Loading...
HomeMy WebLinkAboutOrd 12-06 Grafton Station Shopping Center ORDINANCE NO. 12 - 06 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF DUBLIN ************* APPROVING AN AMENDMENT TO THE STAGE 1 DEVELOPMENT PLAN AND A STAGE 2 REZONING FOR THE PROJECT KNOWN AS GRAFTON STATION SHOPPING CENTER LOCATED AT THE SOUTHWEST CORNER OF DUBLIN BOULEVARD AND GRAFTON STREET AND BORDERED BY DUBLIN BOULEVARD AND NORTH SIDE DRIVE IN AREA H OF DUBLIN RANCH (APN 985-0036-009) P A 05-030 THE CITY COUNCIL OF THE CITY OF DUBLIN DOES HEREBY ORDAIN AS FOLLOWS: Section 1. RECITALS A. By Ordinance No. 6-00 the City Council rezoned the approximately 71-acre area known as Dublin Ranch Planning Area H to a Planned Development Zoning District and adopted a Stage 1 Development Plan for Area H. B. This Ordinance adopts an amendment to the Stage 1 Development Plan approved by the City Council on March 21, 2000. C. This Ordinance amends the Stage 1 Development Plan for Dublin Ranch Planning Area H and adopts a Stage 2 Development Plan for a portion of Area H known as Grafton Station. Section 2. FINDINGS AND DETERMINATIONS A. Pursuant to Section 8.32.070 of the Dublin Municipal Code, the City Council finds as follows: 1. The Project, known as Grafton Station, Planned Development Zoning meets the purpose and intent of Chapter 8.32 in that it provides a comprehensive development plan that is tailored to the commercial land uses proposed on the Project site and creates a desirable use of land that is sensitive to surrounding land uses by virtue of the layout and design, which is in close proximity to Dublin Boulevard and the 1-580 freeway. 2. The proposed amendment will be harmonious and compatible with existing and potential development in surrounding areas because: 1) the proposed development is consistent with the approved development for this property as approved under the Stage 1 Planned Development Zoning; and 2) the proposed development is consistent with the type of development, regional serving retail, as envisioned in the Eastern Dublin Specific Plan. B. Pursuant to Section 8.120.050.A and B of the Dublin Municipal Code, the City Council finds as follows: 1. The Stage 2 Development Plan for Grafton Station will be harmonious and compatible with existing and potential development in the surrounding area in that: 1) the land uses and site plan establish a commercial development (retail shopping center); 2) the proposed project is Ord No. 12-06, Adopted 9/5/06, Item 4.4 Page 1 of 4 consistent with the Eastern Dublin Specific Plan and the Stage 1 Development Plan, as amended; 3) the project site has been designed to reduce impacts on the residential development across Dublin Boulevard and to be compatible with the community-serving retail development along Grafton Street in Area G; 4) the project site includes attractive landscaping and site elements including a location for public art, light fixtures, benches, plazas and pedestrian paths to create an attractive landscape palette and material palette for the shopping center; and 5) the Stage 2 Development Plan includes design guidelines to create an attractive shopping center which is compatible with the surrounding developments. 2. The project site is physically suitable for the type and intensity of the zoning district being proposed because 1) the project site will have a Floor Area Ratio (FAR) of .25 which is consistent with the FAR established in the Stage 1 Development Plan and the Eastern Dublin Specific Plan; 2) the proposed project will include retail and office uses which is consistent with the land use designations of General Commercial and General Commercial/Campus Office; and 3) as amended, the Stage 1 Development Plan will permit a maximum of 318,000 square feet of retail floor area which will maintain aFAR of .25 and will therefore be consistent with the Stage 2 Planned Development Rezone; 4) the Stage 2 Development Plan for the Grafton Station Planned Development Zoning has been designed to accommodate the topography of the Project site which typically is characterized as vacant, flat land suitable for the development of a shopping center and therefore physically suitable for the type and intensity of the proposed Planned Development Zoning district. 3. The Stage 2 Development Plan will not adversely affect the health or safety of persons residing or working in the vicinity or be detrimental to the public health, safety and welfare because the Project will comply with all applicable development regulations and standards and will implement all adopted mitigation measures. 4. The proposed amendment and the Stage 2 Planned Development Rezone is consistent with the Dublin General Plan, Eastern Dublin Specific Plan and the Stage 1 Planned Development Zoning because: 1) the proposed amendments to the use list are compatible with the permitted, conditional and temporary uses established under the Stage 1 Development Plan approved by the City Council; 2) the proposed amendments to the list of permitted, conditional and temporary uses are consistent with the land use designations of General Commercial and General Commercial/Office and the Eastern Dublin Specific Plan Tassajara Gateway subarea which envisions a mix of regional and community serving retail on the project site; 3) the proposed amendments to the site area to increase the overall gross acreage to 29.2 acres is due to the realignment of Dublin Boulevard and a more accurate measurement of the site since the adoption of the Stage 1 Development Plan; 4) the proposed Stage 2 Rezone is compatible with the intent of the Eastern Dublin Specific Plan for the Tassajara Gateway subarea and the Stage 1 Development Plan as amended; and 5) the Stage 2 Rezone includes design guidelines to create a shopping center with a main street character which is compatible with development in the neighborhood and the future development in Area G along Grafton Street. C. Pursuant to the California Environmental Quality Act, the City Council finds as follows: 1. Pursuant to the California Environmental Quality Act (CEQA), Section 15164 provides that an addendum to a previously certified Environmental Impact Report (EIR) may be prepared when the project requires a minor technical change to the EIR and there are no new significant Ord No. 12-06, Adopted 9/5/06, Item 4.4 Page 2 of 4 environmental effects and no substantial increase in the severity of previously identified significant effects. Section 3. Map of the Property. Pursuant to Chapter 8.32, Title 8 of the City of Dublin Municipal Code, the Stage 2 Development Plan applies to the following property ("the Property"): 29.2::.t net acres within Parcel 1 of Parcel Map 9003 for P A 05-030 (APN 985-0036-009) at the southwest corner of Dublin Boulevard and Northside Drive and bordered by Dublin Boulevard and Northside Drive in Area H of Dublin Ranch. A vicinity map showing the area for a Stage 2 Development Plan is shown below: I . Section 4. APPROVAL The regulations for the use, development, improvement, and maintenance of the Property are set forth in the amended Stage 1 Development Plan as attached in Exhibit A and the following Stage 2 Planned Development Zoning Development Plan as described below and attached as Exhibit B for the Property, which is hereby approved. Any amendments to the Stage 2 Planned Development Zoning Development Plan shall be in accordance with Section 8.32.080 and/or Chapter 8.120 of the Dublin Municipal Code or its successors. Stage 2 Development Plan for Grafton Station This is a Stage 2 Development Plan pursuant to Chapter 8.32 of the Dublin Municipal Code. This Development Plan meets all the requirements for a Stage 2 Development Plan and is adopted as a zoning amendment pursuant to section 8.32.030.B of the Dublin Zoning Ordinance. The Stage 2 Development Plan consists of the items and plans identified below, which are contained in the Stage 2 PD Rezone booklet received by the Planning Division on August 7, 2006 and the Stage 2 Development Plan attached as Exhibit B ("Stage 2 Development Plan"), which are incorporated herein by reference. The Stage 2 PD Rezone booklet is on file in the Dublin Planning Department under project file P A 05-030. The PD, Planned Development Zoning District and this Stage 2 Development Plan provide flexibility to encourage innovative development while ensuring that the goals, policies, and action programs of the General Plan, Eastern Dublin Specific Plan, and provisions of Chapter 8.32 of the Zoning Ordinance are satisfied. 1. Statement of Compatibility with Stage 1 Development Plan. The Grafton Station Stage 2 Development Plan is compatible with the Stage 1 Development Plan and amended Stage 1 Ord No. 12-06, Adopted 9/5/06, Item 4.4 Page 3 of 4 Development Plan for Dublin Ranch Planning Area H in that the Project is a commercial development as planned for in the Stage 1 Development Plan. 2. Statement of Permitted Uses. Permitted, conditional, accessory, and temporary uses are allowed as set forth in the Stage 2 Development Plan, attached as Exhibit B, pages 1-6. 3. Stage 2 Site Plan. See Stage 2 PD Rezone booklet, attached as Exhibit C, received August 7, 2006. 4. Site Area. See Stage 2 Development Plan, page 6. 5. Development Regulations. See Stage 2 Development Plan pages 7-8 and Stage 2 PD Rezone booklet received August 7, 2006, pages 1-11 - 1-13. 6. Architectural Standards. See Stage 2 PD Rezone booklet received August 7, 2006, pages II-I - 11-38 and 111-1- 111-6. 7. Preliminary Landscaping Plans. See Stage 2 PD Rezone booklet received August 7, 2006, pages L-l and Sections 1-13 and pages IV-l - IV-13. 8. Applicable Requirements of Dublin Zoning Ordinance. Except as specifically provided in this Stage 2 Development Plan, the use, development, improvement, and maintenance of the Property shall be governed by the provisions of the Dublin Zoning Ordinance pursuant to section 8.32.060.C. Section 5. EFFECTIVE DATE AND POSTING OF ORDINANCE This Ordinance shall take effect and be in force thirty (30) days from and after the date of its passage. The City Clerk of the City of Dublin shall cause the Ordinance to be posted in at least three (3) public places in the City of Dublin in accordance with Section 36933 of the Government Code of the State of California. PASSED, APPROVED AND ADOPTED BY the City Council of the City of Dublin, on this 5th day of September 2006 by the following vote: AYES: Councilmembers Hildenbrand, McCormick, Oravetz and Zika, and Mayor Lockhart NOES: None ABSENT: None ABSTAIN: None ATJ J\ ~-\\~ City Cler Ord No. 12-06, Adopted 9/5/06, Item 4.4 Page 4 of 4 Dublin Ranch Area H . December 11. 1998 . Revised Mav. 2006 Project Description for DUBLIN RANCH AREA H Planned Development District and Stage 1 Development Plan (P A 98-070) Introduction Dublin Ranch is located within the Eastern Dublin Specific Plan Area and comprises approximately 1,311 * acres. The portion of Dublin Ranch that has been annexed to the City of Dublin consists of 1,111 acres. The 1,311 acre portion of Dublin Ranch was pre- zoned in conformance with the East Dublin Specific Plan when it was annexed to the City under P A 94-030. Therefore, this Development Plan will also serve as an amendment for a minor modification to that prezoing. Additionally, this Development Plan is being submitted concurrently with a minor modification ofthe Dublin General Plan/East Dublin Specific Plan Amendment. Dublin Ranch Area H, hereinafter called the Project Area, is bordered by Dublin Boulevard on the nolih, Dublin Ranch Area C to the east, 1-580 on the south and the property ofthe Dublin Land Company on the west. It is approximately 70.8 acres in size. This area has two land use designations, General Commercial and Campus Office. The Specific Plan shows 35.9 acres designated General Commercial and 36.7 acres for Campus Office. In this Stage I Development Plan, these acreages have been modified, proposing 43.9 acres of Campus Office, 18.7 acres of General Commercial and the remaining 10.5 acres as being either all General Commercial or all Campus Office. PA 98-070 is a Stage 1 Development Plan as defined by Section 8.32.030(A) of the Dublin Zoning Ordinance. This submittal includes a listing of permitted and conditionally permitted land uses; data on site area; proposed square feet; a phasing plan; and textual information sufficient to establish consistency with the General Plan and Eastern Dublin Specific Plan. Existing Land Use and Site Conditions Existing land uses within the Project Area is predominantly agricultural, consisting of cattle grazing and dry farming of grain and hay crops. No residences or other structures exist within the area. Adjoining properties currently employ these same uses. The project area is primarily open grassland or dry farmed croplands with no existing trees. The entire area is virtually flat with an average grade change of four feet, or . Dublin Ranch includes all of the property in the Eastern Dublin Specific Plan area shown as being owned by Chang Su-O-Lin and Pao-Lin, excluding Phase I which is currently under development. Planned Dovelopment District and Stage I Development Plan Project Description . Page 1 of 6 16034-13dcS-3-06AreaHPlanDev.doc EXHIBIT A Dublin Ranch Area H . December 11. 1998 . Revised Mav. 2006 .0035%, across the site. Elevations across the project area generally rise from south to north. Various biological studies have been undertaken in the Project Area and surrounding areas by H. T. Harvey & Associates relative to special status plants and wildlife species. No special-status wildlife or plant species were detected on site. Please refer to the Appendix for a summary of these studies. A report prepared by Ted Winfield & Associates containing an analysis of the areas of the site that are subject to Corps of Engineers' jurisdiction was formally submitted to the USACE on May 20, 1999. This report was prepared with the field review and input of Corps representatives and is expected to be verified in writing by the Corps very soon. Maps and acreage estimates contained in the draft report are considered to be preliminary until the Corps has officially verified the jurisdictional delineation. Proposed fill for this project will require a Corps of Engineers permit. It is anticipated that the Corps permit for Area H will be part of a larger permitting effort that will include all of the remaining portions of Dublin Ranch which are encumbered with areas of Corps' jurisdiction. Refer to the Appendix for a summary of this study. No archaeological resources or indicators of such have been found on the site by Holman & Associates Archaeological Consultants either during their work undertaken for the East Dublin Specific Plan or a follow up site survey on May 20,1999. A Phase 1 and 2 site assessment of the Project Area has been conducted by Berlogar Geotechnical Consultants to determine the presence of anyon-site hazardous waste and substance sites. The findings of the study indicated that no problem sites were found. In addition, an environmental records search was conducted by Berlogar to determine if the site was included on a site of hazardous waste and substance areas. The results of this search indicated that neither this particular site nor any areas within a two mile radius of the center of the site are listed as a hazardous site, hazardous material generator or transporter, or known to have underground storage tank leaks. Refer to the Appendix to review this document in greater detail. Community Theme Area H is more urban and contemporary in use and appearance than the rest of Dublin Ranch. To provide a degree of thematic unity throughout Dublin Ranch, certain common elements such as community signage, light standards, street furnishings and similar plant palettes will be utilized. Refer to the following Design Guidelines for further discussion about key design concepts. Planned Development District and Stage I Development Plan Project Description · Page 2 of 6 16034-13dcS-3-06AreaHPlanDev.doc Dublin Ranch Area H . December 11. 1998 . Revised Mav. 2006 Proposed Development Plan When the Eastern Dublin Specific Plan was prepared, the region-serving commercial and office land use designations were located adjacent to 1-580 for three reasons: the land there is generally level, these sites are highly visible and easy access is available from the freeway. For these reasons Area H is a prime commercial/office site. The site is fully visible from 1-580 and is within 950 feet and 2,700 feet of the Tassajara Road and Fallon Road interchanges, respectively. Area H, in combination with Area C of Dublin Ranch, is the only remaining large (over 100 acres) commercial/office site in Dublin and, as such, is highly desirable for users needing campus-type sites, especially high tech users expanding from Silicon Valley. The Development Plan proposes to increase Campus Office uses by either 7.2 acres or 17.7 acres above what is depicted on the Specific Plan (the difference being whether the 10.5 acre GC/CO flex parcel is developed with Campus Office uses or not) and the General Commercial area is being reduced by a like amount. In addition, the Development Plan proposes that the midpoint ofthe density range of the floor area ratio (FAR) for Campus Office uses be increased from the 0.35 in the Specific Plan to 0.45, with .60 FAR being the maximum of the range. This will allow the flexibility to exceed .45 FAR for some parcels; however, the average FAR for all CO parcels would not exceed .45 FAR. This FAR revision would set a maximum of 318,000 sq. ft. of General Commercial with the "Least Office" scenario or a maximum of 1,066,349 sq. ft. of Campus Office in the "Most Office" scenario. However, in either scenario, the total square footage of any combination of GC and CO shall not exceed 1,269,992. For comparison, the East Dublin Specific Plan has 390,951 square feet of General Commercial and 559,528 square feet of Campus Office, for a total of 950,4 79 square feet. If the property is subdivided, individual parcels may be developed at greater than their respective midpoint F ARs (0.25 for GC and 0.45 for CO) as long as the overall square footage maximums are not exceeded. For example, if29.2 acres of GC-designated land is developed and it is subdivided into two parcels, one of those parcels could be developed at a FAR greater than 0.25 as long as a corresponding decrease in the FAR on the other parcel kept the overall building square footage at or below the 318,000 sq. ft. figure. The changes described above are based upon the result of market assessment studies undertaken by EDA W, Inc., whose analysis concludes that the 1-580 corridor is "over- zoned" for regional/community-serving commercial uses. The corridor is saturated with large format, specific market and full service retailers. Approximately 150 acres of land intended for such users are still available in the Specific Plan area, however, recent market studies show the buildout population of Eastern Dublin will not be at high enough levels to warrant a commercial area of this size. Additionally, the market assessment indicates a considerable demand at present for regional and headquarters office land. That need is especially acute for large parcels of such land. It is for these reasons that the Development Plan for Area H is proposing the flexibility to have either a 7.2 acre or 17.7 acre reduction in General Commercial and a corresponding increase in Campus Office- designated property. Because demand cannot be predicted with complete accuracy very Planned Development District and Stage I Development Plan Project Description . Page 3 of 6 16034-13dcS-3-06AreaHPlanDev.doc Dublin Ranch Area H . December 11. 1998 . Revised Mav. 2006 far into the future, the 10.5 acres at the southwest corner of Area H is being shown as having a flex designation of either GC or CO. Area H is intended to work in harmony with the remainder of Dublin Ranch, especially Area G. One of the premises on which the viability of the Village Center is based is that a large percentage of its daytime activity will come from employees and visitors from businesses in Area H. Therefore, whatever can be done from a physical design standpoint to integrate the two areas would be beneficial to both. The Development Plan proposes to achieve this goal by aligning the principal north-south access point into Area H with Main Street of the Village Center within Area G. The concept is that the Village Center would, in effect, be extended into Area H by designating the southwest and southeast corners of the intersection as a "gateway" for uses which would directly complement Area H businesses and employees. The northeast corner of Dublin Boulevard and the Village Center Main Street is visualized as the site of an approximately 50 room executive, extended stay hotel. It is likely that the majority of customers of this hotel would be visitors to the office complexes in Area H and the adjoining office (CO) properties to the east. The primary north-south access point would generally serve as a dividing point between the CO uses to the east and the generally GC areas to the west. The 18.7 acre parcel at the northwest corner of Area H would be the site for large format retailers. It could attract freestanding uses such as large bookstores, office supply, electronics, etc. or a - ,. -.. community-serving shopping center with a supermarket anchor. The CO sector to the east of this street could either be subdivided into smaller individual parcels for small office building developers or kept intact as a campus for one or two large owner-users. The 10.5 acre site at the southwest corner of Area H would serve either commercial or office users depending upon area need. Planned Development District and Stage I Development Plan Project Description . Page 4 of 6 16034-13deS-3-06AreaHPlanDev.doc Dublin Ranch Area H . December 11. 1998 . Revised Mav. 2006 Below, land use acreages and square footages depicted on the proposed Development Plan are compared to the approved Specific Plan acreages and square footages. The two alternatives are illustrated, one for the maximum GC and the other for the minimum GC areas possible under this proposal. The following table uses a density mid-range of 0.45 FAR for the Stage I Development Plan CO uses, while a density mid-range of 0.35 FAR is used for the Specific Plan CO uses. For GC, a 0.25 mid-range FAR is proposed in both instances. Alternative 1: Maximum CO/Minimum GC Scenario ("Most Office") Proposed PD Stage I East Dublin Development Plan Specific Plan Designation Acres Sq. Footage Acres Sq. Footage GC 18.7 203,643 35.9 390,951 CO 54.4 1,066349 36.7 559,528 Total 73.1 1,269,992 72.6 950,479 Alternative 2: Minimum CO/Maximum GC Scenario ("Least Office") Proposed PD Stage I East Dublin Development Plan Specific Plan Designation Acres Sq. Footage Acres Sq. Footage GC 29.2 318,000 35.9 390,951 CO 43.9 860,528 36.7 559,528 Total 73.1 1,178,528 72.6 950,479 The square footage figures cited above establish the maximum limits for Area H. They indicate that a maximum of 318,000 sq. ft. of General Commercial with the "Least Office" scenario or a maximum of 1,066,349 sq. ft. of Campus Office in the "Most Office" scenario is permitted. However, in either scenario, the total square footage of any combination of GC and CO shall not exceed 1,269,992. For comparison, the East Dublin Specific Plan has 390,951 square feet of General Commercial and 559,528 square feet of Campus Office, for a total of 950,479 square feet. Attached and detached dwellings at densities established for the Medium, Medium- High, and High Density Residential land use designations per the East Dublin Specific Plan may be allowed as a Conditional Use if the following conditions are met: · Established traffic levels of service are not exceeded. Appropriate traffic study( s) may be required to make the proper determination regarding traffic levels of service; Planned Development District and Stage I Development Plan Project Description . Page 5 of 6 16034.13dcS-3-06AreaHPlanDev.doc Dublin Ranch Area H . December 11. 1998 . Revised Mav. 2006 . Established traffic levels of service are not exceeded. Appropriate traffic study(s) may be required to make the proper determination regarding traffic levels of service; . That the project is consistent with the intent ofthe Specific Plan and does not result in adverse environmental or service impacts; and . Residential uses may not occupy more than 50% of the developed area. Neither this Development Plan nor the Specific Plan include schools, parks or other public facilities since the plans for Area H are devoted exclusively to commercial and campus office uses. However, since a certain number of employees from the area will utilize nearby public parks, a per square foot public facilities fee for commercial and office building construction has been established by the City to help pay for recreation facilities. Project Access and Circulation The major east-west access to the Project Area will be from Dublin Boulevard, a six-lane arterial. Secondary east-west access will be provided by an existing frontage road along the north boundary ofI-580 that extends from Tassajara Road to approximately the middle of Area H. The primary north/south access point to the Project Area would be the southerly extension of Main Street. This connection will tie the Project Area to the Village Center (immediately to the north in Area G) where many of the commercial uses that will serve employees in the Project Area will be located. Secondary access point(s) may be located at the Class IT Collector B and Dublin Blvd. intersection and/or other locations along Dublin Blvd. in accordance with the East Dublin Specific Plan and Dublin General Plan standards and approved by the director of public work. Circulation within the Project Area may be via a system of individual internal streets, a collector loop, or some other system. However, the preference is for larger land users since campus-type developments are more in line with the design concept envisioned for Area H. Larger blocks of land would entail fewer public streets and these streets would be replaced with internal private circulation systems. Whatever the case, the internal street system will be created only as users are found. An analysis has been prepared by TJKM to determine whether the proposed project land use changes would have a greater impact on traffic levels than those shown in the Eastern Dublin GP A/SP EIR. Because offices generate considerably less P.M. peak hour traffic than do retail commercial uses and the P.M. peak is the critical traffic period for Eastern Dublin, the analysis concluded the traffic impacts of this Development Plan would be less than those anticipated by the Specific Plan even though more building square footage is possible. For this reason, the traffic ramifications of the Area H Development Plan will not require modification of the existing EIR or preparation of a new EIR. The TJKM report can be reviewed at the City of Dublin. Planned Development District and Stage I Development Plan Project Description . Page 6 of 6 16034-13dcS-3-06AreaHPlanDev.doc Dublin Ranch Area H . December 11, 1998 . Revised May 2006 Project Description for DUBLIN RANCH AREA H East Dublin General Plan/Specific Plan Amendment (P A 98-070) Introduction Dublin Ranch is located within the Eastern Dublin Specific Plan Area and comprises approximately 1,311 * acres. The portion of Dublin Ranch that has been annexed to the City of Dublin consists of 1,111 acres. This Stage 1 Development Plan is being submitted concurrently with a minor modification to the Dublin General PlanlEast Dublin Specific Plan Amendment. The 1,311 acre portion of Dublin Ranch was pre-zoned in conformance with the East Dublin Specific Plan when it was annexed to the City under PA 94-030_ Therefore, this Development Plan will also serve as an amendment for a minor modification to that prezoing. These modifications are addressed in a General Plan and Specific Plan Amendment (P A 98-070) being processed concurrently with this Development Plan. Dublin Ranch Area H is bordered by the extension of Dublin Boulevard on the north, Area C of Dublin Ranch to the east, 1-580 on the south and property of the Dublin Land Company to the west. The project area is 70.8 acres in size. This area has two land use designations, being General Commercial and Campus Office. The Eastern Dublin Specific Plan shows 35.9 acres designated as General Commercial and 36.7 acres as Campus Office. These acreages have been modified in this Stage I Development Plan to propose 43.9 acres of Campus Office, 18.7 acres of General Commercial and the remaining 10.5 acres that could be developed as either all General Commercial or all Campus Office. The Development Plan Project Description for Area H describes the physical nature of the area, existing land uses, the nature of the development proposed for it, and the community theme. Please refer to that document for further information on this site. Area H (P A 98- 070) is a Stage 1 Development Plan as defined by Section 8.32.030(A) of the Dublin Zoning Ordinance. This submittal includes a listing of permitted and conditionally permitted land uses; data on site area; proposed square feet; a phasing plan; and textual information sufficient to establish consistency with the General Plan and Eastern Dublin Specific Plan. Conceptual Development Plan Specifically, the Development Plan proposes to increase Campus Office uses as either 7.2 acres or 17.7 acres above what is depicted on the Specific Plan (the difference being whether the 10.5 acre GC/CO flex parcel is developed as Campus Office or not) and the General Connnercial area is being reduced by a like amount. In addition, the Development General PlanlEast Dublin Specific Plan Amendment Project Description . Page 1 of 6 Dublin Ranch Area H . December 11. 1998 · Revised Mav lQ!M. Plan proposes that the midpoint of the density range of the floor area ratio (FAR) for Campus Office uses be increased from 0.35 in the Specific Plan to 0.45, with .60 FAR being the maximum of the range. This will allow the fleXIbility to exceed .45 FAR for some parcels; however, the average FAR for all CO parcels would not exceed .45 FAR. These minor modifications create the necessity for this General Plan/Specific Plan Amendment (GP A/SP A). This FAR revision would set a maximum of 318,000 sq. ft. of General Connnercial with the "Least Office" scenario or a maximum of 1,066,349 sq. ft. of Campus Office in the "Most Office" scenario. However, in either scenario, the total square footage of any combination ofGC and CO shall not exceed 1,269,992. For comparison, the East Dublin Specific Plan has 390,951 square feet of General Connnercial and 559,528 square feet of Campus Office, for a total of950,479 square feet. If the property is subdivided, individual parcels may be developed at greater than their respective midpoint FARs (0.25 for GC and 0.45 for CO) as long as the overall square footage maxim\l1'm are not exceeded. For example, if29.2 acres ofGC-designated land is developed and it is subdivided into two parcels, one of those parcels could be developed at a FAR greater than 0.25 as long as a corresponding decrease in the FAR on the other parcel kept the overall building square footage at or below the maximum 318,000 sq. ft. figure. The changes descnbed above are the result of market assessment studies undertaken by EDAW, Inc, fur Area H that concludes that the I -5BQcorridor is "oYef=z.oned" tor regionaVcorrnnunity-serving connnercial uses. As mentioned in the Area G Development Plan and GP A/SP A Project Descriptions, the corridor is saturated with large fonnat, specific market and full service retailers. Approximately 150 acres ofland intended for such users are still available in the Specific Plan area, however, recent market studies show the buildout population of Eastern Dublin will not be at high enough levels to warrant a connnercial area of this size. Additionally, the market assessment indicates a considerable demand at present for regional and headquarters office land. That need is especially acute for large parcels of such land. It is for these reasons that the Development Plan for Area H is proposing the fleXIbility to have either a 7.2 acre or 17.7 acre reduction in General Connnercial and corresponding increase in Campus Office-designated property. Because demand cannot be predicted with complete accuracy very far into the future, the 10.5 acres at the southwest corner of Area H is being shown as having a flex designation of either GC or CO. Acreages allocated to designated land uses depicted on the proposed Development Plan alternatives have been compared to the approved Specific Plan and are given below. The two alternatives are illustrated, one for the maximum and the other for the minimum GC and CO area acreages possible under this proposal. The following table uses a density mid-range of 0.45 FAR for the Stage I Development Plan CO uses, while a density mid- range of 0.35 FAR is used for the Specific Plan CO use. For GC a 0.25 mid-range FAR is proposed in both instances. The square footage figures cited below establish the maximum limits for the two options for Area H. General Plan/East Dublin Specific Plan Amendment Project Description . Page 2 of6 Dublin Ranch Area H . December 11.1998 . Revised Mav J!lQQ Alternative 1: Maximum COlMinimum GC Scenario ("Most Office") Proposed GP/SPA I EDSP Designation Acres Sq. Footage Acres Sq. Footage GC 18.7 203,643 35.9 390,951 CO 54.4 1,066,349 36.7 559.528 Total 73.1 1,269,992 72.6 950,479 Alternative 2: Minimum COlMaximum GC ("Least Office") Proposed GP/SP A Development Plan EDSP Designation Acres Sq. Footage Acres Sq. Footage GC 29.2 318,000 35.9 390,951 CO 43.9 860.528 36.7 559.528 Tutal 73.1 1,178,528 72.6 95Jl~479 Attached and detached dwellings at densities established for the Medium, Medium- High, and High Density Residential land use designations per the East Dublin Specific Plan may be allowed as a Conditional Use if the following conditions are met: . Established traffic levels of service are not exceeded. Appropriate traffic study( s) may be required to make the proper determination regarding traffic levels of service; . That the project is consistent with the intent of the Specific Plan and does not result in adverse environmental or service impacts; and . Residential uses may not occupy more than 50% of the developed area. Project Circulation An analysis has been prepared by TJKM to determine whether this project proposal would have a greater impact on traffic than levels shown in the Eastern Dublin OP A/SP EIR. Because office uses generate considerably less P.M. peak hoW" traffic than do retail! commercial uses, and the P.M. peak is the critical traffic period for Eastern Dublin, the analysis concluded the traffic impact of this Development Plan would be less than anticipated by the Specific Plan, even though more building square footage is possible with the Development Plan. For this reason, the traffic ramifications of the Area H General Plan/East Dublin Specific Plan Amendment Project Description . Page 3 of 6 Dublin Ranch Area H . December 11. 1998 · Revised May 2006 Development Plan will not require modification of the existing EIR or preparation of a new EIR. The table below compares the vehicle trips projected to be generated by the land uses shown on the Development Plan with those predicted in the Specific Plan. The two scenarios are given for the Development Plan, "Least Office" and "Most Office". The former is based on the increase in Campus Office designated land of 7.2 acres above what is depicted on the Specific Plan and the latter on the increase of 17.7 acres. The mid-point of the range, .45 FAR, was used to detennine the square footage of the Campus Office use. For GC, a 0.25 FAR mid-range is proposed in all instances. Total Quantity Dally A.M. Peak P.M. Peak (Sa. Ft.) TriDS Hour TriDs Hour TriDs 390,951 16,780 403 1,462 559.528 4.538 694 604 950,479 21,318 1,097 2,066 Land Use Existing Specific Plan: General Corrnnercial Campus Office "Least Office" Scenario: General Connnercial . Campus Office 318,000 860.528 13,649 6.979 394 1.067 1,189 929 Total 1,178,528 20,628 1,461 2,118 "Most Office" Scenario: General Corrnnercial 203,643 8,740 210 762 Campus Office 1.066.349 8.648 1.322 1.152 Total 1,269,992 17,388 1,532 1,914 As can be seen from the table, the "Most Office" scenario generates the fewest P.M. peak hour trips. It projects 152 fewer such trips than does the Specific Plan. The "Least Office" scenario contemplates a few additional P.M. peak hour trips than the Specific Plan with the difference in this instance being 52 trips. Utility Services Dublin San Ramon Services District (DSRSD) will provide water, wastewater and recycled water service to the Project Area. These services are planned in accordance with the DSRSD Eastern Dublin Facilities Master Plan (and/or subsequent revisions). At the General Plan/East Dublin Specific Plan Amendment Project Description · Page 4 of 6 Dublin Ranch Area H . Df~cember 11. 1998 · Revised Mav 2006 present time it is anticipated that existing and future water storage reservoirs and turnouts from Zone 7 mains will provide water service for the Project Area through buildout. Distribution mains are planned to be located in all streets. Final locations and sizing of these facilities will be in accordance with the standards and recommendations ofDSRSD. Sewer service for the Project Area will require connection to DSRSD's existing sewer system Gravity sewer mains will be extended easterly in Dublin Boulevard and then northerly into the project site. Final sizing and location of sewer facilities will be determined in conjunction with DSRSD. When available from the DSRSD wastewater treatment plant, recycled water will be provided for irrigation of landscaped areas, thereby reducing potable water demand. The zones within which recycled water will be supplied will be created by DSRSD after - completion of ongoing studies. The details regarding how recycled water will be integrated with development of the Project Area will need to be coordinated with DSRSD. Final location and sizing of recycled water facilities will be detennined by DSRSD in accordance with its Facilities Master Plan (and/or subsequent revisions) and the Recycled Water Ordinance. DSRSD has recently constructed a recycled water main in the Dublin Boulevard alignment as part of its "Clean Water Revival (CWR)" program. This main will remain in service and additional recycled water distnbution mains will be constructed to serve landscaped areas within the project site as required. The storm drain system for the Project Area will consist of major backbone facilities and local facilities. The backbone facilities will generally consist of larger diameter pipes networked throughout the site. These larger collector pipes will connect to open channels or box culverts that will direct the flow towards the existing G-3 channel, a Zone 7 facility located at the south end of the site. Local facilities will generally consist of smaller diameter pipes connecting individual sites or areas to the collector system. The actual sizes and locations of proposed storm drain facilities will be detennined at an individual project's tentative map stage. The PD application modifies the type and location of proposed land use within the Area F, G and H boundaries. To detennine if there are any substantive changes to the timing and amount of storm water runoff, a hydrology study of the proposed land use map was prepared and compared to the hydrology of the Specific Plan land use map. The results of this analysis indicate that the overall hydrologic characteristics of the proposed PD site plan, dated July 1999, are nearly identical to the Specific Plan approved in May of 1993. Using the runoff coefficients for various land uses published by Zone 7 and accepted by the City of Dublin, it is anticipated that the proposed land use plan will have approximately one acre less of impervious surface than the original Specific Plan. There are seven fewer acres of commercial and office land use than the Specific Plan. However, the additional acreage allocated for high density residential land use in the proposed PD site plan will offset this reduction. General Plan/East Dublin Specific Plan Amendment Project Description . Page 5 of 6 Dublin Ranch Area H . December 11. 1998 · Revised Mav 2.!1!M Therefore, the hydrologic impacts and mitigation measures identified in the Environmental Impact Report (certified 1993) and the subsequent 1993 Eastern Dublin Specific Plan (certified by City Council Resolution 51-93, May 4, 1993, amended August 22, 1994) are adequate. No additional environmental assessment or mitigation measures are required. General Plan/East Dublin Specific Plan Amendment Project Description . Page 6 of 6 Stage 2 Development Plan Stage 2 Planning Development Zoning District (P A 05-030) Grafton Station Shopping Centerl Dublin Ranch Planning Area H (APN 985-0036-009) This is a Stage 2 Development Plan pursuant to Chapter 8.32, Planned Development Zoning District, of the Dublin Zoning Ordinance for Grafton Station located at the southwest corner of Dublin Boulevard and Grafton Street and bordered by Dublin Boulevard and Northside Drive. This Development Plan meets all of the requirements for Stage 2 Planned Development review of the project. This Development Plan includes Site, Architectural, Circulation, and other plans and exhibits prepared by MacKay and Somps, received by the Planning Division on August 7, 2006, and Landscape Plans prepared by GLS Architecture/Landscape Architecture, received by the Planning Division on August 7, 2006, referred to as Project Plans labeled as Exhibit C of Attachment 2 to the August 15, 2006 City Council Agenda Statement, stamped approved and on file in the Planning Department. The Planned Development District allows the flexibility needed to encourage innovative development while ensuring that the goals, policies and action programs of the General Plan, Eastern Dublin Specific Plan, Stage 1 Planned Development Zoning and provisions of Section 8.32, Planning Development Zoning District of the Zoning Ordinance are satisfied. The Stage 2 Planned Development Zoning District Development Plan meets the requirements of Section 8.32.040.B ofthe Zoning Ordinance and consists of the following: 1. Zoning 2. Permitted Uses 3. Conditional Uses 4. Temporary Uses 5. Accessory Uses 6. Dublin Zoning Ordinance - Applicable Requirements 7. Density & Affordability 8. Development Regulations 9. Parking/Garage and Loading 10. Site Plan and Architecture 11. Preliminary Landscape Plan 12. Compliance with Stage 2 Planned Development Plans Stage 2 Planned Development Zoning District Development Plan 1. Zoning PD, Planned Development Zoning District. Eastern Dublin Specific Plan and Stage 1 Development Plan states that the land use for this property is General Commercial and General Commercial/Campus Office which permits retail and office uses. EXHIBIT B PD. Planned Development Zoning District PA 05-030 Grafton Station 2. Permitted Uses Permitted uses shall be as adopted by Ordinance XX, the amended Stage 1 Planned Development Zoning Development Plan (P A 05-030) and as shown as follows: PD-General Commercial (Large Scale Big Box Stores) The following are permitted uses for the Planned Development General Commercial site: a. Community-serving retail uses including but not limited to: Appliance store (less than 5,000 square feet) Auto parts Bookstore Clothing! apparel/accessories Drug store Electronics/computers General merchandise store Grocery/food store Hardware/home improvement store (less than 5,000 square feet) Hobby shop Home furnishings and appliances Other retail uses automatically permitted in the C-l District Pet supplies Shoe store Sporting goods Stationary and office supplies Toy store b. Regionally-oriented, high volume, retail uses including but not limited to: Discount centers Factory stores Furniture outlets Home improvement centers Promotional centers c. Service uses including but not limited to: Bank, savings and loan and other financial institutions Barber/beauty shop/nail salon Copying and printing Dry cleaner (no plant on premises) Formal wear -rental Photographic studio Real estate/title office Shoe repair Tailor Travel agency Watch and clock repair 2 PD, Planned Development Zoning District PA 05-030 Grafton Station d. Eating, drinking and entertainment establishments including but not limited to: Bagel shop Barf cocktail lounge Cafe Coffee house Delicatessen Ice cream/yogurt Microbrewery Restaurant - no drive-through (outdoor dining permitted with a Conditional Use Permit) Theater - indoor (Dinner, Movie, Live Play, etc.) PD-General Commercial (Conventional Retail) The following are permitted uses for the Planned Development General Commercial site: a. Community-serving retail uses including but not limited to: Art Gallery/Supply Store Auto parts Bakery Bicycle shop Bookstore Clothing! apparel! accessories Drug store Electronics/computers Floor coverings General merchandise store Gift Shop Hardware/home improvement store (less than 5,000 sq. ft.) Hobby shop Home furnishings Home appliances (less than 5,000 sq. ft.) Jewelry store Liquor store Music store Newspapers and magazines Paint, glass and wallpaper store (less than 5,000 sq. ft.) Party Supplies Pets and pet supplies Photographic supply store Picture framing shop Shoe store Specialty food/grocery/supermarket Specialty goods including cooking supplies, housewares, linen, window coverings, china! glassware, etc. Sporting goods Stationary and office supplies Toy store Variety store 3 PD, Planned Development Zoning District P A 05-030 Grafton Station Other uses which could meet the intent on the General Commercial land use designation as determined by the Community Development Director b. Business/professional offices and service establishments including but not limited to: Administrative Office (second story only) Bank, savings and loan and other financial institutions Barber/beauty shop/nail salon Copying and printing Dry cleaner (no plant on premises) Employment Agency Formal wear -rental In-Patient and Out-Patient Health Facilities as licensed by State Department of Health Services (Second Story only) Locksmith Medical Clinic Photographic studio Professional Offices Real estate/title office Shoe repair Tailor Technology access center Tele-commuting center Watch and clock repair d. Eating, drinking and entertainment establishments including but not limited to: Bagel s/bakery Barf cocktail lounge Cafe Coffee house Delicatessen/sandwich shop Ice cream/yogurt Microbrewery Restaurant - no drive-through (outdoor dining requires a Conditional Use Permit) Theater - indoor (Dinner, Movie, Live Play, etc.) Video Store 3. Conditional Uses Conditional uses shall be as adopted by Ordinance XX, the amended Stage 1 Planned Development Zoning Development Plan (P A 05-030) and as shown as follows: PD-General Commercial (Large Scale Big Box Stores) Animal Sales and Service (PC) Attached dwellings (PC) 4 PD, Planned Development Zoning District PA 05-030 Grafton Station Community center (PC Dance Floor (ZA) Day Care Center (PC) Drive-through/drive-in facility (PC) Hotel and motel(PC) Public/Semi-Public facilities (PC) Retail - Outdoor Storage Recreational facility/indoor (ZA) Other uses which could meet the intent on the General Commercial land use designation as determined by the Community Development Director PD-General Commercial (Conventional Retail) Administrative Office (CUP required for first floor occupancy) PC Animal Sales and Service (PC) Attached dwellings (PC) Community center (PC Dance Floor (ZA) Day Care Center (PC) Drive-through/drive-in facility (PC) Hotel and motel(PC) In-Patient and Out-Patient Health Facilities as licensed by Stage Development of Health Services (CUP required for first floor occupancy) (ZA) Public/Semi-Public facilities (PC) Recreational facility/indoor (ZA) Video Arcade (ZA) Other uses which could meet the intent on the General Commercial land use designation as determined by the Community development Director * Key/Decision Maker Authority: ZA Zoning Administrator, PC Planning Commission 4. Temporary Uses Temporary uses shall be as adopted by Ordinance XX, the amended Stage 1 Planned Development Zoning Development Plan (P A 05-030) and as shown as follows: PD-General Commercial (Large Scale Big Box Stores) Arts and crafts fair Christmas tree sales Farmers'rnarket Festival/street fair Parking Lot Sales Sidewalk sales Temporary construction trailer 5 PD, Planned Development Zoning District P A 05-030 Grafton Station PD-Campus Office (Conventional Retail) Arts and crafts fair Carnival Christmas tree sales Farmer's market Festival/street fair Parking Lot Sales Sidewalk sales Temporary construction trailer 5. Housing PD-General Commercial Land Use Designation Mixed-use developments including residential uses may be permitted at a Stage 2 Planned Development/Development Plan application if location and design ensure compatibility and if the incorporation of residential uses meets the intent of the Eastern Dublin Specific Plan. PD- Campus Office Land Use Designation Mixed use developments including residential uses may be permitted at a Stage 2 Planned Development if the following conditions are met: a. If the development meets a specific housing need in the community. b. If the established traffic levels of service are not exceeded. Appropriate traffic study( s) may be required to make the proper determination regarding traffic levels of service. c. If the development creates a pedestrian orientated attractive environment. d. That the project is consistent with the intent ofthe Specific Plan and does not result in adverse environmental or service impacts. e. Residential uses may not occupy more than 50% of the developed area 6. Dublin Zoning Ordinance - Applicable Requirements Except as specifically modified by the provisions of this PD, Planned Development Zoning District Development Plan, all applicable general requirements and procedures of the Dublin Zoning Ordinance shall be applied to the land uses designated in this PD, Planned Development Zoning District Development Plan. 7. Density Site Area: ::1:29.2 acres (gross) .25 318,000 square feet FAR: Development Potential: 6 PD, Planned Development Zoning District P A 05-030 Grafton Station 8. Development Regulations Unless otherwise stated below, all development regulations in this Stage 2 Planned Development Zoning District are subject to the requirements of the c-o and C-2 Zoning Districts and comparable Commercial Zoning Districts. Q~velopment Standard ..... < <y. r 'uti . i Lot Area: ::.t29.2 acres (gross) Lot Dimensions: Lot Width: feet along Dublin Boulevard Lot Depth: feet Setbacks: 10 feet (varies) along Dublin Boulevard 10 feet along Brannigan 10 feet along Grafton Street 10 feet along Northside Drive Required Parking:* Retail One stall per 300 square feet of floor area Office One stall per 250 square feet of floor area Outdoor Storage One stall per 1,000 square feet of floor area Eating and Drinking One stall per 100 square feet of floor area Establishment Building Height 15 feet (minimum) 60 feet (maximum) Floor Area Ratio: .25 *Refer to the section below for discussion on parking requirements. 