Loading...
HomeMy WebLinkAbout7.4 Historic Park Ph 1~~O~DU~.~f CITY .CLERK J ~ ;~ File # ^®^©'DI~J \~ ~~ $~ // ~ ~LIFOg~ AGENDA STATEMENT CITY COUNCIL MEETING DATE: October 21, 2008 SUBJECT: .Authorization to Bid Dublin Historic Park, Phase I Report prepared by Herma Lichtenstein, Parks & Facilities Development Manager ATTACHMENTS: 1) Dublin Historic Park -Plan View Phase I 2) Dublin Historic Park.-.Bid Alternates Plan RECOMMENDATIO Authorize Staff to Bid the Project with Additive Alternates ~~ FINANCIAL STAT T: Total Budget Amount $3,698,915 Base Bid Estimate $3,683,140 10% Contingency $ 368,314 Total Additive Alternates Estimate $ 533,436 10% Contin ency $ 53,344 Total Bid /Contingency Estimate $4, 638, 234 Total Estimated Budget Shortfall $ 939,319 DESCRIPTION: At the March 4, 2008 City Council meeting, the Council received the Dublin Historic Park Master Plan Addendum and approved Option C .which was to relocate five structures from the Kolb Ranch to the Dublin Historic Park including the Old House, the Main House, the Sunday- School Barn, the Hay Barn and the Pumphouse. Attachment 1 is the plan view of Phase I of the Dublin Historic Park. Additionally at the meeting the Council designated $3.18 million of the FY 06/07 General Fund surplus to the General Fund Reserve for the project. The balance of the project budget is from the General Fund. At the April 15, 2008 meeting, the Council approved a change order to the agreement with. Royston Hanamoto Alley and Abey (RHAA) for design and construction administration services for the building of the Dublin Historic Park, Phase I, Option C. This included the design of the. elements related to the Kolb structures approved by the Council as Option C. COPY TO: RHAA/PCSC/HCAC/DFAF/Peter MacDonald/Casey Strom Page 1 of 2 ~ , L ITEM NO. • "~" G:\COLJNCIL\Agenda Statements\2008\10-21 Bid Authorization Historic Park with Paul's comments.doc n J~ 0 RHAA has prepared the construction documents, which have been reviewed by the necessary City departments. The Architect has also provided Staff with an updated cost estimate. The cost estimate is in excess of the available budget and, as a result, portions of the work have been removed from the base bid and included as additive alternates as follows. Add Alternate A ($282,362) Move and refurbish hay barn to meet minimum seismic requirements and serve as a shade structure for the future playground. Base bid does not relocate barn. (It should be noted that the original concept when the Master Plan Addendum was adopted was to move and store the hay barn onsite and re-erect it in phase II at a cost of $106, 000. Upon further investigation it became evident that the cost for dismantling and storing the barn was approximately the same as moving it and refurbishing.) If this alternate is not funded the City would not have the option of obtaining the actual structure in the future, as all structures must be removed from the Kolb Ranch site by April 1, 2009. As an option a replica structure could be installed at a later date using a combination of new and recycled materials. Add Alternate B ($141,991) Extend "Hawthorn Lane", which is a tree lined pathway leading from the parking lot by the bank to the back of the cemetery on west side of park. Base bid includes only turf and irrigation. Add Alternate C ($109,083) Completely renovate the bank parking lot and add shade trees. Base bid includes only slurry seal and restriping of existing lot. The Current bid climate is showing some favorable results which may offset the cost estimate shortfalls. However, as the project itself is complex and involves historic structures these favorable conditions may not apply. The contract would be awarded based on the lowest base bid. After the contract is awarded, depending on the available funding the City would have the option to negotiate any of the alternates if desired. The alternates, with the exception of the Hay Barn, that are not included in Phase I could be constructed in future phases when funding becomes available. RECOMMENDATION: Staff recommends the City Council authorize Staff to bid the project with additive alternates. Page 2 of 2 .L DUBLIN BOULEVARD H n HH,a,.~ L•J y - EXISTING BANK ~ SIDEWALK CONSTRUCTION TRY _... _ /.. BY OTHERS, N LC... o f c e ~ _, ~_ - - - I C ~ // I ; 1 i- - r, ~~ ~ li II '~ o Gal I 1 ~ (NI DECORATNE SANDBUSTED I' I BANK LETTERS IN$IDEWALK.I ~~ SIDEWALK BY OTHERS.' TEMPORAR ' IIRT STAGE NORTH I 1 I ~ i LOCATION LAWN ,MEANDER MONUMENT I I PATH ~ SIGN ~ I ~, _ i. _..,_ I HAWTHORN - I. ~ LANE ~ I ~ ~'~ ~ m I ADD ALTERNATE #2 ~ ~~ I I ' ~ I ~ (NORTH SECTION) _ I ~ nl ~E I' ~ Z Y b. I ADD ALTERN9T / r~ oI 3 I I // z o I ~< I ~ ~P k ~' ~ D { ]I I -- ` BS~PUMP .FRONT \ HOUSE ', 11 pA GARDEN X L' PARKING LOT sl-~-WIH r ~. I ~ ~ ~ ~ 40USE I PA ~ ~ 48 STALLS (4ADAJ ~ ~~ PA ~ PA SIDEWALK ~~~III _ _ I CONSTRUCTION BY B"I I ', DROP-0FF +~~ __ - _ `~. ~ ', .OTHERS, N.LC I I ~ -I PA PA I I PA I~ I ~ ~ I FRONT PATH ADD ALTERNATE ~ I I ~ ~ _ ~ ~ ~ PA (SOUTH SECTION) I - -- ~ - r~ ~ HAWTHORN B2 ARP ~ STREET PARKING ~ ~ / ~~ LANE PICNIC ~ ~ HOLE ~ ,:. 20 STALLS (i ADAI, I I / f AREA m I, N:LC. I, I / /' SOUTH / ~ ~\\\ FRONT L. '; ~ LAWN MEANDER FIELD // ~ C3 SUNDAY I ~ ~ t _~~~~7 PATH - .. SCHOOL BARN ~' '~` ``\~ PRO ECTED BEII - I ~`-~.:..... I \r\ 1 .. ~ ITYP. B4. HAV I ( I ..\ ~~ ~ : ~ I I BARN. - I L_._____.J _~~~_~~ ~~ I ` , I ( /`L ~ II .. I EOYARD NT ~ I I ~ I _-_ 11\ , `; \~ ADD ALTERNATE -" ~~" ; ~~ _ i r ,~ ~~ \_ r _ _ _ 1 __- ~ ~~ I APPROX.LIMITOFWORK~ % ~~ I ~ IL ~ ~ CHURCH I~__ ~ I ~.. ~~_. __.~ I` j(E)TREES TOBE 11,1 PATHWAY ~. I I PROTECTED -' CONNECTION TO ~~ I (TYP.) (EI CEMETERY ~ ~, ~ (E)TREES TO BE ~ I PROTECTED ~ ~-1 I` _ PATHWAY - I i. fTYP.) 1 CONNECTION TO I (E) CEMETERY ~ ~_ I ` _~_~ - l [v PATHWAY ~ CONNECTION TO '- EXISTING (E) CEMETERY CEMETERY,-~ N.LC. (~ IO~~V ~.JN' 1