 '~ ~,300.00 r ~ 2,300.00 ~ :~.__ 6 688.00 : $ .6 688_.00 -- $ 2.700.00 $ 2.700.00 $ 2.500.00__.$___ 2,500.00 2 PlaneAC Pavement 12'W!de . [~F ~ 1,560 $ 3.00 $ 4,680.00 $ 2.00 $ 3,120.00. $ .2.335. $ 3,642.60 ~ $ 1.92 $ 2.995.20 $ _ 1_.450 $ 2.262.00 $ 2.00 $ 3,120.00 3 Plane AC Pavement 6' Wide LF 24,499 $ 1.00 $ 24,499.00 $ 0.95 $ 23,274.05 $ 0.80 $ 19.599.20 $ 1.16 $ 28.418.84 $ 0.7725 $ 18.925.48 $ 1.00 $ 24.499.00 4_a iFailu?¢_ReP~ir~s3"(Oveday) SF '. 104¢419'~'$ 1_.45_'~;-' 1~1,407.55_.__$ 1.43 $ 149.319.17 $ 1.69 $ 176.468.11 ' $ $ 1.73 $ 180,644.87 $ 1.80 $ 187.954.20 4b Failure Repairs 3" (Slu_r.~y Seal) . SF 875 $ 1.45 $ 1,268._7_5.. _$~ 3.00. $ 2,625.00_ $ 4.62 ' $ 4,-042.~d ' ~ 4.~ ~ $ 3.543.75" $. 2.00 $ 1.750.00 $ 1.~(~ ' $ 1.575.00 4c Failure Repairs 4" (San Ramon Rd) . . SF _ 3,586 . $ 2.70 $ 9,682.20 $ 3.00 $ 10,758.00 $ 2.03 $ 7.279.58 $ 4.22 $ 15,132.92 $ 2.75 $ 9,861.50 $ 2.00 $ 7.172.00 5 Crack Sealing LS 1 $ 100000 $ 1,00000 $13,000.000'$ 'i3(~00.00 $ 11:742.00 $ 11,742_00 $ 20000.00 $ 20,000.00-- i $12 540.000*$ 12;540~00 $ 11.00~0~ ~ 11,000.00: 6a Install 1 1/2" AC overlaY ...... SF . 383 324 $ O.~.8 ' $ 183,995.52 is. 0.47 $ 180.162.28_ $ 0.475 $182,078.9~ ' ' $ 0_~50. :-$191,662.~ i $. 0.532 $ 203.928.37 $ 0:5~7- $ 209,678.2--3 6b ,l_ns_tall ! l/2"ACoverl~y__(Woodrose) SF 650 $ 1.00 $ 650.00 . $ 5.00_ $ ~,250.00 $ 3.40 $ 2,210.00 $ 4.09 $ 2.658.50 $ 2.00 $ 1.300.00 $ 0.55 $ 357.50 7 Adjust Monum_e~t_s to Grade . . EA 30 $ 190.00 . $ 5,'(~0.00 ~$ _180.00 . $. 5,400.00 $ 190.00 $ 5.700.00 ........ $ 270.30 $ 8.109.00 ' $-' 305.00' $ 9.150.00 $ 210.00 . $ 6:3_0~)._00 8 12" Stop Bar, White, Thermo. . LF . 218 $ 2.00 $ 436.00 $ 2.20 $ 479.60 $ 2.07 $ 451.26 $ 2.04 ......... $ 444.72 $ 3.00 $ 654.00 $ 2.20 $ 479.60 9 .12" Stop Bar, _Ye!!~.w_, Thermo. LF 388 $ 2.00 $ 776.00 $ 2.20 ' $ 853.60 $ 2.065 ....... $ 801.22 $ 2.04 $ 791.52 $ 3.00 $ 1,164.00 _$ ~ 2.20 $ ...... 853.60 10 Detail 21, Yel_low, Thermo. _. LF %054 -$ "- 1.50 i$ 1,~1.00: $ 1.55 $ 1,633.70 $ 1.445 $ 1,523.03 $ 1.43 $ 1.507.22 $ 1.679 $ 1,769.67 $ 1.50 $ 1,581.00 11 YIELD Legend, Thermoplastic EA 1 $ 100.00 ~ $ 100.00 ~ . 110:00': ~; .11_0.00 ~ $ 103.00 $ 103.00 ' ' $ 102.00' $ 102.0~) ' ' $ 150.00 $ 150.00 $ 110.00 $ 110.00 EA $ 12 iSTOPLegend Thermoplastic ' 12 100.00 $ 1,200.00 $ 110.00 $ 1.320.00 $ 103.00 $ 1,236.00 $ 102.00 $ 1,224.00 - ' $ '- 125.00 --$ ~500.00 $ 110.00 $ 1.320.00 13 Reflective Markers (Blue) EA 30 $ 10.00: $ 300.00 I $ 12.00. '$ 3~(~00._ $_ '1-1.~.33 ~$ 339_90 .............. $ 11 22 $ 33660 $ 17.00 $ 510.00 $ 11.00 $ 330.00 ..... TOTAL:]" f i $ 390,976.02 $ 398265,40 $ 419,517.30 - $ 433,977.63 ' $ 448,809.88 $ 458,830.13 ~,~?.4~.~2002 - 2003 Annual Street Overlay Program '~,~? Location Map ~ I I IM~ -- Streets Illl Pavement Resurfacing - Overlay 0.126 0,25 0.5 0,76 1