9. Parking/Garage and Loading A total of 1,206 - 1,226 parking spaces will be required to support the shopping center. Future Site Development Reviews will ensure that parking will be provided to support the entire shopping center. Based on the parking provided, retail uses will be limited based on the availability of parking, Retail parking requirements are located in Chapter 8.76, Off-Street Parking and Loading Regulations of the Dublin Zoning Ordinance. Parking requirements for Metropolitan at Dublin Station are as follows: Eating and Drinking Establishment Furniture/Lar e A liance Store General Retail Re air Sho Banks and Financial Institutions Outdoor Seating Day Care Center (15+) 7 PD, Planned Development Zoning District PA 05-030 Grafton Station I Medical Office (Health Services/Clinics) 11 per 250 sq. ft. Parking/Garage and Loading shall be provided in accordance with the Chapter 8.76, Off- Street Parking Regulations, of the Dublin Zoning Ordinance, except as stated herein and as shown otherwise on the plans and exhibits prepared by MacKay and Somps, received by the Planning Division on August 7, 2006, and Landscape Plans prepared by GLS Architecture/Landscape Architecture, received by the Planning Division on August 7, 2006, referred to as Project Plans labeled Exhibit C to Attachment 2 of the August 15, 2006 City Council Staff Report, stamped approved and on file in the Planning Department. 10. Site Plan and Architecture This Development Plan applies to approximately :1::29.2 gross acres on the southwest corner of Dublin Boulevard and Grafton Street. The property is located between Dublin Boulevard to the north and Northside Drive to the South. The shopping center will be constructed in phases with the Lowe's building and related site improvements constructed during the first phase. Once complete, the shopping center will have 318,000 square feet of retail floor area. Once complete, the shopping center will have eight retail buildings dispersed throughout the site. The Stage 2 Planned Development Rezone booklet includes design guidelines for the shopping center. The goal of the design guidelines is to create a shopping center which maintains the feel of a "Main Street" environment. The guidelines include architectural elements which are compatible with typical main streets which have a variety of architectural styles. See attached plans and design guidelines prepared by MacKay and Somps labeled Exhibit C of Attachment 2 received by the Planning Division on August 7,2006, and Landscape Plans prepared by GLS Architecture/Landscape Architecture, received by the Planning Division on August 7,2006, referred to as Project Plans labeled Exhibit C of Attachment 2 to the August 15, 2006 City Council Staff Report, stamped approved and on file in the Planning Department. Any modifications to the project shall be substantially consistent with these plans and of equal or superior materials and design quality. 11. Preliminary Landscape Plan The landscape plan reinforces the urban design intent of the vicinity by creating a pedestrian oriented perimeter with sidewalks, street tree planting, and pedestrian paths. The terminus of Grafton Street has been designed to provide a public gathering area with attractive landscaping, a water feature and enhanced paving. An opportunity for public art has also been provided in the traffic circle on Grafton Street. In order to break up the expanse of the parking lot and to provide shade year round in the parking lot, the parking lot has been designed with a large mix of evergreen trees to provide a canopy year round. Deciduous trees have also been included in the parking lot as accent trees. A double row of trees will be planted along Dublin Boulevard. Street trees will also be planted on Grafton Street and the Brannigan Street extension. 8 PD, Planned Development Zoning District PA 05-030 Grafton Station A bioswale will be constructed adjacent to Northside Drive. The project plans also include lighting, pots, benches and trash receptacles See plans (Sheet L-1, Sections 1 through 13 and Materials List) prepared by GLS Architecture/Landscape Architecture, received by the Planning Division on August 7, 2006, referred to as Project Plans labeled Exhibit C of Attachment 2 of the August 15, 2006 City Council Staff Report, stamped approved and on file in the Planning Department. 12. Compliance with Stage 2 Planned Development Plans The project shall substantially comply with the project plans and exhibits prepared by MacKay and Somps, received by the Planning Division on August 7, 2006, and Landscape Plans prepared by GLS Architecture/Landscape Architecture, received by the Planning Division on August 7, 2006, referred to as the Stage 2 PD Rezone booklet labeled Exhibit C of Attachment 2 to the August 15,2006 City Council Staff Report, stamped approved and on file in the Planning Department. Such project plans are incorporated by reference. Any modifications to the project shall be substantially consistent with these plans and of equal or superior materials and design quality. 9 I I I I I I I I I I I I I -I I I I I I 11 GRAFTON STATION AT DUBLIN RANCH AREA H Stage II PD Rezone City of Dublin, California ~ [M ~ PROJECT TEAM: OWNER/APPLICANT: DUBLIN RANCH HOLDINGS, LLC AnN: JAMES TONG CHARTER PROPERTIES 4670 CHABOT DRIVE, SUITE 100 PLEASANTON, CA 94588 (925) 463-1666 CONTACT: JAMES TONG ARCHITECT: WILLIAM HEZMALHALCH ARCHITECTS 2850 RED HILL, SUITE 200 SANTA ANA, CA 92705-5543 (949) 250-0607 CONTACT: CHRISTOPHER KOCH SIGN CONSULTANT: GNU GROUP 3445 MT. DIABLO BOULEVARD LAFAYETTE, CA 94549 (925) 444-2020 CONTACT: JOYCE JACKSON CIVIL ENGINEER/ MACKAY & SOMPS LAND PLANNER: 5142 FRANKLIN DRIVE, SUITE B PLEASANTON, CA 94588 (925) 225-0690 CONTACT: DAVECHADBOURNW BAHRAM SADAGHIANI LANDSCAPE GLS ARCHITECTURWLANDSCAPE ARCHITECT: ARCHITECTURE 2677 MISSION STREET, SUITE 200 SAN FRANCISCO, CA 94 110 (415) 285-3614 CONTACT: DEAN WILLIAMS RECEIVED AUG 0 7 2006 DUBLIN PLANNING C" .I"D bl" C. il'''' A E~hlibi!(~" e-r ity OJ U In oune meetmg, ugu~, ~ " I I I .1 I I I I I I I I I I I I I I I /'1> CITY OF DUBLIN PLANNING APPLICATION FORM NOTE: Please discuss your proposal with Planning Staff prior to completing this form. All items on this form related to your specific type of application must be completed. Some of the items listed might not apply to your specific application. Please rint or e Ie "bl . Attach additional sheets, if necessar . I. TYPE OF APPLICATION: x Temporary Use Permit [TUP] Conditional Use Permit [CUPj Site Development Review [SDRj Variance [VARj Tentative Subdivision Map [T MAP] Sign/Site Development Review [SIGN/SDRj Master Sign Program [MSP /SDR] Planned Development Rezone [PD REZj Rezone [REZj General/Specific Plan Amendment [GP A) x II. GENERAL DATA A. Address/Location of Property: GRAFTON STATION AT DUBLIN RANCH - AREA H (See attached description) B. Assessor Parcel Number(s): See attached-description. C. Site Area: 26.8 acres D. Zoning: See attached. E. General Plan Designation: See attached. F. Existing/Proposed Use of Property: See attached for full description. G. Existing Use of Surrounding Properties: See attached for full description. III. AUTHORIZATION OF PROPERTY OWNER AND APPLICANT A. PROPERIY OWNER: In signing this application, I, as Property Owner, certify that I have full Iegal capacity to, and hereby do, authorize the filing of this application. I understand that conditions of approval are binding. I agree to be bound by those conditions, subject only to the right to object at the hearings or during the appeal period. I further certify that the information and exhibits submitted are true and correct. (Note: All Property Owners must sign if property is jointly owned) Name: Chang Su-O Lin, H. Yao Lin & H. Lien Lin By: Mr. James Tong Company: Capacity: Property Owner Capacity: Authorized Representative Phone: (925) 463-1666 Fax:( 925) 463-1861 Date: 3'- f -e-~ ~.6 Signature: B. THER THAN PROPERIY OWNER: In signing this application, I, as Applicant, certify that I have authorization from the property owner and have attached separate documentation showing my full legal capacity to file is application. I agree to be bound by the conditions of approval, subject only to the right to object at the hearings or during the appeal period. I further certify that the information and exhibits submitted are true and correct. Name: Title: Company: Phone: Address: Fax: Signature: Date: 16034-13dcGraftonStationPDIIApp.doc I I I I I I I I I I I I I I I I I I I 10f Attachment to City of Dublin Planning Application Form II. General Data Parcel I of Tract 8640 Parcel Map North ofI-580, East of Tassajara Road, South of Dublin Blvd. within Dublin Ranch and West of Fallon Road Portion of 985-0009-015 26.8 ac PD General Commercial PD General Commercial/Campus Office General Commercial General Commercial/Campus Office F. Existing/Proposed Use ofProoerty: The existing use of the property listed above consists primarily of dry land farming. The site is currently vacant and undeveloped and has been filled in anticipation of future development. Proposed uses include: General Commercial G. Existing Uses of Surrounding Properties Existing uses of surrounding properties include undeveloped, vacant land to the east and west and the 1-580 freeway and Northside Drive located to the south of the Project Area. High Density Residential neighborhoods in Area G of Dublin Ranch are currently under construction north ofthe Project Area. 16034-13dcGraftonStationPDIIApp.doc I qo Planner Date CITY OF DUBLIN APPLICATION SUBMITTAL REQIDREMENTS FOR PLANNED DEVELOPMENT ZONING DISTRICT STAGE 2 DEVELOPMENT PLAN On a case by case basis, a City Planner will place a checkmark (..J) next to the infonnation required for submittal. The Planner may I determine that specific infonnation may not be needed to process a particular application. If the Planner decides to waive certain infonnation, the Planner will initial the waived infonnation and keep a copy of the form for City records. I It is City policy not to accept incomplete applications unless a Planner has specifically identified those items waived by writing N/ A and their initials next to them. Please note if an incomplete application is received by mail or hand delivered by courier it may be returned to the applicant. Incomplete or inaccurate infonnation may result in processing delays or denial of the project. I Checking off the Quick Check box does not necessarily mean that all the requITed application items have been submitted. Staffwill do a thorough review of the submittal for completeness and enviromnental determination, often involving an on-site visit. Staff will send a notice to you within 30 days listing the items necessary to complete the application. I To comply with State law, the following represents a comprehensive list ofinfonnation which must be submitted prior to acceptance of the application for a Stage 2 Development Plan for all or a portion of the Planned Development Zoning District, as applicable under I any proposed or adopted phasing plan: GENERAL INFORMATION: I Project Street Address/Location: North on-580. East ofTassaiara Rd.. South of Dublin Blvd. in Dublin Ranch & West of Fallon Road Project Name: Grafton Station at Dublin Ranch Project Description: Commercial Development proiect on 26.8 acre site in Dublin Ranch - Area H I General Plan Land Use Designation: (Same as Specific Plan) Specific Plan Land Use Designation: General Comm. & Gen Comm./Campus Office I Zoning District: PD-General Comrn. & PD General Comrn./Campus Office Applicant Name: Chang Su-O Lin. H. Yao Lin and H. Lien Lin T Ath d APN: 985-0009-015 Phone: 925-463-1666 I James ong, u onze Representative SUBMITIAL QUICK REQUIRED CHECK TYPE OF SUBMITIAL REQUIRED Completed Application Form including the address and signatures of Applicant(s) and Property Owner( s). Completed Environmental Information Form including signatures of Applicant(s) and Property Owner(s). Application Fee and Processinf! Deposit (Cash or check payable to City of Dublin) Fee Deposit _ PD Zoning District, Stage 2 $N/A $ Environmental Filinf! FeeslDeposits - County Administrative Fees ($25.00) $ $N/A (check payable to Alameda County Clerk) - Initial Study Fee ($25.00) $ $ N/A (payable to City of Dublin) - Enviromnental Impact Report Deposit) $N/A $ (payable to City of Dublin - Special Studies Deposit (traffic, noise. etc.) $N/A $ (payable to City of Dublin TOTAL TOTAL FEE DEPOSIT $ $ I I I I I I Revised 11/09/05 I P:\ 16034-13_ GCIofficelSubmittals\16034-13dc2-24-06GraftonStationStageIlPDApp.doc I ~ I SUBMITIAL QUICK REQUIRED CHECK TYPE OF SUBMITIAL REQUIRED Completed Processinl! Fee Al!reement Form Findinl!s Statement: (1 copy) provide the following information necessary for required fmdings of approval to be made: a. Describe how the proposal will be harmonious and compatible with existing and future development in the surrounding area. b. Is the site physically suitable for the type and intensity of the zoning district being proposed? c. Will the proposal adversely effect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare? d. Is the proposal consistent with all elements of the General Plan and any applicable Specific Plans of the City of Dublin? e. How does this project satisfy the purpose and intent of Chapter 8.32 "Planned Development" of the Municipal Code? Written Statement: (1 copy) describe the project in detail, state the benefits and costs the rezoning will have upon the City and give reasons why the application should be approved. Provide factual infonnation supporting the following: a. Statement of compatibility with Stage I Development Plan (if applicable). b. Proposed Uses, including permitted, conditional, and accessory uses; c. Site area (gross and net), maximum densities for residential and non-residential development by type, minimum densities where applicable for compliance with the Dublin General Plan or applicable specific plans; and maximum number of residential units by type and or maximum non-residential square footage for each use. d. Development Regulations for lot areas, lot square footage per dwelling unit, lot width and frontage, lot depth, setbacks, distances between buildings; maximum lot coverage, common useable outdoor space, floor area ratios, height limits, parking, driveways loading areas, signage, grading standards, and trash enclosures, accompanied by any necessary diagrams e. Area-wide and project-wide architectural standards, concepts and themes. f. Indicate how this project would be compatible with the Inclusionary Zoning Regulations for the provisions of affordable housing. This statement should supplement any statement regarding compliance with the Housing Element of the General Plan. g. Is the site where the project is proposed located on a hazardous waste and substances site (pursuant to Government Code Section 65962.5). Vicinity Map (I copy) showing the site in relation to nearest cross streets. Stal!e 2 Site Plan (10 copies) drawn to I" = 20' scale and fully dimensioned (folded, 9" x II" maximum size). The plans must be prepared and signed by a licensed civil engineer, surveyor, architect, or designer. The plans must graphically and understandably describe the proposal. The plans must show the following: a. north arrow and scale; b. location and arrangement of existing and proposed land uses; c. location and arrangement of existing and proposed land uses within 100 feet beyond the district boundary; d. existing and proposed circulation system; e. existing structures and proposed general building areas; f. contours; g. limits of grading; h. parking areas, driveways and loading areas in general; i. phasin,g boundaries per Stage 1 Development Plan. I I I I I I I I I I I I I I I I I P:\16034-13 - OC\office\Submittals\16034-13dc2-24-Q6GraftonStationStageIIPDApp:!oc I <Zz I SUBMITfAL QUICK REQUIRED CHECK TYPE OF SUBMITfAL REQUIRED J. sunnnary of development calculations including: - area of the Stage 2 site (gross and net) - maximum densities for residential and non-residential development by type - maximum number of residential units by type - maximum non-residential square footage for each use Preliminary Landscapine: Plan (10 copies, folded 9" x II" maximum size) This plan shall be consistent with the site plan and architectural plans for the proposed Planned Development and shall implement the Master Neighborhood Landscaping Plan. The plan shall be a generalized design layout which demonstrates clearly the character, massing and site compatibility of the proposed landscaping program and shall include the following: a. Design layout showing the desired landscaping program in terms of location of proposed landscaping and hardscape, b. Generalized plant palette with the generalized location, size and name of the proposed plants and trees (both common and botanical c. Fencing location and materials d. Statement of overall design theme Reduced Copies (10 copies, 11" x 17") of each sheet for all plans Site Color Photoe:raphs and Slides (I set) showing views of and from site, including neighboring development. (prints should be mounted on 8Y2" xII" mountboard.) (Slides should be placed in clear plastic sleeve or holder.) A written inventory/index of the slides shall be provided. Scale Model of Proiect: A scale model of the project to be submitted within one month (not before) of the hearing date. Aerial Photo legibly showing a direct overhead view of the proposed district and 300 feet beyond its boundary showing sufficient topographic data to indicate clearly the character of the terrain; the type, location, and condition of mature trees, and other natural vegetation; and the location of existing development. The aerial photo shall not be more than one year old. Preliminarv Title ReportJPropertv Profile (I copy) to document ownership, prepared within three months of application submittal. I I I I I I I I I I I I I I I I I P:\16034-13 - GC\office\Submittals\16034-13dc2-24-06GraftonStationStageIIPDApP31oc I ~.-~ ..".... I I SUBMITIAL QUICK REQUIRED CHECK TYPE OF SUBMITTAL REQUffiED Public Notice Materials: - a. Reproduced copy of Alameda County Assessor's Parcel Map showing the project parcel(s) outlined in red and a 300-foot radius in blue drawn from the perimeter of the parcel(s), b. Two sets of mailing labels; one set addressed to current property owners by name; and another set addressed to all current occupants/tenants on the properties contiguous to the project site. The labels need to show the addresses and Assessor's Parcel Number's within 300 feet of the parcel(s) typed on 8Yz" x 11" sheet labels. (Example of how these labels should be typed:) J. Doe (Property Owner) OccupantlTenant APN: 941-042-0003 APN: 941-012-3456 1010 Main Street 1010 Dublin Blvd. Any town, CA 91234 Dublin, CA 94568 c. Plain envelopes (I set) 4W'x9W' with first class postage (stamps only, no metered mail will be accepted, no return address) with labels affixed on envelopes. Properties within 1,000 feet of Camp Parks: a. Two additional sets of plans including written information, diagrams, traffic information, aerial photo and any additional required information must be submitted for Military notification of the proposal. b. Two plain envelopes 4W' x 9W' with first class postage (stamps only, metered mail will not be accepted, no return address, no mailing address) for Military notification. Lel!al Descriptions (1 copy) Traffic Data specific to the site or proposed project: traffic generation rates, peak hour counts, trip distribution and similar information. (Applicant checks with Public Works Dept. for additional information.) Special Information or information in such form and number as may be required by the Planning Department. I I I I I I I I I I I I OFFICE USE ONLY I Planner Date The Quick Check has determined that the application submittal is incomplete and cannot be accepted. I The Quick Check has determined that the application appears to contain the items required bv this checklist (completeness as defmed by Section 65943 will be determined within 30 days of application) and processinl! will bel!in. I For assistance or questions regarding this form, please contact: PLANNING DEPARTMENT STAFF, CITY OF DUBLIN, 100 CIVIC PLAZA, DUBLIN, CA 94568, (925) 833-6610. I P:\16034-13 - GC\Office\Submittals\16034-13dc2-24-06GraftonStationStageIIPDApp41oc I I I I I I I I I I I I I I I I I I I '3~. Rev. 12/03 Application Name: Grafton Station at Dublin Ranch - Area H Stae:e 2 Development PlanIPlanned Development Rezone Tentative Parcel Map Site Development Review (Lowe's Home Improvement Warehouse) Initial Study (ENVIRONMENTAL INFORMATION FORM - PART 1) (To be completed by Applicant pursuant to City of Dublin Environmental Guidelines Section 1.6) Date Filed: March 2006 GENERAL INFORMATION: 1. Name and address of authorized representative of property owner: Chane:Su..,O Lin. Ront!: Yao Lin_&HoJU! LienLin By: Mr. James Tone:. Authorized Representative 4690 Chabot Drive. Suite 100. Pleasanton. CA 94588 2. Address of Project: East of Tassaiara Road. South of Dublin Blvd. in Dublin Ranch. West of Fallon Road and North of 1-580 in Dublin. California 3. Name, address and phone number of person to be contacted concerning this project: Mr. James Tone: Authorized Representative Chabot Drive. Suite 100 Pleasanton CA 94588 (925) 463-1666 David Chadbourne MacKay & Somps 4690 5142 Franklin Dr. Suite B Pleasanton. CA 94588 (925) 225-0690 4. List and describe any other related permits and other public approvals required for this project, including those required for this project, including those required by city, regional, state and federal agencies: Service from DSRSD 16034-13dc3-14-D6GraftonStationStage2PD-Env.InfoForm.doc I I I I I I I I I I I I I I I I I I I <65 5. Existing Zoning District: PD General Commercial; PD General Commercial/Campus Office 6. Description of Project: (Include site area, uses, size and number of buildings, parking, number of dwellIng units, scheduling, and any other information necessary or helpful to understand project. This attached description must be complete and accurate. Exhibits or photographs should be identified and attached.) The Grafton Station at Dublin Ranch Project Area is comprised of approximately 29.2 acres within portions of the Dublin Ranch ~lanning area referred to as Area H. This applIcation includes a Stage II Development Plan proposal for the entire project area. Also included are a Tentative Parcel Map and a Site Development Review package for the Lowe's Home Improvement Warehouse project. . With respect to the Stage II P.D. area, it is proposed that all of the acreage within the Project Area be re-designated as General Commercial. The Development Plan for this project proposes 318,000 square feet of General Commercial-designated development on approximately 29.2 acres (gross acres). Commercial floor area ratios proposed for the project fall within the ranges permitted by the Eastern Dublin Specific Plan and Dublin General Plan. The proposed project is consistent with the type, location and size of the land use designations assigned to the properties by the current version of the Eastern DublIn Specific Plan. A Lowe's Home Improvement Warehouse store (139,410:1:: square feet) is currently slated to be la-cated near the southwest corner of the Project Area (identified as Anchor' A'). At the northwest corner of the site, between Lowe's and Dublin Boulevard, another lar~e pad (identified as Pad A) for large format and/or "Big Box" retail use(s) IS planned. The building(s) to be sited on these two pads will be oriented to the east, where the primary parking for all the retail uses will be located. A smaller retail pad (pad B) will line Dublin Blvd. at the north end of the Project Area along Dublin Blvd. Other smaller retail pads (Pads C-l, C-2, and D) site along Grafton Street have also been designed to generally shield the street from views of the parking lots. These buildings have been designed to front the adjacent street as well as the parking lot and to extend along almost the entire len~th of Grafton Street south of Dublin Blvd. Additionally, the building architecture will address both Grafton Street and the parking lot; those traveling along Grafton Street will not see the blank walls of the rears of buildings. Two additional small commercial pads (pads E-l and E-2) will be located south of the intersection of Grafton Street and the future street connections to the east. The pads at this intersection will address this corner condition (including the traffic circle) and the adjacent parking lot. The southernmost of the two pads will face the parking lot as well as provide a visual terminus to Grafton Street at the traffic circle. A linear bioswale will be constructed south of the parking lot adjacent to Northside Drive as part of the project. This facilitr will provide treatment for a portion of the storm water runoff from the parking lot and roof areas within the Project Area in accordance with the conditions of the Water Quality Certification Order issued by the Regional Water Quality Control Board in 2003. After passing through the bioswale, runoff will be collected and piped to the regional water quality basin that will be constructed by others on the parcel immediately east of the Project Area. Flows from the water quality basin will then be discharged into the G-3 Channel south of 1-580. 16034-13dc3-14-06GraftonStationStage2PD-Env.InfoForm.doc I I I I I I I I I I I I I I I I I I I ~k> A Tentative Parcel Map (Tract 9003) has been included in this application package, which will create the parcel for the proposed Lowe's Home Improvement_Warehouse as well as two other Grafton Station commercial parcels. The intent of this is to allow the Lowe's project to move forward in advance of development of the other commercial parcels. Access to each of these parcels will be available from either Dublin Boulevard or Northside Drive as well as via a proposed 24' easement over the future Grafton Street extension and the future east-west access streets connecting Grafton Street to the main parking lot Please refer to the attached photo~raphs of affected land area(s) for additional data regarding existing site conditions. 7. Are the following items applicable to the project or its effects? Discuss below all items checked (attach additIOnal sheets as necessary). All of the following items are addressed in the program EIR prepared for the Eastern Dublin General Plan Amendment/Specific Plan or the Mitigated Negative Declaration for Dublin Ranch Planning Area H (pA-98-068), November 1999. Yes No 1. Change in existing features of any bays, tidelands, beaches, lakes or hills, or substantial alteration of ground contours. 2. Change in scenic views or vistas from existing residential areas or public lands or roads. 3. Change in pattern, scale or character of general area of project. 4. Significant amounts of solid waste or litter. 5. Change in dust, ash, smoke, fumes or odors in vicinity. 6. Change in ocean, bay, lake, stream or ground water quality or quantity, or alteration of existing drainage patterns. 7. Substantial change in existing noise or vibration levels in the vicinity. 8. Site on filled land or on slope of 10 percent (10%) or more. 9. Use of disposal of potentially hazardous materials, such as toxic substances, flammables or explosives. 10. Substantial change in demand for municipal services (police, fire, water, sewage, etc.). 11. Substantial increase in fossil fuel consumption (electricity, oil, natural gas, etc.). 12. Relationship to larger project or series of projects. 16034-13dc3-14-Q6GraftonStationStage2PD-Env.InfoForm.doc I I I I I I I I I I I I I I I I I I I ~7 ENVIRONMENTAL SETTING: 8. Briefly describe the project site as it exists before the project, including information on topography, soil stability, plants and animals, and any cultural, historical or scenic aspects. Describe any existing structures on the site, and the use of the structures. If necessary, attach photographs of the site. See the Eastern Dublin GP AlSpecific Plan EIR paees 2-2 and 2-3. Eastern Dublin Specific Plan paees 5 and 6. and the Initial Studv/Mitieated Neeative Declaration prepared for Dublin Ranch Plannine Area H (P A-98-068). November 1999. Also. please refer to the attached photoeraphs of the area for additional data reeardine existine site conditions. 9. Briefly describe the surrounding properties, including information on plants and animals, any cultural, histoncal or scenic aspects and the type of land use. Refer to the Eastern Dublin GP AlSpecific Plan EIR paees 2-2. Eastern Dublin Specific Plan paees 5-7. and the Initial Studv/Mitieated Neeative Declaration prepared for Dublin Ranch Plannine Area H (P A-98-068). November 1999. CERTIFICATION: I hereby certify that the statements furnished above and in the attached exhibits present the data and informaf on required for this initial evaluation to the best of my ability, and t/ the facts, statements and information presented are true and correct to th est of my knowledge and belief. Dated: .g'-I:C- ~ (; Signa e Mr. James T n Authorized Re resentative Print N ameITi e 16034-13dc3-14-o6GraftonStationStage2PD-Env.InfoForm.doc I I I I I I I I I I I I I I I I I I 1,-.- -- -- ---- @ .-- -- .-- - .- -- co~.:;;-.--' COS1t:--;~ CO~1~- - ~- COD~ -- ~AX.V~ - . - [\.\..[\.,..." .- -' DUBLIN RANCH DRIVE >- ~~ DUBLIN Gc3 ::>~ o ~ CENTRAL PARKWAY DUBLIN BL YD. ~ o ~ ...l III PLEASANTON NOT TO SCALE IIIDllIIIPS CMl ENGlNEERlNGe-lAND PlANNINC-t.AND SURVEYING P1eosonton, CA (92~) - 22~-0690 10:5&29 __ P:\1e034-I!o..~VIcwtr..-r~., DUBLIN RANCH GRAFTON STATION VICINITY MAP STAGE 2 DEVELOPMENT PLANIPLANNED DEVELOPMENT REZONE TENTATIVE PARCEL MAP Dublin, CaJifomio July 2006 '" <-I L' I ~ DUBLIN RANCH GRAFTON STATION AERIAL PHOTOGRAPH STAGE 2 DllVIlLOPMENT PLANIPLANNED DEVELOPMENT IUlWNB TENTATIVE PARCEL MAP O' 400' 800' I IIIIDY,.... aw. ENOIl..-lNIIl ~lNflolAIIl SURYE'IING _ l>\ (125) - 225-OlIllCl JJuhlin, C8lifomia July 2fJ()6 7-20-2006 10:54: 12 oshannon P:\ 16034-1:LGC\planning\Stage2PO\Aerial-Map-Feb06Graft.nSlatian.dwg I I Project Description I for I Grafton Station at Dublin Ranch - Area H . Julv 2006 ~O I GRAFTON STATION AT DUBLIN RANCH AREA H I STAGE II PLANNED DEVELOPMENT REZONE I Introduction I The Grafton Station commercial development project is a Stage II Development Plan as defined by Section 8.32.030(A) of the Dublin Zoning Ordinance. I The Project Area is located within the City of Dublin and is bordered by vacant land (zoned General Commercial) to the west; Dublin Blvd. and medium high density neighborhoods of Area G to the north; Interstate 580 to the south and vacant land (zoned Campus Office) and a future stormwater treatment basin to the east. The Project Area consists of approximately 29.2 acres, encompassing portions of Area H of Dublin Ranch. I I The Stage II PD submittal is based on the Stage I PD for Area H (P A 98-070), approved by the Dublin City Council on March 21, 2000. This submittal includes a Stage II PD development plan; data on site area; listing of permitted and conditional uses; design standards covering site development, architecture, landscape development and signage; proposed densities and maximum number of square feet for proposed uses; vehicular and pedestrian circulation plan; phasing plan; prototypical street sections; and textual information sufficient to establish consistency with the Dublin General Plan and Eastern Dublin Specific Plan (GP/EDSP) as amended. I I I Background Dublin Ranch is located within the Eastern Dublin Specific Plan Area and comprises a total of 1,311 acres, all of which have been annexed to the City of Dublin. This annexation, which included the Grafton Station Project Area, also pre-zoned the affected lands to conform with the Specific Plan land use designations established under P A 94-030. Area H of Dublin Ranch was later rezoned under P A 98-070. The most recent land use designations for the Project Area were approved on March 21, 2000 (Ordinance 6-00) as part of the Stage I PD approval for Area H. I I I I Stage II Development PlanIPlanned Development Rezone' Project Description. Page 1 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 '11 I I Existing Site Conditions and land Use The Project Area has very little variation in topography and gently slopes upward from the south (adjacent to 1-580) to Dublin Blvd. The lowest elevation within the Project Area is at approximately 345 feet above sea level, while the highest elevation is at approximately 352 feet. Drainage currently flows generally in a north to south direction towards the freeway and the G-3 Channel. The Project Area is without any existing tree cover and non-native grasses cover the majority of the area. I I The Project Area has predominantly been used historically for dry land farming and cattle grazing, however, these uses are not currently occurring on the property. Current land uses surrounding the project are Dublin Blvd. and the High Density Residential neighborhoods of Area G to the north; vacant land (zoned General Commercial) to the west; vacant land (zoned Campus Office) and a future stormwater quality treatment basin to the east; and Northside Drive and Interstate 580 to the south. I Various biological studies have been undertaken within the Project Area and surrounding areas by H. T. Harvey & Associates. The presence of the California red-legged frog and the California tiger salamander was addressed in the Initial Study/Mitigated Negative Declaration (MND) for Dublin Ranch Planning Area H (P A 98-070) previously prepared by the City of Dublin. Mitigation measures were designated and approved as part of the Mitigated Negative Declaration. Two delineations conducted by Ted Winfield & Associates identified the areas that are subject to the U. S. Army Corps of Engineers (USACE) jurisdiction within the Project Area. These submittals were formally verified by the USACE on August 18, 1999 and December 2, 1999. Mitigation measures have been incorporated in the wetland fill permit issued by the U. S. Army Corps of Engineers (USACE) on May 23,2003. A copy ofthe permit may be found in Appendix B. A summary of the Biological Surveys conducted to date has been included in Appendix E. Please refer to other appendices in this submittal package as well as documents on file with the City of Dublin for additional site conditions information. I I I I With respect to existing flood hazards, no portion of the Project Area is within a 100-year flood hazard area. A Letter of Map Revision was issued by FEMA on August 27,2004 confirming that the Project Area is removed from the Special Flood Hazard Area. A copy of the FEMA documentation is included in Appendix F. I Geotechnical investigations of the Project Area and surrounding areas have been conducted by Berlogar Geotechnical Consultants to determine the soil condition and slope stability. The studies indicated no areas of geotechnical concern within the Project Area. These studies have been included in Appendix C. I Project Theme I The overall theme of the project is to create design consistency between the various types of commercial uses by use of common elements. The intent is also to create a variety of viable commercial opportunities and locations as well as clear visual and pedestrian links throughout the project so that there is a strong physical interconnection between the various uses and pad locations. Grafton Station is envisioned as an extension of the Village Center commercial development along Grafton Street south of Dublin Boulevard. Where appropriate, the continuation of architectural and landscape themes, materials, forms and elements established for the Village Center project will be implemented, although the intent is create a unique but complementary retail experience for Grafton Station. Grafton Station will provide an alternative to the typical modem strip shopping center or power center by providing a human-scaled, vibrant and physically appealing place for shopping, business services, dining and community activities. Further discussion and details concerning the Grafton Station design theme are found in the Site Planning and Site Design Standards section of this document. I I I I I Stage II Development PlanIPlanned Development Rezone' Project Description. Page 2 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 M "-/1 2. I I Proposed land Use and Development Concept The Development Plan for this project proposes 318,000 square feet of General Commercial-designated development on approximately 29.2 acres. Commercial floor area ratios proposed for the project fall within the ranges permitted by the EDSP/GP. I The proposed project is consistent with the type, location and size of the land use designations assigned to the properties by the current version of the Eastern Dublin Specific Plan. The table below indicates the proposed land uses, and densities for the project as compared to the approved land uses presented in the General Plan/Specific Plan. I Proposed Stage II PD East Dublin General Plan! t .....A It...... DI-... . . DI..... I ..., A II...... DI..... Land Use Designation Gross Net FAR Square Gross FAR Square Acres Acres Feet Acres Feet General Commercial 29.2* 26.8 .25 318,000 26.9* .25 292,941 I I * The discrepancy in land use acreages is due to the re-alignment of Dublin Blvd and Grafton Street (south of Dublin Blvd.), more accurate measurement of the parcels and the inclusion of half of the street right-of-way of Northside Drive in the gross acreage. I As noted in the table above, the Stage II Development Plan for Grafton Station proposes a maximum of 318,000 square feet of commercial development. Modifications to the amount of square footage allocated to proposed uses on specific pad sites may be made at the Site Development Review stage so long as the total amount of square feet for the Project Area does not exceed 318,000 square feet. I I A Lowe's Home Improvement Warehouse store (139,410::1: square feet) is currently slated to be located near the southwest comer of the Project Area (identified as Anchor' A'). At the northwest comer of the site, between Lowe's and Dublin Boulevard, another large pad (identified as Pad A) for large format and/or "Big Box" retail use(s) is planned. The building(s) to be sited on these two pads will be oriented to the east, where the primary parking for all the retail uses will be located. The proposed site layout permits freeway exposure for the large retail uses while preserving views to the hills north and east of Dublin Ranch from 1-580. I I A smaller retail pad (Pad B) will line Dublin Blvd. at the north end of the Project Area along Dublin Blvd. Other smaller retail pads (Pads C-l, C-2, and D) site along Grafton Street have also been designed to generally shield the street from views of the parking lots. These buildings have been designed to front the adjacent street as well as the parking lot and to extend along almost the entire length of Grafton Street south of Dublin Blvd. Additionally, the building architecture will address both Grafton Street and the parking lot; those traveling along Grafton Street will not see the blank walls of the rears of buildings. Two additional small commercial pads (Pads E-l and E-2) will be located south of the intersection of Grafton Street and the future street connections to the east. The pads at this intersection will address this comer condition (including the traffic circle) and the adjacent parking lot. The southernmost ofthe two pads will face the parking lot as well as provide a visual terminus to Grafton Street at the traffic circle. More specific depiction of the proposed pad locations and configuration is shown on the Conceptual Site Development Exhibit in Planning and Site Design Standards of this PD Package. I I I I A linear bioswale will be constructed south of the parking lot adjacent to Northside Drive as part of the project. This facility will provide treatment for a portion of the storm water runoff from the parking lot and roof areas within the Project Area in accordance with the conditions of the Water Quality Certification Order issued by the Regional Water Quality Control Board in 2003. After passing through the bioswale, runoff will be collected and piped to the regional water quality basin that will be constructed by others on the parcel immediately east of the Project Area. Flows from the water quality basin will then be discharged into the G-3 Channel south ofI-580. I I Stage II Development Plan/Planned Development Rezone' Project Description. Page 3 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 C13 I I Project Access and Circulation Primary access to the Project Area from other areas of Dublin, Pleasanton or Interstate 580 will be via Dublin Boulevard and an extension of Grafton Street .(a private street extending south of Dublin Blvd.). Visitors to the project's commercial uses approaching from the west will enter the site through a parking lot driveway off Dublin Blvd. or turn south onto Grafton Street at the intersection of Grafton Street and Dublin Blvd. to access the site. Visitors from the east will turn into the site from Dublin Blvd. onto Grafton Street. A bus stop is proposed to be located nearby on the south side of Dublin Blvd, just east of Grafton Street. I I I Truck access to the loading docks for the larger commercial buildings, including Lowe's Home Improvement Warehouse, will be via a separate private driveway that extends south from the intersection of Dublin Blvd. and Brannigan Street and provides direct access to the rear of the buildings in this area. Trucks making deliveries to either the General Commercial (Big Box) uses or the smaller Conventional Retail uses will not be allowed to use Grafton Street. Secondary access to the Project Site from the south will be provided from a location at the current terminus of Northside Drive. A driveway connection and bridge crossing the bioswale area located north of Northside Drive are proposed to be constructed in conjunction with the Lowe's project. I I Pedestrians will be able to utilize the linear landscaped walkways extending through the parking lot connecting Lowe's and the retail uses on Pad A to the retail pads along Grafton Street. Street circulation systems have been designed with safety, convenience and visual quality in mind, and, at the same time, address pedestrians' and bicyclists' needs. Pedestrian connections between various retail locations within Grafton Station and to adjacent areas within Dublin Ranch as well as emergency vehicle access have been incorporated into the overall land plan. I I Proposed street sections are comparable to those already approved or built in other areas of the Eastern Dublin Specific Plan area, with additional sections being incorporated to address site-specific design needs. Street sections and lane configurations at Project Area intersections are based on the findings and recommendations of the traffic analysis. All streets and driveways south of Dublin Blvd. within the Project Area (including the extension of Grafton Street) will be privately owned and maintained by a property- owners association and will be based on a slightly modified section from the City of Dublin's design standards. I I Utility Services The Dublin San Ramon Services District (DSRSD) will provide water, wastewater and recycled water service to the Project Area. These services are planned in accordance with the DSRSD Eastern Dublin Facilities Master Plan (or subsequent revisions) that includes the proposed Project Area. It is anticipated that existing water storage reservoirs and pumping stations will provide water service for the Project Area through buildout. The Project Area will be served by Pressure Zone 1 potable water. There is an existing Zone 1 main located within Dublin Boulevard, which includes two stubs to serve the Project Area. One stub is located at the intersection of Brannigan Street and Dublin Boulevard and the second one is at the future intersection of Grafton Street and Dublin Boulevard. Water mains will be extended from both the locations to the Project Area. Final locations and sizing of these facilities will be in accordance with the design standards and recommendations ofDSRSD. I I I I Sewer service for the Project Area will require connection to DSRSD's existing sewer system and sewer treatment will occur at DSRSD's treatment plant. A gravity sewer main exists within Dublin Boulevard and includes an existing stub to the Project Area which will be utilized. Final sizing and location of onsite sewer facilities will be determined in conjunction with DSRSD. I There is an existing recycled water main along Dublin Boulevard, which includes an existing stub to serve the Project Area at the future intersection of Grafton Street and Dublin Boulevard. This stub will be I Stage II Development PlanIPlanned Development Rezone. Project Description. Page 4 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 ot"f I extended south along Grafton Street and will be utilized to serve Grafton Street retail uses as well as Anchor 'A' and Pad 'A'. I The Project Area is within the Zone 7 Drainage Study Area, therefore, its expected flows are anticipated and planned for by Zone 7 and the project's facilities will be sized appropriately. The storm dr~in system for Grafton Station will be designed to collect and handle the entire Project Area including all of the parking areas and roof drains. The actual size and final locations of the proposed storm drain facilities will be determined in conjunction with preparation of improvement plans. I I Specific storm water quality treatment requirements applicable to this project have been fully resolved per a Transmittal of Order (R2-2003-0032) from the San Francisco Bay Region Regional Water Quality Control Board (April 22, 2003). The runoff to be treated will drain into a linear bioswale located south of the main parking lot. After passing through the bioswale, runoff will be discharged into the regional water quality basin to the east of the Project Area and eventually discharged to the G-3 Channel south of 1-580. Additional details regarding treatment requirements are included in Appendix B. I I Proposed Phasing Approach I Phase 1 will include construction of a Lowe's Home Improvement Warehouse store and an associated parking lot on the southern portion of the site. The Grafton Street extension (private street), private roadways connecting the parking area to Grafton Street and a private driveway along the western edge of the site that will extend southward from the Dublin Blvd.-Brannigan Street intersection will be constructed as part of Phase 1 to service the Lowe's facility. Grafton Street improvements, including curb and gutter as well as the median and traffic circle, will be completed in Phase 1. This approach is based upon the existence of, or ability to connect to, needed water, sanitary, and storm facilities and other infrastructure and roadway connections. Phasing and development timing of the remainder of the project will depend largely upon market demand. Tentatively, Phase 2 will include a large retail pad(s) within the northwestern portion of the site, as well as a parking lot to the east of the building(s). The smaller Conventional Retail pads along Dublin Blvd. and Grafton Street will comprise the third and final phase. It is anticipated that most, if not all, bulk site grading within the Project Area would be done with the initial development phase. I I I I Sanitary, water, and recycled water services will be provided by the Dublin San Ramon Services District (DSRSD) in accordance with their Facilities Master Plans. Final locations and sizing of these facilities will be determined in conjunction with the recommendations of the DSRSD Facilities Master Plan. I Ownership and Maintenance of Open Space and Pedestrian Areas A property owner's association (POA) will be created to maintain the common area improvements including Grafton Street and various private driveways, sidewalks, plazas, paseos and open space areas. Additional details regarding ownership and maintenance of Project Area elements are described in the Landscape Design Guidelines. Responsibilities for maintenance of landscape and open space elements, street and pedestrian areas will be in accordance with the following table: I I Feature Owner Maintenance Responsibility Right-of-way Landscaping City POA (curb to ROW line)-Dublin Blvd. Median and associated Landscaping in City City Dublin Blvd. Sidewalks along Dublin Blvd. City POA Sidewalks along Grafton Street POA POA Traffic Circles, Medians and POA POA Associated Pavement/Landscape Areas I I I Stage II Development PlanIPlanned Development Rezone. Project Description. Page 5 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 I '16 I in Private Streets ROW within Project Area Landscaping along Grafton St. POA POA Landscaping/W alkways within POA POA Common Area Parcels, outside of Street ROW Landscaping on Individual Parcels Individual Property Individual Property Owner Owner I I Hazardous Waste Analysis A Phase 1 and 2 Environmental Site Assessment of the Project Area and surrounding areas has been conducted by Berlogar Geotechnical Consultants (dated 9/25/97) to determine the presence of any hazardous waste and substance sites. The findings of these studies indicated that no problems were found. In addition, an environmental records search was conducted by Berlogar to determine if the site was included on a list of hazardous waste and substances areas. The results of this search indicated that neither the Project Area nor any areas within a two-mile radius of the site are listed as a hazardous site, hazardous material generator or transporter, or known to have underground storage tank leaks. A copy of the Environmental Site Assessment report is included in Appendix D. I I I Benefits and Costs of the Project upon the City This project will allow the construction of 318,000 square feet of commercial uses. Some of these new retail uses will serve residents of Dublin Ranch, including nearby Areas F and G, while other uses will draw consumers from other locations within the City of Dublin as well as nearby communities. This will substantially increase sales and property tax revenue for the City of Dublin. I I The developer would pay for all infrastructure and capital facility costs required for development of the proposed project as development proceeds. As is typical of development requirements in Dublin, property owners/project proponents would dedicate land required for roads; construct roads; and contribute funds as required through the City's Traffic Impact Fee program, as required. Along with this, normal expenditures for City services (fire, police, recreation, general administration, etc.) would be compensated by the development through required fees and property tax revenues. It is anticipated that property tax revenues, along with increased local sales tax attributable to the Project, will cover or exceed the public service costs. I I I I I I I I Stage II Development PlanIPlanned Development Rezone' Project Description. Page 6 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 I '1~ I Findings Statement I for I GRAFTON STATION AT DUBLIN RANCH AREA H I Will the proposal be harmonious and compatible with existing and fUture development in the surrounding area? I Development of the Project Area will be harmonious and compatible with eXIstmg and future development in the surrounding area. The policies and goals of the Eastern Dublin Specific Plan and General Plan will ensure that this project will be compatible both in terms of land use and physical design with adjacent development. Proposed land uses will follow the intent of and be consistent with those uses provided for in the permitted and conditional uses included in this Stage II PD Rezone submittal, the City of Dublin Zoning Ordinance and Eastern Dublin Specific Plan. I I Is the site physically suitable for the type and intensity of the zoning district being proposed? I The Project Area is physically suitable for the type of commercial development proposed. The site is generally level and without tree cover and is thus well suited to large commercial uses. This project's proposed land use plan is consistent with that indicated in the General Plan and Eastern Dublin Specific Plan. The project will mitigate impacts on the environment, including wildlife and its habitat. All applicable local, state and federal regulations concerning the protection of these elements will be adhered to. I I Will the proposal adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare? I The project will not adversely affect the health or safety of persons residing or working in the vicinity, or be detrimental to the public health, safety and welfare for numerous reasons. No uses that produce noxious odors, hazardous materials, or excessive noise are permitted. I The Army Corps of Engineers wetland fill permit (issued May 23, 2003) and the Water Quality Certification from the California Water Quality Control Board (issued April 22, 2003) for the balance of the Dublin Ranch holdings and their associated mitigation requirements cover the Project Site. The permits specifically address mitigation for all existing on-site environmental features and allow the proposed development to proceed. No major faults are located under the Project Site. Based on the letter from the Federal Emergency Management Agency (dated August 27,2004), the Project Site is no longer within the 100-year floodplain, as the site has been raised to at least one foot above the 1% Annual Chance Flood Elevation. I I All traffic impacts of the Project that might affect the public, health, safety or welfare will be analyzed and mitigated. I Is the proposal consistent with all elements of the General Plan and any applicable Specific Plans of the City of Dublin? I Stage II Development PlanIPlanned Development Rezone' Findings Statement. Page 1 I I Grafton Station at Dublin Ranch - Area H . Julv 2006 '11 I As noted previously, the Project is consistent with the elements, goals and policies of the Dublin General Plan and the Eastern Dublin Specific Plan. I How does this project satisfY the purpose and intent of a "Planned Development"? I This project satisfies the purpose and intent of a "Plarmed Development" by establishing a zoning district wherein: I . Unifying landscape and architectural treatments and elements link the Project Area and the Village Center (Area G). · The high density residential units of Area G are buffered from views of the parking lots by the attractively designed buildings and landscape screening that address Dublin Boulevard. · The large General Commercial buildings and the smaller Conventional Retail and Commercial pads are linked by internal pedestrian cormections, while still permitting views across the site of the nearby hills. · Truck traffic patterns are designed to avoid any future residential area(s) and the conventional retail/commercial streetscape along the Grafton Street extension while still serving the needs of the retail tenants. I I I I I I I I I I I I I Stage II Development PlanIPlarmed Development Rezone. Findings Statement. Page 2 I I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch . July 2006 q~ Permitted, Conditional, and Temporary land Uses for GRAFTON STATION AT DUBLIN RANCH Planned Development District and Development Plan 1. PO General Commercial (Specifically applies to large scale Big Box Retail Uses) Permitted Uses: a. Regionally-oriented, high volume, retail uses including but not limited to: Discount Center Factory Store Furniture Outlet Home Improvement Center Promotional Center b. Community-serving retail uses including but not limited to: Appliance Store (less than 5,000 square feet) Auto Parts Book Store Clothing! Apparel/Accessories Drug Store Electronics/Computers General Merchandise Store Grocery/Food Store Hardware Store (Less than 5,000 Square Feet) Hobby Shop Home Furnishings Pet Supplies Shoe Store Sporting Goods Stationary and Office Supplies Toy Store Other Retail Uses automatically permitted in the C-l District c. Service uses including but not limited to: Permitted, Conditional and Temporary Land Uses. Page I of7 I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch. July 2006 0'1 Bank, Savings and Loan and Other Financial Institutions Barber/Beauty Shop/Nail Salon Copying and Printing Dry Cleaner (No plant permitted on premises) Formal Wear - Rental Locksmith Photographic Studio Real EstatefTitle Office Shoe Repair Tailor Travel Agency Watch and Clock Repair d. Eating, drinking and entertainment establishments including but not limited to: Bagel Shop/Bakery Bar/Cocktail Lounge Cafe Coffee House Delicatessen Ice Cream/Y ogurt Micro-Brewery Restaurant - Full Service, Sit-Down And Take-Out permitted - Outdoor Dining permitted * - Drive-Through not permitted Theater - Indoor (including Dinner, Live Play, etc.) Conditional Uses: Animal Sales and Services (PC) Attached Dwellings at densities established for the Medium, Medium High and High Density land use designations (PC)** Dance Floor (ZA) Day Care Center (PC) Drive-Through/Drive-In Facility (PC) Hotel and Motel (PC) Public/Semi-Public Facilities (PC) Retail- Outdoor Storage (PC) Recreational Facility/Indoor (ZA) Permitted, Conditional and Temporary Land Uses. Page 2 of7 I I I II I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch . July 2006 100 Other uses which could meet the intent of the General Commercial land use designation as determined by the Community Development Director Temporary Uses: Arts and Crafts Fair Christmas Tree Sales Farmers'Market Festival/Street Fair Sidewalk Sales Parking Lot Sales Temporary Construction Trailer Permitted, Conditional and Temporary Land Uses. Page 3 of7 I I 2. I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch. July 2006 10 \ PD General Commercial (Specifically applies to Conventional Retail and Commercial Uses) Permitted Uses: a. Local-serving retail uses including but not limited to: Art Gallery/Supply Store Auto Parts Bakery Bicycle Shop Book Store Clothing! Apparel/ Accessories Store ComputerslElectronic Equipment Drug Store Floor Coverings FloristJPlant Shop Gift Shop Hardware (Less Than 5,000 Square Feet) Hobby Shop Home Furnishings Home Appliances (Less Than 5,000 Square Feet) Jewelry Store Liquor Store Music Store Newspapers and Magazines Paint, Glass and Wallpaper Store (Less Than 5,000 Square Feet) Party Supplies Pet Store and Supplies Photographic Supply Store Picture Framing Shop Shoe Store Specialty Food/Grocery/Supermarket Store including Meat, Fish, Wine, Candy, Health Food, etc. Permitted, Conditional and Temporary Land Uses . Page 4 of 7 I I I I I b. I I I ! I I I I I I I I I I I Grafton Station at Dublin Ranch . July 2006 ID~ Specialty Goods including Cooking Supplies, Housewares, Linen, Window Coverings, China/Glassware, etc. Sporting Goods Stationary/Office Supplies Toy Store Variety Store Business/professional offices and service establishments including but not limited to: Administrative Office (for second story occupancy only) Bank, Savings and Loan And Other Financial Institutions BarberlBeauty ShoplNail Salon Copying and Printing Dry Cleaner (No plant permitted on premises) Employment Agency Formal WearlRental In-Patient and Out-Patient Health Facilities as licensed by State Development of Health Services (for second story occupancy only) Locksmith Medical Clinic Photographic Studio Professional Offices including: Accounting, Architectural, Dental, Engineering, Legal, Medical, Optometric, etc. Real EstatelTitle Office Shoe Repair Tailor Technology Access Center Tele-Commuting Center Travel Agency Watch And Clock Repair Permitted, Conditional and Temporary Land Uses. Page 5 of7 I I Grafton Station at Dublin Ranch. July 2006 I I I I I I I 103 c. Eating, drinking and entertainment establishments including but not limited to: BagelShopnBakery Bar/Cocktail Lounge Cafe Coffee House Delicatessen/Sandwich Shop Ice CreamIY ogurt Micro-Brewery Restaurant - Full Service, Sit-Down and Takeout permitted - Outdoor Seating permitted* - Serving alcohol permitted - Drive-Through not permitted Theater - Indoor (including dinner, movie, live play, etc.) Video Store Conditional Uses: Administrative Office (CUP required for first floor occupancy) (PC) Attached Dwellings at densities established for the Medium, Medium High and High Density Land Use Designation (PC)** Animal Sales and Services (PC) Community Center (PC) Dance Floor (ZA) Day Care Center (PC) Drive Through/Drive In Facility (PC) Hotel/Motel (PC) In-Patient and Out-Patient Health Facilities as licensed by State Development of Health Services (CUP required for first floor occupancy) (ZA) Lodge Hall Recreational Facility - Commercial or Public (PC) Public/Semi-Public Facilities (PC) Recreational Facility - Indoor (ZA) Video Arcade (ZA) I I I I I I I I I I Permitted, Conditional and Temporary Land Uses . Page 6 of? I I Grafton Station at Dublin Ranch . July 2006 10'1' Other uses that could meet the intent of the Neighborhood Commercial land use designation as determined by the Community Development Director I I I I I I I I I I I Temporary Uses: Arts and Crafts Fair Carnival Christmas Tree Sales Farmers' Market Festival/Street Fair Parking Lot Sales Sidewalk Sale Temporary Construction Trailer KeylDecision Maker Authority: Zoning Administrator - ZA Planning Commission - PC I I I I I I Notes: * Outdoor dining requires Site Development Review approval by the City of Dublin ** Residential use per the Eastern Dublin Specific Plan may be allowed as a Conditional Use if the following conditions are met: If the established traffic levels of service are not exceeded. Appropriate traffic study(s) may be required to make the proper determination regarding traffic levels of service. That the project is consistent with the intent of the Specific Plan and does not result in adverse environmental or service impacts. Residential uses may not occupy more than 50% of the developed area. Residential use is only permitted on the 10.5 acre portion of the Project Area which has a designation of General CommerciaVCampus Office. Permitted, Conditional and Temporary Land Uses · Page 7 of7 LEGEND: LAND USE SUMMARY i I I I I I I I I I I I I I I I r--- \ : , I , I , I , I , I \ : \ I , I , I \ I , I \ I GC General Commercial CO Carnpus Office GC General Commercial VC Village Commercial H High Density Residential LAnd Use ~ Gron Ac." FAR GamI---c.-::..,;,t Ar1ctu'A' )22 )26 .254 Pad'N } } } Pad'B Pod'C.!, CAMPUS OFFICE Pod 'C.X 146 )66 .246 Pad'D Pad'!',.)' (CO) Pad '!',.X Tolal 26.. -- 29.2 0.25 CAMPUS OFFICE (~O) S(IlD~ Fnl CAf"IOI'OL) 139,410 118,830 13.500 21.1f:IJ 6.OCXJ ..OCXJ 5.OCXJ 5.OCXJ JJS.l6O (JI8,lMM);j:) _ _ _ _ Limit of Stage 2 PD Project Area Retaining Wall NOTES: VILLAGE COMMERCIAL (VC 5) . QroS."l acn:a~ i'l rreasm:d 10 ceBer Iile of ~Vcohlor strms. I. Proposed building envelopes for Pads as shown on this . exhibit are conceptual only and are intended to provide an adequate area within which to locate a building footprint(s) on each Pad, based on the maximum allowable square footage for a particular Pad. 2. A maxirnum of318,000 S.F. Is allowed forthe Graflon Station project as shown on this plan. Modifications to the amount of square footage allocated to proposed uses and buildings on specific Pad sites may be made at the Site Development Review stage so long as the total amount of square feet for the Project Area does not exceed 318,000 SF. 3.The maximurn FAR noted in the Land Use Sumrnary table is for the overall Grafton Station Project Area. The FAR on an individual parcel(s) may exceed the .25 , threshold as long as the average FAR for the Project Area does not exceed the .25 FAR maximum limit. 4.0ff-street parking spaces within the Project Area will be subject to a reciprocal parking easement between all affected property owners. Based on this, all parking spaces required for an individual building/use are not required to be provided on the parcel on which the building/use is located. { /1 1"-'7 / 'I 1!Jt p-'- ~(< )",,) J] 0lf I r---i-.....--.r' ':f>( ~ I I [ ( LAt:JDSDO~ 1\ \ c: ~~::1 ~CAcE-- uGO U I I rJj a:,( J J ~"'18Im~~ 10 I'~ F ,,0 r~ . ~I ffi ~~H DENSI, ~I ~ tSIDENTI JJi dLIK (H1) - -7) j t .-:A n ---J ~ ~~ ! BRANNIGAN STREET On PD REZONE AREA BOUNDARY GENERAL COMMERCIAL (GC) 7-,}-2006 06,34,57 ploltiver P;\ 160J" -1..LCC\p&onning\SI~2po\ US-POI SIOCje2D-elopmenIF'lon.dwg l:nAFTIIN m STi\TIIIN A T DUBLIN RANCH Dublin, California AREA H REV I S DESCRIPTION' CITY SUBMmAL CITY RE-SUBMmAL ClTY RE-SUBMITT At ION S: DATE 3115106 5/10106 7116106 PROJECT NUMBER: SCALE: DATE ISSUED: 16034.13 AS NOTED MARCil 2006 STAGE 2 PLANNED DEVELOPMENT REZONE STAGE 2 DEVELOPMENT PLAN . HOATH 0' 30' 60' 120' mAClCAl. som,s CPA. [HCIH[[RttotC_u.ND Pl>>HNC.uHD Sl.Rv'OlNC PltASANTON. CA 9-4581 (92~) 2~-0690 SIIEET NUMBEIt PD-l .,~-,-- r --' \ ('-.,t'.- ......~_..- ~ ~<4~ I 1"~'1 ...".-:u:s~\ : I 'J;~:>.t ,.../ \,..~ / ..-_oJ",,, "a....... ..~'I:.'! ..)U.J . '4~J. :;.4'1:.6. . :W4.:? ~1u., --".---'-----.""~ , A 3:":;-" '::'.1 ~ ' /----~,...\ /' - \ / /--.....~ - /./ , ... ..--," i ,---" ,/' ,.". ) / / /' .J..'; .:Jo!~<! i (_ \ \ \ \ .:!"~ \ , J.3.F :;0111.... :k-':J ~ . j~'3 \ 1 \ ..~J.oli )<tJ~ ,-" I \ I ~ '.:olI5.f ! .1..<~~. .~,t- ) / /" <" ';<''\E J.'" '\' 'C: r, ( \ )J':Ul f ! /') ///" /.....J4.t.9- jt.,!$.. MIlicH !:!.N~ -- ,/ ( ::0.:. { ..J DRAINAGE SWALE ".' i ,,':j~ r .. :.\.o<~.t .~oli~ @ . Manhole Catch Basin Retaining Wall Direction ofFJow Top of Curb Lip of gutter elevation Top of Wall Bottom of Wall Curb & Gut1er Grade Break Top of Gutter CullFiII Areas TC LIP 1W BW C&G GB TG . J4t.ii i i i I \ Ul.l. \ Vh1 .~...'t NOTE: I otherwise noted. . vement elevations un ess I. All elevations are pa / -' 1. _ '1006 Q7;OO:,lo4 ptollinr P02Prt'limCrodingE.hNorthSec.dwg plonnintj\S'0<j<2PO\YS- P\'60J4-lJ_CC\ ~STATlIIN GIIAFTIIN~" A T DUB~~c H STAGE 2 PLANNED DEVELOPMENT REZONE PRELIMINARY GRADING EXHIBIT NORTH SECTION * HOATH 0' 50' 100' 25' IIA~~~~!~~ ~~Ofol, CA. 94588 SllEET NUMBER: PD-2 ."~"i //./. fX1 t:::::l\ Ml (:fj: f:JJ1 f1;/ ! W I' RETAINING WAl!;:" ~D 0 o .:l::",;;." .:;":!<i.* .~. "" /' / L ....!J!.. MATCH LINE ) i ! \ \. \ \ ~s ~:; ., / i I LEGEND: CIIAFTON m STATIIIN @ Manhole . Catch Basin Retaining Wall _._---~ Direction of Flow TC Top of Curb UP Lip of Gutter Elevation TW Top of Wall BW Bonom of Wall C&G Curb &. Guner OB Grade Break TO Top of Guner V~ CutlFill Areas A r DUBLIN RANCH Dublin, California AREAH NOTE: I. All elevations are pavement elevations unless noted otherwise i i R E V I S I 0 N s: . )~::.fi . :J~';':'\ DESCRIPTION DATE CITY SUBMITTAL 3/15106 cm RE-SUBMITTAL 5/1 0106 cm RE-SUBMITTAL 7/16106 . ':-4!l' .,~,,~ +\ ! ! J.~-7-- j I ! . -::~::.6 PROJECT NUMBER: SCALE: DATE ISSUED: 16034-13 AS NOTED MARCil 2006 ; ! ; ! (/i Ii! l \ ~ \ \ \ \ STAGE 2 PLANNED DEVELOPMENT REZONE PRELIMINARY GRADING EXHIBIT SOUTH SECTION ~ 0' 25' SO' 100' DIIeICAY. som,s CN\. [NCN[[RtNC.l.ANO P\ANNlNC..u.ND SURVE'rtNG P\..EASN(FON. CA.. ~saa (92~) 22~-0690 STATE OF CALIFORNIA SLOPE & DRAINAGE EASEMENT 7 . ,i-2006 06:.39:42 p(oll~er P;\ 16QJ4-1J_CC\plonning\Sloge2PO\YS-POJPrelimCrodingE.hSoulhSec:.dwg slim NUMBER: PD-3 , \ \ \ \ \ )----- / LEGEND: ......... Pedestrian Circulation .......... Vehicular Circulation _ . . _ Limit of Stage 2 Planned Development Rezone Area , .. 1.' : '\ ,:' . . . . . , . : \ : . . . . . . : '\ : h~ i \ ~ ! , I ii i i i .~...........,fl~ ':;:::;.:::.:f' 'I' : , . , , , , . '., i , , I i 'A Ii , . , i +:/ : , . . . , , . : I : . . , , . . : /' : . , , . . . :,' : , , , , . , . , , : I : I , . , . , : I' : _.... I " . : ',: I' , " I ! ;: i ! ' ~ : .' .. I. I :r::~ll__... ... ........ .... ..................... .....11::. ...... ............ ..... ................. ............~. -....... .... . ....~..... \ . BRANN IGAN STREET ' _~~:~ .. ..~>L~='::= :=._.=.::= :.=.:=.::=:.=._..... ::=: .=._'=-.:::=:::::::::::;.,...I...~~::::: .=.::::-.:::::: .=.-.:::-.::::: :.=.::::-.: :::::~...-.:::-.: :::::.= .-.:::-.: :::::.::::: .-.=~....... - - - - - ---1--:.. ....;..~ ....t....'-.................................................................................. 1.* .. . ~Iml "l 1 1 ~r17 \.~-:-.. ~r~ ~ l-j -,I ~ u :t -~ ~ '-., --.:;:: !- f- In 'r- I , I , j , I I I I I , I , I D c ANCHOR 'A' LOWES HOME IMPROVEMENT WAREHOUSE 139,410 S.F. PAC 'A' 11 ,830 S.F. -"-T ~ j 1-12-2006 06:.0:.2 ,,011_ P:\ 16034- 1J_CC\plonnlnQ\SIOQ.2PlI\IIS-Po.V",'c:uIo, -Pod C1,""ollon.do<j i , I I I , I \ rm \ ! \ , \ I , " I ' I I I I I , I I I , I , I , I I I I I , I I I I I , I I I , / , I ~ j ~ , I I I I I I , I / , I I I I CRAFTON 1m STATION AT DuBLIN IAIICIl Dublin, California AREA H REV I S ION S: DIlSCIIPJlDl{ DA'11I atY BUBMnTAL W.4l6 an' I!-SllBMIlTAL S/llW6 atYDmllMIITAL 7nMl6 PB.OJl!Cl'NUMBlll: 8CALB: DA'l1UllSllED: lS1)4.U AlI~ YA1C12006 STAGE 2 PLANNED DEVELOPMENT REZONE VEHICULAR AND PEDESTRIAN CIRCULA TION PLAN ~ 0' 30' 50' 120' IlAllCAYl... CMl. (NQN[[lJNc..&JIrrI) PLNI..c-u.wo su~c PLL\<4NtON. CA. 04&88 (US) US-DOlO SIIEEl' NlJMIIIlI; PD-4 , VARIES VARIES IZ'MIN. 12' 12' /2' 12' 12' VARIES IZ'MIN. 12' /2' 8' /2' 12' VARIES SIDEWALK TRAVEL TRAVEL TRAVEL TRAVEL TRAVEL SIDEWALK SIDEWALK TRAVEL TRAVEL TRAVEL TRAVEL SIDEWALK LANE LANE FC FC LANE LANE LANE LANE LANE FC FC LANE LANDSCAPED MEDIAN LANDSCAPED MEDIAN G8' 5G' FC Section FC FC Section 2 FC ~ ct I , IiLla ~ - VARIES IZ'MIN. 21.5':!:: . SIDEWALK 450DIAGONAL PARKING 13' /3' TRAVEL TRAVEL LANE 2G' LANE 2 I .5':!:: VARIES 450DIAGONAL SIDEWALK PARKING VARIES I 2' SIDEWALK TRAVEL LANE 1 G' VARIES TRAVEL SIDEWALK LANE LANDSCAf'ED MEDIAN G9':!:: 48' FC FC FC FC Section 3 Section 4 -...wa 06:41:18 ploll~r P:\ l6OJ4-IJ_C(.\pIonninq\Sloge2PD\US-P05-P06Slreet-Site Cross Se<:tions.dwq SECTION KEY N.T.5 Legend ~ Section Number Jtii ~ VARIES I 2' I 2' VARIES SIDEWALK TRAVEL TRAVEL SIDEWAlK LANE 24' LANE FC FC Section 5 I:IIAFTIIN m ST/\TIIIN AT DUBLIN RANCH Dublin, California AREA H REV I S ION S: DESCRIPTION DATE CITY SUBMmAL 3115106 CITY RE-SUBMmAL 5/10106 DTY RE-SUBMlIT AL 7/16106 PROJECT NUMBER: SCALE: DATE ISSUED: 16034.13 AS NOTED MARCil 2006 STAGE 2 PLANNED DEVELOPMENT REZONE STREET/SITE CROSS SECTIONS * "tORT"" 0' 5' 10' 20' IDACICAY &: SOIDPS ClVt. [NCIN[(RaHC.lAHO PlNNt<<:..u.HO 9JM:'nHG PlLASNfTOH. CA. 9-4SM ('2~) ~-0690 SI IEET NUMBER: PD-5 . .. t 20' 18' PARKING STALL 14.5'+ PLANTER ISLAND IS' TRAVEL LANE IS' TRAVEL LANE 14.5':,:: PLANTER ISLAND 18' PARKING STALL 30' FC FC FC C Section G It I I I I I I I I I I I I I ct I I I I I LOWE'S BUILDING 23.G'+ VARIES CONCRETE APRON 17.5' TRAVEL LANE 17.5' TRAVEL LANE 35' FC FC GO':,:: Section 7 -4.W,) 06:41:18 plollive-r P:\ 160J.-1J_Ct\p$onning\St~2PO\US-P05-PD6Str~t-Site Cross Sections.dwq t ~-2a-- ill (TYr.) ~ {;' CURll / 2'" 5tN1 RI>N ,~ VERTICAl 3' UP CURll \ / '0 VERTICAl C1JR6 30 UP I / 2'" {;' CURll f 1_ RI>N RA/5fD CONe. lANDSCAPED CONe. APRON ISlAND APRON Grafton Street Traffic Circle Detail nt, It I . I I ct I I I I I RETAINING WALL 17.5' TRAVEL LANE 17.5' TRAVEL LANE V ARIES DISTANCE TO FUTURE BLDGS 35' FC C Section 8 <$ 9 ~, "';~ '1 .) :G-q SECTION KEY N.r.5. Legend ~ Section Number FC FC Section 10 ~ ! I: IIAFTlIN m HATIIIN A T DUBLIN RANCH Dublin, California AREAH REV I S ION S: DESCRlI'TION DATE CITY SUBMITTAL 3115106 cm RE-SUBMIIT At 5/10106 em RE-SUBMITTAL 7/16106 PROJECT NUMBER: SCALE: DATE ISSUED: 16034-13 AS NOTED MARCil 2006 STAGE 2 PLANNED DEVELOPMENT REZONE STREET/SITE CROSS SECTIONS ~ ....O...TN 0' 5' 10' 20' lDIeDY & som,s CI\It.. [NClNHRIt<<;_LAND PlANNlNC-lN'lO SUR'YE"l1HG Pl.EASANTON. CA. g.t588 (92~) 22~-0690 SIlEET NUMBER: PD-6 I I I I I I I I I I I I I I I I I I I I \ \ GRAFTON STATION AT DUBLIN RANCH AREA "H" DESIGN STANDARDS I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 1, 12- TABLE OF CONTENTS SECTION I: PLANNING & SITE DESIGN STANDARDS SECTION II: ARCHITECTURAL DESIGN STANDARDS SECTION III: COLOR AND MATERIAL GUIDELINES SECTION IV: LANDSCAPE DESIGN GUIDELINES SECTION V: SIGNAGE DESIGN GUIDELINES APPENDIX I: ARCHITECTURAL STYLE GUIDELINES Planning & Site Design Standards I Grafton Station at Dublin Ranch. July 2006 it.., I I I SECTION I: PLANNING & SITE DEVELOPMENT STANDARDS I 1. SITE DEVELOPMENT REVIEW (SDR) I 2. COMMUNITY DESIGN CONCEPT STATEMENT & GOALS I 3. GRAFTON STATION RETAIL CENTER 4. CONVENTIONAL RETAIL AND I COMMERCIAL DEVELOPMENT 5. GENERAL COMMERCIAL (BIG BOX) I DEVELOPMENT 6. GRAFTON STATION SITE I DEVELOPMENT STANDARDS 7. SITE DEVELOPMENT CONCEPT I 8. GRAFTON STATION CONCEPTUAL SITE DEVELOPMENT EXHIBIT I I I I I I I I I - 1 Planning & Site Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 [I + SECTION I. PlANNING & SITE DESIGN STANDARDS 1 . SITE DEVELOPMENT REVIEW (SDR) These Design Standards are intended to provide the necessary framework for the development of a future Site Development Review (SDR) submittal(s) to the City of Dublin for the Grafton Station Project, either for the overall Project Area or for separate development projects on individual pad sites. While the theme and character for Grafton Station has been defined to promote an attractive and harmonious environment providing continuity throughout Grafton Street and adjacent streets which make up the General and Village Commercial areas, the SDR will resolve detailed issues related to the specifics of the design. It is intended that this SDR process would encompass all sidewalk and landscaped areas between the back of curb and the building face along Grafton Street and Dublin Boulevard as well as the paseos, plazas, parking, private streets and drives and other landscaped areas within the Project Area. Details that will be developed further in the SDR include such items as the selection of specific paving materials, locations and patterns, street furniture and accessories, entry monuments, sculptural elements, planting areas and ownership/maintenance program. Refer to the Grafton Station Conceptual Site Development Exhibit for additional information regarding development boundaries and limits and location of specific project elements. Refer also to Section II for Architectural Design Standards, Section III for Color and Material Guidelines, Section IV for Landscape Guidelines and Section V for Signage Design Guidelines. 1- 2 Planning & Site Design Standards I I 2. I I I I I I I I I I I I I I I I 'I Grafton Station at Dublin Ranch · July 2006 116 COMMUNITY DESIGN CONCEPT STATEMENT & GOALS Grafton Station is envisioned as an extension of the Village Center commercial development along Grafton Street south of Dublin Blvd. As such, it also proposes to continue selected elements of the design theme established in Area "G" by the Village Center (now known as The Promenade at Dublin Ranch) along Grafton Street north of Dublin Blvd. We therefore continue to draw upon the small towns of the Tri-Valley area for the inspiration of the architecture and the small town community theme we seek to establish in Grafton Station. In addition, the Grafton Station design concept incorporates General Commercial uses, which are in keeping with the Eastern Dublin Specific Plan. Such towns were found throughout Central and Northern California serving the surrounding farms and ranches. These towns provided the opportunity of a fulfilled life for the community with the necessary shopping, housing, entertainment, education, religious and medical services, as well as being the focal point for transportation and civic needs of the local residents. The unique sense of place was nurtured and achieved through a rich and varied architectural character developed over time, based upon the local history of the communities. Today the "Main Streets" of some of these towns continue to draw people from the surrounding larger, more modern urban and suburban commercial developments because their pedestrian-oriented character and small town scale offer more than just necessary services. They provide a needed simplicity coupled with a greater sense of community, which people seek today, just as they did a century ago. The visual elements of these "Main Streets" appeal to both the people of the past and present because they helped create a place with a sense of history in a community environment in which people want to participate in, be part of and simply enjoy. It is possible to identify many of the design elements which help create the "Main Street" visual character. While the successful development of Grafton Station depends on many considerations beyond the built environment, the implementation of these standards and guidelines will help to provide an initial step in creating the physical environment in which the retail development will live and thrive within the community it serves. 1- 3 Planning & Site Design Standards I I Grafton Station at Dublin Ranch · July 2006 I \ l.o 3. GRAFTON STATION RETAIL CENTER I I Introduction: I I The Grafton Station Retail Center is located within Area H south of Dublin Blvd. at Grafton Street and is a continuation of the Village Center to the north, which consists of Grafton Street Retail, Commercial and the Residential Mixed-Use areas north of Dublin Blvd. Adjacent future development to the east is currently slated for Campus Office uses, however, an alternative mixed use development containing residential, commercial and office elements may be proposed at that location. While some of the components in this area are different in building type, activity and scale, it is the goal to have development along Grafton Street south of Dublin Blvd. feel as a physical continuation of the Village Center north of Dublin Blvd., but with its own distinct identity as a retail destination. I These Standards include a description of design objectives and stylistic analogs to be incorporated into the overall architectural concept for Grafton Station. I I I Grafton Station "Main Street" Character: I I I I Grafton Station consists of two general types of commercial activities: Conventional Retail and Commercial development, which would typically be characterized by small scale stores, shops, offices, branch banks, restaurants, etc, and General Commercial development, consisting of large scale Big Box Retail uses. The goal is to maintain the feel of the small town pedestrian-oriented "Main Street" retail environment for both types and scales of retail activity within Grafton Station. The elements that typically define the "Main Street" character are: Building Fac;:ade Forms, Details and Massing Entrances and Store Front Details Walkways and Paving Materials Streetscape Elements and lighting Landscape Elements Street Parking Color and Materials Graphics and Signage Utility and Service Locations and Access I I These components are fundamental to the creation of a successful "Main Street". They must each be addressed in regard to design, location, scale and use. I II I 1- 4 Planning & Site Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 111 4. CONVENTIONAL RETAIL AND COMMERCIAL DEVELOPMENT Building Fa~ade, Forms Details and Massing is the primary means to establishing the street character. The individual building with the design elements of walls, columns, pilasters, fenestration, overhead shade structures, colonnades and roof forms can be addressed in one of two ways; as a total building concept or as a collection of concepts woven into a composition to make a complete building appear to be several buildings connected together and possibly developed and adapted over time. Either approach is acceptable. The choice should be made in part based on the concept of single or multiple users as well as the overall scale and size of the building. Material and Color selections and applications shall be applied to reinforce a building form, wall mass, an individual detail or a collection of design elements. The location of materials should also determine material selections and application for their durability in daily exposure to pedestrian activity and environmental conditions. Materials should be chosen for being pedestrian friendly and in keeping with the character of the Architectural Style (Refer to the Architectural Styles Guidelines - Appendix I for additional information). Refer to Section III for Color and Material Guidelines information. Storefront and Entries shall be treated differently to reinforce the entrance by recessing the doorways to prevent conflict with pedestrian traffic with doors opening or closing. Sliding doors are not permitted along Grafton Street unless used as a storefront to completely open a store fac;:ade to the street and remain in a fixed open position during business operation. Entry doors may be automatic or manually operated. Storefront design shall be varied from store to store or based on a building concept. Variety is desired over monotony or overly repetitive patterns and window design. Four-sided architecture is required. The side and rear facades of buildings in Grafton Station will be actively used, therefore, they should have an appearance similar to a "front" in regard to doors, windows, etc. Although the architectural treatment may be simplified and vary according to function, these elevations should remain consistent through style, use of materials, colors and details. Street Design Elements: Street Character beyond the building edge is developed from streetscape elements, such as walkway patterns and materials, furniture, lighting, signage, landscaping, parking, service access and utilities location. The following is a brief overview and discussion of design considerations. Refer to Section IV - Landscape Design Guidelines and to Section V - Signage Design Guidelines for additional requirements. Walkway patterns, color and/or materials shall be varied and used to denote entry locations, special use areas, edges, and street crossings and to help create a sense of scale and interest in the pedestrian pathway. Minimum walkway width shall be not less than 12 feet. Encroachments may occur within this area, but shall not create a clear walking area less than 8 feet minimum width. 1- 5 Planning & Site Design Standards I I I I Grafton Station at Dublin Ranch · July 2006 Il<is Street Furniture shall be planned for and space provided for seating, outdoor dining, information kiosks, bicycle racks, trash receptacles, clocks, newsstands or vending boxes, postal boxes and traffic bollards. A detailed plan showing locations for these elements is required at the time of submittal of specific site plans for Site Development Review of building development proposals. I I I Lighting shall be provided for general walkway areas, paseos, plazas, courtyards, landscape accents, storefront displays and entryways, and for building accents. lighting fixtures should be designed for their specific purposes and may be wall mounted, pole mounted, light bollards, recessed or suspended as appropriate. Uniformity of design style or character is not required on the buildings but standard streetlights shall generally match the design character, mounting heights and spacing established in the Village Center portion of Grafton Street (Area "G"). Signage shall conform to City ordinances and the Signage requirements set forth in Section V - Signage Design Guidelines". I I I I I Landscape Elements may occur in several ways; street trees in tree wells protected with metal tree well grates, planter boxes of various sizes and shapes, raised planters or planter areas at grade. Overhead trellis structures, hanging plants or arbors are allowable so long as minimum clearances are maintained in the pedestrian walkway areas. Wall trellises for planting support is also acceptable for vine pockets at buildings. Refer to Section IV for Landscape Design Guidelines information. Street Parking on Grafton Street may be parallel or angled parking where appropriate. On-street parking allows for the convenience of short-term stops for shoppers as well as providing a sense of an older, traditional "Main Street" and will help act as a traffic-calming element as cars transition from Dublin Blvd. into the main parking area off Grafton Street. On-Street Parking shall be maintained as a free parking zone (not metered) with a 45 min. time limit. I I Utility, Mechanical, and Service Locations and Access shall be coordinated and located to not be visually intrusive or obstruct pedestrian activity. These elements shall not be located immediately adjacent to either Dublin Blvd. or Grafton Street and must be adequately screened from public view. Where feasible, utilities shall be enclosed in closets, rooms, wells, or screened from view by walls or landscaping. I I I I I Service access for the freestanding retail buildings on Grafton Street shall be located at secondary elevations or at ends of buildings whenever feasible. Alternate locations for access may occur from the parking lot side of the building with service entries integrated into the overall character of the buildings but distinctly separated and screened from the business entries. The preferred location for trash facilities is to integrate them into the building design such that they shall be secured and screened from public access and view. Trash facilities shall conform to the current City Ordinances and water quality treatment 1- 6 Planning & Site Design Standards I I Grafton Station at Dublin Ranch · July 2006 Il~ I I I I I regulations. Where it is necessary for trash facilities to be freestanding elements, they shall be located on the parking plan layout with proposed screening elements noted. Mechanical systems for retail buildings shall be screened and secured from pedestrian view and access and meet current City Ordinances. Fire safety equipment shall be located in coordination with the local Fire jurisdiction and code requirements. Locations of equipment shall not conflict with public walkways and access. Architectural Styles: Historical references to Architectural Styles or detailing may be used, but contemporary interpretations of styles or modern contemporary design are acceptable. The successful design composition incorporates the proper use and application of materials, color theory, proportion and human scale, program function, engineering and construction practices. The end goal is to create a sense of place and not merely a place that encloses space. I I Architectural Styles that may be developed for the Grafton Station are as follows: I I I I I I I I II II Italianate Brick-Front Romanesque Arcaded Block False-Front Gable-Front Artistic-Front Modern Broad Front Central California Vernacular Mid-Century Modern Post Modern Refer to Appendix I for specific Architectural Style Guidelines. 1-7 Planning & Site Design Standards I I Grafton Station at Dublin Ranch · July 2006 l2-0 5. GENERAL COMMERCIAL (BIG BOX) DEVELOPMENT I I The single user program of the typical big box retail often creates a problem of scale and a general lack of Architectural diversity. In response to this, the following principles are required be used in approaching the design of the shell: I I I I I I I I I II I I I The Principle of Building Massing: Building Massing must be broken into three or more primary forms through changes in volume, wall heights, roof forms, parapet heights and offsets in wall planes. Color and material applications are used to reinforce and help define each of the massing forms. The Principle of Building Massing must be applied to all four elevations. In addition detailing used on primary elevations should be in part continued on other elevations to complete the building overall character(s). Main Street Character: The Main Street Character is typically lost in the large scale parking lots required to support the retail activity of the big box retail programs. In addition the lack of streetscape elements and the scale of these buildings tends to destroy any Main Street feel in part to the overall size but also the sameness in detail, wall surfaces and often mega-scale details that reinforce the overall size of the building. In response to this it is required that the following principles be used in developing the exterior elevations and planning the site: Entrances: Entrances shall incorporate special forms, materials, signage and lighting to announce their locations and function. Primary and secondary entries and exits should be treated differen~y to recognize their function of arrival or departure as well as help create diversity in the Building Facade. Overhead Design Elements: Overhead elements for shade and weather protection over defined walk areas are required on 30% or more of the building fac;:ade. The application and details should coincide or relate to the Building Massing changes. Awnings, canopies, roofed or partially roofed arcades with columns are all acceptable solutions. The covered portion should be wide enough to cover a clear walk area of 8 feet minimum. Overhead design elements minimum height above finish grade shall not be less than 81-0". I I Walkways: A required walkway in front of the entire building fac;:ade shall be a minimum of 12 feet in width. Design elements, column arcades and other street furniture may encroach within this so long as a clear walkway not less than 8 feet is maintained. Walks should have a variety of patterns and/or colors that reinforce the building massing, entry conditions and boundary areas such as the walkway edge or a special function area such as for outdoor displays or other activities. 1- 8 Planning & Site Design Standards I I I I I I I Grafton Station at Dublin Ranch. July 2006 12..1 Landscape Elements: Adjacent to the walk areas between the walkway and the parking or driveways is an area reserved for street tree and landscape planting. This area shall be a minimum of 6 feet. Street trees shall be protected by the use of metal tree well grates. Planter boxes and or raised planters may also be used. Shape, sizes and color may vary. Bollards may also be used to define and protect this landscape edge. Multiple pedestrian access points are desirable. Landscaping and streetscape elements are not meant to be a barrier to access or any loading areas. Refer to Section IV - Landscape Design Guidelines. Streetscape Elements: Streetscape elements such as benches, tables, lighting, clocks, postal boxes, trash receptacles, signage, bicycle racks, display areas, and banners shall be incorporated into the overall planning of the "Main Street" along the building facade. Signage shall conform with the City ordinances and as referenced in the Section V - Signage Design Guidelines. I I I Storefront Design: Storefront window design is required to be included in the building design wherever compatible with interior space functions. Alternate storefront design may use display windows, glass block, false windows, or grille and wall patterns that simulate a storefront window without being glazed. Detailing of false windows should reinforce the concept of a storefront window by use of changes in wall surfaces, color and/or materials behind the window grille pattern to reinforce the idea of a window where none exists. Window patterns should be consistent with the actual storefront windows. Styles and patterns may vary in response and support of the changes in the building massing forms. I I I I I Wall Materials: Wall finish materials and colors should be varied for application locations and differences in color in part to create variety and interest and smaller scaled elements, but also used to reinforce the Building Massing concept. Material applications should not be equally or uniformly distributed throughout the elevations but applied to create elements of importance or to define a specific form or building mass. Applied details need not be consistent throughout the building but varied to create interest and differentiation in the building to give it more than one uniform character. This needs to be done in a balanced way and not make the building overly busy or too fragmented within the overall massing concept composition. Refer to Section III - Color and Materials Guidelines. I I I I Parking: The scale of the parking required to support the big box single user retail activity or a typical shopping center tends to destroy the "Main Street" character of the past. Parking lots tend to be unfriendly to pedestrian traffic. The amount of paving and/or parked cars creates a harsh desert-like environment. To mitigate this shade trees and accent landscape elements are to be incorporated uniformly throughout the field of parking. Formal pedestrian pathways shall be incorporated into the parking plan wherever possible to provide direct access between the Big Box retail pads and the 1- 9 Planning & Site Design Standards I I I I I I I I II I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 (22.. Conventional Retail uses along Grafton Street. Refer to Section IV-landscape Design Guidelines and the Conceptual Site Development Exhibit for additional requirements and information. Lighting: Lighting shall be provided for general walkway areas, parking areas, landscape accents, storefront displays and entryways, and for building accents. Lighting fixtures should be designed for their specific purposes and may be wall mounted, pole mounted, light bollards, recessed or suspended as appropriate. Uniformity of design style or character is not required on the buildings but standard streetlights shall generally match the design character, mounting heights and spacing established in the Village Center portion of Grafton Street (Area "G"). Parking area lights shall be uniform in character, style, mounting height and general spacing throughout the parking areas. Architectural Styles: Historical references to Architectural Styles or detailing may be used, but contemporary interpretations of styles or modern contemporary design are acceptable. The successful design composition incorporates the proper use and application of materials, color theory, proportion and human scale, program function, engineering and construction practices. The end goal is to create a sense of place and not merely a place that encloses space. Architectural Styles that may be developed for the Grafton Station are as follows: Italianate Brick-Front Romanesque Arcaded Block False-Front Gable-Front Artistic-Front Modern Broad Front Central California Vernacular Mid-Century Modern Post Modern Refer to Appendix I for specific Architectural Style Guidelines. 1- 10 Planning & Site Design Standards I I I I I I I I I 'I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 (2 3- 6. GRAFTON STATION SITE DEVELOPMENT STANDARDS The standards contained herein are based on minimal requirements. Refer to following Specific Design Standards for further information regarding building development. DEVELOPMENT STANDARDS Minimum Parcel Size N/ A; Refer to Conceptual Site Development Exhibit Parcel Depth N/ A; Refer to Conceptual Site Development Exhibit Parcel Width N/ A; Refer to Conceptual Site Development Exhibit . Minimum Building Setback Grafton St: 12 Feet from Face of Curb Dublin Blvd: 20 Feet Minimum Building Setback Dublin Blvd: 1 0 Feet 2, 4, 6 from Arterial & Collector Street Right-of-Way Building to Building 20 Feet Minimum 6 Separation Encroachments (C) Building Height Minimum: 15 Feet Facade5 Maximum: 65 Feet 1 Office Parking Spaces 1/300 Sq. Ft. 7 Bank Parking 1/150 Sq. Ft. 7 Conventional Retail Parking 1/300 Sq. Ft. 3,7 Spaces Restaurant Parking Spaces 1/100 Sq. Ft.3 Big Box Retail Parking 1/300 Sq. Ft.3 Spaces F.A.R. Maximum: .258 Accessory Structure (D) I - 11 Planning & Site Design Standards I I I I I I I I I I I I I I I I I I I NOTES: (A) (B) (C) Grafton Station at Dublin Ranch · July 2006 /2l.f Setbacks measured from property line or face of curb as applicable. See Section 11- Architectural Design Standards for additional Architectural Treatment requirements. Encroachment items may occur within the minimum setbacks for all conditions and shall comply with the following standards as applicable: Building Fac;:ade First Floor: Building Fac;:ade Second Floor: Roof Overhang, Cornices, Etc.: Pilasters and Columns: Arcade Columns/Walkway: Seating Areas: Covered Walkways/Canopies: Entry Doors: Exterior Stairs: Bay Windows: Balconies: Window Boxes: Chimney: A/C Units: Not Allowed 2 Feet 4 Feet 2 Feet 10 Feet (8' Ft. clear walkway min.) No restrictions as long as minimum 8 ft. walkway maintained 8 Feet No Encroachment Allowed NA 2' 2' NA NA NA (D) Setbacks for accessory structures shall be in accordance with the Building Code in effect at the time of construction/installation. Retaining walls up to 3' high may be used to create a level usable area. Retaining walls in excess of 3' to create usable area are subject to review and approval of the Building Official or Community Development Director and Director of Public Works. Walls over 30" in height are subject to safety criteria as determined by the Building Official. Parking requirements for other land uses not identified in these Design Standards shall conform to the current requirements of the Dublin Zoning Ordinance. (E) (F) 1. Measured from average of finished ground surface to highest point of roof including equipment/penthouse, architectural elements, etc. The Community Development Director may allow appurtenances subject to his/her approval. 2. 3. Determination of setbacks must consider visibility and landscape requirements. Shared/reduced parking standards permit these uses to reduce required number of parking stalls by 1 0% from the standards shown here. An exception to the standard for setbacks from Grafton Street may be permitted for buildings located at the corners of Dublin Boulevard/Grafton Street. See additional requirements regarding Gateway Plazas in the Design Standards. At least 40% of building facade shall be 20'minimum height. 4. 5. 1- 12 Planning & Site Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 l-Z$ 6. Setbacks subject to review and approval of Building Official for Building Code and Fire Code issues. Setback to building overhang to be 3' minimum or as required by current City Building Code Standards. Curbside and on-street parking may be counted toward required number of parking spaces. The maximum FAR noted in the table is for the overall Grafton Station Project Area. The FAR on an individual parcel(s) may exceed the .25 threshold as long as the average FAR for the Project Area does not exceed the .25 FAR maximum limit. 7. 8. 1- 13 Planning & Site Design Standards I I I I I I I I I I I I I I I I ,I I I Grafton Station at Dublin Ranch · July 2006 12.6 7. SITE DEVELOPMENT CONCEPT Refer to Conceptual Site Development Exhibit for specific locations of the following: ANCHOR "A" Anchor "A" is designated as a single tenant use, one-story General Commercial (Big Box) Site and shall meet all the requirements of the General Commercial (Big Box) Planning and Site Design Standards and Architectural Design Standards. PAD "A" Pad "A" is designated as a single tenant use or multiple tenant use, one-story General Commercial (Big Box) Site and shall meet all the requirements of the General Commercial (Big Box) Planning and Site Design Standards and Architectural Design Standards. PAD"B" Pad "B" is designated as a multiple tenant use, one story Conventional Commercial Site and shall comply with the Conventional Retail and Commercial Planning and Site Design Standards and Architectural Design Standards. PAD "C-1" Pad "C-1 " is designated as a multiple tenant use, one and two story Conventional Commercial Site and shall comply with the Conventional Retail and Commercial Planning and Site Design Standards and Architectural Design Standards. PAD "C-2" Pad "C-2" is designated as a single or multiple tenant use, one story Conventional Commercial Site and shall comply with the Conventional Retail and Commercial Planning and Site Design Standards and Architectural Design Standards. PAD "0" Pad "D" is designated as a multiple tenant use, one story Conventional Commercial Site and shall comply with the Conventional Retail and Commercial Planning and Site Design Standards and Architectural Design Standards. PAD "E_ 1" Pad "E-1 " is designated as a single tenant use, one story Retail or Restaurant Site and shall comply with the Conventional Retail and Commercial Planning and Site Design Standards and Architectural Design Standards. PAD "E_2" Pad "E-2 is designated as a single tenant use, one story Retail or Restaurant Site and shall comply with the Conventional Retail and Commercial Planning and Site Design Standards and Architectural Design Standards. 1- 14 Planning & Site Design Standards I I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 ) 2-, PROPOSED CONCEPTUAL SITE USE ANAL YSIS* Site Location Proposed Proposed Parking Spaces Parking Spaces Commercial Allowable S.F. Required Provided Type Anra Anchor "A" General 139,410 Sq. Ft. Commercial Big Box Retail Pad "A" General 118,830 Sq. Ft. Commercial BiQ Box Retail Pad "B" Conventional 13,500 Sq. Ft. Commercial & Retail Pad "C-1" Conventional 21,260 Sq. Ft. Commercial & Retail/Office Mixed Use Pad "C-2" Conventional 6,000 Sq. Ft. Commercial & Retail/Mixed Use Pad "D" Conventional 9,000 Sq. Ft. Commercial & Retail Pad "E-1" Conventional 5,000 Sq. Ft. Commercial/ Restaurant Pad "E-2" Conventional 5,000 Sq. Ft. Commercial/ Restaurant Total 318,000 Sq. Ft. 1,127-1,147** 1,299 * Based on Planning and Site Development Design Standards and Proposed Conceptual Site Development Exhibit ** Off-street parking spaces within the Project Area will be subject to a reciprocal parking easement between all affected property owners. Based on this, all parking spaces required for an individual building/use are not required to be provided on the parcel on which the building/use is located. 1- 15 Planning & Site Design Standards I I I I I I I I I I !I I I I I II , I I I (2<3 SECTION II: ARCHITECTURAL DESIGN STANDARDS 1. GENERAL REQUIREMENTS AND CONSIDERA TlONS 2. INTRODUCTION 3. CONVENTIONAL RETAIL AND COMMERCIAL 4. GENERAL COMMERCIAL 5. GRAFTON STATION CONVENTIONAL RETAIL AND COMMERCIAL & GENERAL COMMERCIAL DESIGN ST ANDARDS 6. ARCHITECTURAL ELEMENTS, MATERIALS AND DETAILS 7. CONCEPTUAL CHARACTER ELEVATIONS AT PADS 'A' THRU IE' 2004580 II-I Architectural Design Standards I I I I I I I I I I I I I I I I I I I t "2. '1 Grafton Station at Dublin Ranch . July 2006 SECTION II. ARCHITECTURAL DESIGN STANDARDS 1. GENERAL REQUIREMENTS AND CONSIDERATIONS Building Concepts should be approached from a basis of a proposed Architectural Style, the scale or size of the building being contemplated and whether or not it is a single tenant use or multiple tenant use building. From this the design may evolve as a composition based on a single Architectural Style or as a collection of Architectural Styles. Variety and interesting forms and details are encouraged. Structure should be considered as an expressive element in the design as it establishes the underlying rhythm of column bays, storefront design, pilasters, fenestration, and material and color applications. Materials and colors can create a sense of place and time evoking interest through pattern, surface changes and detail. Material selection and placement at the pedestrian levels shall be made based on durability and authentic use and detail. Elements above the pedestrian levels may incorporate synthetic materials while still paying attention to detail and durability. Material use and color shall be in keeping with the Architectural Style. Application of good design principles that incorporate sensitivity to view corridors, scale, proportion, color theory, lighting, storefront design, landscape design, historic references, proper use of materials and integration with modern construction practices are expected to be adhered to in building development throughout Grafton Station. The goal is to create a sense of place and community. 2004580 11-2 Architectural Design Standards I I L~O Grafton Station at Dublin Ranch . July 2006 2. INTRODUCTION I I The Grafton Station Retail Center consists of two types of retail activity: Conventional Retail and Commercial and General Commercial. I I The Conventional Retail and Commercial is characterized by smaller scale Conventional Retail stores and shops, restaurants, offices, branch banks, etc. and typically are one or two story in building height. These buildings generally occur along Grafton Street, and Dublin Blvd. and can be single or multiple tenant buildings. I The larger Big Box, General Commercial warehouse or a single large square footage tenant characterizes the General Commercial. Buildings are usually one story in height and while primarily a single tenant user, multiple tenants are permissible and may occur in a Big Box format. I I I These Design Standards include a description of design objectives and stylistic analogs to be incorporated into the overall architectural concept for Grafton Station and distinguishes between the various types and scale of retail activity from an Architectural viewpoint. I I In this Section we will primarily concentrate on the Building aspects of the "Main Street". But in the design of these buildings the Site Planning goals must be kept in mind and building forms need to respond or even create conditions to allow for the other elements that make up the "Main Street" environment. I I I I I I I 2004580 11-3 Architectural Design Standards I I I I I I I I I I I I I I I I I I I l'3 \ Grafton Station at Dublin Ranch . July 2006 3. CONVENTlOANl RETAIL & COMMERCIAl Building Design Concept: Individual retail buildings may be designed as a single entity, style or concept or composed as a collection of several smaller buildings with varying styles and architectural treatments. The overall composition of either approach shall provide for three to seven changes in building massing and form with corresponding changes in surfaces, wall offsets, roof and parapet heights, fenestration, color and/or material applications. Each building shall provide consistent Architectural detailing on all visible sides, including rear elevations. The principle of mass and form changes shall apply to all elevations. Building Setbacks: Buildings must be setback a minimum of 12 feet from the face of curb at Grafton Street and parking areas. Within this 12 foot setback, walkways, street trees in grated tree wells, encroachments by architectural projections, canopies, outdoor dining, benches, lighting, trash receptacles, etc. may occur. The building setback along Dublin Blvd. is not more than 20 feet from face of curb or less than 10' from the street ROW. Walkways will not be wider than 12 feet along Dublin Blvd. Additional area remaining between walkways and curb will be for landscape uses, streetscape elements and/or utilities. Primary Building Facades: The treatment of the building fac;:ade may be approached as a single Architectural style building concept with articulation of building mass, form, materials and color or as a collection of buildings through changes in Architectural styles, materials and colors. The latter approach may further the impression of a place built and perhaps adapted over time establishing a sense of history for Grafton Station. 2004580 11-4 Architectural Design Standards I I l3'~ Grafton Station at Dublin Ranch . July 2006 I Long, monotonous uninterrupted walls or roof planes are not allowed. Design techniques include incorporating wall offsets, recesses, changing the exterior expression of the second floor plate line, and varying head and sill heights of windows, as well as their shape and spacing. I I I Building offsets (12 inches minimum) shall be provided at least every 75 feet or at changes in the storefront facade design. This may be achieved by use of pilasters or columns, which may encroach up to 24 inches into setback areas, or fac;:ade offsets that increase the setback up to 15 feet maximum. Setbacks greater than 15 feet are allowed to provide for plazas, paseos and courtyards for outdoor features and activities such as fountains, artwork, seating and/or dining I I I areas. I I Where upper story windows occur they should be vertically aligned or organized with the location of windows and doors on the ground level in mind including storefront or display windows. These architectural fenestrations shall be compatible with the style, materials, colors and details of the building. I All Grafton Station area buildings shall have a minimum front facade height of 15 feet, with at least 40% of that facade having a height of 20 feet or greater. I I I I Material and color applications should be selected to evoke a period in time where historic architecture references are being used, and/or to reinforce a building mass or form, and to call attention to detail. Refer to Section III Color and Material Guidelines for additional information. I I 2004580 11-5 Architectural Design Standards I I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 133 ,"'~ POST MODERN MID CENTURY MODERN BROAD FRONT IT AllAN A TE BRICK FRONT ignage Opportunities Vary Cornice Eave & Parapet Styles &Heights Varied Storefront Design & Window Articulation Offset Wall Planes Pedestrian Signage Opportunity PAD D SINGLE BUILDING / MULTIPLE TENANT /BLDG. CONCEPT 2004580 11-6 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 13'-/' MINIMUM OF 3 CHANGES IN BUILDING MASSING Mixed Use Opportunities Offices Over Retail Vary Material Applications Articulated Entries Varied Storefront Designs l 1 J Offset Wall Surfaces Fenestration Ordered & Organized With Storefront & Bay Structure PAD C- 1 SINGLE BUILDING CONCEPT WITH MULTIPLE TENANTS 2004580 11-7 Architectural Design Standards I I 1"3~ Grafton Station at Dublin Ranch . July 2006 I I Secondary Building Facades: Grafton Station buildings along Grafton Street and Dublin Blvd. will be visible from the sides and rear and should therefore create the same sense of arrival and pleasing entry statement found on the front facade. Side and rear elevations should be articulated with an appropriate level of detail as front facades and support the concept and requirement of four-sided architecture. I I I I Mixed-Use Building Facades and Entries: Where second level offices or retail uses may occur over ground level retail uses, the use of awnings or other overhead structures extending from second floor facades are encouraged to provide some separation and privacy for the second floor occupants where they are not a part of the same tenant or business activity. In mixed use buildings, where ground floor commercial/retail uses and entrances for upper level offices occur, entrances shall be highlighted by differences in facade treatment, use of distinct but compatible exterior materials, signs, awnings, and exterior lighting. I I I I I Entry Design: Entrances to buildings fronting on Grafton Street and/or Dublin Boulevard shall be articulated and defined by architectural elements such as pilasters, columns, lintels, pediments, porches, porticoes, balustrades, railings and overhangs, where appropriate. These elements, when utilized, shall be compatible with the architectural style of the building and its materials, colors and details. Entries may be recessed or flush with the main building fac;ade. Secondary entries shall be articulated differently than main entries to denote their type of function and/or importance. Sliding type entry door operation is not permitted however swing door operation may not encroach into pedestrian walkways where the walkway would become less than 8' clear. An exception to sliding door uses is I I I I I I I 2004580 11-8 Architectural Design Standards I I I I I I I I I I I I I I I I I I I l~~ Grafton Station at Dublin Ranch . July 2006 allowed where sliding doors are used to open an entry wall face and remains open during business hours. Slorefront Design: At Conventional Retail buildings (Village Commercial) ground floor building facades fronting on Grafton Street are to be at least 60% transparent window surface. Storefront design shall encourage the use of colorful awnings or pedestrian arcades and pedestrian oriented store signs. Encroachments: Building Encroachments may occur within the minimum setbacks from face of curbs for all conditions (Dublin Blvd, Grafton Street, & Parking Lots) as follows: Building Fac;:ade First Floor: Building Fac;:ade Second Floor: Roof Overhang, Cornices, Etc.: Pilasters and Columns: Arcaded ColumnsfWalkway: Seating Areas: Covered Walkways/Canopies: Entry Doors: Exterior Stairs: Bay Windows: Balconies: Window Boxes: Chimney: A/C Mechanical Equipment: Not Allowed 2 Feet 4 Feet 2 Feet 10 Feet (8 Feet. clear walkway min.) No restrictions as long as minimum 8 ft. walkway maintained 8 Feet No Encroachment Allowed Not Allowed 2 Feet at Second Floor Locations 2 Feet Not Allowed Not Allowed Not Allowed 2004580 11-9 Architectural Design Standards I \~1 Grafton Station at Dublin Ranch . July 2006 I Architectural Styles: Historical references to Architectural Styles or detailing may be used, but contemporary interpretations of styles or modern contemporary design are acceptable. The successful design composition incorporates the proper use and application of materials, color theory, proportion and human scale, program function, engineering and construction practices. Refer to Appendix I for specific Architectural Style Illustrations I I I I I I I I Roofs and Roof Forms: Roofs are a dominant architectural element as viewed across the street and from the surrounding area. Provide roofline offsets in order to add architectural interest and variety to the massing of each building and to relieve the effect of a single, long roof. Gable and/or hipped conditions may be used to add variety and interest to the skyline. Roof types should be in keeping with the character of the architecture. Parapet roofs, varied in height and design, are an appropriate solution to provide opportunities for architectural enhancement and transitional heights between buildings or changes in massing. Architectural elements such as dormers, belvederes, chimneys, cupolas, clock towers and other elements, which add visual interest to roofs, are encouraged in keeping with the Architectural Style. I I I I I I I I I 2004580 11-10 Architectural Design Standards I I t 3<6 Grafton Station at Dublin Ranch . July 2006 I I MGalewar- Archileclure: Buildings with dominant building styles and/or greater height shall be designed for the Grafton Station Gateways (corners of Grafton Street and Dublin Boulevard in order to emphasize the importance of these "entries" to Grafton Station. Appropriate scale and facade treatments include multi-story and/or stepped facades with "front" facades on all visibly exposed sides. Vertical elements, upper story balconies, towers or unique architectural features are used at these corners to aid in attaining a sense of arrival and place. Architecture may be recessed or extended into these prominent corners to provide public plaza spaces. I I I I I I I I I I I I I I I 2004580 II-II Architectural Design Standards I I?Cf Grafton Station at Dublin Ranch . July 2006 I I I I I Project Signage & logo GaJeway Archih;octurEl Tower Element I I I StreetT rees Per landsc Design Guidelines I I I I w Co~, Pkao 80;";" @Grafton SJeps Back Street I I PAD B I GATEWAY ARCHITECTURE AT DUBLIN BLVD AND GRAFTON STREET I I 2004580 11-12 Architectural Design Standards I Stone Elements Dublin Ranch Recurring Theme Durable Authentic Base Course MaJerial ego Quarry Stone, Tile or Precast I I l '-I- 0 Grafton Station at Dublin Ranch . July 2006 I Comer and MicJ.Block Conditions: Buildings located at major and minor street intersections will have at least two front facades visibly exposed to the street. Two story and/or stepped facades or special Architectural design elements are encouraged at these corner locations to further emphasize corners. Vertical architectural elements, such as corner towers, and added embellishments, such as flags or fountains, also may contribute to the special nature of these locations. I I I I I I I I I I I I I I I I Squares, courts, plazas, building recesses and/or colonnades at mid-block and corner locations are desirable for variety and visual relief to the street. At least one pedestrian Paseo between buildings must be developed to connect the parking area to Grafton Street. Building Separation and Plazas: Provide a minimum of 20 feet between individual buildings. Pedestrian passageways or paseos between buildings shall provide a minimum clear walkway of 8 feet. Encourage the development of sidewalk cafes and indoor/outdoor restaurants by providing recessed storefronts and building offsets or orientations to promote pedestrian interaction along Paseos. Landscaped elements shall be incorporated into the plazas and paseos. Special Considerations: The building designs shall consider and provide for location of signs along Grafton Street oriented toward pedestrians rather than the automobile. Refer to Section V-Signage Design Guidelines. Screen all loading docks and service areas from public streets and adjacent land use views. These facilities should be incorporated into the building architecture. 2004580 11-13 Architectural Design Standards I I I I I I I I \~\ Grafton Station at Dublin Ranch . July 2006 T rash facilities, service entries, loading docks, utilities equipment such as transformer vaults, telephone boxes, and meters, mechanical equipment such as A/C units, etc., shall take place at the rear or sides of buildings. These elements shall be screened from view and public access and/or incorporated into facilities within the building design. I I I I I I I I I I I I 2004580 11-14 Architectural Design Standards I I I I 142- Grafton Station at Dublin Ranch . July 2006 @2006 WILUAM HEZMAlHAlCH ARCHITECTS, INC. I I I I I I I I I I I I I I I -+ W'M;"'~__} PAD C-l /B VIGNETTE PASEO 2004580 11-15 Architectural Design Standards I I I I I I I I I I I I I I I I I I I t ...t~ Grafton Station at Dublin Ranch . July 2006 4. GENERAL COMMERCIAL Building Design Concept: Individual retail buildings may be designed as a single entity, style or concept or composed as a collection of several smaller buildings with varying styles and architectural treatments. The overall composition of either approach shall provide for three to seven changes in building massing and form with corresponding changes in surfaces, wall offsets, roof and parapet heights, fenestration, color and/or material applications. Each building shall provide consistent Architectural detailing on all visible sides, including rear elevations. The principle of mass and form changes shall apply to all elevations. Building Setbacks: Big box retail buildings are required to have a minimum building setback of 12 feet from the face of curb at the drive aisle or parking area. Building setbacks greater than 12 feet are permissible to establish special outdoor use areas. A clear walkway width of 8 feet minimum must be maintained. Within this 12 foot setback from face-of-curb to the building face, walkways, street trees in grated tree wells, encroachments by architectural projections, canopies, outdoor dining, benches, lighting, trash receptacles, etc. shall occur. A clear walkway width of 8 feet minimum must be maintained. Buildings adjacent to Dublin Blvd. and without intervening parking areas shall be setback not more than 20 feet from face of curb or not less than 10 feet from the street ROW. Walkways will not be wider than 12 feet or less than 8 feet along Dublin Blvd. Additional area remaining between walkways and curb will be for landscape uses, streetscape elements and/or utilities. 2004580 11-16 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 \y~ BIG BOX RETAIL PRINCIPLE OF MASSING REQUIRED CHANGES: 3 MIN. 7 MAX. SINGLE BUILDING W/MULTIPLE BUILDING CHARACTER CONCEPT MID CENTTURY MODERN ARCADE BLOCK MODERN BROAD FRONT Color & Material changes to Reinforce Massing Changes & Forms Arcaded / Covered Wall For 1/3 of building Overall Varied Roof Types and Heights .-- Glazing Required For 30% of Building Fac;:ade Length Overall Signage / Logo Space Refer to Signage Standards Entry Articulation With Awning and Recessed Doors PAD A BIG BOX MULTIPLE TENANT DESIGN & MASSING CONCEPTS 2004580 11-17 Architectural Design Standards I I I I I I I I I I I I (i{-C; Grafton Station at Dublin Ranch . July 2006 Primary Building Facades: Long, monotonous uninterrupted walls or roof planes are not allowed. Design techniques include incorporating wall offsets, recesses, changing the exterior expression of the roof or parapet line, and varying head and sill heights of storefront windows, as well as their shape, spacing and detailing. Building offsets (12 inches minimum) shall be provided at least every 100 feet or at changes in the storefront facade design. This may be achieved by use of pilasters or columns, which may encroach up to 24 inches, or fac;:ade offsets that increase the setback up to 15 feet maximum. Setbacks greater than 15 feet are allowed only at plazas to provide for outdoor activities such as display or dining areas. Entry arcades and arcaded walks may also be used in meeting this requirement of fac;:ade offsets. Refer to encroachments listed below for additional information regarding arcaded walks. I Upper clerestory windows should be vertically aligned with the location of windows and doors on the ground level, including storefront or display windows. These architectural fenestrations shall be compatible with the style, materials, colors and details of the building. I I I I The treatment of the front fac;:ade may be developed as a single building concept with changes in massing and forms or as though the single building were a collection of buildings with changes in Architectural styles, materials and colors that may further the impression of a place built and adapted over time. All Grafton Station area buildings shall have a front facade with a minimum height of 15 feet, with at least 40% of that facade having a height of 20 feet or greater and a maximum height of 451. Maximum height of Building to a roof ridgeline or tower element is 65' . I I 2004580 11-18 Architectural Design Standards I I I I I I I I I I 4 L,.. Grafton Station at Dublin Ranch . July 2006 Secondary Side and Rear Facades: Grafton Station Big Box buildings will be visible from the sides and rear. Side and rear elevations shall be articulated with a simplified level of detail consistent with primary front facades. Side and rear facades generally will contain service areas and shall be screened from public areas as well as integrated into the building design to the extent possible. Screening elements may include walls and fences as well as Landscape elements. lighting in these areas should be addressed for aesthetics as well as function and prevent light pollution from occurring on adjacent properties. I I I I I I I I I I Entry Design: Entrances to buildings fronting parking areas or Dublin Boulevard shall be articulated and defined by architectural elements such as pilasters, columns, lintels, pediments, arcades, canopies, porticoes, and roof overhangs, where appropriate. These elements, when utilized, shall be compatible with the architectural style of the building and its materials, colors and details. Entries may be recessed or flush with the main building fac;:ade. Entry door operation may be swinging or sliding type doors, however door operation may not encroach into pedestrian walkways where the walkway would become less than 8 feet clear. Slorefront Design: At Big Box Retail buildings (General Commercial) Storefront window design is required to be included in the building design wherever compatible with interior space functions. Alternate storefront design may use display windows, glass block, false windows, or grille and wall patterns that simulate a storefront window without being glazed. Detailing of false windows should reinforce the concept of a storefront window by use of changes in wall surfaces, color and/or materials behind the window grille pattern to reinforce the idea of a 2004580 11-19 Architectural Design Standards I I I I I I I I I I I I I I I I I I I { 4~7 Grafton Station at Dublin Ranch . July 2006 window where none exists. Window patterns should be consistent with the actual storefront windows. Styles and patterns may vary in response and support of the changes in the building massing forms. A total of 30% of the length of the building fac;:ade shall contain glazed elements with a minimum window head height of 8 feet and a maximum sill height of 4'. Half of the required glazing may consist of clerestory windows occurring above 8 feet with a minimum window height of 2 feet. Glazing does not need to be evenly distributed across the building fac;:ade but may be grouped at entries or other discrete locations. Wall openings and open fencing or wall grilles that remain open on a full time basis during business hours can also be counted as fulfilling part of the required wall glazing for up to 50% of the total required glazing. Overhead Design Elements: Overhead elements for shade and weather protection over defined walk areas are required on 30% or more of the building fac;:ade. The application and details should coincide or relate to the Building Massing changes. Awnings, canopies, roofed or partially roofed arcades with columns are all acceptable solutions. The covered portion should be wide enough to cover a clear walk area of 8 feet minimum. Overhead design elements shall not be less than 8 feet in height above finish grade. 2004580 11-20 Architectural Design Standards f_t'D Grafton Station at Dublin Ranch . July 2006 I I I I I I I I I I I I I I I I I I I Encroachments: Building Encroachments may occur within the minimum setbacks from face of curbs for all conditions (Dublin Blvd, Grafton Street, & Parking Lots) as follows: Building Fac;:ade First Floor: Building Fac;:ade Second Floor: Roof Overhang, Cornices, Etc.: Pilasters and Columns: Arcaded Columns/Walkway: Seating Areas: Covered Walkways/Canopies: Entry Doors: Exterior Stairs: Bay Windows: Balconies: Window Boxes: Chimney: A/C Mechanical Equipment: Not Allowed 2 Feet 4 Feet 2 Feet 10 Feet (8 feet clear walkway min.) No restrictions as long as minimum 8 feet walkway maintained 8 Feet No Encroachment Allowed Not Allowed 2 Feet at Second Floor Locations 2 Feet Not Allowed Not Allowed Not Allowed Architectural Styles: Historical references to Architectural Styles or detailing may be used, or contemporary interpretations of the approved list of styles noted in the appendix are acceptable. The successful design composition incorporates the proper use and application of materials, color theory, proportion and human scale, program function, engineering and construction practices. Refer to Appendix A for specific Architectural Style Illustrations. 2004580 11-21 Architectural Design Standards I I I I I I I I I I I I I I I I I I I \40 Grafton Station at Dublin Ranch · July 2006 5. GRAFTON STATION CONVENTIONAL RETAIL & & GENERAl COMMERCIAl ARCHITECTURAl DESIGN STANDARDS Design Standard Conventional Retail and General Commercial Commercial Massing Changes 3 Min; 7 Max; 3 Min; 7 Max Building Heights 15 ft. Fac;:ade Minimum; 20 ft. to 20 ft. Min; 45 ft. Max. 35 ft. for 40% of Building FrontaQe Min. Tower & Roof Elements 65 feet Max. 65 feet Max. Number of Stories 2 Max. 2 Max. Storefront Facades 12 inches Min. for every 3 12 inches Min. every 100 ft. or less Offsets storefronts or every 75 feet of storefront which ever is Qreater Storefront Glazing 60% Length of Store Fac;:ade 30% Length of Store Fac;:ade 1 Storefront Clerestory Glazing No Limits or Requirements 50% Maximum of required Storefront (above 8') Glazing (2'-0" Min Height Req.) Storefront Glazing Head and Head Height Min: 8'-0" Head Height Min: 8'-0" Sill HeiQhts Sill HeiQht Max: 3'-0" Sill HeiQht 4'-0" Max. Awnings, Arcades, May Occur; 8'-0" Min Clearance 30% Length of Store Fac;:ade; 8'-0" Trellis/Shade Structures Min Clearance Roof / Mechanical Screened from View Screened from View Equipment Trash/Utility/Mechanical Incorporated into Buildings at Incorporated into Buildings at Equipment/Service Entries/ secondary elevations and secondary elevations and screened Storage Yards and Loading screened from view from view Docks 1. Big Box Retail Stores may count up to half of the 30% Glazing requirement by use of alternate design techniques such as screened or open fenced areas, display windows, clerestory windows, non-glazed window patterns that mimic a storefront window such as grids, wall trellis structures, bas-relief wall surfaces with color changes and/or murals or wall openings that remain open during business hours. 2004580 11-22 Architectural Design Standards I I I I I I I I I I I I I I I I I I I ,r 0 Grafton Station at Dublin Ranch · July 2~ 6. ARCHITECTURAL ELEMENTS, MATERIALS AND DETAILS Roof Malerials: Different roof types include various pitches, shapes and forms. This provides the opportunity to introduce a variety of roof materials. Acceptable materials include: High Quality Composition roof (comparable to 50 yr. + grades) Concrete tiles - (all shapes) Standing seam / corrugated metal (appropriate to style) Built-up asphalt/membrane - (Flat Roofs only) Facade Treatments and Malerials: The facade is the primary element that defines the character of a building. Primary facade elements include windows; doors, base course, wall surfaces, and pitched roofs or articulated cornices. Acceptable facade materials include: Smooth plaster or lightly textured (no rough plaster) Wood siding/composite materials (such as Hardie Plank) Brick, stone, pre-cast concrete Tile - as a secondary material Glass block - as a secondary material EFIS materials & foam materials are not allowed within 6' of finished grade. Doors: Doors are one of the most important facade features because they are the store/building entry. Illustration of the location, orientation and proportion of entries and doors is required. Door types and edge treatments should be illustrated including sidelights, trim and transoms. Acceptable door materials include: 2004580 11-23 Architectural Design Standards II I I I I I I' I I I I I I I I I I I I 1~3 Grafton Station at Dublin Ranch · July 2006 Other permitted moveable fixtures associated with outdoor dining include: tables, chairs, umbrellas, low level lighting, heaters and landscape planters, pots, etc. Secondary Elements/Delails Trim T rim should include, where appropriate to the style, eaves, corner boards, gable and eave boards, pediments, friezes, lintels, sills, quoins, belt courses, balustrades, soffits, etc. Gutters Roof gutters and down spouts, whether built in or attached, should be specified as to shape and integrated with the trim. Utilily Meter Above ground meters shall be located at the sides or rear of buildings away from adjacent streets or pedestrian walkways. All meters except those placed underground shall be enclosed or set behind architectural or mature landscape elements to screen them from view. Mechanical Equipment All mechanical equipment, including air conditioners, gas regulators, telephone/cable TV pedestals, satellite dishes, solar panels, etc. shall be located in visually unobtrusive locations, screened from view from surrounding areas and baffled for noise attenuation where necessary. Skylights and Rooftop Windows Unless they are integral elements of the architectural design, skylights and rooftop windows shall be completely screened from view from surrounding areas. Roof Flashing & Vents Roof flashing shall be integrated with the roof design. Place vents in unobtrusive locations away from public view from surrounding areas, unless they are part of the building's architectural style. Roof flashing & vents hall be painted to 2004580 11-26 Architectural Design Standards I I I I I I I I I I I I I I I I I I I I? c.t Grafton Station at Dublin Ranch · July 2006 match adjacent material colors. Use of unpainted metal flashing and/or vents as a design element is subject to review and approval during SDR process. 2004580 11-27 Architectural Design Standards I I I I I I I I I I I I I I I I I I I l~~ Grafton Station at Dublin Ranch · July 2006 7. ARCHITECTURAL CHARACTER ILLUSTRATIONS PAD A- EAST ELEVATION AT PARKING LOT PAD A - NORTH ELEVATION AT DUBLIN BLVD. PAD B - NORTH ELEVATION AT DUBLIN BLVD. PAD Cl / B - EAST ELEVATION AT GRAFTON STREET PAD C2 - EAST ELEVATION AT GRAFTON STREET PAD D - EAST ELEVATION AT GRAFTON STREET PAD E-2 / E-l - NORTH ELEVATION AT GRAFTON STREET 2004580 11-28 Architectural Design Standards I' I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 l~~ Drive @2006 WILLIAM HEZMALHALCH ARCHITECTS, INC. PAD A CONCEPTUAL EAST ELEVATION AT PARKING LOT 2004580 11-29 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 l ;--} @2006 WILLIAM HEZMALHALCH ARCHITECTS, INC. PAD A CONCEPTUAL NORTH ELEVATION AT DUBLIN BLVD. SINGLE TENANT OPTION 2004580 11-30 Architectural Design Standards I I I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 I ? ~ Drive Drive @2006 WILLIAM HEZMALHALCH ARCHITECTS, INC. PAD A CONCEPTUAL NORTH ELEVATION AT DUBLIN BLVD. MULTIPLE TENANT OPTION 2004580 11-31 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 I '5~ PAD B CONCEPTUAL NORTH ELEVATION AT DUBLIN BLVD. 2004580 11-32 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 I ~ "D @2oo6 WllUAM HEZMAlHAlCH ARCHITECTS, INC. PAD C 1 PAD B CONCEPTUAL EAST ELEVATION AT GRAFTON STREET 2004580 11-33 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Entry Drive Plaza For Outdoor Dining @2006 WILLIAM HEZMALHALCH ARCHITECTS, INC. Grafton Station at Dublin Ranch · July 2006 l~1 PAD C-2 CONCEPTUAL EAST ELEVATION AT GRAFTON STREET J 20' Min. Building Separation 2004580 Architectural Design Standards 11-34 I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 l LP z.., @2006 WlluAM HEZMAlHAlCH ARCHITECTS, INC. PAD D CONCEPTUAL EAST ELEVATION AT GRAFTON STREET 2004580 11-35 Architectural Design Standards I I I I I I I I I I I I I I I I I I I Grafton Station at Dublin Ranch · July 2006 l ~ ~ ~~ '. j Architectural Themed Tower / Focal Element @ End of Grafton Street Architectural Roof & Parapets & Wall Massing Street & Plaza Trees Per Landscape ......:.~ @2006 WILLIAM HEZMALHALCH ARCHITECTS, INC. Window Wall / Storefront Glazing PAD E-2 / PLAZA RESTAURANT PAD E- 1 RESTAURANT CONCEPTUAL NORTH ELEVATION AT GRAFTON STREET 2004580 11-36 Architectural Design Standards I I I I I I I I I I I I I I I I I I I l~~ Grafton Station at Dublin Ranch · July 2006 SECTION III. COLOR AND MATERIALS Colors and Materials Overview Effective use of colors and materials will promote an underlying sense of old town character with dynamic variety to create a visually stimulating environment at Grafton Station, Dublin Ranch Area 'H'. Variety in texture hue and value are the keys to avoiding undesirable monotony. Each architectural theme shall utilize appropriate historic references for colors and materials selections. When contemporary building materials are intended to replicate those from yesteryear, colors should be used within the tonal ranges from history's originals. For instance, concrete'S' tile should be used in the terra cotta hues found in clay roof tile. To provide unity at Grafton Station, Dublin Ranch Area 'H' all color palettes shall have a dominant theme of warm, nature-based hues combined harmoniously with cool, vibrant accents. Warm colors are defined as those found in the spectral range between purple, red and yellow or those colors that are influenced by red and yellow. Cool colors range between green and blue or those colors influenced by blue. Colors and materials applications should be applied with an emphasis on contrast. Different building materials will be visually highlighted with deliberate placement of smoother surfaces adjacent to those with rougher textures. Roof planes should vary from wall planes in texture and color to avoid a monolithic appearance. Colors should be applied strategically providing well-designed use of contrast in hue and value to create a visual hierarchy. Value is defined as 2004580 11I- 1 Color And Materials I I 1 Lob Grafton Station at Dublin Ranch · July 2006 I I I the relative lightness or darkness of a color compared against the gray scale. Architectural elements of greatest importance, such as main entrances, shall receive the highest contrast for dominance. Secondary architectural features should be downplayed by the use of lower contrast. I I Each architectural vernacular included in the Grafton Station, Dublin Ranch Area 'H', General Commercial Design Guidelines has its own unique colors and materials vocabulary that assist in further defining the theme. The palettes suggested for each architectural vernacular should be the foundation for colors and materials selections within that theme. I I llalianale: Brick and stone quoins, decorative cornices, lintels and pilasters with elaborate capitals are all hallmarks of the Italianate style. Floral motifs, rosettes and anchor irons were also common historic elements. Where brick and stone occur, emphasis should be placed upon them through the use of contrasting adjacent surfaces. Brick and stone should be rustic in texture and earthy in color. Areas of stucco, for Italianate architecture, offer an exciting color opportunity for the dark, saturated, warm hues of southern Europe. Pre-cast concrete details, or those intending to mimic them, should be used in tones that replicate the natural colorations created by sand, cement and water. Bronze or black tones are appropriate for decorative metal accents. I I I I I I I I Brick-Front: As its name implies, Brick-Front architecture relies on a predominant use of brick as the main building material. Ornamental accents of stone or pre-cast concrete are appropriate and add visual interest. The use of different types of brick and multiple brick coursing techniques are I I 2004580 11I-2 Color And Materials I I l~~ Grafton Station at Dublin Ranch · July 2006 I encouraged to heighten the textural and tonal variation. Brick that is uniform in color and machined with no texture should be limited in use as only minor accents. The dominant hue for Brick-Front should be red ranging from yellow-based terra cottas to bluer influenced burgundies. Neutral toned bricks may be used as accents. I I I I I Romanesque: Coursed, rock-faced sandstone blocks, stone and brick are the main materials that define the Romanesque style. When designed primarily with stone or brick, the opposite material should be used for trim. Brick can be simple or ornamental with geometric designs. Stone should be block~ike and not irregularly shaped. Stucco or siding may be used in combination with more traditional appearing Romanesque materials. Historic Romanesque buildings were often banks or public buildings implying a formality that should be maintained and translated through the appropriate use of materials and colors. Richness in texture and the use of neutral, naturally occurring colors should be employed to achieve dignified sophistication. I I I I I Areaded Block: I I I I Arcaded Block architecture borrows from the Romanesque the same characteristic use of stone blocks or bricks with the addition of arches or arcades as the dominant design feature. Eclectic combinations of classical and picturesque elements such as spires, metal roofs and canvas or metal awnings further define this style. Stucco walls may be employed as a part of the material mix with buildings grounded by the look of a masonry base. The variety of materials utilized should be accentuated by the use of different colors between them. The overall palette for Arcaded Block will blend neutral, natural masonry colors with vibrant hues, both warm and cool, as accents. I I 2004580 11I-3 Color And Materials I I \~1 Grafton Station at Dublin Ranch · July 2006 I False-Front: With its association in the settlement of the West, the vernacular of Falsfrfront is inherently basic. Characteristic materials used for these first commercial buildings include clapboard, board and batten or brick. Modern interpretations can include wainscots made of wood paneling, masonry, metal, tile or stucco. Simplicity is key in the use of materials and colors for False-Front. Machined or industrial looking materials are to be avoided. Colors should be predominantly warm and earth-toned in light to dark values avoiding relationships of extreme contrast. I I I I I Gabl&front: Gable-Front buildings of yore, with their rural setting and everyday use for hardware, feed and general stores are most casual in concept. Clapboard, wood siding, stucco and masonry can be used with wooden brackets at gables and a dominant signboard. Contemporary elevations may also utilize tile, metal or wood paneling at wainscots. Unadorned informality is the goal for material applications. The full spectrum of color may be employed without undue complexity or sophistication to create an informal appeal. I I I I I I I I I Artistic-Front: Characterized by its residential, cottage nature, the Artistic- Front includes decorative bases of stucco or masonry with wood detailing. Walls can be stucco or various siding types. Combinations of different materials should be used with an emphasis on textural contrast as the main focus. Random shaped stone and rustic, hand-molded brick are suitable for Artistic-Front elevations. Dynamic color combinations that are nature based will translate the attention getting design intent of Artistic-Front retail architecture. I I 2004580 111-4 Color And Materials I I llt.? ~ Grafton Station at Dublin Ranch · July 2006 I Modem Broad Front: This double-width, single story, storefront, architectural style, as the name implies, requires design elements that visually assist in broadening the front of the building and creating openness. Brick cladding and pre-cast ornamentation are direct historic references. Contemporary interpretations can include stucco, tile, masonry or metal wainscoting and canvas or metal awnings. Modern materials that are industrialized in appearance are most appropriate. Thin window mullions will assist in increasing the visual width of elevations. The usual colors of industrial and raw materials should be the basis for Modern Broad Front color palettes. I I I I I Central California Vernacular: The residential feel inherent to the late 19th century Central California Vernacular is facilitated by the use of materials reminiscent of those found on the homes of this period in agricultural communities. Wood shake or composition roofing, indigenous-looking stone, used brick and wood siding are all appropriate to communicate this style. Colors can vary, warm to cool and light to dark. Color combinations should exhibit variety that is more subdued than flamboyant. I I I I I I Mid Century Modern: The sleek simplicity of the Mid Century Modern style requires only a limited palette of materials. Roofing materials should not be mixed. Restrained combinations of tile, metal, stucco, glass block, masonry and wood siding may be used. Materials should maintain overall geometric lines with an emphasis on a machined and not naturally procured appearance. Subdued color palettes in predominan~y neutral tones are most appropriate. I I I I I 2004580 11I-5 Color And Materials I I I' '" Ip, Grafton Station at Dublin Ranch · July 2006 I Post Modem: The Post Modern style provides the greatest opportunity for exuberant use of color and material combinations. A wide range of building materials can be implemented including stucco in varying textures, masonry in angular shapes, wood siding and tile. The mix of materials should be lively. Saturated color in primarily warm tones with high-contrast combinations is thematically correct. I I I I I I I I Submittal Requirements and Review: Color and materials submittals are required for the Specific Design Review. Submittals must consist of samples that accurately represent the textures and colors proposed for the essential components of the exterior elevations including, but not limited to, visible roof materials, stucco, siding, masonry, pre-cast, storefront, windows, doors, trim and accent colors as well as significant architectural details like shutters, awnings and decorative metal. Mounted color and material samples, clearly labeled and mounted on boards, no larger than 24" x 36", will be accepted for review. Colored elevations, cross referenced to the samples are also required. I I I I I I I I 2004580 11I-6 Color And Materials I I I I I I I I I I I I I I I I I I I \1:'0 Grafton Station at Dublin Ranch · JulY 2006 SECTION IV: GUIDELINES LANDSCAPE DESIGN 1. VEHICULAR CIRCULATION 2. GENERAL DESIGN STRATEGIES 3. GRAFTON STREET MAIN ENTRY 4. GRAFTON STREET LANDSCAPE 5. PLAZA AND TRAFFIC CIRCLE AT SOUTH TERMINATION OF GRAFTON STREET 6. ENTRY STREETS TO PARKING LOTS 7. PARKING LOTS 8. PLAZA AT PADS BAND C 9. RETAINING WALLS 10. BIOSW ALE LANDSCAPE 11. OWNERSHIP AND MAINTENANCE OF GRAFTON STATION COMMON AREAS IV - 1 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I l"'1 \ Grafton Station at Dublin Ranch . JulY 2006 SECTION IV LANDSCAPE DESIGN GUIDELINES 1. VEHICULAR CIRCULATION Principal Entry The Grafton Street right-of-way is the principal vehicular access route within the Project Area. It extends two blocks south from Dublin Boulevard and divides Area H into two sections with Grafton Station to the west and future Campus Office uses to the east. The Water Quality Treatment Basin is to the south. Grafton Station provides opportunities for pedestrian circulation in addition to vehicles. Building and Site Access Grafton Street provides the main connection from Dublin Boulevard to Conventional Retail and Commercial pads B, C-1, C-2, D, E-1 and E- 2 along Grafton Street itself; and to Anchor A and Pad A to the west. It also is one of the streets which serve the Water Quality Treatment Basin and the future Campus Office site. Street Organization The northern portion of Grafton Street at Dublin Boulevard has a median to facilitate traffic movements by dividing the one south- bound lane from the three north-bound lanes. The southern portion of Grafton Street narrows to one lane in each direction, with diagonal parking serving the shops which open onto the street. Grafton Street terminates at a traffic circle and adjacent plaza with large trees, outdoor seating areas, public art and a fountain. This plaza also serves as a pedestrian access point to the Water Quality Treatment Basin. Connections From Grafton Street From Grafton Street there are three vehicular connections to the east and west . Two connections extend west from Grafton Street to parking lots serving the retail building pads. The primary one is a private interior lane lined with trees that divides Grafton Station into two halves and breaks down the scale of the development. This lane provides motorists direct access to all parking lots and buildings. The second connection to the west from the Grafton Street is at the traffic circle and provides a more direct access to Anchor A, as well as Pads E- 1 and E- 2. The third connection from Grafton Street is a future street extending east from the traffic circle to the Water Quality T reatrnent Basin and the Campus Office site. Other Auto and Delivery Connections From Dublin Blvd. From Dublin Boulevard there are two vehicular connections besides Grafton Street. One is an auto connection which goes directly to Pad A and Anchor A. The other is for large delivery trucks. IV - 2 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I [ '1 2- Grafton Station at Dublin Ranch . JulY 2006 Ingress and egress for delivery trucks serving Anchor A and Pad A is provided directly off Dublin Boulevard at the northwest corner of the site. Delivery vehicles use a 35' wide driveway behind Anchor A and Pad A for access to loading docks. A loop around the outer edges of the Anchor A parking lot with a minimum 15' wide travel lane in each direction is provided for trucks to turn around and exit the site at the same location they entered from Dublin Boulevard. Trucks making deliveries to Anchor A and Pad A are not allowed to use Grafton Street. Connections From Northside Drive From Northside Drive, the frontage road parallel to the freeway, there is an additional access point which bridges over the linear bioswale, which serves to treat stormwater runoff from the Project Area. (See Overall Key Plan for further information in the Grafton Station proiect site.) 2. GENERAL DESIGN STRATEGIES Mixing Autos and Pedestrians Grafton Station is part of Area H of Dublin Ranch, which includes plans for future residential, campus office and commercial uses. In addition to serving the larger Dublin community, which will access the site by car, Grafton Station will serve local residents as well as business and office workers who will be able to walk to shopping and services. Traffic Calming Landscaping will be used to encourage pedestrian usage while accommodating and slowing cars. Starting on Grafton Street at the Project Site entry at Dublin Boulevard, sidewalks and plazas will include concrete unit pavers, closely spaced street trees and grates, fountains, public art and pedestrian scale lighting. Traffic calming devices within Grafton Station include: . Dublin Boulevard/Grafton Street comer entry plaza at Pads B and C - 1 . Concrete unit pavers in crosswalks . Courtyards with seating and landscaping at other Grafton Street intersections . Traffic circle with public art and plantings . Plaza at Pads E- 1 and E- 2 . Pedestrian connections and trees in parking lots Identity In order to create a cohesive and unified identity within Grafton Station, there will be consistency and compatibility between IV - 3 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I ll~ Grafton Station at Dublin Ranch . JulY 2006 architecture and landscape by using a simple and limited palette of construction materials, site lighting, furnishings, paving and plant materials. Street and building signage shall conform to the Master Signage Program prepared by the GNU Group for Grafton Station. In addition to the master signage program, buildings at the intersection of Grafton Street and Dublin Boulevard will have taller architectural elements on the corners to announce arrival at Grafton Station. A fountain with bubblers and accent lighting will be located in the sidewalk area between Grafton Street and Pad B. Site Planting Concept The landscape concept is expressed primarily through the use of street trees, which establish a hierarchy of spaces and provide the much needed shade: · The parkway on Dublin Boulevard is planted with a staggered double row of large deciduous trees which continues the landscape treatment which has already been established. · Grafton Street sidewalks are planted with the large flowering Robinias which continues the same tree anticipated from the northern portion of Grafton Street within the Village Center, while the median is planted with a smaller flowering accent tree. The traffic circle has a ring of low shrubs and ground cover that circle the public art; and possibly a ring of trees. · Metal tree grates are provided for all trees planted in paved areas and along street frontages, and are to be a minimum of 6' square. · The large plaza at the end of Grafton Street is also planted with a grid of Robinia trees, with water feature, low hedges and seating for outdoor dining. · The parking lots have four types of trees - one for shading cars, one for shading pedestrian walkways, one to mark the interior ease-west street which divides the main parking lot in two, and one that marks the vehicular circulation on the perimeter. · There are evergreen screening trees and understory shrub plantings to block the view of the back of Anchor A from the south and west. · There are riparian plantings in the bioswale associated with stormwater management parallel and adjacent to the freeway. 3. GRAFTON STATION MAIN ENTRY Intersection of Grafton Street and Dublin Boulevard Pad B on the south western corner of the Grafton Street/Dublin Blvd. intersection is set back to provide an "entrance" or a "gateway" to Grafton Street with a low fountain and signage which is unique IV-4 Landscape Design Guidelines I I il I I I I I I I I I I I I I I I I [1 Y. Grafton Station at Dublin Ranch . July 2006 relative to other locations in Dublin Ranch, yet within the consistent pallette of materials used throughout Area H. Landscape Treatment The Dublin Boulevard street tree will continue in front of Pad B to the corner of Grafton Street, with additional shrubs facing Dublin Blvd. These additional plantings will be placed to complement the building's architecture, retail entries and windows. Paving Materials Unit pavers on sand with a simple geometric pattern, including 2 contrasting but subdued colors, will match the paving used throughout the main shopping areas. The entry band of enhanced paving, consisting of matching unit pavers and concrete restraining edges will be used at the intersection of Dublin Boulevard to serve as a threshold leading into Grafton Station. (See Grafton Street Enlargement Sheets 1 and Z and Entry Plaza Enlargement Sheet for further information on Grafton Street) 4. GRAFTON STREET LANDSCAPE Paving for Sidewalks and Crosswalks Grafton Street will have a 12' minimum wide sidewalk with the face of buildings typically located at the back of the sidewalk. In some locations, the buildings will be located further than the 12' minimum from the back of curb. Sidewalks along both sides of Grafton Street will be paved with the same 2 color concrete unit pavers from back of curb to the face of the buildings, as will adjacent courtyards, crosswalks, and a collar around the traffic circle. Crosswalks paved with concrete unit pavers and concrete restraining edges are located at all of the intersections on Grafton Street providing pedestrians with connections to retail buildings as well as adjacent Campus Office uses and the Water Quality T reatrnent Basin. Planting In order to connect with Grafton Street north of Dublin Boulevard, Grafton Street is planted with the same deciduous, flowering Robinia 'Idahoensis' street tree at approximately 30' on center, in cast iron tree grates. In areas where the building face is further from the back of curb than the 12' minimum, there will be additional pots and/or planters with shrubs and ground cover. The landscape median that divides the north and south bound travel lanes on the first block of Grafton Street will be planted with a smaller flowering accent tree, with low shrubs and ground cover. (See Recommended plant PaleRe on the Overall Key Plan.) IV - 5 landscape Design Guidelines I I I I I I I I I I I I I I I I I I I l15 Grafton Station at Dublin Ranch . July 2006 Site Amenities Furnishings and colors shall be standardized throughout Grafton Station. Bicycle racks, trash receptacles and benches shall be used at building entries in a similar style as other such street furnishings at the Village Center across Dublin Boulevard. Lighting standards along Grafton Street and the two entry streets between Pad buildings shall be the some as used on Grafton Street north of Dublin Boulevard in the Village Center. Fixtures shall be 100 watt metal halide on a 1..4' pole with a single luminaire mounting arm. Fixtures shall be spaced at 60' - 90' on center and aligned in pairs instead of staggered along the street. 5. PLAZA AND TRAFFIC CIRCLE AT SOUTH TERMINATION OF GRAFTON STREET Plaza at Pads E-1 and E-2 At the end of Grafton Street is the large shaded plaza on the north side of building E- 2 which fronts onto the traffic circle and terminates Grafton Street. It is large enough to relate to the scale of the traffic circle, and is also divided to make smaller areas for outdoor dining, pedestrian circulation and casual seating with a fountain and low hedges. Paving Materials Paving materials may be a combination of concrete unit pavers and colored, sandblasted concrete to match other Grafton Station open spaces. Planting Low shrub plantings at the southern edge of the traffic circle provide a screen between the plaza and autos on Grafton Street. A bosque of large shade trees in cast iron tree grates provide a cool, leafy space for outdoor seating. Amenities A series of connected water features with bubblers and accent lighting will be located in the plaza, and will be similar in design to the fountain in the entry plaza at Grafton Street and Dublin Boulevard. With the plaza's proximity to 1-580 to the south, the water feature's design should include jets and bubblers that will mask some of the highway noise for plaza users. A massive concrete, wood and steel trellis is suggested in four locations around the traffic circle. This trellis will help to define the traffic circle at the end of Grafton Street, and provide an additional layer of separation between the plaza and Grafton Street. IV - 6 Landscape Design Guidelines I ! I I I I I I I I I I I I I I I I I I 11~ Grafton Station at Dublin Ranch · JulY 2006 Public Art Public Art will be located in the center of the traffic circle at the termination of Grafton Street on an elevated platform. The landscape concept will be designed to work with the public art, and may be surrounded by a ring of large trees. (See Traffic Circle Enlargement Sheet for further information.} 6. ENTRY STREm TO PARKING LOTS Street Design Concept The northern entry street off Grafton Street that divides Pads C - 2 and D, and extends into the parking lots between Anchor A and Pad A will consist of one travel lane in the west-bound direction and two travel lanes in the east-bound direction. A landscape median is located between the two directional lanes. As this is a significant access point, the Pad buildings have a generous 20' wide minimum sidewalk to separate cars from buildings, and to provide opportunities for pedestrian circulation and for retail uses at Pad D to spill out onto the sidewalks. The southern Entry Street that connects the traffic circle with the Anchor A parking lot will consist of one 12' wide travel lane in each direction of travel. This road divides the Pad buildings D and E-1 along Grafton Street and both sides shall have extremely wide sidewalks to encourage retail uses from Pads D and E-1 to spill out onto the sidewalks. Planting The predominant feature of both entry streets are the double rows of evergreen street trees with low shrubs and seating. Trees are planted in metal tree grates at approximately 20' on center. The large areas from building to back of curb allow for layers of landscaping to define smaller scaled spaces for outdoor seating, dining or shopping. In order to define the northern entry street as it extends west past Grafton Street Pad buildings to divide the two parking lots for Anchor A and Pad A, a wide planting island is proposed on both sides of the street to be planted with a large accent tree at approximately 40' on center, with medium height, evergreen shrubs to screen parked cars in adjacent lots. Paving Materials Sidewalks along entry streets will be paved with the same concrete unit pavers from back of curb to the face of the retail buildings to match sidewalks along Grafton Street. Crosswalks located at all of the intersections along both entry streets shall be paved in concrete unit pavers to match sidewalks with concrete restraining edges. IV -7 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I 111 Grafton Station at Dublin Ranch . JulY 2006 Lighting Lighting standards along Entry Streets between Grafton Station Pad buildings shall be the same as what is used on Grafton Street. Fixtures shall be 100 watt metal halide on a 14' pole with a single luminaire and mounting arm. Fixtures shall be spaced at 60' - 90' on center and aligned in pairs along both sides of the street instead of staggered along the street. Fixtures in the landscape median shall be 100 watt metal halide on a 14 pole with double luminaire and mounting arms. Light Poles shall be painted to match other site furniture within the Grafton Station Project Site. (See Entry Street Enlargement Sheets 1 and 2 for further information.) 7. PARKING LOTS Parking Layout Parking spaces in both lots are laid out with a repeating module of three standard sized spaces adjacent to two compact spaces. Parking spaces include the City of Dublin standard parking space of 9' wide by 20' deep, a compact parking space of 9' wide by 17' deep, and a handicapped parking space of 9' wide by 20' deep with a striped loading zone of at least 5' wide by 20' deep. Parking spaces in both lots take advantage of a 2' overhang into a landscape planting island. This allows for less paving, more landscape, and a more efficient parking lot layout. Landscape Treatment Each of the landscape planters adjacent to pairs of compact spaces is at least 16' wide and 10' deep and is planted with a large deciduous canopy tree, shrubs and ground cover. Landscape planting islands are bordered with Hush concrete curbs on all sides. Where islands abut parking spaces, a 6" raised concrete curb extend across half of each parking space to act as a wheel stop, and to allow parking lot runoff to be filtered by the planters. The 6" raised concrete curbs are also located on the outside edge of all landscape planting islands facing the vehicular drive aisles. Each parking aisle is terminated with a 36' long landscape planting end island planted with two large accent trees, shrubs and ground cover. There are also unique, enlarged landscape planting islands through both lots, which are more heavily planted with trees, shrubs and ground cover plantings to modulate the scale of the parking lot. Along the southern edge of the parking lot serving Anchor A, there are enlarged landscape planting areas at the termination of drive aisles that run in the north-south direction. These planting areas will be planted with large scale evergreen trees which will eventually accent the southern edge of the lot and soften the views for I I I I I I I I I I I I I I I I I I I l1 ~ Grafton Station at Dublin Ranch . JulY 2006 (See Parking lot at Dublin Boulevard Enlargement Sheet, Handicapped Parking enlargement Sheet, and Parking lot Enlargement Sheet for further information.) Parking Lot Lighting Parking lots shall be lighted with both single and double 180 degree mounted fixtures on 30' high poles. Fixtures shall have double tension mounting arms. Lights will be 400 watt super metal halide. Fixtures are approximately 80' apart and placed in each parking lot parking aisle and in locations around parking lot perimeter. Light poles shall be painted to match other site furniture within the Grafton Station Project Site. Paving Materials Parking lots are to be paved in asphalt and striped per City design standards. Handicapped parking spaces, loading zones and crosswalks are improved at building entries with unit pavers with concrete restraining edges to define autocourt areas to slow traffic and improve parking lot appearance. Pedestrian Connections Each parking lot in the Grafton Station Project Site will have at least one 16' wide landscape planting aisle that contains a 5' wide concrete pedestrian walkway connection running its entire length. This connection serves to connect Anchor A and Pad A to the Pad buildings along Grafton Street. These connections encourage users to navigate the entire Grafton Station development on foot instead of in a vehicle. Each pedestrian walkway connection is to be colored sandblasted concrete. Walkways are lined with shrub and ground cover plantings as well as a double row of medium-sized evergreen accent trees. Two in-ground up lights shall be placed to accent each tree along Pedestrian Connections. (See Materials list for more information.) 8. PLAZA AT PADS BAND C Design Concept The primary outdoor plaza space for the site is at the interior sides of Pads Band C-1. It will have seating and outdoor dining space shaded by trees and wood and steel trellises. A series of connected water features with jets and lighting will serve as the focal point of the plaza, and will be similar to the fountain at the comer of Grafton Street and Dublin Boulevard. The plaza will tie in with pedestrian circulation along the retail storefronts under the building arcade which fronts the plaza. Entries IV - 9 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I tt'" Grafton Station at Dublin Ranch . JulY 2006 to the Pad buildings will be Ranked by large potted plants. Benches will be provided throughout the plaza, under architectural arcades and along pedestrian passages between Pad buildings. Shade trees in metal tree grates provide a buffer between the plaza and the adjacent parking lot. Paving Materials The main triangular seating area is defined by colored concrete with sandblast finish, and is surrounded by the same unit pavers in 2 colors to match those used throughout. (See Plaza at Retail Pads 8 and C Enlargement Sheet for further information.) 9. RETAINING WALLS Design Concept Retaining walls are necessary in three locations and shall be of similar design. One retaining wall is necessary on the southwest corner of the site because the loading dock and truck turnaround at Anchor A is at a different elevation than the grade at the adjacent property line. Similarly, a second retaining wall is necessary along the southern edge of the Anchor A parking lot because of the grade difference between the parking lot and the proposed bioswale that parallels Northside Drive and 1-580 to the south. A third retaining wall is necessary along the delivery truck entry that runs behind Pad A because of a grade difference between the delivery entry and the western property line. Dimensions The three retaining walls are of similar design. The wall at the southwest corner of the site will be approximately 78' long. It shall vary in height from approximately 2' high to approximately 4' high. The wall at the southern edge of the parking lot at Anchor A and roughly aligns with the length of the bioswale will be approximately 234' long. The wall will have a break at the vehicular connection between the parking lot and Northside Drive. It shall vary in height from approximately 2' high to approximately 6' high and will extend an additional 24" above the finish grade of the adjacent parking lot along its whole length. This wall's design will include an ornamental steel railing because of its proximity to pedestrian traffic. The third retaining wall located along the delivery entry drive will be approximately 550' long. It shall vary in height from approximately 2' high to approximately 8' high. This wall's design will include an ornamental steel railing because of the height of the wall and its proximity to vehicular traffic. IV - 10 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I (% Grafton Station at Dublin Ranch . July 2006 Retaining Wall Design and Materials Retaining walls have poured concrete columns located at 18' on center and at the ends of the retaining wall. The bases of columns shall be approximately 18" wide and 24" thick, and shall step in at the top, to accept a continuous horizontal concrete cap or bond beam. Columns include formwork recesses and reveals to create shadows in selected areas. The poured concrete columns on the retaining wall shall match the other materials in the wall in color and finish. Between the concrete columns, the retaining wall has stacked 4" high x 8"x16" colored concrete blocks with a slight batter (2%). Concrete blocks and cap shall be consistent in colors and finish as other materials in the Grafton Station Project Site. There will be an ornamental painted steel guardrail on top of the wall paralleling the bioswale that extends 18" above the masonry. The guardrail shall consist of panels of evenly spaced, steel members at 4" apart, with intermediate steel posts 4'-6" apart. Steel guardrails are attached to concrete column extensions. Metal railings are to be painted to match other metal site furnishings. (See Retaining Wall Enlargement Sheet for further information.} 10. BIOSWALE LANDSCAPE Stormwater Management The Grafton Station development shall include a Water Quality Treatment Bioswale on the southern edge of the Grafton Station site, between the Anchor A parking lot and the existing Northside Drive. The purpose of the bioswale is to treat the stormwater runoff from the entire project before conveying it into the adjacent Water Quality Treatment Basin. Storm water is directed to the bioswale and is allowed to slowly travel its length. As water travels, it is absorbed into the ground where it is "treated" by slowly percolating through the plants and earth. This is an alternative to a more traditional method of simply directing water into catch basins and directing it off-site in pipes. After treatment, water is piped into the adjacent Water Quality Treatment Basin. Dimensions The bioswale is approximately 234' long and have a Rat bottom that is approximately 21' wide. The sides of the swale shall have a slope not exceeding 2:1. Materials The Bioswale shall be constructed of existing soil. The flat bottom of the swale shall be planted with rushes and sedges that will tolerate wet conditions much of the time. The sides of the swale shall be planted with riparian/native trees, shrubs and vines in informal arrangements. IV - 11 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I l ~I Grafton Station at Dublin Ranch . JulY 2006 11. OWNERSHIP AND MAINTENANCE OF THE GRAFTON STATION PROJECT AREA Grafton Street will be owned and maintained by a master property owners association (POA) comprised of Grafton Station property owners and other Area C property owners. This specifically applies to the area between the back of curb on each side of the street, including landscaped medians, traffic circle, crosswalks, special paving and landscape elements. It is envisioned that the future collector street extending east from the traffic circle at the Grafton Street terminus that will loop through Area C and return to Dublin Boulevard will also be POA owned and maintained. The street lighting system on Grafton as well as the future streets comprising the loop street system that returns to Dublin Blvd. will be owned and maintained by the POA. Utility and access easements related to Grafton and other loop streets will be provided to the City and DSRSD as required. The two east-west streets connecting the main on-site parking lot to Grafton Street will be owned and maintained by a separate sub- association of the POA. In addition, the sub-association will own and maintain all common area parcels outside of the footprints of the Conventional Retail & Commercial buildings (Pads B - E), including all sidewalk and landscape areas between the back of curb and the building face along Dublin Blvd. and Grafton Street. This will specifically include sidewalks, plazas and paseos; street trees and other landscaped areas; irrigation systems; water features; benches, trash receptacles and other street furniture; on-site signage and walkway and landscape lighting systems. The bioswale area that extends along the south end of the main parking lot will be located within the Anchor A parcel but will be maintained by the POA sub-association for Grafton Station since it provides required water quality treatment for all of the Grafton Station landowners. This will include the retaining wall and fence; drainage piping and structures; and all landscaping associated with the bioswale. IV - 12 Landscape Design Guidelines I I I I I I I I I I I I I I I I I I I Exhibits: Sheet L-1 Detail Sheet 1 Detail Sheet 2 Detail Sheet 3 Detail Sheet .4 Detail Sheet 5 Detail Sheet 6 Detail Sheet 7 Detail Sheet 8 Detail Sheet 9 Detail Sheet 10 Detail Sheet 11 Detail Sheet 12 Detail Sheet 13 Materials List (<:6 -z.. Grafton Station at Dublin Ranch . JulY 2006 Overall Key plan Grafton Street Section (at first block) Grafton Street Section (at second block) Traffic Circle Enlargement Entry Comer Enlargement Open Space Enlargement (at Pads Band C-1) Entry Street Section (at first block) Entry Street Section (at second block) Parking at Dublin Boulevard Enlargement Parking Lot Enlargement Handicapped Parking Enlargement Retaining Wall/ Bioswale Enlargement Retaining Wall Detail Landscape Screening Enlargement IV - 13 Landscape Design Guidelines I I ~------------------------ ( ------, ,.. ~~'.~' . . I I I PAD-A I I I I I I I I a:: o I I I I FUTURE CAMPUS OFFICE DEVELOPMENT I .OVERALL KEY PLAN E9z v NOTE: RETAIL PAD BUILDING OUTUNES SHOWN WITHIN THE GENERAL COMMERCIAl PARCELS ARE CONCEPTUAL ONLY. ACTUAL DESIGN AND LAYOUT MAY DIFFER FROM THAT SHOWN HERE. REFER TO STAGE" PO DEVELOPMENT PlAN (SHEET PO-l) FOR BUILDING ENVELOPE lOCATIONS. KEY I r-.. STREET SECTION CUT. SEE ~ ~=:g":~~~~OR (~ - -1 OETAll AREA. SEE I I CORRESPONDING EXHIBIT FOR \ J DETAIL PlAN ---0 LEGEND o c:=:::J ASPHAlT PAVING [[]I[]) ~~:ETE PAVING WI SANDBlAST f:IEEjJ ~~~~~:s EJ flX2f1 HANDICAP PARJ()NG SPACE U 9'X15' COMPACT PARKING SPACE TI 10'X2f1 CONTRACTOR PARKING SPACE =:J 9'X2O' STANDARD PARKING SPACE SlGNAGE, SEE MASTER SIGNAGE o PROGRAM PREPARED BY GNU GROUP FOR SPECS. AND EXACT lOCATIONS PARKING lOT LIGHTS, SEE SHEET t-7 AND UTJUTY PlAN FOR SPECS. AND EXACT LOCATIONS UPUGHT :3 CART CORRAl PLANT PALETTE ~ ntEESALONG Dn'fn' DfmIETO ANCHORS.W8OX: Laf9tJ~.-.rT... QUERCUS~ SlluIIIllrnl.JveOall. o ~~~~:-.-:::- ~ ~~-=T_ _w..Oo> ~ PEDESl'RWt CONNECTION TREES. "!lOX \:..1 ~~T'" FftaII8s8OiwTree 0. .. ENDOFDfhVEAI8lEACCEHI'TREES-3I"8OX: E~~1I88 O N;N>A""-"""",,, -- . PlAZANEAACCSffTREES-24'8OX: E-.-_ MAGNOUAGRNOR,ORA ~lObII~t.IlIgIlOIi8l ~0 =~....oox, ~Oo> . . ... SCASENlJtB1JlEE5.2oI"8OX: ~~j SCHINUSMOIJ..E CaIiforriaPepperTree o.~ 'P t;::::,:,:,:,:,:,:,:,:::,:,J - 1:::::::::::::::::::::1 SCAUNIIIG SHRUBS. fa GM...:: NlBUTtlSUNEOO ~TtfIll MVRTUS COMMUNIS Myrtte TI98 I.ANOSCAPE~ 1 GAL. GAOUNO CO'iEAS . SPAClNO AS 1MlICATEO: COTONEASTStOMNERl'l.C:Mf'ASI" @M'o.c. auG€IION~FI.EA8NE fil18'O.C. ROSMARINUSCFFlCWAUS @2'I"O.c. URIOf'E GIGNfTEA @tS"o.C. TRACHEl.OSF'ERM JASYNOIDES ~.e- o.C. ,........... COM<l<""-"" CNroRUM TEVC<WU ""'""""'" U.",""......... BushMorflingGkll'V -- ............ """"""UNB>O_ RQSA-YMl1:R..O\HERCARf'ET DE"""' PW:HEIlIIOUl .-- NERlUM 0LENClER 'SlNBl.E WttTE NERlUM CUNCJER -ow.t V\INW PlTTOSPORUM TOSIAA ."""'- PHORMIUM TEPWt 'VMEGATA' Dwa1S1rBwb11rryT.... ,"'- """'..... ~ ~......0IMndw ...... Now'"*" "" 3N OLWETER D.G. MlJU;H IN INTEAIOR ISLANDS UNDER CAR OVERtWiGS R1PAItIM! BlO&WALE &AHK PI.Nff1NG, SEE AECClWMENOEO~PAlET1'E ON SHEETl1.5 llfOSWAI.E EIOTTOlII PI..AN1W'tG: SEE FlECONMB<<lEO PLANT PALETTE ON SHEET L1.5 tt, /;RAFTIIN m SHTlII~ A T DUBLIN RANCH Dublin, California REV I S ION S: DESCRII'TION DATE CITY SUBMITT At 031151U6 CITY RE.SUBMITT AL 05/10/06 CITY RE.SUBMIITAL 07111106 PROJECT NUMBER: SCALE: DATE ISSUED: 16034.13 1~=6O'.()" MARCH 2006 STAGE 2 PLANNED DEVELOPMENT REZONE OVERALL KEY PLAN gls Archileclu"" Landscape ArchilectuJe 26n MIssion SIreeI #200 San Frandsco, CA94110 voice41512853614 facsimile 4151285 3624 e-mai gls@glsarch.com SHEET NUMBER: L-1 I I I I I U 0 I <( a. I I MIN. 2 SOUTH SIDE BOUND I WALK LANES S E C T 10 N I I I I I I I I I I I II 3 NORTH BOUND LANES MIN. SIDE WALK \~'1 GRAFTON STREET TREE IN TREE GRATE, TYP. 14' POLE LIGHT STANDARD, TYP. SEE MATERIALS LIST MEDIAN LANDSCAPE ISLAND wi MEDIUM ACCENT TREES, SHRUBS AND GROUND COVER STREET TREES AND SIDEWALK DIMENSIONS SHOWN FOR DESIRED DESIGN INTENT. EAST SIDE OF GRAFTON STREET TO BE CONSTRUCTED WITH FUTURE CAMPUS OFFICE DEVELOPMENT W Uf- -z .......w w.......::E O:Oa. ::J o f-V1...J ::J::Jw .......a.> ::Ew <(0 o LARGE POTTED PLANT AT ~AIL ENTRIES. TYP. ~GRAFTON STREET PAVED wi PHALT, TYP. o o <( a. TYP. SEE W Of- -z .......w w.......::E O:oa. 0.. ::J 0 >- f-V1...J I- ::J::Jw .......a.> ::Ew <(0 0 J J J ~ } ~ 12'-0" 12'-0" 12'-0" 8'-0" 12'-0" 12'-0" 12'-0" MIN. P LAN J ,',,' MIN. METAL TREE } GRATE, TYP. 12'-0" MIN. GRAFTON STREET SECTION EB SCALE: 1 "=20'-0" I I I I I I I I I I I I I I I I I I I leg5 GRAFTON STREET TREE, TYP. 14' POLE LIGHT STANDARD, TYP. SEE MATERIALS LIST STREET TREES AND SIDEWALK DIMENSIONS SHOWN FOR DESIRED DESIGN INTENT. EAST SIDE OF GRAFTON STREET TO BE CONSTRUCTED WITH FUTURE CAMPUS OFFICE DEVELOPMENT o "'....... "4''1; " ,.,p"..... . ~.. "'0<>" ."..."" 9 uOlin 0: 01. <t.. 0'". _0.0". o' 318181F1I""11811';31 I 1E31E3I~ElI IElII'=" 1""11""F1IRI881818181I'=II 81131!ITi!!1-1 '!iii!'ElIE3I~1 Ell E3 E -- O-II'=lrt=ltl=ll ,,- 1 2' _ 0" 1 2' _ 0" ""''''--11 =Ul=IIt= 0-"'-"__ 11:::;:11 It=llt=llt=ll W 01- -z lL.w WlL.:::;; O::Oa. => o I-tn....J =>=>w lL.a.> :::;;w <(0 o 12' -0" 21'-0" 24' -0" 21'-0" 12'-0" MIN. ON-STREET TRAVEL ON-STREET MIN. SIDE DIAGONAL LANES DIAGONAL SIDE WALK PARKING PARKING WALK SEe T I 0 N SIDEWALK PAVED Wi CONCRETE UNIT PAVERS, TYP. GRAFTON STREET PAVING TO BE CITY STANDARD ASPHALT. TYP. GRAFTON STREET TREE, TYP. 0 ~ ~ 0 <( a. ~ ,.() d\ tn => I- a. z :::;;ww <(0:::;; o-a. lL.o wlL.....J 0:: Ow =>1> I- w => 0 lL. J f2'-OJ MIN. P LAN 21'-0" J 21 ' -0" 14. POLE LIGHT STANDARD, _I . TYP. SEE "ATERlAlS LIST J2'-O-J MIN. EB j, 24' -0" GRAFTON STREET SECTION SCALE: 1 "=20'-0" ------------------- F U T U R E CAMPUS OFFICE D EVE LOP MEN T PAD D SHRUB AND GROUND COVER PLANTINGS, TYP. BENCHES. TYP. SIDEWALKS PAVED wi CONCRETE UNIT PAVERS. TYP. IN I G AREA, TYP. PAD E-2 P LAN SCALE: 1 "=20'~O" EB @) t TRAFFIC CIRCLE ENLARGEMENT I l~l I 14' POLE LIGHT STANDARD, TYP. SEE MATERIALS LIST WATER FEATURE WI BUBBLERS AND LIGHTS LARGE POTTED PLANTS AT RETAIL ENTRIES, TYP. SOUTHBOUND MEDIAN NORTHBOUND LANES LANES I I SECTION I GROUNDCOVER PLANTING, TYP. DUBLIN I FLUSH PLANTER WI SHRUB AND GROUND COVER PlANTINGS, TYP. SIDEWALK AND ENTRY BAND UNIT I I I 14' POLE LIGHT STANDARD, TYP. SEE MATERIALS LIST ELEVATED WATER BASIN WI BUBBLERS AND LIGHTS I I LARGE POTTED PLANT, TYP. LOW PLANTlNGS IN FRONT OF WATER FEATURE I PAD B I 8'-0" WIDE LANDSCAPE MEDIAN I COVERED WATER COURSE FLUSH REFLECTING POOL I I I I P LAN PAD C - 1 E9 SCALE:l"~20'-O" 0 ENTRY CORNER SECTION I I I I l1s' is' PAD B DIRECTIONAL SIGNAGE, SEE MASTER SIGNAGE PREPARED BY GNU GROUP COVERED WATER COURSE, TYP. FLUSH REFLECTING POOL ELEVATED WATER BASIN WI BUBBLERS & ACCENT LIGHTS TABLES & CHAIRS FOR OUTDOOR DINING BENCH AND PLANTING POCKET AT TRELLIS POSTS, TYP. PAD C - 1 COLORED CONC. PAVING wi SANDBLAST FINISH, TYP. BENCHES, TYP. BUILDING CANOPY, TYP. WOOD AND STEEL TRELLIS, TYP. c c ICO CRETE PEDESTRIAN CONNECTION I \ . 'Q':j;{}~;' ~ Ie \ \. ~ ..,':::. "~W:::: ~ I OPENSPACEENLARGEMENT I SCALE: 1 "=30'-0" I I I I I 0 I : I I I I I I 10 oc{ I I I I I I \~4 o ~~ ~ ~ib~ ~-" jJ,kl P-v " J,. J)..{>.:II 4- "'" ,., J>. ~ ~ fLUSH PLANTERS WI SHRUBS AND GROUND COVER PLANTINGS, TYP. 14' POLE LIGHT STANDARD. TYP. SEE MATERIALS LIST MEDIAN LANDSCAPE ISLAND WI MEDIUM ACCENT TREES, SHRUBS AND GROUND COVER IN N u .." . ~. . ..,0 ~... 000 .. ._"... ".r ''? <> I I f I I 1.1 II I I II, I o oc{ CL 20'-0" 20' -0" MIN. 2 LANES INGRESS LANE MIN. SECTION fLUSH PLANTERS Wi SHRUBS AND GROUND COVER PLANTINGS, TYP. 14' POLE LIGHT STANDARD, TYP. SEE MATERIALS LIST ENTRY STREET PAVED Wi CITY ASPHALT SIDEWALK PAVED WI CONC. UNIT PAVERS, TYP. a.. N o u o oc{ a.. 20'-0" MIN. 12' -0" 12'-0" 8' -0" " " ~ " '" '" '" '" 2 EGRESS LANES 16'-0" 20'-0" ./ '" .( INGRESS LANES -' MIN. '" SCALE: 1 "=20'-0" G @ P LAN ENTRY STREET SECTION I I I I I I I I I I I I I I I I I I I l~O "/~ ~ ~c ~}-> ~'--' , v'<- 4 4~ b t: ~4 Vr40 ';~,,(~~4:Z A N C H 0 R A ~~~ PARKING LOT~ LARGE ACCENT TREE ALONG ENTRY ROAD IN ENLARGED LANDSCAPE PLANTING ISLANDS, TYP. SHRUB &. GROUND COVER PLANTINGS TO SCREEN PARKED CARS LOT "IElI 18'-0" 30' -0" 18'-0" ST ANDARD PARKING STALL TYP. 14'-0":1: LANDSCAPE BUFFER ENTRY ROAD 14'-0":1: LANDSCAPE BUFFER STANDARD PARKING STALL TYP. SECTION +t o ~~ ~ \) \) POLE LIGHT STANDARD, TYP. SEE MATERIALS LIST a.. >- o "<t + + + + + + + + + + + + + + + + + + + + + + + + + + + STANDARD PARKING STALL, TYP. COMPACT PARKING STALL. TYP. A N C H 0 R A PARKING LOT PAD A PARKING LOT 18' -0" 30'-0" 14'-0":1: 18' -0" SCALE: 1 n=20'-0" G (j) P LAN ENTRY STREET SECTION I I I I 5' -0" f 24'-0" ~8'-0", LANDSCAPE MULCH ONLY BIKE DUBLIN LANE BLVD. I I 'I I INTERIM LANDSCAPE CONDITION PAD A PARKING LOT I I I I ~12~IN.0'HO'-OH LANDSCAPE SIDE PLANTING BIKE DUBLIN BUFFER WALK STRIP LANE BLVD. -f 18'-0" STANDARD PARKING STALL TYP. SECTION l ~ \ SINGLE ROW OF TYPICAL LARGE DECIDUOUS DUBLIN BOULEVARD STREET TREES INSTALLED AS INTERIM LANDSCAPE TREATMENT. LANDSCAPE MULCH APPLIED FROM BACK OF CURB TO RIGHT OF WAY LINE AS WEED DETERENT AS INTERIM TREATMENT ALTERNATING DOUBLE ROW OF TYPICAL LARGE DECIDUOUS DUBLIN BOULEVARD STREET TREES TO MATCH LANDSCAPE TREATMENT IN OTHER SECTIONS OF DUBLIN BOULEVARD SHRUB & GROUND COVER PLANTINGS TO SCREEN PARKED z CARS -0 ....I> ID....I ::lID o + + + +1 + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + + LANDSCAPE BUFFER ~ ALTERNATING DOUBLE ROW OF TYPICAL LARGE DECIDUOUS DUBLIN BOULEVARD STREET TREES TO MATCH LANDSCAPE TREATMENT IN OTHER SECTIONS OF DUBLIN BOULEVARD I I I I I I I PAD A P A R KIN G L 0 T C) C) 18' -0" 12'-0" P LAN MIN. FINAL LANDSCAPE CONDITION 10' -0" 8' -0" BIKE LANE DUBLIN BLVD z -0 ....I> ID....I ::lID o COMPACT PARKING STALL. TYP. STANDARD PARKING STALL. TYP. PARKING AT DUBLIN BOULEVARD SCALE: 1 "=20'-0" G 131 It: I 1"'" 15' -0" 15'-0" 15'-0" 24' -0" 15'-0" 0'-0' 15'-0" 24' -0" 15' -0" 1 0' -0' 15'-0" 24' -0" 22' -0" COMPACT PLANTING COMPACT DRIVE AISLE COMPACT PLANTING COMPACT DRIVE AISLE COMPACT PLANTING COMPACT DRIVE AISLE COMPACT WALK wi COMPACT PARKING PARKING PARKING PARKING PARKING PARKING PARKING PLANTING PARKING SPACE SPACE SPACE SPACE SPACE SPACE SPACE SPACE SECTION / 6" RAISED CONCRETE CURBI WHEEL STOP, + + + + TYP. + + + + + + + + + fLUSH CONCRETE CURB, + + + + TYP. + + + + TREE UPUGHT - 2 PER TREE AT PEDESTRIAN C) CONNECTIONS, TYP. SEE C) C) C) C) C) C) C) MATERIALS UST C) C) C) () C) C) () () CART CORRAL, TYP. 0 a... I >- PARKING LOT POLE UGHT l"- I- 5'-6" STANDARD, TYP. SEE N MATERIALS UST STANDARD PARKING SPACE, TYP. () () C) 0 () C) I a... CO >- - COMPACT PARKING SPACE, TYP. C) () () I- () C) + + n + ~ + 18' -0" 18'-0" 3'-~'-o"1 45' -0" 24'-0" 40' -0" 24' -0" 40' -0" 24' -0" 52'-0" G PLAN PARKING LOT SECTION @ SCALE: 1 "=20'-0" I I I I I I I I I I I I I I I I I I I l q "2- LARGE CANOPY SHADE TREE, TYP. END ISLAND ACCENT TREE. TYP. MEDIUM FLOWERING TREES ALONG PEDESTRIAN CONNECTION, TYP. 5' WIDE CONCRETE PEDESTRIAN CONNECTION I I END ISLAND W / MEDIUM ACCENT TREE, SHRUBS AND GROUND COVER, TYP. I PAINT STRIPING ON UNIT PAVERS TO DELINEATE HANDICAPPED LOADING I ZONE, TYP. CONCRETE UNIT PAVERS IN DIFFERENT COLOR TO DELINEATE PARKING STALLS. TYP. I CONCRETE UNIT PAVERS, TYP. I LANDSCAPE PLANTER, TYP. g' X 20' HANDICAPPED I~ , / SPACE, TYP. I ,g. X 15' COMPACT /;: I STALL, TYP. r-- "- .. I~~~ c c , ~I I 1/ Y + I Y) I ~'1~ , rl 'j:. J ~ , J ~ '~ , J I~i~~ 1.0 "" ~ I I" ~ '<:1/ ... ~ '-t:: v r .. II .. W + ~... ~ ~ ~ H l ! " ....l T~ +..: ~ + (]) + + '" + +.,.: + + + + + + ~ : -:r: ++++++++++..... .0 O(/)~ IV I t:::: D ~ , ~.~ , ~ ~ J ~ ~ ~ 0 I 1(/)<( I I ++ ++++++++1.. I~!~~ . Wo.. 7 ~:;:= ~ -.7 +++++++ +++.. Lf) LOU +~.2 +++++++++++0') ...... U + + +++++ ) <( +j II 1\ + + + + .. + + I '.--: /' K\ V I' ~I :-..;t. I) ~1 I~!~E I - \ '" ;( '1fr 1.0 '.) ;0 .- II I 'I A' C C .. I~ "- y \ , I' r--'-- LARGE CANOPY TREE. I~ TYP. FLUSH CONCRETE 8'-0 ' 27'-0" 18' -0" 18' -0" CURB AT LANDSCAPE , I; , , , PLANTING ISLAND, TYP. , , 7;'-0" \ " \ , 6" RAISED CONCRETE I CURB/ WHEEL STOP, " , TYP. (SHOWN SHADED) , ASPHALT PARKING LOT I I I I I \ \ He PARKING ENLARGEMENT l&r3;. LANDSCAPE PLANTING o I LO -.;t PAVING, TYP. FLUSH CONCRETE CURB, TYP. HC PARKING SIGNAGE. SEE MASTER SIGNAGE PLAN PREPARED BY GNU GROUP, TYP. POLE LIGHT STANDARD. TYP. SEE MATERIALS LIST C) @ SCALE: 1 "=20'-0" I I I I I I I IELEVATION I I I I I I I I I I I to,~ RECOMMENDED BIOSWALE PLANT PALETTE BIOSWALE, SEE PLAN BELOW FOR LOCATION AND DIMENSIONS PAINTED STEEL RAILING, TYP. LARGE RIPARIAN/ NATIVE TREES IN BIOSWALE AREA. TYP. FINISH GRADE OF PARKING LOT BEYOND, TYP. POURED CONCRETE COLUMNS. TYP. CONCRETE BLOCK WALL W/ CONCRETE CAP. TYP. ~~ ~;. ;). .r0 ~ 2; I~ J.:t Jt~;). ~..... ~; iJh[~ ;"'J>.b ~ ~'" ~ s{"V ~.. ~ ;"'t.,b- 0 1:.pA~ ",,, .r0~ ". f ,~ .~ I;). f~ ".~ ~;,~..~ ~ ~. ,'<7 e~ e-.. e-.. 2~ I~ 2~ ,~~~ 2~ I~, f~ Q~ f~ Q~~:; Q:~ ~<- ~.. ~~- ".Q fi /.r0~ e ?t Jt~. <{.t Jf1>~ ~; jJJJ)~, ~; iJl..).9 ~ . f~~f~Q~ ~~.. ~L .r0 J!:~ Jf:~ J.:t"'JJt ~~ ..t Jt~;). ..t ~it;':r. ~ '~~ ~. iJh[~ ~. iJi:l~ ~ A . A~ b~ {J.~ 0.' () 0.' () !:",.. Q~, ~ (;t ". <;7 f::,.. ", . <;7 <>!t{ .Q Cjj RIPARIAN & NATIVE TREES - 48" BOX: CALIFORNIA SYCAMORE Platanus racemosa CAUFORNIA LIVE OAK Quercus agrifolia VALLEY OAK Quercus lobata ~ ELDERBERRY Sambucus mexicana TREE PLANTING, SEE RECOMMENDED Q9 PLANT PALETTE ON SHEET L-' ~::::::::::::::::: :1 SEE RECOMMENDED PLANT PALETTE ON -:. :-:-:-:-:.:-:-: SHEET L-2 ........ . PARKING LOT POLE STANDARD, TYP. SEE MATERIALS LIST ~ ~ ~ ~ //,/1 GRASSES & SHRUBS AT BIOSWALE SIDES, 5 GAL: r i' /?' i" 0/1 BLUE WILD RYE Elymus glaucus / / / CALIFORNIA BROME Bromus carinatus CALIFORNIA WILD ROSE Rosa califomica COFFEE BERRY Rhamnus ca/ifornica CREEPING WILD RYE Leymus triticoides DEER GRASS Muhlenbergia rigens MEADOW BARLEY Hordeum brachyanterum RED FESCUE Festuca rubra PURPLE NEEDLE GRASS Nassella pulchra TOYON Heteromeles arbutifolia Ja':"o_ci TYP. ~ NEW CATCH BASIN AT END OF BIOSWALE I L U~ I "jjlJ ~ ) -:-::.:X' Jh VEHICULAR\~ ~.~~.~. :~/,~~~/'~W)~~~~// ~ N~~.}:_ ACCESS I~~ / V'i /. / ~.// ~//':.~x/ / ~ ~%; // / / . ..... 1/ /// '\./ /~/ //./ / ~~y/~/ <.,E/~ ./ //~~~..<<""'" 30'-0":t ,;:/ ~ /~// o~P.? / / / / / / / / //~ / / /",^",,/ / /,/ ~::.;.-:.;.;. 1/.... it.. .... 'l//. ~/: /, .... //;/////;/ .... .... "./ '/'.... ,;. ....... WIDE ~ / /.... ~ ~~/::'/ V~,f>/ /~/ /~i /~~/ /~ //'::::::::::. TYP v~~ r/,.~,~ /..10// %///'>:St,~~~/.~//? /~///// 'y//;/.-;/// :::>:.'::: . "V.l.... //JIttPC/'lYJ./~V/(~ ,,/..../"" .... r..--:...... ~/. /~/ ~~ .,.<-:.'. o 'I '" .<, ~ / ~//'<VFA " / / ~ / /~//"" /xv,//. / ......-:. ""} ~ ~ '" '" '" F ,7Ct'A / / / //-1 / / /,/,'> ///7/~ . .... ~ >V '" wr '" ~ ~ '" V",U", I l',./'W .... ~/ ~///// -:::: -:::. w '" ~--, '" ~ '" L} -:'-'""\....,--.:>.- "" ""~/~/// ,,:-:.-:.':-: '" ..". \If..". '" '" .." '" +-J"tf '" "V&.ol' "" '" ..... ",,;........,, ...."',/ "::::'., <::: I ..v '" '" "'...... ~:- '" '" \V >/....'" ........:. " w ... '" '" '" '" :s. oJ..U . '" '" r// .... .<.......<... '" '" >&- '" ",> 0 a: ... '" '" ' ./~ /...... ,', '" '" '" '" (/) i ~>- 'IV ~ "..... .... '" \Ir '" '" ... '" ... ... '" '" '" _,-0 ~",3: ~ '" '" '" '" 'I' ,; ; ""::::."<.:::',:.':.: '" 'V '" '" '" '" "'en ~... 'oJ, '" ,/ /......:.. ..... ~;b'~?MX::~?M~~~?0."'/...J~~"'~//~"'~~~... :;~~)r_ ~/ :X~~~y~: .... .... ...." ///// /~.... ~ ~0/;:1>::>........... ,; '" " ... ,/ .... " ,/ .... ....,/ '/" ~ ~ "'bl"" \"'S/-P;"........ . . . /' .... .... ..../ ,/ '" / '" " ,/ /. '" ~/ " / '""',............:..... " "" """"""~;""""" "Q<< ,,~:......+..<++. , " ,,",,",," " " " ,,",,",," " "~" "" y/,./".. ~." :.:.:.........:- / ,//~/;;;;;;;;//;;;;~;~~~~~~j))j))))!J / / / / / j.(ZXZ/:'/:'~/%M?<::::::::: / / ~/::::::::<:l \ PARKING LOT SIGNAGE, SEE MASTER SIGNAGE PROGRAM PREPARED BY GNU GROUP t>;; 000 0 ~ J 6' OIA. RIVER ROCK MULCH MORTARED ~ 0 ~ 0 ~ 0 ~ ~ INTO 4" CONC. SLAB ~ ~X~ tJl""i1:::::.;.. . ^: ~~ > ;. '%f;;i&;~ >;. "./;~~);~iJ,;;.. ~~~ ./~/ ~ /a(~/~' "'~ '" :~~~/~/~/tf"; , ~; /~;~ ~~ .//// /<;-~ ,\~ ~"'.. ~ .. "'\"" '" .. ~~'" "'~. '" ~ ~t:7(/. /...."'/ /", ",," ~ 3-. ""'~,Ai \' v'W 'W 'W "'- 'W 'W W ~..... ~ 'W 'W ....- e "..... .......... ..... '" 'ffi:/ / ~""' '" .. - "-... S '" j '" ... '" '" , "?1t"~7"'''''''''''''''''''''''''''-''''''''' ""'", '" ",'" ..... ..... ..... ..... ..... ..... w ..... ..... ..... ..... ..... . ~ ~ w .............................. w '" \............... ..... .......... ..... ..... .......... ..... ..... :r./. "'-- ..... w ..... ..... w .......... w ..... w..... .............................. 'W..... , "/ -/ "y /. ''/ ..... ..... 'W ..... ..... ..... .,\ .................... ..... ..... ~.'/./ '////~~~////;;/-" "'.., , ., '" '" '" '" '" '" '" '" ~ / / / / / ~/,%.~ :-~~~~~~A/%'7'h '" '" '" '" '" t#_::::_~~~~, / / / / /0~~/~Z~ · .. . · . f" ;....:.:.... ." \ BIOSWALE AREA, TYP. --- - _ RIPARIAN AREA, TYP. t '" .. '" .. .. i RUSHES/ SEDGES FOR THE BOTTOM OF BIOSWALE. 5 GAL.: SPIKE RUSH Eleocharis macrostachya SANTA BARBARA SEDGE Carex barbarae SLENDER SEDGE Carex praegracilis COMMON RUSH Juncus effuses SOFT RUSH Juncus patens RUSH Juncus siphenoides I P LAN - - N ffi SCALE: 1"=20'-0" RETAINING W ALL/ BIOSW ALE ENLARGEMENT I I I I I I I I I I I I I I I I I I I \q~ PAINTED STEEL RAILING wi POSTS AT 4'-6", TYP. COLOR TO BE DARK GREENI BLACK TO MATCH OTHER OUTDOOR MET ALWORK INTEGRAL COLORED CONCRETE WALL COLUMN WI SANDBLAST fiNISH AT 18'-0" O.C. TYP. 8" X 8'. CONCRETE WALL CAP, COLOR TO BE LIGHT BROWN 4" X 16" CMU WALL wi 2% BATTER. COLOR TO BE .OAK. BY "ANGELUS BLOCK COMPANY" 8"-10" LAYER OF 6'. DIAM. RIVER ROCK AT BACK OF RETAINING WALL 6'. RAISED CONCRETE CURBI WHEEL STOP EXTENDS LENGTH OF SOUTHERN EDGE OF PARKING LOT ASPHALT PARKING LOT PAVING SECTION 18' -0" TYP. RIPARIAN SHRUB PLANTING, TYP. SEE RECOMMENDED PLANT PALETTE ON SHEET 11 FINISH GRADE OF PARKING LOT BEYOND, TYP. 4" X 16" CMU WALL PAINTED STEEL RAILING wi POSTS AT 4'-6.' O.C., TYP. - NO RAILING ON RETAINING WALLS AT SOUTH WEST CORNER OF SITE AND BEHIND PAD A. 8.' X 8.' X 24" INTEGRAL COLOR ~ CONCRETE WALL CAP ~INTEGRAL COLOR CONCRETE WALL COLUMN WI 1" REVEALS AND SANDBLAST FINISH AT 18'-0.' O.C., TYP. ~ / "" " 4' -6" I / / 4' 6" - .t 4'-6" 4' -6" z w<{ w-' VlQ.. ~o ~~ 0::0 <{<{ >0::: o ELEVATION .. I, I, RETAINING WALL DETAIL SCALE:1/4"~I'-O" @ I I I 41'-0":t 77' -O":t ...: oJ....':. ...: .:~...... .J .:~.. .:.. ...: o:i." ...... ..: .::..:. oJ ':i'. .". IJ.: :Q~ PP"" OI',jOOI) I I I I I I I I I I I a aa a <> <> I <> <> <> '" u (/)0 w:: a.. 0:0>- 1-,1- II) () () () () + + + + + + + + + + + + + + + + + + + + + + + + + + I I DRAINAGE SWALE, SEE GRADING PLAN PREPARED BY MACKAY AND SOMPS PROJECT PYLON SIGN - SEE MASTER SIGNAGE PROGRAM PREPARED BY GNU GROUP o Q 0 ",,000 l> 1>" ",po " " o 00 "i;oQ l> 1>"0 ",po POURED CONCRETE AND CONCRETE BLOCK RETAINING WALL, SEE DETAIL ON SHEET 12 LARGE SCREENING SHRUBS, TYP. SEE RECOMMENDED PLANT LEGEND SHEET L-1 [ MEDIUM SCREENING SHRUBS, TYP. SEE RECOMMENDED PLANT LEGEND SHEET L-1 PARKING LOT PO LIGHT STANDARD, TYP. SEE MATE I LS LIST SCREENING TREE , TYP. SEE RECOMMENDED P LEGEND SHEET L I LANDSCAPE SCREENING ENLARGEMENT I o 00 "i;oo l> 1>"0 ",p I> DO o 00 "i;oQ l> 1>" ",pO 0 I> 0"0 =r::::: T SEE RECOMMENDED PLANT PALETTE ON OVERALL KEY PLAN SHEET L-1 LOWE'S HOME IMPROVEMENT WAREHOUSE o 00 "i;oQ l> 1>0 ",po 0 I> 0"0 o Q 0 "i;oQ l> 1>" ",po 0 I> 0"0 SCALE: 1 "=30'-0" l~~ o 00 "i;oQ l> 1>, ",po 0 1>. G I I I I I Concrete Unit Pavers Ackerstone- 6"x 12" Precast concrete umt pavers, "pewter" color. shotblast finish. I Sidewalks are 60mm thick pavers Installed on sand and asphalt sub-base. Crosswalks and handicap areas-90 mm thick pavers installed on sand and concrete sub-base. I All pavers to be installed running in running bond pattern. with long dimension running perpendicular to path of travel, no bevelled edges I I MBR200 CA.q ...ll'MINI M IIINt. Jllltl~JII'I'IIU tI'l\I. 1'l1~'1 IIOUIli lW'\l RIKI:.\. C\1'il1~ C'\:iT IITIUUNf.; l~ ~\';\ILl\.M.l 0"'; nu. 11_, flu:!. S.I......CMlllt H~II:H I; ~1 '1'Ir;1n~ "*,U..;HT: .l'i III (( I t.:G. i I I Colored Concrete Typical sidewalk- Integral lamp black coloring, hand troweled finish concrete. Hand tooled control joints 1/4 depth of concrete. 1 ,. minimum. Bench and Trash Receptacle Fairweather- Bench Model PL-5 6' Steel and iron bench. Paint dark green/black to match other street furnishings. Bicycle Rack Mag/in - Bike Rack Model MBR200 Circular Form matches benches. Paint dark green/black to match other streeet furnishings I I Victor Stanley. InC.-Trash Receptacle Model S-42 Designed to be compatible with bench. Paint dark green/black to match other street furnishings I I I I I Trellis A wood and steel trellis is suggested in the Plaza at Pads Band C to provide shade for benches and outdoor seating areas. Four massive concrete, wood. and steel trellises are suggested around the traffic circle to define the circle and provide an additional layer of separation between the Plaza and Grafton Street. I Parking Lot Lighting Kim Lighting- Large Structural 30' Pole Mount. Single mount and double 180 degree mount on poles. Double tension mounting arm, 400 watt super metal halide. Tree Grate Neenah Foundry Company- Tree Grate Model R-8716 180 Square, 2 piece 6'x6' cast iron tree grate with 3/8" slot openings, plain galvanized finish. Tree Opening can be expanded by cutting out center rings. Grates with removable tree light openings to be used for trees at corners and mid-block plazas, Plaza Lighting Architectural Area Lighting: Universe Collection- Model #UCMLUMSTR." 1 OOMHDGNSLA17D86. 14' Pole, single lumina ire mounting arm. lOOW 3000K Metal halide lamp. In Grade Uplighting Kim Lighting- "Cool Lens" in Grade Light- 70 Watt Pulse start metal halide, Planting Pots Fountain Raised concrete fountains with bubblers and accent lighting will be located in the entry plaza. outdoor space at Pads 8 & C. and at the plaza at Grafton Street's traffic circle. \Cf, i..U u_ uaau -._uuJ ~llfTIN~STATllnl l T DUBLIN I H C H Dublin, California REV I S DEiClIPTION ,.~-,._.._._..~..~....,_. ~ CITY SU1IM1TI'~L ION S: L .~ft;!".. r I PIlOJECl NUMBER: SCALE: DATE ISSUED: IlO;It-lJ t.t~RQI:!8116 STAGE 2 PLANNED DEVELOPMENT REZONE Materials List gls ~ l.alII/IctlIf --- iIl1 Mi8IioII SiIIlI! QOlI SIn F,-. CA 9411Q _41M'853614 f8ailja um 3D! MII~.1XIl1I I I \ct<6' Grafton Station at Dublin Ranch · July 2006 I APPENDIX I I I Architectural Styles Visually the Grafton Street commercial street facade should resemble an idealized image of a traditional "Main Street". This can be successfully achieved through a mix of commercial styles found throughout California during the early part of the 20th Century. Since the buildings on such a street were built or replaced over an extended period by individual builders, they possessed an eclectic character, sense of variety and spontaneity unlike the predictable, repetitious and somewhat monotonous appearance often found in many late 20th Century commercial developments. The desired eclectic street scene can consist of authentic interpretations of various styles, a more contemporary interpretation of these styles or ideally an interesting combination, which reinforces the perception of a long established community built over time. I I I I I I I One building style that shall be avoided is that of a corporate chain store with its easily recognized logo/marketing and architectural image. By requiring that Grafton Station buildings reflect contemporary interpretations/versions of the specified authentic styles and related signage criteria, the goal of achieving an architectural image reminiscent of a California "Main Street" that evolved over time with its mix of styles can be assured. I I I I The following styles represent part of a mix for inclusion in the Dublin Ranch Village Center & Grafton Station: - Italianate - Brick-Front - Romanesque - Arcaded Block - False-Front I I I 2004580 A-1 Appendix I I LOc1 Grafton Station at Dublin Ranch · July 2006 I I - Gable-Front - Artistic Front - Modern Broad-Front - Central California Vernacular - Mid Century Modern - Post Modern I I I I I Written descriptions, a list of primary characteristics and graphic illustrations of each of the above eleven (11) authentic styles are provided following this section. The description of each authentic style is followed by two elevations. The first illustrates the authentic style and the second is a contemporary interpretation of it. styles - Contemporary Architecturallnterprelalions I 'I I The following two paragraphs provide a description of the intent for the contemporary architectural interpretation. These parameters are generally applicable to each of the eleven (11) historical styles. I I I I I I I In response to economic constraints and modern construction practices, the contemporary version of each style is simplified in form, detail and ornamentation. Finish materials selected shall be appropriate in their use and application, and be durable in nature. Basic wall materials include stucco, masonry (brick and stone), siding (wood, synthetic wood composites), and metal and cast concrete or synthetic concrete composites. Roof materials may be of a built-up or membrane type at parapet conditions, and concrete tile, composition shingle tile, or metal roof (flat, standing seam, or corrugated) . Canopies and awnings may be of metal, glass, wood or canvas, fixed or retractable where appropriate and be flat or pitched forms with or without signage graphics. 2004580 A-2 Appendix I I I I I I I I I I I I I I I I I I I 20D Grafton Station at Dublin Ranch · July 2006 Details and ornamentation may be of pre-cast stone, concrete or synthetic materials; metal, wood, masonry, tile and glass. The choice of materials should be governed by the style as well as its location / proximity to the pedestrian. As an example of this, second story false materials are less visible/detectable than those at street level, and would be more appropriately used in those locations. Colors shall be appropriate to style and material and be in compliance with the Master Color Palette. Refer to Section VI Color and Materials Guidelines regarding additional information on color and material selections and applications. 2004580 A-3 Appendix I I 2.6\ Grafton Station at Dublin Ranch · July 2006 I I I I I I I I I I I I I I I I I ltalianate Popular during the 1880's, Italianate was one of the first successful historic styles built from manufactured materials. The Italianate storefront was distinguished by long and narrow Windows, corners of buildings with quoins, in brick or stone, and stacking of upright elements on top of one another. While architectural detailing could be accomplished with brick, iron-front, or wood construction, the best opportunities for ornamentation were offered by wood and metal construction. Details commonly used with these construction types included floral motifs, rosettes, pilasters topped with elaborate capitals and decorative anchor irons. Ornamentation on brickwork construction was normally limited to enhancement of the cornice and lintels. This style established a design standard that is still evident in the great number of Italianate upper stories in business districts throughout the country. Characteristics 2-3 stories Brick cladding or iron front Flat roof Decorative cornice Tall narrow windows with segmental arch 2004580 A-4 Appendix I I I Sheet Metal Cornice I I I I Central Door I I I I I Column Capitals AndlOr Brackets Ma)' Occur I Decorative Door & Window Untel I Vertical Proportioned Windows wI Multi-lites I I I I I "2DZ- Grafton Station at Dublin Ranch · July 2006 Authenlic Elevalion (ltalianafe) t=t 02006 WILlIAM HEZMAlHALCH ARCHITECTS, INC. Contemporary EIeYt1lion (1IaIianate) Decorative frieze Parapet Roof With Decorative Cornice mmmm 02006 WR.lIAM HEZMAlHAlCH ARCHITEOS, INC. 2004580 A5 Bracket Surrounds 2/2 Windows String Course Masonry Or Stucco Wall finishes May Occur Appendix I ,I I I I I I 2D~ Grafton Station at Dublin Ranch · July 2006 I I I I Brick -Front Built as a single building or in groups with party walls, the brick- front store could extend up to a block in length. It was the most popular store front for the longest time and varied in height from one to three stories. Single story buildings were not often built alone, but rather as a series of stores along a portion of a block. The entrance was on or off center. The lower level was dominated by large windows framed by the building's corners and the panel of brick between floors. The upper levels often included single or double oriel windows, brick friezes, panels and decorative tin cornices. Other options included the use of parapet walls, continuous sills or decorative lintels and string or belt courses dividing the wall laterally. The cornice functioned as a cap under which other elements were arranged and balanced. I I Characteristics 1-3 stories Brick cladding Flat roof with parapet Canted oriels on 2nd floor I I I I I I I 2004580 A-6 Appendix I 2D~ Grafton Station at Dublin Ranch · July 2006 I I AuthenHc EIeK/Hon fBricl-Front} I I I Continuous SiI I I Double Door I 02{)06 WILLIAM HEZMALHALCH ARCHITECTS, tNc. I Corbeling May Occur Brick Pilaster Storefront Glazing Decorative Panel Wainscot Contemporary Elevation fBria-Front} I GENERAL: . Single Building or groups wi party walls · 1-3 Stories I Decorative Lintel & Sill Trim Decorative Pre-cast Cornice Pre-cast Ornamentation I I Face Brick Veneer I I Double Door Entry I 02006 WIUIAM HE:zMo\LHALCH ARCHITEOS, INC. I I 2004580 A-7 Flat Roof With Parapet Large Windows In Groupings Pre-Cast Base Wall Trim Or Cut Stone Veneer Appendix I I '2.0 6" Grafton Station at Dublin Ranch · July 2006 I I I Romanesque The Romanesque vernacular style was a picturesque mode of expression and was characterized by a low, wide, arched entrance flanked by round-arched windows. At its most ambitious level it used a primary facade of coursed, rock-faced sandstone blocks. The design emphasized the rhythm of the arches and surface texture. Romanesque buildings were also designed in stone and brick, one material serving as trim for the other. Where brick was used as a primary surface material, eliminating the rough surface, elaborate (Queen Anne) brick elements such as arcades, arches and cornices were introduced with moldings surrounding the curved elements. Romanesque was popular for banks and public buildings and corner business blocks. The buildings implied security and commitment to purpose. I I I I I I I I I I I Characteristics 1-2 stories 2-3 stories in brick Flat roof with parapet Large round-headed windows Heavy voussoirs Arcaded entrances Colored glass Canted corner entrance I I I 2004580 A8 Appendix I I I Elaborate Tin Cornice I I I Keystone Arched Decorative Glazing I Large Single Lite Storefront Window I I I Parapet Roof or Steep Pitched Roofs May Occur I I I I I Brick Or Stone Veneer, Base Wall Trim At First-Floor I I I I 20~ Grafton Station at Dublin Ranch · July 2006 AuthtlllHc Elsdon (RomanesqueJ @2OO6W1UlAM HEZMALHAtCH ARCHITEGS, INC. Hipped Roof (Steep Pitch) Or Parapet Roof May Occur Terra Cotta Patterned Frieze String Course Large Voussoirs First Floor Finish Wall Usually Stone or Brick Confempomry EIsYOlion (RomanesqueJ 02006 WIlLIAM HEZMAlHAJ.CH ARCHITECTS, INC. 2004580 A-9 Decorative Cornice & Frieze String Course Arched Decorative Glazing With Ornamental Sill, Jams & Lintel Trim Stucco, Siding Or Masonry Veneer May Occur Base Course Wainscot In Stucco Masonry Or Cut Stone Appendix , I I 207 Grafton Station at Dublin Ranch · July 2006 I I I I I I I Areaded Block The Arcaded Block, often used as a corner commercial building at the heart of a business district, was normally an imposing structure with a strong overall shape and solid massing. One elevation would often be larger than the other and different in design detail. Firm lines on both elevations, e.g. string or belt courses provided continuity in design. H.H. Richardson and Louis Sullivan, among other Architects, had demonstrated how an elevation could be integrated through the use of arches, round-headed elements, or arcades. Windows appeared as clusters or bands of light, portions of walls had a light feeling. This design focused on the intersection of walls at the corner, which often culminated in a tower that rose from a recessed or canted ground-level entrance. I I Stylistically, the Arcaded Block was an eclectic combination of classical and picturesque elements. Broad arches of stone blocks were part of the Romanesque revival vocabulary. Queen Anne design motifs included tall chimneystacks and upper level oriel windows. The arcaded block was an anchor for the commercial district and one of the strongest design statements of all vernacular building types and styles. It maintained its position in business districts throughout the 1 870-1940 periods. I I I I I Characteristics . 2-4 stories . Corner building . Brick . Flat roof with parapet . Tower, often with spire or canted corner entrance I I I 2004580 A-1O Appendix I I I I I Pediment Round-Headed Windows I I I Belt Course First Floor Arcade I I I 26g Grafton Station at Dublin Ranch · July 2006 AuIh(Jfl/ic EIe'lClfion (Arcac/<<l81ocl) @2006 WILlIAM HEZMALHAlCH ARCHITECTS, INC. Bell Tower Roof Corner Tower Stone Column Conlemporary Elsdon (ArcocIstJ Blocl) I Parapet Roof With Deeorative Corniee I Window Shading Deviees May Oeeur I I Sill Belt Course Trim I Masonry Or Stueeo Wan Finish May Occur I I I a OJ 02006 WlUAM HEZMALHALCH ARCHITECTS, INC. 2004580 All Second Floor Set-Back From First Floor Arcade Metal Roof Corner Tower First Floor Arcade Canvas Or Metal Awnings At Building Entries Appendix I I I I I I I I I I I I I I I I I I I 204 Grafton Station at Dublin Ranch · July 2006 Fals.Front The FalstTFront commercial building has been associated with the settlement of the west and is best typified by the one and two story storefront, which is the most common of commercial buildings. The false front simply extends the facade, so that the building seems larger than it is. The false portion extends the facade vertically and horizontally so that the roof over the main body-most often a gable or flat roof-remains hidden from view. The entrance is centered with display windows on either side. Central pediments aligned with the entrance and panel divisions align with display windows. Detailing and ornamentation in the form of corner boards, columns, or pilasters are integrated into the facade and carried up the front. FalstTFront commercial buildings did not create illusions that fooled the citizenry but provided symbolic evidence of the general civilizing process. The false front often got replaced by or incorporated into brick buildings. It maintained the scale of the original town site. Characteristics 1-2 stories Wood frame Clapboard, brick or board and batten Gable roof covers main building Front does not conform to roof shape Sometimes plain porch with shed roof 2004580 A-12 Appendix I 2lD Grafton Station at Dublin Ranch · July 2006 I I AuthsnHc EIeKllion (FalseFront) I 1~ ~ u. ~ II J/ " I I ront ./1 "- /7 ""... A === ~ ~ A ~ - ill I Gable Roof Behind F I Symmetrical Facade I I I 02006 WlUIAM HEZMALHAlCH ARCHITECTS, INC. I Wood Cornice With Brackets Signboard Or Simple Paneling lit Window Material Wood, Stucco Or Masonry Double Door Or Single Door May Occur Conlsmparal)' Elevalion (FalseFront) I I Pediment Stepped Gable I Decorative Paneled Walls May Occur BB8 Hm i I Base Course Wainscot; May Be Stucco, Metal, Masonry, Tile or Wood Paneling I @2006 WIUlAM HEZMALHALCH ARCHITECTS, INC. I I I I 2004580 A-13 Fiber Cement Siding Plain Cornice Flat Or Pitched Roof Behind Front May Occur 1/1 Pane Clerestory Windows Display Windows Appendix I I I Zll Grafton Station at Dublin Ranch · July 2006 I I Gable-Front The Gable-Front store was a frame structure, usually clad in clapboard and served as a general store, hardware, and grocery or feed store, most often in a small town or rural setting. The upper level provided living space for the owner. The straight gable roof and the end wall gable defined the simple, direct, unadorned building form. Most elements reinforced that shape. A shed roof or awning covered the entrance area. I I I I I I I I I I Window fenestration included modest display windows on the ground level and traditional double hung sash windows in other locations. A large signboard on the facade advertised the name of the store. Other boards advertised specific products. Decoration was limited to brackets in the gable. The gable-front was an important building; sometimes serving as the post office and often a center for social activity, service and information. I Characteristics 1-2 stories Frame, gable roof Signboard Sometimes a porch I I I 2004580 A-14 Appendix I 212.. Grafton Station at Dublin Ranch · July 2006 I I Authentic Elevation (Gable-FronlJ Sign Board Gable Roof I I Bracket I Wall Finish May Be Wood. Siding. Stucco or Masonry I Shed Roof Over Porch I Store Front Window Corner Board o I I @2006 WIUlAM HEZMA1HAlCH ARCHrrECTS, INC. Contemporary ElevaHon (Gabfe.FronlJ I I Gable Roof ~ ::--... ::--.... ...................... '/ ,...... ~ .... Siding. Masonry Veneer or Stucco with Coursing Wall Finish May Occur I '/ == i=F == - Double Hung Windows I L- ~ ~ ~ L-_ _ fR:R:, illll!lil! ~ ~. I Base Course Wainscot; May Be Stucco. Metal. Masont)'. Tile or Wood Paneling If~ TT I I Roof. Awning or Trellis Over Entrance I =gg= Display Windows 02006 WIllIAM HEZMALHALCH ARCHnECTS, INC. I I I 2004580 A-15 Appendix I I I I I I I I I I I I I I I I I I I 21~ Grafton Station at Dublin Ranch · July 2006 Artistic Front The Artistic Front was primarily associated with a grouping of physically connected stores. The 1920's seem to have been the major period for this development, although there were examples of shopping areas built before and long after that decade. Based on their unusual appearances, they were referred to as artistic designs, which derived from the use of architectural details as attention-getting devices. The use of intersecting roof forms, gable fronts, stucco and Tudor-trim gables came directly from the Cottage design vocabulary. Each structure could be distinguished from the others through the unique application of individual details, yet still belonged to the group. Occasionally these fronts were built as individual free standing businesses (e.g. gas stations) and looked very much like cottages. Characteristics 1 or 2 stories Detached or grouped Residential scale Brick of stucco cladding Intersecting gable, or stepped parapet roof 2004580 A-16 Appendix I I I Gable Or Hipped Roof May Occur. Dormers May Occur I I I Wall Finish May Be Wood, Siding Or Stucco I Panel Front Door I I I I Residential Scale Roof (One or Two Story) Gable Roof or Hipped Roof May Occur with Shingled Roof I I Decorative Stucco, Stone or Masonry Base Courses May Occur I I I I I I 2. I'-\, Grafton Station at Dublin Ranch · July 2006 AuthenHc Elevation (Artistic FronlJ 02006 WIUlAM HEZMALHALCH ARCHITECTS, INC. Residential Scale. 1 Or 2 Stories May Occur Store Front Windows Contemporary ElevaHon (ArtisHc Fronl) .c m D WEmIa C2OO6 WILlIAM HEZMA1HALCH ARCHITECTS, INC. 2004580 A-17 Dormer Roofs May Occur Fascia. Eaves. Trellis Columns. Etc. All Residcntialln Style And Material Stucco Siding or Masonry Wall Finishes May Occur Appendix I I I I I I I I I I I I I I I I I I I "2 I :;; Grafton Station at Dublin Ranch · July 2006 Modem Broad Front The design of the double-width storefront, labeled the Modern Broad-Front utilized modern materials. The use of steel beams and columns made a single-space over two stores or one wide store possible. The broad front was most often a low one-story structure. The facade design included two thick piers anchoring the edges and holding a sub-divided brick panel above. Display windows were separated into panels with thin mullions. All of these elements helped broaden the front and reinforced the openness of the building's face. Though it had a few historical details as links to the past, the simpler ornamentation usually included either brickwork or terra cotta panels or copings around the edges. The Modern Broad-Front truly was originally and today remains a modern building. Characteristics 1 story Brick cladding Flat roof with shallow stepped parapet Cast stone or cement ornamentation 2004580 A-18 Appendix I I I I Stepped Parapet With Cornice May Occur I Transom Windows I Display Window With Thin Mullion I I I 21(p Grafton Station at Dublin Ranch · July 2006 1 cr. r- 02006 W1UlAM HEZMAtHMCH ARCHITECTS, INC. I Panalized Frieze With Simple Trim Ornamentation Stepped Parapet With Simple Cornice Trim I I Display Windows With Thin Mullions Base Wainscot Trim May be Stucco. Tile. Masonry or Metal I I I I I I I Authentic Elevation (Modem BmarJ.Fronlj [ ~ -! o Frieze Panel Brick Pier Conlemporary EIevaHon (Modem BmarJ.Fronlj t:I D 02006 W1WAM HEZMAlHALCH ARCHITECTS, INC. Symmetrical Organization of Facade Typical 2004580 A-19 Building Often 1- Story But 2-Story May Occur Canvas Or Metal Awning at Entry and Display Window May Occur Entry Is Recessed With Transom Windows Wall Panel Detailing to Segment Surfaces Appendix I I I I I I I I I I I I I I I I I I I 21/ Grafton Station at Dublin Ranch · July 2006 Central California Vernacular The Central California Vernacular is a building type representative of many agricultural communities in the late 19th century. Buildings tended to be visually less commercial in nature with gables or hipped roofs and overhangs. Buildings were usually wood framed but occasionally masonry. Building wall materials were quite flexible and included stucco, masonry, or wood siding. Roof forms included hip, gable or parapet flat roof solutions. A variety of roof materials including shingles or tile were used. Characteristics 1-2 stories Cladding Pitched roof with hips or gables or parapet flat roof Occasional dormers in attic/upper floor Residential feel, material and detail 2004580 A-20 Appendix I I I I I Ornamcntation Simplc Or Non-Existent I Various Slmplc Grided Window Pattcrns I I Store Front Display Windows Single or Double Doors May Occu Organization Oft Asymmetrical I I I I I Eave Details With Corbels Or Exposed Rafter Framing May Occur I Dcck or Terraces May Occur I Multi-Lited Transom I I I I "2 l Z Grafton Station at Dublin Ranch · July 2006 AuthenHc Elevation Vernacular} (Cenlral Califomia Hi ed 0 Gabled Roof Typical ~c pp r :ij:=- - -==--.: ~- ~p ~ ~-. -I. - ~~El~~ I 1 I I IT I I I I I CT'"' - r ..of--- "- en - C1 @2OO6WII.UAM HEZMALHAlCH ARCHrrECTS, INC. arapets May Occur Offices Above Rctail String Course Trim May Occur Arched Windows & Portals May Occur Wall Finish in Brick. Stucco or Siding Con/emporary Elevation (Cenlral California Vernacular) ~ 02006 W1LUAM HEZMALHALCH ARCHITECTS, INC. 2004580 A-21 Multiple Roof Forms (Hips Or Gables) Masonry, Siding or Stucco Wall Finishes May Occur Various Simple Grided Window Patterns Displa)' Windows Base Wall Trim. \Valnscot. Stucco, Masonry or Tile May Occur Appendix I I I I I I I I I I I I I I I I I I I 2lq Grafton Station at Dublin Ranch · July 2006 Mid-Century Modem The Mid Century Modern is a building type representative of contemporary architecture begun as early as the 1930's and extending into the late 1960's. The buildings tended to be visually austere in nature often industrial in its use of materials with little detail or detail so refined it disappeared into the structure whose only evidence was seen in the cantilevered roofs or wall sections. Buildings were often framed in steel but occasionally masonry and wood. Building wall materials were quite flexible and included stucco, glass block, masonry, or wood siding. Roof forms included shed, gable or parapet flat roof solutions. A variety of roof materials including shingles or tile, metal and built- up roofs were used. Characteristics 1-4 stories Architecture was made up of simple wall planes, volumes and surfaces. Extensive use of glass contrasted with wall planes. Pitched roof with shed, gables or parapet flat roof and cantilevered elements. Commercial/Institutional/Corporate feel, material and detail. 2004580 A-22 Appendix I 2.2.0 Grafton Station at Dublin Ranch · July 2006 I Mid Century MocIem I I Minimal detailing & Simple wall planes and few ornamentation material contrasts I I I I Asymmetrical plan and elevation Wall planes punctuated with composition typical glazing I I I I I I I I I I I 2004580 A-23 Appendix I I I I I I I I I I I I I I I I I I I 2 2.../ Grafton Station at Dublin Ranch · July 2006 Post Modem Post Modern is a building style representative of contemporary architecture that developed as a reaction to the extreme simplicity and elimination of details begun with the Mid Century Modern. It sought to bring back classical details but simplified and distilled into the essence of the classically detailed forms. The period can be seen as developing from 1960's into and through the 1980's. The buildings tended to be visually rich in form and color with a mix of roof types from flat parapet roofs to gable and hip forms. Buildings were framed in wood, steel and masonry. Building wall materials were also quite diverse and included stucco, masonry, or wood siding. Building forms were often more formal in their plan and organization but less in keeping with the classical forms it drew upon and interpreted; the elevations were more playful and eclectic with the use of color and their application and mix of materials. Characteristics 1-4 stories Architecture was made up of simple wall planes and surfaces, mass, and volumes. Mass and Volume contrasted with glass and fenestration. Roof types included Shed, Barrel Vault, Gable, Hip and/or Parapet flat roofs. Formal plan organization. Eclectic use of materials and color.. - Architectural Details were classically derived but interpretive in form. 2004580 A-24 Appendix I I I I I I I I I I I I I I I I I I I Ordered plan and hierarchy of elements typical 2Zz.. Grafton Station at Dublin Ranch · July 2006 Post Mot:Iem Varied Mass & Volume Simplified classical details, elements and fonns Mass & Glazing Fenestration Contrasted Contrasted widl asymmetry 2004580 A-25 Appendix I I I I I I I I I I I I I I I I I I I 22-p ~ Pleasanton 5960 Inglewood Dr., Suite 100 PIeasanIon, CA 94588. 8535 925. 463. 0611 925. 463.3690 fax Sacramento 980 9th St., 16th Floor Sactamento, CA 95814-2736 916. 449.9095 Transportation Consultants Santa Rosa 141 SImy Cir., Suite 280 s.rta Rosa. CA 95401-4110 707. 575. 5800 707. 575.5888 fax Fresno 516 W Shaw Ave., Suite 200 Fresno, CA 93704-2515 559.325. 7530 559.221.4940 fax tjkm@tjkm.com www.tjkm.com MEMORANDUM February 28, 2006 To: Dave Chadboume- MacKay & Somps Project No.: 157-145 From: Gordon Lurn Jurisdiction: City of Dublin Subject: Trip Generation for Proposed Grafton Station Project Table 1 presents the results of the traffic generation analysis for the Grafton Station Connnercial Project in Dublin Ranch - Area H. TABLE I: PROPOSED GRAFtON STATION TRIP GENERATION Daily A u J::tr..... P"'lllc P U J::tr..... P"'lllc Use ITE Code Size Units Rate In% Out % In Out Total Rate In % Out % In Out Tota lYNe's (Anchor 'A') 862 139.41 kst 29.80 0.54 0.46 90 n 16 2.45 0.47 0.53 161 181 elail (Pads'S, C-1, C-2, and Di 820 49.76 kst 42.94 0.61 0.39 31 20 51 3.75 0.48 0.52 90 97 estauranls (Pads 'E-1 and E-2") 931 10.00 kst 89.95 0.52 0.48 4 4 7.49 0.67 0.33 50 25 ig Box Retail (Pad 'Ai 861 118.83 kst 41.80 0.71 0.29 ~ .m 4.24 0.50 0.50 252 Total 318.00 172 120 553 Detailed trip distnbution analysis has not been performed at this time. However, the majority of the customers are expected to come from: · Eastbound 1-580 (exiting at Tassajara Road) · Westbound 1-580 (exiting at Tassajara Road) · Eastern Dublin (various local streets) · Eastern Pleasanton (via Santa Rita RoadlTassajara Road) The largest intersection closest to the proposed Grafton Station is Dublin BoulevardlTassajara Road. With build out of Dublin Ranch Area C and H (including Grafton Station), this intersection is expected to operate at LOS C during the a.m peak hour and LOS B during the p.m peak hour. ~'.'----_.__.,..,.....--...._.,......--...............-----...-..------.--....- .- I · I - I I I I I I 'I I ,I ,I I .1 I I I I I r ~2~ DEPARTMENT OF THE ARMY SAN FRANCISCO DISTRICT, CORPS OF ENGINEERS 333 MARKET STREET SAN FRANCISCO, CALIFORNIA 94105-2197 HAY 23 _ Regulatory Branch SUBJECT: File Number 25144S Mr. James Tong 6601 Owens Drive, Suite 100 Pleasanton, California 94566 Dear Mr. Tong: Enclosed is your signed copy of a Department of the Army permit (Enclosure 1) to construct a masterplanned residential, commercial and open space development in the City of Dublin, Alameda County, California. Please complete the appropriate parts of "Notice to Permittee" form (Enclosure 2), and return it to this office. You are responsible for enswing that the contractor and workers executing the activity authorized herein arelOlowledgeable with the terms and conditions of this authorization. Should you have any questions regarding this matter, please call Bob Smith of our Regulatory Branch at 415-977-8450. Please address ail correspondence to the Regulatory Branch and refer to the file number at the head of this letter. Sincerely, Michael McCormick Lieutenant Colonel, U.S. Army District Engineer Enclosures Copy Furnished (w/enel 1 only): US EP A, San Francisco, CA US FWS, Sacramento, CA CA RWQCB, Oakland, CA CA DFG, Y ountville, CA I I I I I I I {pRNATE } ""2 "2. ~ NOTICE TO PERMITTEE Please use the forms below to report the dates when you start and fmish the work authorized by the enclosed pennit. Also if you suspend w. for an extended period of time, use the forms below to report lhe dates you suspended and resumed work. The second copy is for your records. If you find that you cannot complete the work within the time granted by the permit, please apply for a time extension at least one month before your permit expires. If you materially change the plan or scope oftbe work, it will be necessary for you to submit new drawir and a request for a modification of your permit. (cut out as needed) ----- Date: NOTICE OF COMPLETION OF WORK under Department of the Army permit No. 251445 TO: District Engineer, US Army Corps of Engineers. Regulatory Branch, 333 Market Street, 8lh Floor. San Francisco. CA 94105-2197 In compliance with the conditions of the permit dated 5/23/03 to construct a master planned community in the City of Dub liD. this is to not you that the work was completed o~ Permittee: Jennifer LiD. et. aI. Address: 6601 Owens Drive, Suite 100 PJeasanton, CA 94566- I I Date: NOTICE OF RESUMPTION OF WORK under Department of the Army permit No. 25144S TO: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 In compliance with the conditions of the permit dated 5~3/03 to construct a master planned community in the City of Dublin, this is to notil you that work was resumed on Permittee: Jennifer Lin, et. aI. Address: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- I I I I I I I I I I I Date: NOTICE OF SUSPENSION OF WORK under Department of the Army permit No. 25144S TO: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 In compliance with the conditions of the permit dated 5/23/03 to construct a master planned community in the City of Dublin. this is to noti~ you that work was suspended on Permittee: Jennifer LiD. et. aI. Address: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- Date: NOTICE OF COMMENCEMENT OF WORK under Department of the Army permit No. 25144S TO: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 In compliance with the conditions of the permit dated 5/23/03 to construct a master planned community in the City of Dublin. this is to notify you that work was commenced on Permittee: Jennifer Lin, et. al. Address: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- I Aug 94 ?:7- I I I I I I I I I I I . I ~ I I I {pRlV A IE } "2 "2.{.a NOTICE TO PERMITTEE Please use the fonns below to report the dates when you start and finish the work authorized by the enclosed permit. Also if you suspend wor~ an extended period of time, use the forms below to report the dates you suspended and reswned work. The second copy is for your . ..cords. If you find that you cannot complete the work within the time granted by the permit, please apply for a time extension at least one month before your permit expires. If you materiaUy change the plan or scope of the work, it will be necessary for you to submit new drawings md a request for a mOdification of your permit (cut out as needed) ----- ------ Date: ~OTICE OF COMPLETION OF WORK under Department of the Army permit No. 25144S ro: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 (n compliance with the conditions of the permit dated 5/23/03 to construct a master planned conununity in the City of Dublin, this is to notify you that the work was completed on Pennittee: Jennifer LiD, et al. Address: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- Date: ~OTICE OF RESUMPTION OF WORK under Department of the Army permit No. 25144S 00: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 In compliance with the conditions of the permit dated 5/23/03 to construct a master planned conununity in the City of Dublin, this is to notify you that work was resumed on o..onittee: Jennifer Lin, et al. kess: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- Date: 'lOTICE OF SUSPENSION OF WORK under Department of the Army permit No. 25144S ro: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 .n compliance with the conditions of the permit dated 5/23/03 to construct a master planned community in the City of Dublin; this is to notify IOU that work was suspended on >ermittee: Jennifer LiD, et. al. \ddress: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- Date: 'l'OTICE OF COMMENCEMENT OF WORK under Department of the Army permit No. 25144S ro: District Engineer, US Army Corps of Engineers, Regulatory Branch, 333 Market Street, 8th Floor, San Francisco, CA 94105-2197 I. . n compliance with the conditions of the permit dated 5/23/03 to construct a master planned conununity in the City of Dublin, this is to notify IOU that work was conunenced on . . ,>ermittee: Jennifer Lin, et al. I \ddress: 6601 Owens Drive, Suite 100 Pleasanton, CA 94566- I 'AGe" I I 22..7 I I DEPARTMENT OF THE ARMY PERMIT Permittee: Jennifer Linn. et ale I I Permit No.: 25144S Issuing Office: San Francisco District I NOTE. The term "you" and its derivatives, as used in this permit, means the permittee or any future .transferee. The term "this office" refers to the appropriate district or division office of the Corps of Engineers having jurisdiction over the permitted activity or the appropriate official of that office acting under the authority of the commanding officer. You are authorized to perform work in accordance with the terms and conditions specified below. I I Project Description: I You are authorized to discharge fill into 10.22 acres of wetlands and waters of the United States to construct a residential and commercial development. Work shall be carried out in accordance with the attached plans and drawings labeled" APPLICATION BY: Jennifer Lin, et al; LOCATION: Dublin, CA; COUNTY: Alameda; PURPOSE: Residential, Commercial and Open Space Development" in 17 sheets, dated April 17, 2000 and April 21, 2003. I I I Project Location: The project site is located on unnamed drainages between Tassajara Road and Fallon Road in the City of Dublin, Alameda, County, California. Permit Conditions: I General Conditions: I 1. The time limit for completing the work authorized ends on Oct 15. 2008. If you find that you need more time to complete the authorized activity, submit your request for a time extension to this office for consideration at least one month before the above date is reached. I 2. You must maintain the activity authorized by this permit in good condition and in conformance with the terms and conditions of this permit. You are not relieved of this requirement if you abandon the permitted activity, although you may make a good faith transfer to a third party in compliance with General Condition 4 below. Should you wish to cease to maintain the authorized activity or should you desire to abandon it without a good faith transfer, you must obtain a modifi- cation of this permit from this office, which may require restoration of the area. I I 3. If you discover any previously unknown historic or archeological remains while accomplishing the activity authorized by this permit, you must immediately notify this office of what you have found. We will initiate the Federal and state coordination required to determine if the remains warrant a recovery effort or if the site is eligible for listing in the National Register of Historic Places. I ENG FORM 1721, Noy 86 EDmoN OF SEP B2 IS OBSOLETE I (33 CFR 325 (Appendix A)) I I I. I I I I I I ., I I I I I J J I I I 22.~ 4. If you sell the property associated with this permit, you must obtain the signature of the new owner in the space provided and forward a copy of the p~rmit to this office to validate the transfer of this authorization. 5. If a conditioned water quality certification has been issueci for your projC{ct, you must comply with the conditions specified in the certification as special conditions to this permit. For your convenience, a copy of the certification is attached if it contains such conditions. 6. You must allow representatives from this office to inspect the authorized activity at any time deemed necessary to ensure that it is being Or has been accomplished in accordance with the terms and conditions of your permit. Special Conditions: 1. Th~ p~rmittee slaall comply.with the t~rms and c:onditions of the Biological Opinioll_ issv.ed on July 1, 2002 by the U.S. Fish and Wildlife Services S~rvice pursuant to Section 7 or tbe Endangered Species Act. A copy of the opinion is attsehed. 2. Mitigation shall be carri~d out in accordance with the mitigation llnd monitoring plan preparedfor this proj~ct by H.T. Harvey & Associates label~d: " Proj~d Area Mitigation and Monitoring Plan, Dublin, Cali- fornia" dated Marcil 3, 2003. Further Information: 1. Congressional Authorities: You have been authorized to undertake the activity described above pursuant to: ( ) Section 10 of the Rivers and Harbors Act of 1899 (33 U.S.C. 403). (X) Section 404 of the Clean Water Act (33 U.S.C. 1344). () Section 103 of the Marine Protection, Research and Sanctuaries Act of 1972 (33 U.S.C. 1413). 2. Limits of this authorization. a. This permit does not obviate the need to obtain other Federal, state, or local authorizations required by law. b. This permit does not grant any property rights or exclusive privileges. c. This permit does not authorize any injury to the property or rights of others. d. This permit does not authorize interference with any existing or proposed Federal project. 3. Limits of Federal Liability. In issuing this permit, the Federal Government does not assume any liability for the following: a. Damages to the permitted project or uses thereof as a result of other permitted or unpermitted activities or from natural causes. b. Damages to the permitted project or uses thereof as a result of current or future activities undertaken by or on behalf of the United States in the public interest. c. Damages to persons, property, or to other permitted or unpermitted activities or structures caused by the activity authorized by this permit. d. Design or construction deficiencies associated with the permitted work. 2 < I 2-Zq I e. Damage claims associated with any future modification. suspension, or revocation of this permit. 4. Reliance on Applicant's Data: The determination of this office that issuance of this permit is not contrary to the public interest was made in reliance on the information you provi~ed. I 5. Reevaluation of Permit Decision. This office may reevaluate its decision on this permit at any time the circumstances warrant. Circumstances that could require a reevaluation include, but are not limited to, the follow- ing: I a. You fail to comply with the terms and conditions of this permit. I b. The information provided by YDU in support of your permit application proves to have been false, incom- plete, or inaccurate (See 4 above). I c. Significant new information surfaces which this office did not consider in reaching the original public interest decision. I .", Such a reevaluation may result in a determination that it is appropriate to use the suspension, modification, and revocation procedures contained in 33 CFR 325.7 or enforcement procedures such as those contained in 33 CFR 326.4 and 326.5. The referenced enforcement procedures provide for the issuance of an administrative order requir- ing you to comply with the terms and conditions of your permit and for the initiation of legal action where appropriate. You will be required to pay for any corrective measures ordered by this office, and if you fail to comply with such directive, this office may in certain situations (such as those specified in 33 CFR 209.170) accomplish the corrective measures by contract or otherwise and bill you for the cost. I ~,~ I 6. Extensions. General condition I establishes a time limit for the completion of the activity authorized by this permit. Unless there are circumstances requiring either a prompt completion of the authorized activity or a reevalua- tion of the public interest decision, the Corps will normally give favorable consideration to a request for an extension of this time limit. J '7" below. '" .""Itt... Jodie.,,, 'bot you "..pt "d 'g"e to ""ply ,.;th the 'eno, ond eondltlo", ,f /fA~v ~_ '2. ",1:> dco3 (Date) -I :1 .... -I This permit becomes effective when the Federal official, designated to act for the Secretary of the Army, has signed below. 'I ~~~J&~) I 'I When the structures or work authorized by this permit are still in existence at the time the property is transferred, the terms and conditions of this permit will continue to be binding on the new owner(s) of the property. To validate the transfer of this permit and the associated liabilities associated with compliance with its terms and conditions, have tbe transferee sign and date below. I (Transferee) (Date) 'I ...:- 3 :1 I' I I I I I .1 I I ~.'" I .... I ... I '1 I I -' I I I ...,. I 2~D San Francisco Pacific Ocean .. "-V "O.iH PURPOSE: Residential, Commercial and Open Space Development VICINITY MAP PROJECT ARE"- Scale: I" = 10 mi LOCATION: Dublin, CA. 900'= East of Tassajara Road and 200': North of 1-580. SOURCE OF BASE: NGVD ADJACE.l,ff PROPERlY O'WNERS: See Application APPLICA nON BY: Jennifer Lin, el al. rio James Tong 6601 Owens Dr., Suite 100 PleasantoD, CA 94566 COUN1Y: Alameda FIGtJRE: I of 17 DATE: April 17, 2000 I 2. ~I I . I .., \ . ..--.:~, ,..: ". /,..cI" ~/._.: ~ .;!~-- " . . hIus : : : ~ .\ "\-d 4k.-, .....v-,,~ I I 4 4;1 ,.a-,.,. I g I I I '. '. I I I I T. r '? I .'.. ;;.... ~""'" '- < .~ "'q .jP ^ ..... I I . '-V I MORrN I PURPOSE: Residential, Commercial and Open Space Development DETAIL AREA MAP PROJECT AREA Scale: 1" = 3 mi LOCATION: Dublin, CA. 9OO':!: East of Tassajan Road and 200'::: North. off-58G. SOURCE OF BASE: NGVO I -.4JJJACENT PROPERTY OWNERS: See Application APPLlCA TION BY: Jennifer Lin, et al. c/o James Tong 6601 Owens Dr., Suite 100 Pleasanton, CA 94566 cmJNTI: Alameda FIGTjRE: 2 of 17 DA11E:AprilI7,2000 I 2 -3> "2- I I :-_ Ell........ ! I ! M5 .JO.z ~ ,.,.. I , I !< J " II I I \:5 111 ~ 111 L. 111 111 U'l U'l 111 I- I ..~ I I GC ze.SAC~ I co "'3.'ACGlaft co ........ IC G.... I' __11_1 I_-.-u_~-.-H"'''-''_''' LEGEND 1-500 -' LOW llOlSm'ltI:5lDOlnOL .. u:DlUWllOlSm'~ ... --.. _1lI9l5ftY~ " _ DOC5IIYIlI:SIDCNIlAL co ~ 0fI'ICl: tOe ~~ = G::>Il:RH.~/ CAMPuS orna: C1' COOoIMUNITY r-. tIS NtIGllllOllhOOO SOl.IMZ: or ~._ os O'-EN S/'A(% o fLDADIrM:Y 501Oa. M5 o.aoou: SOlOOl. PlY ruu::/ SCUIrUllUC ... - I ...t.. I I -.. ',- CRtATm ANDAVCIIDCD WATe!tS orTt1t UNlTeoSTATeJ I- PURPOSE: Residentia~ Commercial and Open ~oace Development DEVELOPMENT PLAN PROJECT AREA I .- 11< o 250 500 1000 . " . JURCE OF BASE: NGVD ADJACENT PROPERTY OWNERS: See Application SCAlE:1--1000' LOCA 110N: Dublin, CA. 900'= East ofTassajara Road and 200':1: North of 1-580. APPUCA110N BY: Jennifer Lin, et at cloJames Tong 6601 Owens Dr., Suite 100 Pleasanton, CA 94566 COUNTY: Alameda FIGURE: 30fl7 DATE: Apri12I, 2003 1. 23,? 1 . 1 I '''~~f:~:;'~~ ;t .~,. ~ :~:..:?;/- I ~: :,.~r~. .." - "0 J .....- : \ 1 I -I I -. I 0- I I I. Il.L-:A' r" A hl.:;_~ "-- \,J )..' t!~. ~..~~...-~. :-:f":'.::=- 1-5100 ".::J. 1 ~ '-J-I' 1 JURISDICTIONAL WATERS I.REA 5:o--'Y 1'00cbI Wdond n.t.bt I &~2 AC Ddoned ~o.-c_w~ I 0.4& u:; Other..........,. cillo: U.5. - ~ I 0.92 M:. T_ I 1lL22 AC _0.1. -I I I PURPOSE: Residential, Commercial and Open Space Development JURISDICTIONAL WATERS OF TIlE UNITED STATES o 250 500 '000 PROJECT ARE.~ SOURCE OF BASE: NGVD SCAlE: ," - '000' APPLICATION BY: Jennifer LiD, eL a1. cia James Tong 6601 Owens Dr., Suite 100 Pleasanton, CA 94566 ~ -- LOCATION: Dublin, CA. 900':: EastofTassajara Road and 200'= North of 1-580. -r I ADJACENT PROPERTY OWNERS: See Application COUNTY: Alameda FIGURE: 4 of17 DATE: April 17, 2000 I I .. I I I .- 1 1 J 1 .... I ..:' I -~...: I I I I I _.J I I' .,- 1 ; I LEGEND 234f AREA , '\ I .i . F G~5OI1 {JnvC: o i .1l Y I ! .' ! .AREA C r\: 1-580 * .. -,.. -" ~ ....... WATeRS or Ttlf UHlTW STA15 TO Of RlltD PURPOSE: Residentia~ Commercial and Open Space Development ADJACENT PROPERTY OWNERS: See Application .)OURCE OF BASE: NGVD WATERS OF TIIE UNITED STATES TO BE FILLED o 250 500 1000 . . PROJECT AREA LOCATION: Dublin, CA 900'% East ofTassajara Road and 200':1: North on-5S0. SCAlE:1-= 1000' APPUCATION BY: Jennifer LiD, et al. c/o James Tong 660 I Owens Dr.. Suite 100 Pleasanlon, CA 94566 COUNTY: Alameda FIGURE: 5 of 11 DATE: April 21, 2003 -I. I ~ I -I J .-;: -J 1 I J ~J I -I -~. I 1 I ,,--,:,/ I - -..: 1 I I 2~~ \1 l\l rit f l\l l\l III III l\l ~ ~~I jl - ~'-"J j I ~ ~ { AREA - -- - '\. :c. j AREA F J I S AREA H AREA C 1-500 ~ .. .,a LEGEND - - - ou,TW DRAlNAGf5 PURPOSE: Residentia~ Commercial and Open Space Development ON-SITE MITIGATION PROJECT AREA SOURCE OF BASE: NGVD ADJACENT PROPERTY OWNERS: See Application o 250 500 tooo . . SCAlE:t -_'000' LOCA 110N: Dublin, CA. 900'= East ofTassajara Road and 200':1: North of 1-580. APPUCATION BY: Jennifer Lin, et. aI. clo James Tong 660 I Owens Dr., Suite 100 Pleasanton, CA 94566 COUNTY: Alameda FIGURE: 6 of 11 DATE: April 21, 2003 .-I7-l'OOO kso.,.lIf'S P'\.1"J4-lO\.ol.r'W'W\Q,C~","hC\'Duibo"'oO'tOc~,,)NSIT(HIT-"-o I I I I I I I I I .... I 1 I --" I '1 I ,..-iI I I PURPOSE: Residential, Commercial and Open Space Development I ';OURCE OF BASE: NGVO ADJACENT PROPERTY OWNERS: See Application I 2~~ ~ NORtH OFF-SITE MITIGATION PRomCf AREA APPLICATION BY: Jennifer Lin, et. al. clo James Tong 660 I Owens Dr., Suite 100 Pleasanton, CA 94566 LOCATION: Dublin, CA. 900'::1: East of Tassajara Road and 200':!: North ofl-580. COUNTY: Alameda FIGURE: 7 ofl? DATE: April 21, 2003 ,. "~' T.. \.. . !',,!;., .. \ " '.1 .. _:, \\,. .. .;t ..... \ ' ..;;:!. ,'. t.; . . , ..';" . ",\ ,". . '.-: \.. /' , ,.. "" ...... " ." ". ,~ ~ ":'IIl\I,ii\1 ,',~. ".1 ..' : .' '" · roi ~. *".: . ;;.tit.. :~ :':11. :...:..., ..;:..:': . .1': .~ .,:.... ..~~tl" d' \1 .OS,,"\":-. * .t I".... .'. ,...... \ y.'.'" ..;!l;:.' .' 1;t... ,!-!' , - _.... .. '.' ,.... '." ' ., "'-.Jr" _' ,U..~" IT" · ,.' . . ." · , " ,V\- ,'.'1 . .... . ... " ',. . :," , '.. .t.... ,'. .'~ .' ',illi ~ " '.,', ,-r.. "~\i ti .'" .........., . - .. .,to": ....' ,,~-'-,;;:'-' " II ""T i It'''~''''' . .1:') ~. ,,;.:'J'~'~' -~ -t..).;,.\:...~.:"--r-' \ .' ' " " "." .....h.. , ...~, ." . : 00, ,.ir'..< l... : ,'~" '.4 ",-., . u aT'. ...,' ., .>,. . ....:: ,.,." . ,<" ".' ,.. ,. '.', .'"" "..~ ~. , -" i.t;t~. .~,..._ -.' '!'!;./.~ .',:. ,- '. ::. ,; ~v<...",~ .- k' '.. . ..J~- ,.' '.. . " 'Y' .... . , t\l\ %/}~'1J\;~~;,~ . ,. 1i :"'l;l~>'- .'~' '1",!\~lI\~fd;'-..." ,,' ", }f:::'?;.:;,':':' .4"''\ ~',~.".;:.. . ~:':'\f~""..'.:" -~.}.:.\~ ;-'" ,\\..~ ",\' ,':..2' '!.J.r::'f" ".' :..;,:.1 ..' "'. 'C,. "., .. ,..'J .. . r"'- .". ..' ,\;~:~'''';\:~:!~,;t~: -r. . . .\!t ~ \ ~ \ ". 1 1." ~ . ,-" . ~.\I .\}.t\:=. . ::~~ ~ "'~1 . ~ \.. :, ,~ ~d \ ,\ \ ~. , ;':. r\ \: \\ : ,.-: ';:,' " _' ,,;r~i\ \ ~~ ij'i\.\'"': -;.! l\i .- ~.~!. \,..\ ,,\~ ,. ~. . ". ".. 'if'... ,'-'ii; . i:' 'of f. ' ~::;., __' J ~~..~. \ .... ~ ~i', \ h~ :: \:~ ,:,a f~ "-1__; .~\:.t: ". \ t.-. .. -.... ---:r~ _~l-IJ.-- '1 I' t., \ ~\ '. . .;;\ .;,.,,,,,': \' ;.\. .. .,.... ... . -. '. , . , ~ :.. i .1' .., .. , \' . .. .LH.." . ::, '. , '.'i .,. ., f.- t;" : ... ,\ ~ \, ".\, , , '.-'L>;- , {. ,;..L. _'1.- .... ~ OJ, . !' J\~:\: ~ I : . -I , ~ _ . ..-""___....,,""alU11'~W:aJelS f ..... _ /' . l'W"-- UI""'~-. ...........,D~lp ~~~5\Cl';.re~ f'~~,..~_~ef 9",e:lP9l'GJ1llS \CI "" ...........- Olt-clI~~~f<09 pcad \0 '!:Ie fi;;$:cr.cd ~ c-..,.-.e\..,;tl\ ~lpoo\ ~ __ UftIl8'R"~~ o::n= ~ \..~~\CIb9f'11l5~ ___ 'aIY3~ ... ~t\f:5l~l'llfQ..\~ ~ ur:--et'~pcain8!I"~up f'd'83 , ~ ,. .., , ~ '1 , '1 r ., , :. ..' TassaJara creek -' , p\J1ll'OSf,: ReSidential, Commercial 8lld open Spacc l)eYelopsncnt ~ s()tJRCf, OF BASE: NOVO ADJAcsIT PROYERiYO~: Sec p..w\icstiO\1 , , . :.:/::1 / . ~:; }\ . .,i) .(, . , :~. \ , ~i ., '...rll ~) '~~l~\\ , .. I:!:: ~:j\' . ,,:~ ... , , .t ....~:~ ~ "',.r. ...'\." . . \ . ... : /.\.-:. : :'~- , .\"- -.' ,.. . ,f' " . \ "..., ~ I . .. .. ..~:~.~~:. .. .. . t.;! 1 't \ \ ,..... Jr ::1-' _ .1-- - 1-:: -j' 1 ,I! a ~./ I { t. ,\, \ ~ '.~,' , :.(~\\, " t'~'..,"a: ; :,'~ __.\",:Ia" "..& ",.. . '\! 1 \ ) )}j .:U.li....~ ,-0 't.... ::"1- J , . 1 ~ -~, \~1':" .- IUf-: t-: .,~ ~:'~ . '.~ ,\\!i.", ~,~.,. .;, .. I'. ,,I r[..... ':,*~, . . \ ~ ~I llHi! "<:i~'- l\- -,' . .!; /I'IF r;-T \ , l I . , .. ,tl':' \ ,. ., , ':; flllt;:"",- ....\ ,c.lI.: . if/I'd!!: . ,..n ..,..tu.,..-.:n , : ..,; j; tI;fj .J .~,I~" \., \ . .; j.~'l ',f '. . -j'--:::-:-'''": \.,'.". '.0;); ". . \.' d!!/, i \: !/ ...-:::.>-~\ 1\\ ' .\ !,,,. , ..' , . ".. _ . '.~ i\ ""~"ti-\:':-~":" I(.....~.:.',. ,." i,I:. _ ._\;"\\\' ., .;.:_1. f{ ;'. ....' ,2' .' \.,\1\, __ 'l~ .~--,,/.' ...., 11 u . ~ \.... .' 1.:,";/" ,".,..', \' 1\ \ : ~~ ~-t. II. I .':,.' . If _ ,:-"",.-:. -"J'. \' I' ,~,' lil ".:....... fl' ~;:._-....,} 1 ,'; 'I - .-::~:-_. 1.~i!r-I.pr'..;11 r-K;.l '._."""'11.:-' ../:11' . ':'( ,". ^~.'" ~ 1 .._ .~',t ...at.,. :.:;,'.' 'i. - . . , ,".'.. :.; .. I \.'f"" ,'\ -~., ,. i\ \, \, ',.. \\h rn , ~ ~\\\ ~.. _.~ . it , i \ \ :l ". ,," t .. O! , \', . ".'. . \ ,'.... -. .'-' . '1~-f\0AQ_._---- ,.oR'fiiE1U'~oE;"~ ...on;Cf ~ .'-'" """" ,-"",,""'" ""..... CI-- ....*..,. of '"\'sssaiaf8. Road and 200'::l: 'North ofl-SSO \ -:. .. .... , "& to"} '.. ~,.. ~ ;,: ~-:. :'t" .......J- ,f!:'~l ". "'h\\\l. . ;f.ln~~' ,:- ":r, ........ ...... r i:!.. :.. ;:.'. i:~: -:i\ 1'. '.' ..,;,,'. IF' .. L'. .~;~;!..~; ': ~~~i', ."\..; . ~:;~!:;?;,&:! .. , ..:f IC,t.a : . .!\\: ,\\i; . ~ ':"1 1 ..~ & &l~\ -~, ..~';;,~~.::.~ :.~: ~'. ,<1.'\ .!: .':.&' 'i"..~ ~ .- :.. -:~...& ..' .::.".~...; "" .....-:;:.;~:1J~ "'. . - ' ; .~.... r.t ~ I Afl'UCAno~ B'Y': Jennifer Un. et. al. cloJ.atneS.'ton~ 6601~S~~S~~100 l'\c:asanton. CA 94S66 comt'fY: p.Jsn1c:da- F1~ 10 of 11 VA'"f'E: .A.ptU 1.\ - - I \. I ..... . t I II I I I I I ,I J I I .~~._--~ ,,~- '-'" , (\ "' J f\ '-...... I", ", ;. \ -, I '~...__........,'. ~-: i ~ "" 1 ! ( --- --..,,;,' ----. --'- .- "\ \, , , "--, \ "../ i \, 1 ,;, :~ ; ........1 '.... { 1:1 --. t_F'.,.)j ::~ i ....-. ,t ..-, ;.. i -, '. " \. ..._--? '- J " '. , -'-'1 '--". " '. f/\__ I J . . "'.-. j .,"- -. I PURPOSE: Residential, Commercial and Open Space Development UN LNERMORE MITIGATION SITE PLAN VIEW PROJECT AREA 23t{ A N Legcncl Red-logged F"'lI Pond: _1 3.17_ 5___ _ 2 1.84_ _3 lI.!I9_ _ 4 0.77_ _ 5 0.&3__ _ & 0JiT_ _ 7 1.37_ _. 2.7&_ _, 2.91_ _ 10 I.CO__ _ 11 0.73_ _ 12 Ull_ _ 13 1.30...... Pand 14 1.34_ _ 15 1.7&_ _16 G.!I3_ _17 1.75_ T__ __ 22.56_ T__ --- RLFP_ 25.71_ ~ ~_Pond ~ 0dginIlIr Pnlposed- _ ~___Pond Gil!:P Ellisting_..... _ _EnhOnCeCI . 3lliodl_pclIldlo1gcleplh . 12iod1_pclIldlo1gdeplh. * Ponds 1.4.1 and 11 ... "-Ponalo ----- depths 0141_ --Ulu....r-c-lIan AnI_ A USACETribuIary_..be / ' __ EnhoncecI _llrainago.. be P"""",,", /\-- LOCATION: Dublin, CA. 900':1: East of Tassajara Road and 200':1: North ofI-S80. I SOURCE OF BASE: NGVD APPLICATION BY: Jennifer Lin, el al. c/o James Tong 660 I Owens Dr., Suite 100 PleasantOD, CA 94S66 ADJACENT PROPERTY OWNERS: See Application COUNTY: Alameda I FIGURE: 12 oft? DATE: April 21, 2003 I I .c "5- 0<( CJ) I I . . . . . . . . . . . . . . . . . . . . . . . . . . . . <> . 0.' .2: .. . :-:: Q' "': b: ~: .5: H. e. 0.' c.: <: I ~' I I rf. I I ~ I :t' "Cl c:: o p., I . . . . . . . . I - .... I -' ...... I I ~'. I .c t 0<( Z I PURPOSE: Residential, Commercial and Open Space Development I- ~OURCE OF BASE: NGVD 1 ADJACENT PROPERTY OWNERS: See Application .J:: 5- om CJ) ~ N .D :s CI) .::: ..,. V'"I "0 c:: o 0.. .J:: -e om Z ,s . . . . . . . . . . . . . . .. . . . . . . . . . , . . . . . . . u' E: ..: -. Vi: ...... b: G. -. ... s::. -= . ... e: "". 0.' <: . . . . . . . . . . . . . . . , . . . . . . . . . . . . . . . . . . . . . . . .... :~. . UN LIVERMORE MITIGATION SITE SECTION VIEW APPLICATION BY: Jennifer Lin, el at. do James Tong 660 1 Owens Dr., Suite 100 Pleasanton, CA 94566 23~ UJ OJ C>> "0 II) .E f! "0 E D>> f! (\J D>> C>> D. .E c: .... D>> II) 0 1ii r X II) (\J w 0 Ci5 "0 I; c CD [J) CD ...J PROJECT AREA LOCATION: Dublin. CA. 900':1:: East of Tassajara Road and 200':1:: North ofI-580. COUNTY: Alameda FIGURE: 13 of 17 DATE: April 21. 2003 I I PURPOSE: Residential, Commercial and Open Space Development M li I t c ~s: " c c.s L C 8.:t u ~ i ! ~~ ~ ~ ! .. .. ;; .. - ~ .7 ... f-:; Ie ~~ ....a #. c x'" u~ ~i ~~ ~ ~~ c f .. 0 ~c ~B h '-,- ~ z ~"i :1 g~ uJ Cl ~U3 <- i~ 52 .. . tIt ~% F Ff 21< ~E: -' ! !~ ~.{! 'J c jflj :-: H ~ ~~ a~ if~ .....- < <0 <c:: <ox: \ I I I << ~.. \ F.: . I I I I I I I I I I I I ~ I I I PROJECT AREA I ADJACI:.'"NT PROPERTY OWNERS: 'See AppliC3tion' APPLICATION BY: Jennifer Lin, et. al. c/o lame:; Tong 6601 Owens Dr., Suite 100 Pleasanton, CA 94566 LOCATION: Dublin. CA. 9oo':/: East of . Tassajara Road and 200':/: North ofI-SSO. SOURCE OF BASE: NGVD COUNTY: Alameda FIGURE: 14 of 17 DATE: April 21, 2003 I I I I I I I I I I I I I I I I I I I - I 2.41 . ';;'".::i:'~. .~~~~i~~.~-::::'--:::;:::_-_._.- ~~-..~ . \!?-..-~ f \" -.-' -- ..- . . , . __." , .' ____. '1 _5 . ~ ...... __-- ..=.----=-~ \ 10 \'\11,\ 'l.. \ ___ H ...~... --- ---'~ \ \ 11 \ 'L- .- ::::il~ \, \ 2J 1 ..l-t-::.!.-. . ,~-~ \~\75\24V~. ~\ ~ \~~~ ., 841 ~ ":\ ~ ~~ \sl"" l' "1 ~ '"\! .\l (~'-~r\ 78 \ 79 eo es ~ ~ \:\~ \\ 1;;)17 !. ~ ~ V ~~~ 63 \ 61/{61 '~ ~ \ ~I\\!'\';.:J ~ ~ (--- 81 J 1/ ~;1 . ~ \ 1 6 iQIJKoc ea ~iN l ~ 72 ~~ 59 e9 ~_~ ~ ~111 ";& ~. ~. ~: : ",:\ ,,\' \i< ' 6l! D&-~ 56 . }< .\ ,\ . I'Jo... ..JI- ,'" ~ \\ r ' . ~~->- ~-':-i' ~.~~" r.. / // / I \ ~~I\ I ^ ~ I.'. "t~';::?o--' r-..~~- I / / /J \ ~,\~,\ II.I y~'..l.-1 ' ~.'... _ :0+-=_ ~ ( It-- ~~ ~\~~{J,~ " v:~~~_ ~ ~ l/{IN'-::~\---W))\\ l~, ~ ':,) ~ <_ t~/~:7/ _~:.'--:=:~ j. ~\ ~ X Xx'" ~ ~:::~I-D~ ,S :/t./ ..../ ~__-- ~ !.~ ~k ---- J ./'" ,/'/ _ ." l"JiZfI\ ~ X X /1/ /,/ --- -!../;s~ ~I' 1\1 I~:)( _~), ~ 5 61 718~ Sr.Q'iH!12 13 1-4 15 ./1 /~ / --- --;r-.. ~' ,Y.\. ~ ~ ~ rc y ~ ,/ ,./ e p_ '. ~ ~ ". v-.r i.-/ ./' / - .Eo : ~ ~ '<' .:. ><^~' 2 -'!! _....~ //.......- . c:- ( Q::\\,. , ~ ~~)( ~ -:HI ~ " 2tD 22~21 2O~';; 'll~17 II ....\>. = --n I' 1\ l~"~ }..O ~ · ~ ~ ~ "3'" "~.u "'f<,'~" 3 -' \ c::==J ~lll 1'-' ~ ",.:~- - J : ;\1 '=='""'"" I~ ~:C!. "_ ,......>"I!._~ ~ I.. I _.1 o~ i -. ~ ' \ . n ......~./ . I\. . \ " "'-n:r.:1Saja~ ~ . i_ . ~ \, --- v I', /- .. ~ '--,/ \\ ., /1 / -' . ...... .... ~ { . l ~- . ....... -- I / _- . , .-' _-:: ,--? --...... .-~ .' <=r=': . ~' ---, '.\ \ ,-'-' ~~ -;..::..z-'"":" -" --6 ~ / /... ~ --->-<--= ~ PURPOSE: Residential, Commercial and Open LOWER NORTIffiRN DRAINAGE Space Development PLAN VIEW · I l' i '-'"'I. _:_ ~, , \~.... \\~\\,,,O I /~--:.:~ ~h~./ / , -.~"'" ../" -'.. Y ";J \ ~ ...... I /. ..... o (",j M v a-- .' . '- ... .- '" .. PROJECT AREA LOCATION: Dublin, CA. 900':1: East of Tassajara Road and 200':1: North ofI-580. SOURCE OF BASE: NGYD APPliCATION BY: Jennifer Lin, et. at c/o James Tong 660 I Owens Dr., Suite tOO Pleasanton, CA 94566 FIGURE: 16of17 DATE: Apri121, 2003 COUNTY: Alameda ADJACENT PROPERTY OWNERS: See Application '_ \_ 1_ \_' \_ l_ l_ .. .. ... ..' .. l_ .. _I _. .. - - ~~ 0 Cf.l'tl !~ >!> ~ ;an ~~ m ~ ~ ~ !!... a. .g~ o ..., o:l :l :;g 0 > ~~ ..., en S n' ~S a. z P- o ~ g ~ 3 a ~ a. ~ e!. ! 0 "Cl g m~ aF:S ~~ _> ~S~ j ~ ~ ~. ~ ~ @ ~ a p 51 i~&?~~l!lll>:l n ~ a -. ~ > tTl ::l >~ ~.? Oll:1g~ ::f~gl1'Z!;;g:;oo ~~OQ ~~ ~..,,~ 0\- .. l'I'l~ 8 S@o> f13C> /Tlotrl Cii~ .." () ~g 'tl Ci ~ ~ m. .N.> ~ 5~ - ~~ ~ -..I > > i !. .. 0 l~ .... 2. - oo,J '" N ... g.? 1:3 ..=~ ~ z ~8 .6" o It a ~~ N V\~ :- ~o . .... t-.l 8 w Barrier along North Bank of . / Conservation Area _l__ '" \ \ \ \ \ \ \ \ \ '\/ ExisUng Grade \ , \ \ \ \ \ \ \ \ \ \ \ \ \ NaUve fill to be placed \ on lower terraces of varying width depending on available space Natural Material Revetment Not to Scale Drought-Tolerant Riparian Trees and ShrUbs~ ~----------------- ~ I I I I I I I I I I I I I I I I I I I I I I 'f Restored '. : Channel . l \~ .... -.......-. Existing Channel to be Filled Approximately 6 Inches of salvaged topsoil to be placed on slopes where stability permits Native fill to be placed on lower terraces 01 varying width depending on available space I Oak Savannah 6 Inches of salvaged topsolllO be placed on slopes Approximately 2 feet of salvaged topsoil to be placed on mld.bank terraces of varying width depending on available space Legend ....1 ,.... ,'" ..."'" Existing Topography New Topography to be Created /"1/ I" ..c. ~ I I I I I I I I \ \ , , , '.... .... '......"'...... -........ ........ ......-..--.- -- -- I I "0 Q) iii l!! o Q) .0 B >- .c 0. f! a o 0. ~ ~ Z I >. .c 0. Il! a o 0. ~ "0 01 C .E & (;j Q) .x ..J W I I I ,~~~ I .c as c c ~ W ..:x:: as o I , "0 c::Jc as 0 0 :B:;::: masS (fJ.c Q) as"" a ~~~ I I .. .. ;e ~ g ~'\. 3 .. .. 'I: 10 .i.l i. ~ j ~ /' ..~ 't". '-0":":,.. 'r~k.:1.:"":."'7".,t.. T c:; 1- .. "';:a-" ......I"~...~JI' -........"l.. lii ~ I-i iO N N m l!! ::J (fJ as Q) ::iE C"O OQ) ~-5 ~g- .0 a: Sf/) Was In ..:x:: 8>- a:iii __ m f!?: m 0 "OQ) 3Z S::l f/) "O~ /' cD../ as "0 ~ ~--- ~~ ~ s:s: Q) "0 f! (!) a .E 1ii 'x w \ --- -- -- --- -- / - / / / / / - - / / .'\ { - LOWER NORTIIERN DRAINAGE TYPICAL CROSS SEcnON OF ADDITIONAL RESTORATION SITE WHERE SPACE IS LIMITED APPUCATlON BY: Jennifer LiD, et aI. c/o James Tong 6601 Owens Dr., Suite 100 Pleasanton, CA 94566 I I .~ I , I :.:; as l!! <( 0115 c c..:x::.Q .Q~lii ~m ~ Q) .c Q) "Et::g as 0 0 mzo I I PURPOSE: Residential, Commercial and Open Space Development I SOURCE OF BASE: NGVD I ADJACENT PROPERTY OWNERS: See Application .~ c c as .c"O Om Ol= elL :;::Q) .!!! .0 ~B a e "0 - Q)--g ~oQ)Q) - fI) 0. 0 o.Q)mas mO"Oo. .cas.c(fJ ot-Q) -S:2:o =...~as - CD a= ~~.E~ ._o~as iii~asc Zo>o "0 _ Q) Q) ....c .Be was Q).c a:o PROJECf AREA 2 l.f3 0) C "C - Q)-1! ~OCDm -00.0 Q.m CD as Q)O"OQ. .c~.cfIJ .9~3!~ =....~as -. m= m3:eas ~.Q~ii ascasc Zo>o Q) aJ o CJ) .8 - o Z LOCATION: Dublin, CA. 900':: East of Tassajara Road and 200':: North of 1-580. COUNTY: Alameda FIGURE: 17B of 17 DATE: April 21 , 2003 2Y~ ~ ~ Is: H. Hickox - Secretary for ~vironme1llal . Protection California Regional Water Quality Control Board San Francisco Bay Region Internet Address: bttp:llwww.swrcb.ca.gov 1515 Clay Street, Suite 1400, Oakland, California 94612 Phone (510) 622-2300 . FAX (510) 622-2460 - . Gray Davis Governor I I I I I I of' I Z" I Via Certified Mail No. 70022410000265003543 Date: APR 2 2 2003 File No. 2198.11 (KHL) Site No. 02-01-C0508 The Jennifer Lin Family Clo Mr. James Tong 4690 Chabot Dr. Ste. 100 Pleasanton Ca. 94588 Subject: Transmittal of Order No. R2-2003-0032, Water Quality Certification and Waste Discharge Requirements, Dublin Ranch Project, City of Dublin, Alameda County Dear Mr. Tong: Enclosed please find a copy of the above-referenced Order, as adopted by the Board at its April 16.2003, meeting. Please note the vcUious required submittals and due dates for reports and plans that are a part of ". the Order. We look forward to continue to work with you in the development of these reports. In I addition, please note that as per our recent letter. there is an outstanding application fee of $9,500 that ..,., must be remitted. I If you have any questions or further comments, please contact Keith Lichten of my. staff via ..; email to k:bl@rb2.swrcb.caeov, or at (510) 622-2380. I I ...., I - Enclosure: Board Order No. R2-2003-0032 Icc: Dale Bowyer, RWQCB Broce Wolfe, RWQCB ~ Water Quality Certifications, USEP A, WTR-8 I Water Quality Certifications, SWRCB-DWQ Bob Smith, U.S. Army COIpS of Engineers, Regulatory Division - I Sincerely, fzr..... Loretta K. Barsamian Executive Officer /?~ California Environmental Protection Agency -- .' I I I I J I I I I I I I I I J I I I I 2~ CALIFORNIA REGIONAL WATER QUALITY CONTROL BOARD SAN FRANCISCO BAY REGION ORDER No. R2-2003-0031 WASTE DISCHARGE REQUIREMENTS AND WATER QUALITY CERTIFICATION FOR: CHANG SU-O UN (AKA JENNIFER UN), HONG LIEN UN (AKA FREDERlC LIN), AND HONG Y AO LIN (AKA KEVIN LIN) DUBLIN RANCH PROJECT, DUBLIN AND LIVERMORE, ALAMEDA COUNTY The California Regional Water Quality Control Board, San Francisco Bay Region, hereinafter Board, finds that: 1. Chang Su-O Lin, Hong Lien Lin, and Hong Yao Lin (hereinafter Discharger) propose to construct a mixed-use residential, commercial, and open space development on a 515- acre site in the City of Dublin (hereinafter Project). The Project consists of the following elements: a. Approximately 2,730 residential units at varying densities on about 271 acres; b. Approximately 2.3 million square feet of retail, office, and commercial uses on about 146 acres; c. 58 acres of parks; d Dedication of 45 acres as open space; and, e. Associated roads, utilities, and other infrastructure. 2. There are approximately 10.22 acres of jurisdictional waters of the United States, including creeks and wetlands, on the Project site. In addition, the site contains an unspecified amount of seasonal creeks that are waters of the State. The site's waters of the United States are comprised of: a. Freshwater seasonal creeks: 5,548 linear feet (0.52 acres, which includes 0.04 acres of associated seasonal freshwater wetlands, such as seeps); b. 0.92 acres of 1 freshwater pond; c. 8.34 acres freshwater seasonal wetlands; and d. 0.44 acres other wetlands. 3. The Project will result in the direct placement of approximately 20,300 cubic yards offill into and/or other permanent distUIbance of all of the 10.22 acres of jurisdictional waters of the United States, including wetlands, and other waters on the Project site. 4. Waters on the Project site serve as habitat for the federally-listed threatened California Red-Legged Frog (Rana aurora draytonii, hereinafter CRLF), and as habitat for the state listed species of special concern and federal candidate-for-listing California Tiger I I I I I I I I I ... I I I J I I I I I I I 7.~ Order No. Rl-2003-0031 permitting for their construction will be required. However, the Discharger has provided conceptual designs for the t:htee crossings, and the Board anticipates that the crossings and any associated mitigation will b~ incorporated into the Mitigation Plan, as discussed . in that Plan. 9. Financial Assurance: The Discharger has submitted an estimate of the cost of creek and wetland mitigation implementation, intended to serve as an estimate for the provision of financial assurance adequate to ensure the success of the proposed mitigation. This Order requires the Discharger to submit its revised estimates and appropriate supporting information, to address the revised monitoring periods in the Mitigation Plan. The Discharge has submitted the final estimates, but not the supporting information.-- This - u Order requires the Discharger to submit, prior to the start of Project construction, a bond or other appropriate instrument of financial assurance, callable by the Board, in the amount of $3,591,620, plus the additional amount necessary to cover the revised mitigation periods. The financial assurance amount may be stepped down upon the successful completion of a mitigation item (i.e., the Northern Drainage mitigation as a whole, Lin Livermore mitigation as a whole, etc.), as determined by the Executive Officer. In addition, the Discharger may propose to step down the financial assurance for certain items, like fencing, unlikely to fail once they have been appropriately constructed. A proposal to do so must be submitted, prior to the start of Project construction, with the required financial assurance instrument and proposal. The mitigation financial assurance estimates are: a. For the Northern Drainage mitigation, $1,097,740; b. For the Tassajara Creek mitigation, $479,408; c. For the Lin Livermore mitigation, $1,001,340; and, d For the on-site creeks, $1,013,132. 10. Long-term Management: The long-term management of the mitigation sites will be transferred to an appropriate land management group or agency, subject to the approval of the Executive Officer. The Center for Natural Lands Management (CNLM) is one suc~ group that has expressed interest in serving as the land manager of the Northern Drainage, Tassajara Creek, and Lin Livermore conservation areas. The Discharger has submitted PAR analyses estimating the endowment amounts necessary for the appropriate management, in perpetuity, of the conservation areas. This Order requires the Discharger to work with a third party land manager accepted by the Board to finalize the determination of what amount of money is necessary for an endowment fund to adequately finance the monitoring and perpetual management and maintenance of the preserve and endangered species habitat protection areas, and to submit this determination to the Board, acceptable to the Executive Officer. The Discharger has presently estimated that an amount of$963,525 is necessary, and this Order requires provision of at least this amount, or a greater amount, as determined through consultation with the accepted land manager. Under the present estimate, the $963,525 is distributed as follows: a. For the Northern Drainage conservation area: $452,083; b. For the Tassajara Creek conservation area: $186,794; and, 4 I. I. I I , I I I I .... , I I J I ...; I , I I I I -Z l.-ll Order No. R2-2003-OO31 c. For the Lin Livermore conservation area: $324,648. 11. On September 2 I, 2000, the Discharger submitted an initial appli~ation for Water Quality Certification and Waste Discharge Requirements for the Project. That application was subsequently completed by additional submittals. 12. The Board has detennined to regulate the proposed discharge of fill materials into waters of the State by issuance of Waste Discharge Requirements (WDRs) pursuant to Section 13263 of the California Water Code (CWe) and 23 CCR 93857, in addition to issuing certification pursuant to 23 CCR ~.3859. The Board considers WDRs necessary to adequately address impacts and mitigation to beneficial uses of waters of the State from this project, to meet the objectives of the California Wetlands Conservation Policy (Executiv~ Order W-59-93), and to accommodate and require appropriate changes over the life of the project and its construction. 13. The Board, on June 21, 1995, adopted, in accordance with Section 13244 et. seq. of the CWC, a revised Water Quality Control Plan, San Francisco Bay Basin (Basin Plan). This updated and consolidated revised Basin Plan was approved by the State Water Resources Control Board and the Office of Administrative Law on July 20, 1995, and November 13, 1995, respectively. A summary of regulatory provisions is contained in 23 CCR 3912. The Basin Plan defines beneficial uses and water quality objectives for waters of the State, including surface waters and groundwaters. This Order is in compliance with the Basin Plan. 14. The subject wetlands, seasonal creeks, and other waters on the Project site are located in the South Bay Basin, and are tributary to Arroyo Mocho. _Arroyo Mocho flows into the Arroyo de la Laguna, Alameda Creek, and thence to San Francisco Bay. The Northern Drainage and Tassajara Creek mitigation are tributary to Tassajara Creek, and thence to Arroyo Mocho. The Lin Livermore mitigation site is tributary to the Arroyo Las Positas, and thence to Arroyo Mocho. The Basin Plan does not explicitly identify beneficial uses for waters on the Project site. However, the Basin Plan states that "ftJhe beneficial uses of any specifically identified waterbody generally apply to all of its tributaries." The Arroyo de la Laguna and Alameda Creek have the following existing beneficial uses defined in the Basin Plan: agricultural supply, cold freshwater habitat, ground water recharge, fish migration; water contact recreation; non-contact water recreation; fish spawning; wann freshwater habitat; and wildlife habitat Additionally, waters on the Project site provide potential habitat for the preservation of rare and endangered species, including breeding and dispersal habitat for the federally listed threatened CRLF, and breeding habitat for the state-listed species of special concern CTS. 15. The Basin Plan Wetland Fill Policy (policy) establishes that there is to be no net loss of wetland acreage and no net loss of wetland value when the project and any proposed mitigation are evaluated together,. and that mitigation for wetland fill projects is to be located in the same area of the Region, whenever possible, as the project. The policy further establishes that wetland disturbance should be avoided whenever possible, and if 5 I I' I. I I I I' I I I I I I I I I I I I 24$ Order No. R2-2003-0031 not possible, should be minimized, and only after avoidance and minimization of impacts should mitigation for lost wetlands be considered. 16. The goals of the California Wetlands Conservation Policy (Executive Order W -59-93, signed August 23, 1993) include ensuring "no overall loss" and achieving a".. .long-term net gain in the quantity, quality, and permanence of wetland acreage and values...... Senate Concurrent Resolution No. 28 states that H[i]t is the intent of the legislature to .. preserve, protect, restore, and enhance California's wetlands and the multiple resources which depend on them for benefit of the people of the State." Section 13142.5 of the CWC requires that the H[h]ighest priority shall be given to improving or eliminating discharges that adversely affect... wetlands, estuaries. and other biologically sensitive areas. " 17. This Order applies to the temporary and permanent fill and indirect impacts to waters of the State associated with the Project, which is comprised of the components listed in Finding 1. Construction of the project will result in the permanent placement of fill in and/or disturbance of 10.22 acres of jurisdictional waters, including freshwater seasonal wetlands, seeps, and creeks. The permanent impact of this fill on waters was identified as a potentially significant impact in the Environmental hnpact Report (hereinafter EIR) and Negative Declarations certified for the Project. 18. The Discharger has submitted an Alternatives Analysis and supplemen,tal information described in the Staff Report to show that appropriate effort was made to avoid and then to rninirni7.e wetland disturbance, as required by the Basin Plan. Board and federal agency staff held extensive additional discussions with the Discharger regarding its Alternatives Analysis. The Board concurs with the conclusions of the Alternatives Analysis, as supplemented. 19. Discharges of storm water associated with construction activity will occur. The CEQA documents certified for the Project identify such discharges, including the pollutants associated with them, as a potentially significant impact. The Discharger is responsible for obt~g appropriate permits for these discharges, including complying with the rules and regulations of National Pollutant Discharge Elimination System (NPDES) permit requirements. This includes complying with the requirements of State Water Resources Control Board Water Quality Order No. 99-08-DWQ, the NPDES General Permit for Storm Water Discharges Associated with Construction Activity (hereinafter General Permit). 20. Discharges of storm water associated with the post-construction operation and maintenance of the Project will occur following its completion. The CEQA documents certified for the Project identify such discharges, including the pollutants associated with them, as a potentially significant impact The Discharger is responsible for obtaining appropriate permits for these discharges, including complying with the rules and regulations ofNPDES permit requirements. This includes complying with the requirements placed on the Project under NPDES Permit CAS0029831, the NPDES 6 I' I I I I I I I I I I I I I I I I I I -z 4. '1 Order No. R2-2003-0031 Municipal Storm Water Permit that covers the City of Dublin. The Discharger has submitted a SWMP for its project that, together with the additional submittals required under this Order, is consistent with the requirements ofNPDES Permit CAS0029831, Provision C.3, the permit provisions addressing new and redevelopment projects. 21. Because of the Project's proximity to sensitive resources, including special status species habitat, and potential to disc4arge materials that could significantly impact those resources, this Order requires the Discharger to submit a StOIDl Water Pollution Prevention Plan or Plans (SWPPPs) for the Project, prepared pursuant to the provisions of the General Permit, at least 60 days prior to the beginning of construction for the Project. 22. Discharges of ground water or other non-storm water during construction may be required. This Order considers such discharges covered by the General Permit, contingent on submittal of an acceptable discharge plan at least 30 days prior to such a discharge. 23. The California Environmental Quality Act (CEQA) requires all projects approved by State agencies to be in full compliance with CEQA, and requires a lead agency to prepare an appropriate environmental document (e.g., Environmental Impact Report or Negative Declaration) for such projects. The Board finds, after review of the Project's environmental documents, that all environmental impacts have been identified and, with compliance with the conditions of this Order, will be mitigated to a level of insignificance. On May 10, 1993, the City of Dublin certified the Addendum and Final Environmental Impact Report for the Eastern Dublin General Plan Amendment and Specific Plan, which includes the Project On November 18, 1997, the City of Dublin certified Negative Declarations for Dublin Ranch Areas A through E, aILd on February IS, 2000, for Dublin Ranch Areas F, G, and H, which include the Project area and/or areas associated with the Project and its mitigation. 24. On August 14, 2000; the U. S. Army Corps of Engineers (Corps) issued a Public Notice for a proposed Individual Permit for the Project (Corps File No. 25144S) pursuant to Section 404 of the Clean Water Act 25. On.July 1, 2002, the United States Fish and Wildlife Service (USFWS) issued a Biological Opinion for the Project (USFWS File No. 1-1-01-F-0208). 26. Pursuant to 23 CCR Sections 3857 and 3859, the Board is issuing WDRs and Water Quality Certification for the Project as descnoed herein. 27. The Board has notified the Corps, City, U.S. Fish and Wildlife Service (USFWS), CDFG, and other interested agencies and persons ofits intent to prescribe WDRs and Water Quality Certification for this discharge. 28. The Board, in a public meeting, heard and considered all comments pertaining to the discharge. 7 I I. I. I I I I I I I I - I I I I I I I ""2.. t;;V Order No. Rl-2003-OO31 29. This Project file is maintained at the Board under File No. 2199.9439 and Site No. 02-01- C0508. IT IS HEREBY ORDERED that Chang Su-O Lin (aka Jennifer Lin), Hong Lien Lin (aka Frederic Lin), and Hong Yao Lin (aka Kevin Lin)(hereinafter Discharger), in order to meet the provisions contained in Division 7 of the California Water Code and regulations adopted thereunder, shall comply with the following, pursuant to authority under ewc Sections 13263 and 13267: A. Discharge Prohibitions 1. The direct discharge of wastes, including rubbish, refuse, bark, sawdust, or other solid wastes into surface waters or at any place where they would contact or where they would be eventually transported to surface waters, including flood plains, is prohibited. 2. The discharge of floating oil or other floating materials from any activity in quantities sufficient to cause deleterious bottom deposits, turbidity, or discoloration in surface waters is prohibited. 3. The discharge of silt, sand, clay, or other earthen materials from any activity in quantities sufficient to cause deleterious bottom deposits, turbidity, or discoloration in surface waters is prohibited. 4. The wetland fill activities subject to these requirements shall not cause a nuisance as defined in ewc ~13050(m). 5. The discharge of decant water from active dredging or fill sites and dredged material stockpile or storage areas to surface waters or surface water drainage courses is prohibited, except as conditionally allowed following the submittal of a discharge plan or plans as described in the Provisions. 6. The groundwater in the vicinity of the Project shall not be degraded as a result of the Project activities or placement of fill for the Project. 7. The discharge of materials other than storm water, which are not otherwise regulated by a separate NPDES permit or allowed by this-Order, to waters of the State is prohibited. 8. The discharge of drilling muds to waters of the State, or where such muds could be discharged to waters of the State, is prohibited. B. Provisions 8 I t I I I I I I I I I I il I I I I I I '2- 'E' J Order No. R2-2003-0031 1. The Discharger shall comply with all Prohibitions and Provisions of this Order immediately upon adoption of this Order or as provided below. 2. The Discharger shall submit copies of all necessary approvals and/or permits for the Project and mitigation projects from applicable government agencies, including, but not limited to. CDFG, USFWS, City of Dublin. and Corps. for each Project component as applicable to that component, prior to the start of construction on that component. Project Implementation Deadlines 3. No construction shall commence on any Project component until all required docwnents. reports. plans. and studies required in the Provisions associated with that component have been submitted to and found acceptable by the Executive Officer. For example. mass grading for the Project may begin, within the timelines of the related Provisions. when the required financial assurance documents. SWPPP. and other documents required in the Provisions have been accepted by the Executive Officer. fu all cases where the Discharger is required to make a submittal acceptable to the Executive Officer. the Executive Officer may detennine that construction may begin sooner than the specified nwnber of days for the submittal prior to the beginning of construction. 4. Not later than 60 days prior to the beginning of construction. the Discharger shall submit. acc~ptable to the Executive Officer. a Plan that includes all appropriate Mitigation Plan implementation details that are not presently included in the Mitigation Plan. This includes planting plans and details such as designs and construction drawings for in- stream structures. pond reconstructions. inigation plans. and all other information, as appropriate. Upon the Executive Officer's determination that the Plan is acceptable, the Executive Officer may determine that construction may begin sooner than 60 days following submittal of the acceptable Plan. A Plan for the following mitigation component may be submitted later than 60 days prior to the beginning of construction, but must be submitted within twelve months of the date of Board approval of this Order: the 7.43 acre mitigation area at the base of the Northern Drainage watershed above Tassajara Road. including the reconstruction of the road crossmg. A Plan for the proposed on-site creek reconstruction may be submitted later than 60 days prior to the beginning of construction, but shall be submitted no later than the time of on- site project design for adjacent urban development (i.e.. residential and/or non-residential uses), and shall include a schedule for construction at the same time as or prior to grading for that adjacent development. The Plan must include: a. Proposed channel designs and earthwork for all creeks. including appropriate longitudinal and cross sections and plan views; 9 I I' I I. I I I I I I I' I I I I I I .-" I I .---p 7. G"V Order No. R2-2003-OO31 b. A detailed planting plan, including species lists, plant sizes and numbers, and planting designs relative to creek cross sections and plan views; c. An irrigation plan for the mitigation areas, where irrigation is proposed; d. - A workplaIi for future submittals of specific details and plans for all creek sections that will be culverted, bridged, or otherwise crossed or immediately adjoined by roads, paths, or si,mi,lar improvements; e. A finalized financial assurances proposal with all appropriate detail on financial assurances being provided to ensure the estahlishment and success, in perpetuity, of the proposed mitigation; [ An implementation schedule that provides for completion of constnIction of the proposed mitigation within 24 months of the Board's adoption of this Order~ n. proposed timing for the reconstruction of the Tassajara Road crossing of the Northern Drainage to a bridge design as specified above, and estimated timing for the submittal of bridge crossing ROWDs for the Fallon Road/Northem Drainage and Tassajara Creek crossings. However, completion of construction of the Northern Drainage mitigation, except the 7.43 acre site and Tassajara Road Crossing, may be as late as 30 months following the Board's adoption of this Order. Completion of construction for the 7.43 acre site and Tassajara Road Crossing shall be no later than 36 months following the Board's adoption of this Order. The implementation schedule shall ensure the completion of the majority of work within the first 12 months following Board adoption of this Order; g. Incorporation ofH.T. Harvey & Associates' memo of March 12,2003, into the Mitigation Plan's Performance Standards and Success Criteria; h. Revised Grazing Plan!Habitat Management Plan language to reflect that the grazing regime in a conservation area may be altered during the grazing season, within the limits of the Plans, if it is clear that the expected performance standards will not be met; 1. Incorporation of the following success criteria for the success of CRLF and CTS, as per the Habitat Management Plans, into the Mitigation Plan: i) CRLF: The proposed Northern Drainage and Lin Livermore mitigation sites shall each result in the creation and/or enhancement of habitat in which CRLF are breeding and ofhigh-quaIity dispersal habitat for CRLF, and on which CRLF predators have been appropriately minimized. The proposed Tassajara Creek mitigation site shall result in high-quality habitat for the CRLF, in which CRLF are present and CRLF predators have been appropriately minimized. ii) CTS: The proposed Northern Drainage mitigation sites shall result in the creation of habitat providing high-quality breeding, larval, and aestivation habitat; and, . J. All other information related to this Provision, Sections a-i, as appropriate. 5. As-built plans for the mitigation sites shall be prepared as per the Mitigation Plan, and submitted to the Board within 8 weeks of the completion of mitigation site construction. 10 .. I I. I I I I I I I I I I I I I I I I I 26? Order No. R2-2003-0031 6. Annual monitoring reports shall be submitted to the Board by December 31 of each monitoring year, as per the Mitigation Plan, and until the sites have met their performance standards and final success criteria and the Executive Officer has accepted ~ notice of mitigation completion for each site. Monitoring reports shall be prepared as described, and shall also include the proposed annual grazing and special-status species monitoring, including photographs, residual dry matter monitoring results, and all other information, as appropriate. 7. Not later than 60 days prior to the beginning of construction, the Discharger shall submit, acceptable to the Executive Officer, draft conservation easements for all mitigation areas, including finalized locations of the two easement zones on Tassajara Creek and the . adjacent tributaries as more specifically set forth herein. Upon the Executive Officer's acceptance of the draft easements, the Executive Officer may determine that work may begin sooner than 60 days after submIttal of acceptable easements. The drafts shall be finalized within ten months of the date of adoption ofthis Order and final executed easements, acceptable to the Executive Officer, shall be submitted within twelve months ofthe date of adoption of this Order. a. The Tassajara Creek Conservation Area (TCCA) easements shall follow the stability analysis completed by Berlogar GeoTechnical Consultants, as reported in the Mitigation Plan. sufficient to provide that the boundary between the habitat conservation area ("Tassajara Creek Management Zone," or TCMZ) and the private conservation area is at or outside a stable setback from the banks of Tassajara Creek, Moller Ranch Creek, and the Northern Drainage. The private conservation area easement may allow the following uses in that area: a pedestrian trail; water quality features (e.g., vegetated swales or detention basins to treat stonnwater runoff); and, the placement of fill into upland areas. b. The construction of a pedestrian trail within the Northern Drainage Conservation Area shall be prohibited, except upon submittal, acceptable to the Executive Officer, of an acceptable trail design. Such a design shall minimize any encroachment into the Conservation Area. Where encroachment is necessary, it shall be limited to hill areas on the south side of the Northern Drainage (e.g., along the existing paved water tank access road, or at a similar elevation). 8. The Discharger shall submit a ROWD or ROWDs for each of its proposed bridge crossings of the conservation areas as discussed in the Findings, and receive appropriate review and action by the Board, prior to beginning construction of those projects. 9. Not later than 60 days prior to the beginning of construction, the Discharger shall submit, acceptable to the Executive Officer, a SWMP implementation plan. The SWMP implementation plan shall include the following: a A work plan and schedule for the proposed submittal, acceptable to the Executive Officer, of final designs for the proposed regional water quality pond, and including a schedule for the pond's construction and completion, not less than 48 months after the beginning of Project construction, or after the development of at least 60 percent of the Project (streets and utilities in place and building pads 11 I , I I t I I I I I I I ..,. I ;1 I ;..; I I I I 2.:s;~ OrderNo. R2-2003-0031 graded), whichever occurs fIrst This shall also include a work plan and schedule for the submittal of an Operations and Maintenance (O&M) plan, as described in the SWMP, that addresses O&M for the regional pond and other BMPs; b. Submittal of finalized Storm Water Quality Deed Restrictions and proposed funding amounts under the Deed Restrictions, sufficient to ensure the appropriate O&M of the regional pond and other BMPs for their lifetime; c. Provision for submittal to the Board of City of Dublin-approved post-construction Stormwater Management Plans for projects in the General Commercial, Commercial, and medium-high and high-density residential areas, within areas B, . C, and H, at the time those projects are constructed. Board staff shall review the submitted SWMPs to determine whether appropriate design measures, source controls, and treatment measures, as descn"bed in the Project SWMP, have been included to the maximum extent practicable (MEP) in those projects. Should the Executive Officer determine that the Plans have failed to include those measures to the MEP, the Executive Officer shall notify the Discharger and the City of Dublin of this determination in writing. After such a notification, future sub-project specific SWMPs shall be submitted, acceptable to the Executive Officer, at least 60 days prior to the beginning of construction for each sub-project. Should a sub-project specific SWMP be unacceptable to the Executive Officer, then Board staff shall provide comments on the Sw:MP within 30 days of SWMP submittal. This process (i.e., required submittal of sub-project SWMPs, acceptable to the Executive Officer, prior to construction) shall continue until the City.ofDublin has demonstrated, acceptable to the Executive Officer, that it has revised its review and approvai process sufficient to ensure that appropriate BMPs will be included to the MEP in Dublin Ranch sub-projects. 10. Not later than 60 days prior to the beginning of construction, the Discharger shall submit, acceptable to the Executive Officer, proof of financial assurance adequate to ensure the success of the proposed creek and wetland mitigation as described in Finding 9. This may consist of a bond, certificate of deposit, or other instrument callable by the Board in the event of creek and/or wetland mitigation failure. This financial assurance shall be no less than $3,591,620. Not later than one week before submitting its proof of financial assurance, the Discharger shall submit a report, acceptable to the Executive Officer, with the supporting information necessary to demonstrate that this' amount includes that necessary to cover the revised mitigation periods, as revised in the Mitigation Plan. The Discharger may submit, acceptable to the Executive Officer, a proposal to "step down" the mitigation over time, as described in the Findings. 11. Not later than 60 days prior to the beginning of construction, the Discharger shall submit, acceptable to the Executive Officer, a draft agreement with a third party appropriate to manage the conservation areas perpetuity. Upon the Executive Officer's acceptance of . the draft agreement, the Executive Officer may determine that work may begin sooner than 60 days after submittal of the agreement. The draft shall be finalized within ten months of the date of adoption of this Order and a final executed agreement, acceptable to 12 I I~ I. I I I I I I I I I I I I II I I I I I "'2. ~. G' Order No. R2-2003-0031 acceptable to the Executive Officer, at least 30 days prior to such a discharge. 18. The Discharger shall notify the Board in writing at least 30 days prior to actual start dates for each Project component (i.e., prior to the start of grading or other construction activity for any Project component, including the creek and wetland mitigati9n components). 19. The Discharger shall at all times fully comply with the engineering plans, specifications, and technical reports submitted with its application for water quality certification and the completed report of waste discharge. 20. The Discharger is considered to have full responsibility for correcting any and all- problems that arise in the event of a failure that results in an unauthorized release of waste or wastewater. 21. The discharge of any hazardous, designated or non-hazardous waste as defined in Title 23, Division 3, Chapter 15 of the California Administrative Code, shall be disposed ofin accordance with applicable state and federal regulations. 22. The Discharger shall remove and relocate any wastes that are discharged at any sites in violation of this Order. 23. In accordance with CWC ~ 13260, the Discharger shall file with the Board a report of any material change or proposed change in the ownership, character, location, or quantity of this waste discharge. Any proposed material change in operation sh3.J.I be reported to the Executive Officer at least 30 days in advance of the proposed implementation of any change. This shall include, but not be limited to, all significant new soil disturbances, all proposed expansion of development, or any change in drainage characteristics at the Project site. For the pmpose of this Order, this includes any proposed change in the boundaries of the area of wetland/waters of the United States to be filled. 24. The following standard conditions apply to this Order: a. Every certifieation action is subject to modification or revocation upon administrative or judicial review, including review and amendment pursuant to CWC ~13330 and 23 CCR ~3867. b. Certification is not intended and shall not be construed to apply to any activity involving a hydroelectric facility and requiring a Federal Energy Regulatory Commission (FERC) license or an amendment to a FERC license unless the pertinent certification application was filed pursuant to 23 CCR ~3855(b) and that application specifically identified that a FERC license or amendment to a FERC license for a hydroelectric facility was being sought. 14 I I I J J I I I I - I I i: il . . I . I r I I I f 25~ Order No. R2-2003-0031 c. Certification is conditioned upon total payment of any fee required pursuant to 23 CCR ~3833 and owed by the discharger. 25. The Discharger shall maintain a copy of this Order at the Project site so as to be available at all times to site operating personnel and agencies. 26. The Discharger shall permit the Board or its authorized representative at all times, upon presentation of credentials: a. Entry onto Project premises, including all areas on which wetland fill or wetland mitigation is located or in which records are kept. b. Access to copy any records required to be kept under the terms and conditions of this Order. c. Inspection of any treatment equipment, monitoring equipment, or monitoring method required by this Order. d. Sampling of any discharge or surface water covered by this Order. 27. This Order does not authorize commission of any act causing injury to the property of another or of the public; does not convey any property rights; does not remove liability under federal, state, or local laws, regulations or rules of other programs and agencies, nor does this Order authorize the discharge of wastes without appropriate permits from other agencies or organizations. 28. The Board will consider recission of this Order upon Project completion and the Executive Officer's acceptance of notices of completion of mitigation for all mitigation, creation, and enhancement projects required or otherwise permitted now or subsequently under this Order.. ' I, Loretta K.. Barsamian, Executive Officer, do hereby certify that the foregoing is a full, complete, and correct copy of an Order adopted by the California Regional Water Quality Control Board, San Francisco Bay Region, on April 16, 2003. CZ~~B~~ Executive Officer 15 I I, I I' I I I I I I I I' I I" I I I I I 257 BGC October 1. 1997 Job No. 1394.904 Ms Jennifer Lin C/o Mr. Ted Fairfield 5510 Sunol Boulevard Pleasanton. California 94566 Subject: Phases 1 and 2 - Environmental Site Assessment Pao- Y eh Lin Property Tassajara Road Dublin, California Gentlemen: INTRODUCTION This report contains the results of our Phases 1 and 2 - Environmental Site Assessment of hazardous and toxic substances for h'le subject project. The site is located north of Interstate 580 and east of Tassajara Road in Dublin. California. The location of the property is shown on the Vicinity Map, Plate 1. Purpose To identify and assess characteristics of the subject property that may have been contaminated based on current or historic uses a Phase 1 - Environmental Site Assessment was performed. Also, based on previous agricultural use of the site, a limited Phase 2 assessment was performed which included: soil sampling and analytical testing to evaluate the presence and/or concentration of pesticides or herbicides in surface soils. For the purpose of this assessment, hazardous contaminants are defined as those substances listed as hazardous per Title 22 of the California Code of Regulations (CCR). SCOPE OF WORK Our scope of services for this study have included: 1. A site reconnaissance including photographic documentation, observations of surrounding properties, and site vicinity; 2. Interviewing current and previous land users; 3. Contacting pertinent government agencies to obtain relevant information; SOIL ENGINEERS' ENGINEERING GEOLOGISTS. 5587 SUNOL BOULEVARD' PLEASANTON, CA 94566 · (925) 484-0220 · FAX: (925) 846-9645 I I I I , I I I I I I I I I I' I I I I I October 1, 1997 Job No. 1394.904 Page 2 2?t' 4. Review of available information pertaining to site history. land uses, and geologic maps of the site vicinity; 5. Examination of several generations of stereopaired aerial photographs; 6. Assembling and interpreting data; 7. Obtaining twenty-seven surface soil samples and performing analytical testing on five composite samples for presence of pesticides (EPA 8140) and herbicides (EPA 8150); and 8. Preparation of this report presenting our findings and opinions. PHASE 1 - ENVIRONMENTAL SITE ASSESSMENT Site Description The site is a rectangular shaped parcel encompassing about 300 acres, as shown on the Sample Location Map, Plate 2. The Assessors Parcel Numbers (APN) are 985-0005-001 and 985-0005- 002. The subject property is currently undeveloped. The southern half is relatively flat having elevations ranging from about 340 to 350 feet, sloping to the south. This area has been recently disced and is currently used for agricultural purposes. The northern half of the site consists of rolling hills and intervening valleys that rise from elevations of 450 to 500 feet with drainage towards the south currently used for grazing. There is an existing stock pond located along a valley in the north-central portion of the site. Site History Information on the history of the site was ~btained by a review of a preliminary title report by First American Title Guaranty Company, dated June 26, 1997, an examination of several generations of aerial photographs of th~ site and surrounding area, and interview and discussions with Mr. Clyde Casterson (who has reportedly managed the property for about 40 years). Mr. Casterson currently leases the site for ranching. Reportedly. the site consists of two parcels (designated as Parcels 1 and 2). Records indicate that the property was a portion of lands of Rancho Santa Rita prior to 1862. The property was owned by Samuel Martin and acquired by Michael and Thomas Devaney between 1862 and 1880. Pao-Yeh Lin and Bih-Yu LiI?-"acquired the lands in 1977 and are the current owners. Aerial photographs taken in 1957 show five small structures and corrals clustered near the north of drainage swale which discharges to the flatland area in the central portion of the site. The BERLOGAR GEOTECHNICAL CONSULTANTS I I I I I I I I' I I I I I I I I I I I October 1. 1997 Job No. 1394.904 Page 3 2?~ 1957 photographs show the remainder of the site appears to be undeveloped vacant lands. Aerial photographs taken in 1969, 1976, and 1986, show the site appears to have remained relatively unchanged from the 1957 photographs. Photographs taken in 1996 show all pre-existing structures had been completely removed; the remainder of the site appears relatively unchanged from the earlier 1986 photographs. According to Mr. Clyde Casterson, based on his knowledge, the property has been used exclusively for farming and grazing purposes over about the past 40 years, and that the previous structures and corrals at the site were vacant since circa 1940. Mr. Casterson has indicated that to his knowledge, no underground storage tanks or asbestos containing materials were located at the site. Site Survey On July 25. 1997, Mr. Theodore Bayham of Berlogar Geotechnical Consultants (BGC) visited the site, toured the grounds, observed conditions at the existing site and surrounding properties. During our site visit, the site was apparently used for agricultural on the southern half and grazing on the northern half. The southern half of the property was plowed but not planted. About 500 feet south of a stock pond near the center of the site. some minor wood rubble and existing fill was noted that appears to be remnant debris from the previous structures. An old well casing was observed in this area. No underground storage tanks (USTs) were observed at the site. and no apparent staining of surface soils in this area was noted. No barrels or suspicious materials were observed at the site.. Surrounding Land Use The surrounding area to the west, east and north is currently undeveloped and also used for farming and ranching purposes. The site is bounded by a frontage road and Interstate 580 to the south. REPORTS BY REGULATORY AGENCIES A review was made of relevant public records concerning the subject property. Primary sources of information consulted include: 1. Alameda County Department of Environmental Health; 2. Dublin Fire Department; and 3. Environmental Data Resources, Inc. - Radius Map with Geocheck. BERLOGAR GEOTECHNICAL CONSULTANTS I I I I I I I I I I I I I I. I I I I I October I, 1997 Job No. 1394.904 Page 4 2LLO Interviews with Alameda County Department of Environmental Health and Dublin Fire Department personnel report no known hazardous materials stored or used at the site, or underground storage tanks. The site is not on the EP A National Priorities List, the California DOHS Bond Expenditure List. nor lists of underground tank leaks or hazardous sites kept by RWQCB of the County or City agencies. It is also not posted on the Comprehensive Environmental Response Compensation Liability and Information System (CERCLIS). The site is not on the Resource Research and Recovery Act (RCRA) listing as a hazardous waste transporter or generator. There are no sites on the EPA National Priority List, the DOSD Bond Expenditure List, the SFBRWQCB North Bay Toxic List within I-mile of the subject site. The environmental data resources radius map with geocheck is provided in the attached appendix. . The California Leaking Underground Storage Tank Report (LUST) reports no underground tank leaks within a I-mile radius of the subject site. HYDROGEOLOGIC SETTING Published maps of the site vicinity (Dibblee, 1980) show the area to be underlain by Plio- Pleistocene sedimentary rocks of the Ta~sajara Formation in the northern, hilly part of the site and Pleistocene-Holocene Age alluvium in the near-level southern part of the site. The Tassajara Formation consists of interbedded siltstone, sandstone. and conglomerate and the alluvium consists of interbedded sand, silt. clay and clayey gravel. The Tassajara Formation unit has been mapped dipping to the south-southwest. Concurrent with this Phase 1 and 2 study, BGC has performed field exploration for a geotechnical investigation at this site. Ground water was encountered in a boring drilled by BGC in the alluvium in the southern part of the site at an approximate depth of 31 feet. Also, at borings in the northern part of the site. encountered ground water in the valley areas at about 10 feet below the ground surface. The ground water gradient at the site likely follows the general topographic gradient towards the south. The [mdings of our Phase I study are summarized below: 1. Historic use of the site appears to have been limited to fanning and ranching. 2. Records indicate that no known contamination or source of contamination exists at the site. 3. No known ground water contaminated sites are located within I-mile upgradient of the site. BERLOGAR GEOTECHNICAL CONSULTANTS I I I I I I I I I I I I I I. I I I I I October 1, 1997 Job No. 1394.904 Page 5 2.~1 4. No underground storage tanks or asbestos containing materials are known to exist at this site. . PHASE 2 - LIMITED SOIL SAMPLING AND ANALYTICAL TESTING Sample Collection A total of 27 soil samples were collected on August 1 and 4, 1997 at the approximate locations are shown on the Sample Location Map. Plate 2. These sampling locations are designated as S-1 through S-27. Samples were obtained from the upper foot of soil, placed in unused glass jars, and transported to our office. The 27 soil samples obtained were composited into a total of five composite samples for analytical testing. The composite included: C-1 (S-1, S-2. S-3, S-4 and S-5); C-2 - (S-6, 5-7, S-8. S-9, S-10 and S-l1); C-3 - (S-12, S-13, 5-14, S-15, S-16 and S-17); C-4 - (S-18, 5-19, 5-20, 5-21 and 5-22); and C-5 - (5-23, S-24. 5-25. 5-26 and S-27) The composite samples were transported under property chain-of-custody on ice to American Environmental Network. Inc. (AEN) in Walnut Creek, California. Composite samples were analyzed for chlorinated herbicides (EPA 8150) and organocWorine pesticides (EPA 8140). The results of analytical testing by AEN on August 26, 1997 is included in the attached Appendix. All five composite samples were found to have no detectable levels of chlorinated herbicides and organochlorine pesticides. Findings The general composition of the topsoil at the sampling locations consisted of dark brown silty clay. No obviously potential hazardous materials were observed during sampling, and no detectable levels of pesticide or herbicide contamination were encountered. CONCLUSIONS On the basis of our Phases 1 and 2 - Environmental Site Assessment we did not find any indication or conditions that would require a further Phase 2 study. LIMITATIONS OUf environmental site assessment is based on a review of geologic maps and literature, examination of aerial photographs, limited analytical testing and surface reconnaissance. Site descriptions described in the text are those existing at the time of our field reconnaissance in August, 1997, and are not necessarily representative of such conditions at other locations and times. The conclusions and recommendations contained herein are professional opinions derived BERLOGAR GEOTECHNICAL CONSULTANTS I I- I I I I I I ! I I I I I I. I /1 I I I October 1. 1997 Job No. 1394.904 Page 6 2.~ ]" in accordance with current standards of environmental assessment practice; no other warranty is expressed or implied. Respectfully submitted, BERLOGAR GEOTECHNICAL CONSULTANTS IY::~~ SeniQr Engineer 4988 Attachments: References Plate 1 - Vicinity Map Plate 2 - Sample Location Map Appendix A - EDR Radius Map with Geocheck Appendix B - American Environmental Network, Inc. - Analytical Testing Results Copies: Addressee (6) Mr. Dave Schneider (1) MacKay & Somps (2) Attention: Mr. Dave Chadbourne wp51/rcport/5331 BERLOGAR GEOTECHNICAL CONSULTANTS I I I I I I I 1 1 I I I I I. I I I I I 2l.eJ REFERENCES Alameda County Department of Environmental Health Services. file review and personal communication on August 26. 1997. American Environmental Network, Inc., laboratory report dated August 26, 1997. Berlogar Geotechnical Consultants, on-going geotechnical investigation and field exploration. August 1997. Casterson, Clyde, phone conversation on August 5. 1997. Dibblee. T.W., 1980, "Preliminary Geologic Map of the Dublin Quadrangle, Alameda and Contra Costa Counties, California", United States Geological Survey Open-File Report 80-537. Dublin Fire Department, file review and personal communication on August 29, 1997. EDR - Radius Map with Geocheck report, "Pao-YehlLin Property", Inquiry No. 187728.1s, dated August 4, 1997. First American Title Guaranty Company, "Title Report Order 592434", dated June 26, 1997. AERIAL PHOTOGRAPHS Pacific Aerial Surveys: (August 5, 1997) May 16, 1957. AV-253. Line 27. Frames 41, 42 May 15, 1969. A V-903. Line 5, Frames 18. 19 May 26. 1976. AV-1250. Line 05. Frames 15. 16 April 20. 1986. A V-2862, Line 5. Frames 18, 19 August 9.1996. AV-5200, Line 28, Frames 37,38,39 BERlOGAR GEOTECHNICAL CONSULTANTS - [) Zlt~ 1- ~~ Ui I~ -- i . ., . . SCALE: 1"== 2000' "I~ , ~ ::> z IQ "1 I. I I I I "\C\N'''Y MAP P AO-'lEHIL\N PROPERTY . T AssAJAAA ROAO OUBLiN. CALiFORN\A FoR MS JENNIFER UN pLA Bf>SE' ~Ol'IS fYi uSGS 7-112 M~ ,~IC a!~LE . UVEf'JiAoRE. cAUfORNII'. P\'IO,i)RE'IISEO 19l1O. ,..T A SCALE of 1:24.llOII- - . __ .......rA.O ~f.01ECHN'CAl CONSUllAN1S .I i > 5"-5 .. ,.// ~. , '. I , j '!' ... 1 ,........ ;-' // ~ I ..... i Ira. 1 i \ l ~ ...., . , \ -......- " ----... ~ \. + ~ I I I . ) J ) I I ) , I , I , I I " '~. ~ ~- , ( \ ~ -. - ") \ " (/ , I -- -\-..., \_, ~. , .. , \ , '-, '" -'- . " " \ l \. '" ;. \' .~....~- j~ :- i. '\ . l --.;. { -, \ '\ .......~"\ \ ; \ BASE' U....mED TOPOGRAPtuC MAP. TASSAJARA ROAD. PRePARED BY Jel\ACKAY AND SOMPS, DATeD 8-6-97, AT A SCALe OF' 1- '= 400".:'. . + \ .. ,---' ,\ :';1 ;; . l. ~ i~ ~ l! ",. < ; I :--j ~i;;" f. ; ~S-3' Iii t~ \. _.'" ~U!.l~':l .....-:... "a,l': \i II .' ~ \ ": ~ ~. . ~ 1>\ ~ f ! + . I t'" : ~" . ~~\\ \\ ;~ ~ ~ h \ \ '~\, r H , ~. \\ \ ,~ i \ ~ i' \ li~ \ \ ~ ~! \ \\q~% S-~\ \. I ~ \ \~~ I "....} ,,\ I \\1 + \ 1 \ hl 1. ,! 11"\' . . _ i \\j \', \1"\1 '--I A 'I l~ r'q; \; .. ~- .) 1 r. .. . \ 1'\ i~ -r t-.J \t:. \ IY' ;, 1 l'l d\~ ' r W' ~ 1 \\i. ~!: .\ l1t. "1 i\ \h' ! I I \ lr ; In "j!', , ! Ii . . i l ~: ~ ~. .iL Ii" ! J 1 ; ~ r: I~i... . . ~ ,'~ ln~n 1\ ;. :~ 1 ; :..;,. 1/ ~U \\' ,p . ~ IP ://, \ .il f ~;. ..;.If i I...J: ~ i J { f, 7~;'./ 11 \ ;.j.ffl/}l ":.. ~1 iq~ i. ~. i.-.---O ---~ SCALE 1" ::= 500" EXPLANATION' .----- PROpeRTY UNe APPROXIMATE LOCATION Of SURfAce SOIL SAMPLES .. SAMPLE .1.OCAT'ON MAP PAO- YEH/UN PROPERTY TASSAJARA .ROAD DUBLIN, CALIfORNIA FOR MS JENNIFER LIN Berlogar Geotechnical Consultants SOIL ENGINEERS' ENGINEERING GEOlOG"'S p,,,-rfi: ? I; I I I I I I" I -" 1" I I, If 11 I' Ii I I I 2l.Rk;> Via Facsimile and Mail March 6, 2006 Job No. 1394.113A Mr. Jim Tong Charter Properties 4690 Chabot Drive, Suite 100 Pleasanton, California 94588 Subject: Geotechnical Assessment of Commercial Development Grafton Station at Dublin Ranch Dublin Boulevard and Grafton Street Dublin, California Dear Mr. Tong: At the request of Mr. Dave Chadbourne of MacKay & Somps, this letter provides our geotechnical assessment of commercial development at Grafton Station at Dublin Ranch in Dublin, California. Based on our discussion with Mr. Chadbourne. we understand that the planned commercial development consists of 8 buildings with associated parking areas, driveways and underground utilities. As part of a larger project, we previously performed three geotechnical investigations at the site and its vicinity, and presented the results in the following reports: 1. Geotechnical investigation report titled '"Dublin Ranch. Assessment District, Infrastructure Improvements, Tassajara Road and Fallon Road, Dublin. California," dated May 5. 1999 (BGC Job No. 1394.112). 2. Geotechnical investigation report titled "Dublin Ranch - Pao- Yeh Un Property, Tassajara Road, Dublin, California," dated August 30, 1999 (BGC Job No. 1394.113). 3. Geotechnical investigation report titled "Preliminary Geologic and Geotechnical Investigation. Pao- Yeh Un Property. T assajara Road, Dublin, California," dated November 13, 1998 (BGC Job No. 1394.106). During our previous investigations, we reviewed aerial photographs of the site and its vicinity, pertinent geologic maps and available published reports; and performed geologic mapping of the site. We also drilled a total of 12 borings to depths of about 25 to 50 feet to explore the soil and groundwater conditions at the site and its vicinity. To evaluate the expansion potential, settlement characteristics, liquefaction potential, shear strengths and corrosion potential of the soil and engineered fill, we conducted 48 Atterberg Limits, 100 single-point consolidation/swell, 72 direct shear, 22 unconfined compression, 13 consolidation. 19 gradation, 8 compaction and 8 corrosion tests. To evaluate the presence and absence of earthquake faults within the site, we reviewed pertinent fault maps and aerial photographs of the site. No earthquake faults (active or inactive) are found SOIL ENGINEERS. ENGINEERING GEOLOGISTS. S587 SUNOL BOULEVARD. PLEASANTON, CA 94S66 . (925) 484-0220 . FAX: (925) 846-9645 I I !I !I I I' :0:$ I I......~....... .~ l1 ..1 I I 'I'; It;, I';, 1"\ 1.........~1 ~,:',) I'i ,......;< I I I March 6, 2006 Job No. 1394.113A 2 ~ 1 Page 2 within the site. In the vicinity of the site, the Mt. Diablo Thrust, Calaveras, Greenville and Hayward faults lie about 3 miles north, 4 miles southwest, 8 miles northeast and 10 miles southwest of the site, respectively. It is our opinion that, from a geotechnical engineering standpoint, the nearby active faults do not preclude commercial development at the site. As part of Area H of Dublin Ranch, the site was mass graded in 2003 under our observation and testing. The results of our observation and testing are summarized in our April 28. 2004 report (BGC Job No. 1394.329). In summary. it is our opinion that, from a geotechnical engineering standpoint, the site is suitable for commercial development. Our previous reports provide sufficient 'conclusions and recommendations for site mass grading, and backbone roadway and underground utility construction. Design-level foundation investigation/study should be performed to provide specific conclusions and recommendations for the design and construction of the commercial buildings and associated parking areas. driveways and underground utilities. We trust this letter provides the information you require at this time. If you have any questions, do not hesitate to call us. Respectfully submitted, I}ERLOGAR GEOTECHNICAL CONSULTANTS · fA ~, f--- ~!~i~tLai rincipal Engineer E 2326, Exp. 12/31107 PSL:jmb Copies: Addressee (2) MacKay & Somps (3) Attention: Mr. Dave Chadbourne word/lettersll 869 5 BERlOGAR GEOTECHN ICAl CONSU l T ANTS I I I I I I I; 1< I, I, I -, I I II I) 1111 2&ct SUMMARY OF BIOLOGICAL SURVEYS CONDUCTED BY H. T. HARVEY & ASSOCIATES AT DUBLIN RANCH AREA H 06 April 2006 RARE PLANT SURVEY OF THE EAST DUBLIN PROPERTY. Project 555-03. August 21, 1990. The Dublin Ranch site was surveyed by H. T. Harvey & Associates for special-status plants in the Spring of 1990. A list of potentially occurring plants was generated by reviewing the Eastern Dublin General Plan Amendment/Specific Plan EIR, appropriate local references, and the California Natural Diversity Data Base (CNDDB). The entire site was surveyed to locate potential habitat for any potentially occurring species. Transects were then established and surveyed through appropriate habitat, searching for any special-status species potentially on site. No special-status plants were found. Due in part to regular grazing of the site, vegetation height, biomass, and diversity were low. SAN JOAQUIN KIT FOX SURVEYS, DUBLIN RANCH, ALAMEDA COUNTY. Project 555-07. November 7, 1991. The San Joaquin kit fox is known from sites seven or more miles to the east and northeast of Dublin Ranch. The range and agricultural lands of the Ranch and surrounding areas would be low to moderate quality kit fox habitat. Previous surveys on portions of the Dublin Ranch and surrounding areas did not detect kit foxes, but detected several possible tracks. These prior surveys were conducted for the Eastern Dublin General Plan Amendment/Specific Plan EIR by Biosystems Analysis. H. T. Harvey & Associates conducted kit fox surveys at twice the intensity recommended at that time (1991) by California Deparbnent ofFish and Game guidelines. These surveys (September- October 1991) did not detect kit fox activity on or near Dublin Ranch. DUBLIN RANCH SPECIAL-STATUS AMPHIBIAN AND REPTILE SURVEYS. Project 555-09. July 20, 1993. Surveys were conducted by H. T. Harvey & Associates for special-status amphibian and reptile species on the Dublin Ranch property during the spring of 1993. The focus of these surveys included California tiger salamander, California red-legged frog, and western pond turtle. I I I! No California tiger salamanders were found during the survey. Fifteen subadult California red- legged frogs were found at two locations. Ten were along the northern boundary of the site in a stock pond adjacent to the intermittent channel of the Northern Drainage. Five more were found along Fallon Road along the southeastern edge of the site. Two adult western pond turtles were 1 . ! Jf. ;Nj l } ,f.. Ll..i'~:r;f:! /r ~.: I I I I I I I I I, I' I 1+ I, I~ I, I.""...'.............. 1 , ,~ 11 I I Z~'1 found off-site along Tassajara Creek. These findings were consistent with the 1989 surveys conducted by Biosystems for the Eastern Dublin General Plan Amendment/Specific Plan EIR. DUBLIN RANCH: 1995 SPECIAL-STATUS AMPIDBIAN AND REPTILE SURVEyS. Project 555-11. March 25, 1996. H. T. Harvey & Associates conducted additional surveys in the spring of 1995 to determine if the distribution and abundance of special-status reptiles and amphibians had changed. These surveys were initiated in a rainfall season (1994-1995) that was nearly 200% of normal. Surveys were undertaken to provide updated data for the City of Dublin, which was undertaking a stream corridor restoration plan and grazing management plan for the vicinity. No California tiger salamanders were detected anywhere on the site. Seven juvenile California red-legged frogs were detected in the same two locations (the Northern Drainage and Fallon Road ponds) as in previous surveys. Two western pond turtles were detected off-site along Tassajara Creek. The location and abundance of the California red-legged frog and western pond turtle have been consistent throughout three separate studies. DUBLIN RANCH FAIRY SHRIMP SURVEYS. Project 555-10. July 15, 1996. Small, claypan pools occurring in the southwestern portion of the Dublin Ranch property were monitored for listed fairy shrimp from December 1995 to April 1996. The only fairy shrimp observed in the pools was Lindahl's fairy shrimp, which is not a special-status species. This species of fairy shrimp tolerates a wide range of conditions and is the most common fairy shrimp in California. In general, the pools supported a low diversity of invertebrates and contained primarily weedy, opportunistic species as mosquito larvae and midgefly larvae. DISTRIBUTION OF THE SAN JOAQUIN KIT FOX IN THE NORTH PART OF ITS RANGE. Project 673-11. March 13,1997. All known records of the San Joaquin kit fox and the results of kit fox surveys in Alameda and Contra Costa Counties, as well as the western portion of San Joaquin County, were compiled and summarized by H. T. Harvey & Associates. These results were used to delineate the limits of the northern edge of the range of the San Joaquin kit fox based on specific, empirical data rather than on more subjective assessments of habitat quality as had been done previously. Data from surveys on and near Dublin Ranch were used in this report. It was determined that there were only two confirmed sightings of kit fox in the region west of Vasco Road; one was reportedly seen in 1992 on Black Hawk Road, and another was observed along Morgan Territory Road, both in Contra Costa County. This report concluded that the sighting along Black Hawk Road is likely an outlier and does not represent a resident kit fox population. While grassland habitat occurs west of kit fox sightings in Alameda and Contra Costa Counties, kit fox have not expanded into these areas in recent years, nor is there any evidence that they have ever used these areas historically. Despite considerable survey effort in these areas, there is 2 _;~ ! fit 1 :...~ l .' > ,~ f, \ _!. f .~ f ; : l { I I:i, 1.......:1 .& I I 1\..........' )f P 1".1. \~ 1.'...1.. 1 ,,~ I I', I' I~ I" I".; J I:~:J 11:11 """ - I I 7-1'0 little evidence to support assertions of their presence in the areas west and south of the range boundary presented in this report. SAN JOAQUIN KIT FOX SURVEYS, DUBLIN RANCH, ALAMEDA COUNTY. PHASE 1,1993 USFWS PROTOCOL, FALL 1996. Project 555-10. June 11, 1997. The Dublin Ranch site was surveyed by H. T. Harvey & Associates following the 30 April 1993 protocol of the U.S. Fish and Wildlife Service. Surveys were conducted in October and November 1996 and again in May 1997, using five survey methods: walking transects of the entire project site to detect occupied or potential dens; spotlighting surveys; automatic camera stations; track plate stations; and a compilation of infonnation derived from other surveys and sightings within 10 miles of the Dublin Ranch site. Although 36 potential dens were found, only one was occupied by canids (coyotes), and no inactive canid dens were detected. No evidence of kit fox presence was detected during spotlighting surveys, at camera stations, or on track plates. A review of previous kit fox sightings and survey results revealed only two confinned sightings of kit fox in the region west of Vasco Road; one was reportedly seen in 1992 on Black Hawk Road, and another was observed along Morgan Territory Road, both in Contra Costa County. Summaries of known kit fox sightings and the results of other surveys within 10 miles of the project site indicated that while grassland habitat providing potential dens and at least moderate prey abundance is present in the Dublin/Livennore area, there is no kit fox population west of Vasco Road. DUBLIN RANCH SAN JOAQUIN KIT FOX PRELIMINARY REPORT AND RESULTS FROM EARLIER PHASES OF KIT FOX SURVEYS. Project 555-13. June 11, 1997. This preliminary report was prepared in accordance with the U.S. Fish and Wildlife Service's 1997 Survey Protocol for the San Joaquin kit fox. This report consisted of a map showing the location of the Dublin Ranch site; a description of habitat suitability for the kit fox on the Dublin Ranch site; a description of vegetative communities found on the project site using CNDDB; a map showing kit fox sightings within a 10-mile radius of the site; a description of the continuity of the vegetative communities between the site and kit fox sightings; results of walking transects of the entire site, assessing habitat suitability (prey availability and denning potential); and an analysis of potential adverse effects of the project, cumulative impacts, and mitigation recommendations (if any). . The survey methodology used by H. T. Harvey & Associates in the first phase of the survey consisted of five elements: walking transects, spotlighting surveys, automatic camera stations, track plate stations, and compilations of infonnation derived from other surveys and sightings within 10 miles of the Dublin Ranch site. Two sets of walking transects were completed. Although a number of potential dens were located, only one active canid den (that of a coyote) and no inactive canid dens were found. No evidence of kit fox was detected during spotlighting surveys, at camera stations, or on track plates. 3 .- . I /l ~;? ~:i~ l...\ L\"\1)( j 111..1 2.11 It was concluded that kit fox are absent from the Dublin Ranch site. Therefore project development would not result in project-specific or cumulative impacts to kit fox, and no mitigation for impacts to kit fox is necessary. DUBLIN RANCH SAN JOAQUIN KIT FOX SURVEY (REVISED). Project 555-13. October 9,1997. In April 1997, the U.S. Fish and Wildlife Service (USFWS) revised its 1993 survey protocol for the San Joaquin kit fox in the north part of its range. This report summarized the results ofH. T. Harvey & Associates' spotlighting surveys and the use of track stations and camera stations on the Dublin Ranch site in May and June 1997, according to the April 1997 USFWS protocol. No evidence of kit fox presence on the" Dublin Ranch site was detected during this survey. It was determined that the relative value of the site for kit fox is low due to the low density of ground squirrels and other prey. Also, the presence of competitors such as coyotes and red fox may constrain the expansion of kit fox into the Dublin area. DUBLIN RANCH FAIRY SHRIMP SURVEYS 1996/1997 WET SEASON. Project 555-10. December 2,1997. Fairy shrimp surveys were conducted by H. T. Harvey & Associates for a second year according to the protocol outlined in the U.S. Fish and Wildlife Service's 1996 Interim Survey Guidelines. Pools in the southeastern portion of the Dublin Ranch site were monitored for fairy shrimp from December 1996 until the pools dried in March 1997. The only fairy shrimp observed in the pools was Lindahl's fairy shrimp, which is not a special- status species. As in the previous winter, the pools were of low quality for the listed species, and characteristics of the pools were not typical of those where the listed species occur. It was concluded that it would be highly unlikely for the listed species to be present on the site. DUBLIN RANCH FAIRY SHRIMP SURVEYS 1997/1998 WET SEASON. Project 555-17. October 9,1998. This report summarized a third winter of surveys for special-status fairy shrimp in the southeastern portion of Dublin Ranch. H. T. Harvey & Associates conducted surveys according to the U.S. Fish and Wildlife's 1996 Interim Survey Guidelines from December 1997 until the pools dried in May 1998. Again, no special-status fairy shrimp were detected. Therefore, based on the distribution of the listed fairy shrimp, the poor quality of the pools on the site, and the negative results from three consecutive years of surveys, it was concluded that these special-status fairy shrimp are absent from the site. 4 ~ i.~ ~ i .1 "'': i i~. t ~ ! ,~ _ ': Ii I: I Ii , I! '2. l-z..- DUBLIN RANCH: 1998 SPECIAL-STATUS AMPHIBIAN AND REPTILE SURVEyS. Project 555-21. November 6, 1998. Previous surveys for special-status reptiles and amphibians on the Dublin Ranch project site had been conducted in 1989, 1993, and 1995. During these surveys, California red-legged frogs had been detected in the Northern Drainage and in a pond along Fallon Road, although neither the California tiger salamander nor the western pond turtle had been previously detected on the site. H. T. Harvey & Associates conducted surveys for the California tiger salamander, California red- legged frog, and western pond turtle throughout the Dublin Ranch site on a number of dates between October 1997 and May 1998. The Northern Drainage and two stock ponds (one next to Fallon Road and one west of Fallon Road in the middle of Area B) were surveyed intensively using daytime and nocturnal visual searches, dip net sampling, and seining. I I I , " I .. , I, '1 I' I~ I. III , t I I I Two juvenile red-legged frogs were located in the Northern Drainage, but no red-legged frogs were detected elsewhere on the site. A pond in the Northern Drainage previously found to support red-legged frogs was no longer suitable for breeding due to the failure of the dam, while the suitability of the Fallon Road pond had declined due to siltation and partial failure of the dam. This pond is also apparently stocked with mosquito fish. Two California tiger salamander larvae were found in a pond west of Fallon Road, in the middle of area B; this species had not been detected during previous surveys on the Dublin Ranch site. No western pond turtles were observed in 1998. P AO YEH LIN PROPERTY SPECIAL-STATUS SPECIES SURVEYS. Project 555-23. May 18, 1999. Surveys for special-status plant and wildlife species, and for habitat potentially suitable for such species, were conducted by H. T. Harvey & Associates on a number of dates in 1998 on the former Pao Yeh Lin property, in the southwestern comer of the larger Dublin Ranch site. No special-status plant species were observed on the site during surveys in June and October 1998, although additional surveys were recommended. During a number of surveys for special- status reptiles and amphibians, conducted between January and august 1998, the only special- status species detected on the site was the California tiger salamander; a number of larvae were detected in the Area F stock pond. No California red-legged frogs or western pond turtles were observed. No Burrowing Owls or American badgers were detected on the site, although potentially suitable habitat was found to be present. Reconnaissance-level kit fox surveys on 23 and 24 July 1998 failed to detect any evidence of kit fox on the site and found only two burrows of appropriate size for kit fox. Based on the paucity of burrows on the site and the negative results of numerous kit fox surveys elsewhere in the project vicinity, kit fox were determined to be absent from the site. 5 f{ r.!f L-?J";'}, ~\: J<:, \r ~,~ /! rf (," I, Ij\ I, I.; fl 11 I) I, I I I I' I*} If 1 Itt; iIJ 2.1/ Pools within Area H were surveyed for listed fairy shrimp, prior to drying, on four days in May and June 1998. No evidence of fairy shrimp was found. DUBLIN RANCH, ALAMEDA COUNTY, CALIFORNIA IDENTIFICATION OF WATERS OF THE U. S. Project 555-30. June 17, 1999. H. T. Harvey & Associates surveyed the entire Dublin Ranch project site for areas meeting the regulatory definition of "Waters of the U. S." Jurisdictional waters were identified and mapped within the project boundaries and included approximately 0.12 acres of tributary waters, 0.23 acres of other waters, and 2.29 acres of potential wetlands. PAO YEH LIN PROPERTY FAIRY SHRIMP SURVEYS 1998/1999 WET SEASON. Project 555-27. October 26,1999. Surveys for listed fairy shrimp were conducted by H. T. Harvey & Associates in a complex of seasonal pools on Areas G and H of the former Pao Yeh Lin property, in the southwestern comer of the larger Dublin Ranch site. These surveys were conducted according to the U. S. Fish and Wildlife Service's (USFWS) 1996 Interim Survey Guidelines. No listed species were observed, the only fairy shrimp found on the site being the common, widespread Lindahl's fairy shrimp. The pools on Area H are hydrologically connected to the pools to the east, which had been previously surveyed according to USFWS protocols and were found not to support these species. Pools containing Lindahl's fairy shrimp on the project site are generally of poor quality and not typical of known pools where the listed fairy shrimp usually occur. Based on the negative findings of surveys on Area H, the negative findings for three years (1995/96 to 1997/98) of surveys from the adjacent (and hydrologically connected) Area C, the distribution of the listed fairy shrimp, and the poor quality of the pools, it was determined that listed fairy shrimp are very unlikely to occur on the Pao Yeh Lin site. DUBLIN RANCH AREAS F, G, AND H (pAO YEH LIN PROPERTY) ECOLOGICAL IMPACTS AND MITIGATION. Project 555-26. November 1,1999. H. T. Harvey & Associates compiled and analyzed the results of previous surveys on the former Pao Yeh Lin property and on adjacent portions of Dublin Ranch, summarized ecological impacts that would result from development of this portion of the Dublin Ranch site, and recommended mitigation for these impacts. I I I Impacts to wetland and riparian habitats regulated by the U.S. Army Corps of Engineers and the California Department of Fish and Game were determined, and mitigation for these impacts was proposed. Impacts to two special-status plant species, the Congdon's tarplant and San Joaquin spearscale, were determined to be potentially significant, requiring further surveys and/or mitigation. California tiger salamanders, as well as their breeding habitat within the Area F stock pond and their surrounding upland estivation habitat, would be lost due to project development. The loss of the Area F stock pond would also represent a loss of California red- legged frog habitat, as an individual had been found in the pond during a previous survey. Mitigation measures were proposed to compensate for the loss of tiger salamander and red- 6 :.lr _/, if 1/{' i~! :;" i~~".f)~ l i II \ 1.1 I 111 Ij legged frog habitat, minimize/avoid the loss of individual tiger salamanders and red-legged frogs, and prevent impacts to active raptor nests, occupied Burrowing Owl burrows, and active American badger dens. , . 11 , I: I" lli I t. >, I , ' I II 1*' PAO YEH LIN PROPERTY FAIRY SHRIMP SURVEYS 1999/2000 WET SEASON. Project 555-27. June, 2000. Surveys for listed fairy shrimp were conducted by H. T. Harvey & Associates in a complex of seasonal pools on the former Pao Yeh Lin property, in the southwestern comer of the larger Dublin Ranch site. These surveys were conducted according to the U. S. Fish and Wildlife Service's (USFWS) 1996 Interim Survey Guidelines. None of the listed fairy shrimp were detected during the 1999/2000 surveys. DUBLIN RANCH: 2000 SPECIAL-STATUS AMPHIBIAN AND REPTILE SURVEYS. Project 555-31. March 5,2001. This report summarizes the findings of surveys conducted within the Fallon Road Pond, the pond west of the Fallon Road Pond, the stockpond and associated drainage of the northwestern neighboring Area F, Tassajara Creek through the Lin Property, and the Northern Drainage and associated stockpond (Redgewick property). Surveys were conducted either by Dr. Jeffery A. Wilkinson or Dr. Mark R. Jennings between November 30, 1999 and August 24, 2000. DUBLIN RANCH PROJECT AREA MITIGATION AND MONITORING REPORT. (Draft). Project 555-26. May 15, 2001. , I' I.,' This draft report summarizes mitigation measures to compensate for impacts to USACE and CDFG jurisdictional area with the Dublin Ranch Project Area (Areas B, C, F, and H). USACE area impacts totaled 10.22 acres while CDFG area impacts totaled 5.51 acres. USACE impacts occur to all drainages, wetlands, and stockponds on-site. CDFG impacts occur to on-site drainage channels and riparian vegetation. Mitigation to compensate for these impacts is located on the project site within the On-Site Drainage Mitigation area and off-site at three locations, Tassajara Creek, the Northern Drainage, and Lin Livermore. USACE mitigation consists of creating 20.67 acres of new jurisdictional area. Mitigation includes new drainage channels at the On-Site Drainage mitigation area, four (4) ponds at the Northern Drainage and Lin Livermore sites, and a complex of seasonally ponded wetlands at Lin Livermore. CDFG mitigation consists of creating 7.48 acres of new jurisdictional area. Mitigation includes new bed and banks within the On-Site Drainage mitigation area, expansion of riparian habitat along Tassajara Creek, and new willow-riparian habitat along the Northern Drainage. DUBLIN RANCH PROJECT AREA BIOLOGICAL ASSESSMENT FOR THE CALIFORNIA RED-LEGGED FROG. Project 555.27. May 15,2001. I Ij I I I The purpose of this document was to review the proposed Dublin Ranch Project Area development in sufficient detail to determine to what extent the proposed action may affect any federally listed endangered or threatened species, or critical habitat for said species. This document was a revised version of the 17 April 2000 Project Area Biological Assessment for the 7 ii, l. tl.l !?J .J"} 1.\ L\~{;( f j ~ !.,~') I, I 1\ I I It 1;1: II, , IJ I' j' I' i: I I ...'.'......'.'......:.. .., I'; I I 21G Red-legged Frog compiled by H. T., Harvey & Associates. The only federally threatened, endangered, proposed threatened or proposed endangered species on the site and determined to be potentially affected by the project is the California red-legged frog (Rana aurora draytonii). DUBLIN RANCH PROJECT AREA CALIFORNIA RED-LEGGED FROG & CALIFORNIA TIGER SALAMANDER 2003 SALVAGE REPORT. Project 555.27. September 16,2004. This report summarizes the methods and results of efforts in 2003 to salvage and translocate California red-legged frogs (Rana aurora draytonii) and California tiger salamanders (Ambystoma californiense) from the Dublin Ranch Project Area to the Conservation Areas in preparation for the initiation of construction. A total of 678 adult. subadult and juvenile California red-legged frogs were collected from the Dublin Ranch Project Area and translocated to off-site mitigation areas between June 2003 and November 2003. A total of 33 California tiger salamanders were captured during the period of June through December 2003. DUBLIN RANCH PROJECT AREA. 2003. PRE-CONSTRUCTION SURVEYS. Project 555.27. 12 June 2003. A series of pre-construction surveys are required for Dublin Ranch by the East Dublin Specific Plan EIR. Additionally, several resources agency permits require additional surveys. This report summarizes results for pre-construction surveys that were conducted for species of concern including Cooper's Hawk (Accipiter cooperii), White-tailed Kite (Elanus caeruleus), Golden Eagle (Aquila chrysaetos), Burrowing Owl (Athene cunicularia), Loggerhead Shrike (Lanius ludovicianus), California Homed Lark (Eremophila alpestris actia), California Yellow Warbler (Dendroica petechia brewsteri), and Tricolored Blackbird (Agelaius tricolor), all protected when nesting, and the San Joaquin kit fox (Vulpes macrotis mutica), and American badger (Taxidea taxus). None of these special-status species were found on the site during surveys. Results of pre-construction surveys for nesting non-special-status raptors and efforts to survey, salvage, and protect California red-legged frog (Rana aurora draytonii) and California tiger salamander (Ambystoma californiense) are also included. DUBLIN RANCH PROJECT AREA. 2004. PRE-CONSTRUCTION SURVEYS. Project 555.27. A series of monthly result summaries of pre-construction surveys conducted for species of concern including the Cooper's Hawk (Accipiter cooperiz), White-tailed Kite (Elanus caeruleus), Golden Eagle (Aquila chrysaetos), Burrowing Owl (Athene cunicularia), Loggerhead Shrike (Lanius ludovicianus), California Homed Lark (Eremophila alpestris actia), California Yellow Warbler (Dendroica petechia brewsteri), and Tricolored Blackbird (Agelaius tricolor), all protected when nesting, and the San Joaquin kit fox (Vulpes macrotis mutica), and American badger (Taxidea taxus). Results of pre-construction surveys for nesting non-special-status raptors are also included. None of these special-status species were found on the site during surveys. 8 ;f f!if?J:.)~( L\,'JL.:[iir(.~ I I I I I I I I , Ii ....'^. I If'" I I .'. I' I ~ II: I I', ,,' , 11~ DUBLIN RANCH PROJECT AREA CALIFORNIA RED-LEGGED FROG 2004 SALVAGE REPORT. Project 555.27. December 27, 2004 This report summarizes for 2004 the continued California red-legged frog salvage program begun in 2003 at the Dublin Ranch Project Site. Includes summary results of diurnal and nocturnal surveys, pool and pond pumping, and vegetation removal within the drainages and wet areas in Areas B, C, F, and H on the Dublin Ranch Project Site. This effort resulted in the capture and translocation of 167 and 162 post-metamorphic individuals, respectively, to the Northern Drainage and Tassajara Creek conservation areas. Nine California red-legged frog egg masses were also collected and translocated to the Northern Drainage Conservation Area. DUBLIN RANCH PROJECT AREA. 2005. PRE-CONSTRUCTION SURVEYS. Project 555.27. A series of monthly result summaries for 2005 of pre-construction survey sconducted for species of concern including the Cooper's Hawk (Accipiter cooperii), White-tailed Kite (Elanus caeruleus), Golden Eagle (Aquila chrysaetos), Burrowing Owl (Athene cunicularia), Loggerhead Shrike (Lanius ludovicianus), California Horned Lark (Eremophila alpestris actia), California Yellow Warbler (Dendroica petechia brewsteri), Tricolored Blackbird (Agelaius tricolor), San Joaquin kit fox (Vulpes macrotis mutica), American badger (Taxidea taxus) and nesting raptors. Only the Burrowing Owl was found during surveys. Permission was obtained from the California Department ofFish and Game and the owls were passively relocated. DUBLIN RANCH PROJECT AREA. 2006. PRE-CONSTRUCTION SURVEYS. Project 555.27. A series of monthly result summaries for 2006 of pre-construction survey sconducted for species of concern including the Cooper's Hawk (Accipiter cooperii), White-tailed Kite (Elanus caeruleus), Golden Eagle (Aquila chrysaetos), Burrowing Owl (Athene cunicularia). Loggerhead Shrike (Lanius ludovicianus), California Yellow Warbler (Dendroica petechia brewsteri). and Tricolored Blackbird (Agelaius tricolor), all protected when nesting, and the San Joaquin kit fox (Vulpes macrotis mutica), and American badger (Taxidea taxus). None of these special-status species were found on the site during surveys. An active program to maintain the site free of burrows to eliminate potential habitat for Burrowing Owls was also reported. 9 it. r. if fi~')~ r~1' ~_\ l\.\(}(-!.~!Tf r~ I I ,I I I I I - I p " I I I _. I I I -. 1'1 I I: 't-11 H. T. Harvey & Associates Dublin Reports H.T. Harvey & Associates. 1990b. Rare Plant Survey of the East Dublin Property, Alameda County. Project No. 555-03. H.T. Harvey & Associates. 1991. San Joaquin Kit Fox Surveys, Dublin Ranch, Alameda County. Project No. 555-07. H.T. Harvey & Associates. 1993. Dublin Ranch Special-Status Amphibian and Reptile Surveys. Project No. 555-09. H.T. Harvey & Associates. 1996a. Dublin Ranch: 1995 Special-Status Amphibian and Reptile Surveys. Project No. 555-11. H.T. Harvey & Associates. 1996b. Dublin Ranch Fairy Shrimp Surveys. Project No. 555-10. H.T. Harvey & Associates. 1997a. Distribution of the San Joaquin Kit Fox in the North Part of Its Range. Project No. 673-11. H.T. Harvey & Associates. 1997b. Dublin Ranch Fairy Shrimp Surveys 1996/1997 Wet Season. Project No. 555-10. H.T. Harvey & Associates. 1997c. Dublin Ranch San Joaquin Kit Fox Preliminary Report and Results from Earlier Phases of Kit Fox Surveys. Project Number 555-13. H.T. Harvey & Associates. 1997d. San Joaquin Kit Fox Surveys, Dublin Ranch, Alameda County. Phase I, 1993 USFWS Protocol, Fall 1996. Project No. 555-10. H.T. Harvey & Associates. 1997e. Dublin Ranch San Joaquin Kit Fox Survey (revised). Project No. 555-13. H.T. Harvey & Associates. 1998a. Dublin Ranch: 1998 Special-Status Amphibian and Reptile Surveys. Project No. 555-21. H.T. Harvey & Associates. 1998b. Dublin Ranch Fairy Shrimp Surveys 1997/1998 Wet Season. Project No. 555-17. H.T. Harvey & Associates. 1999a. Dublin Ranch, Alameda County, California Identification of Waters of the U.S. Project No. 555-30. H.T. Harvey & Associates. 1999b. Pao Yeh Lin Property Fairy Shrimp Surveys 1998/1999 Wet Season. Project No. 555-27. 10 ,. f ij j}('f i j <.t,. .1 <~'~J'r i'( II {r",-; I I I I I I I I I I I I I I I I - I I ~1-t H.T. Harvey & Associates. 1999c. Pao Yeh Lin Property Special-Status Species Surveys. Project No. 555-23. H.T. Harvey & Associates. 1999d. Dublin Ranch Areas F, G, and H (pao Yeh Lin Property) Ecological Impacts and Mitigation. Project No. 555-26. H. T. Harvey & Associates. 2000. Pao Yeh Lin Property Fairy Shrimp Surveys 1999/2000 Wet Season. Project No. 555-27. H. T. Harvey & Associates. 2001a. Dublin Ranch: 2000 Special-Status Amphibian and Reptile Surveys. Project No. 555-31. H. T. Harvey & Associates. 2001b. Project Area Biological Assessment for the California Red- legged Frog. Project No. 555-27. H. T. Harvey & Associates. 2001c. Project Area Mitigation and Monitoring Plan Dublin, California (Draft). Project No. 555-26. H. T. Harvey & Associates. 2003. Dublin Ranch Project Area Pre-construction Sruveys. Project 555.27. H. T. Harvey & Associates. 2004. Dublin Ranch Project Area California Red-legged Frog & California Tiger Salamander 2003 Salvage Report. Project 555-27. H. T. Harvey & Associates. 2004. Pre-construction Surveys Project 555-27. H. T. Harvey & Associates. 2004. Dublin Ranch Project Area California Red-legged Frog 2004 Salvage Report. Project 555-27. H. T. Harvey & Associates. 2005. Pre-construction surveys. Project 555-27. H. T. Harvey & Associates. 2006. Pre-construction Surveys. Project 555-27. 11 !r T !fUU I r ,\: l.'.,son I iT " \. -"2.1"( Federal Emergency Management Agency Washington, D.C. 20472 August 27,2004 ...It.\.. \ ~: II I 1HE HONORABLE GUY HOOSTON MAYOR, CITY OF DUBLIN P.o. BOX 2340 DUBLIN, CA 94568-2340 FOLWWS CONDITIONAL CASE NO.: 99-49-624C CASE NO.: 04-49-m96A COMMUNITY: cnY OF DUBLIN, ALAMEDA COUNlY, CAUFORNlA COMMUNlTYNO.: 060705 DEAR MAYOR HOUSTON: IJ II I I 1'1 .1...........' *i~ i } I, I~j This is in reference to a request that the Federal Emergency Management Agency (FEMA) detennine if the property described in the enclosed docwnent is located within an identified Spe'.cial Flood Hazard Area, the area that would be inundated by the flood having a I-percent chance of being equaled or exceeded in any given year (base flood), on the effective National Flood Insurance Program (NFIP) map. Using the infonnation submitted and the effective NFIP map, our detennination is shown on the attached Letter of Map Revision based on Fill (LOMR-F) Detennination Document This determination document provides additional information regarding the effective NFIP map, the legal description of the property and our determination. 1...1.. i .1 Additional docwnents are enclosed which provide information regarding the subject property and LOMR-Fs. ~ Please see the List of Enclosures below to detennine which docwnents are enclosed Other attaclnnents specific to this request may be included as referenced in the DetenninationlComment document. If you have any questions about this letter or any of the enclosures, please contact the FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal Emergency Management Agency, 3601 Eisenhower Avenue, Suite 600, Alexandria, VA 22304-6439. Sincerely, J=>~~ Doug Bellomo, P.E., CFM, Acting Chief Hazard Identification Section, Mitigation Division Emergency Preparedness and Response Directorate LIST OF ENCLOSURES: WMR-FDETERMINATI<JIl DOCUMENT(REMOVAL) cc: State/Commonwealth NFIP Coordinator Community Map Repository Region Mr. Richard R. Braden Ii II I I '.1 "2.~ ',:-"'e 1 of 2 Follows Conditional No.: 9!}.09-ti24C Oate:August27,2004 Case No.: 04-09-0996A LOMR~ I Federal Emergency Management Agency Washington, D.C. 20472 LETTER OF MAP REVISION BASED ON FILL DETERMINATION DOCUMENT (REMOVAL) COMMUNITY AND MAP PANEL INFORMATION CITY OF DUBLIN, ALAMEDA COUNTY, CALIFORNIA ~IMUNITY COMMUNITY NO.: 06)705 NUMBER: 0607050002B IECTED NAME: OTYOFDUBUN,ALAMBJACOUNTY. "'AP PANEL CAUFORNIA LEGAL PROPERTY DESCRIPTION A portion of Parcel 9, Tract 7148, as shown on the Plat recorded as Series No. 2001057355 in Book 257, Pages 3 through 7, in the Office otthe Recorder, Alameda County, California The legal description of the portion mentioned above is as follows: DATE: 09t'17/1997 OODING SOURCE: POODlNG APPRQ)(JMATE umruoE & LONGITUDE OF PRCPERTY: 37.703, -121.869 SOORCE OF LAT & LONG: PREOSlON MAPPING STREETS 4.0 DAlUM: NAD 83 DETERMINATION II BLOCK! SECTION SUBDIVISION STREET OUTCOME 1% ANNUAL LOWEST . LOWEST WHAT IS CHANCE ADJACENT LOT REMOVED FLOOD FLOOD GRADE ELEVAllON FROM THE ZONE ELEVATION ELEVATION (NGVD 29) SFHA (NGVD 29) (NGVD 29) Portion of 346.0 feet Property X (unshaded) 347.0 feet Tract 7148 Dubin Boulevard Rood Hazard Area (SFHA) - The SFHA is an area that would be inundated by the flood having a i-percent chance of being equaled or eel in any given year(basef\ood~ \"'v:::nONAL CONSIDERATIONS (Please refer to the appropriate section on Attachment 1 for the additional conSiderations listed below.) PROPERTY DESCRIPTION ONS REMAIN IN THE SFHA cument provides the Federal Emergency Management Agency's determination regarding a request for a Letter of Map Revision based on FW for desaibed above. Using the infonnatlon submitted and the effective National Aood Insuranoe Program (NFIP) map. we have detennlned that descnbed portion(s) of the property(ies) is/are not located in the SFHA, an area inundated by the flood having a 1-peroent chance of being equaled or iE'{{ ;n any given year (base flood). This document revises the effective NFIP map to remove the subject property from Ihe SFHA located on the NFIP map; Iherefore, the Federal mandatory flood insurance requirement does not apply. However, Ihe lender has Ihe option to continue the urance requirement to protect its financial risk on Ihe loan. A Preferred Risk Policy (PRP) is available for bUildings located outside Ihe SFHA. mation about Ihe PRP and how one can apply is enclosed. . I PC:'), ,. enninatlon is based on the flood data presenUy available. The enclosed documents provide additional Information regarding this determination. If e any questions about this document, please contact Ihe FEMA Map Assistance Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter ed to the Federal Emergency Management Agency. 3601 Eisenhower Avenue, Suite 600, Alexandria, VA 22~39. I - I I~ ~ Doug Bellomo, P .E., CFM, Acting Chief Hazard Identification Section, Mitigation Division Emergency Preparedness and Response Directorate Version 1.3.3 102426CBML TAPR0409###0996 '1 ~~\ oIlows CondItional Mo.: 99-09-62AC Date: August 27, 2004 Case No.: 04-09-0996.6. lOMR-F :1 Federal Emergency Management Agency Washington, D.C. 20472 . ! LETTER OF MAP REVISION BASED ON FILL DETERMINATION DOCUMENT (REMOVAL) A IT ACHMENT 1 (ADDITIONAL CONSIDERATIONS) EGAL PROPERTY DESCRIPTION (CONTINUED) II,' ' MENCING at the southwest comer of Parcel 9; thence N01"08'49-E, 57.96 feet; thence S88"51'11-E, 25.00 feet to the POINT OF NNING; thence N01"08'49-E, 1216.37 feet; thence S88"47'06-E, 148.09 feet; thence 692.44 feet along a curve to the right having a ldius of 2252.00 feet; thence 150.74 feet along a curve to the left having a radius of 5058.00 feet; thence S 17"07'28"W, 133.00 feet; 1,1 ce Soo"45'oo-E, 900.00 feet; thence N90"00'OO"W, 180.00 feet; thence S78"29'17"W, 347.39 feet; thence N83"36'55"W, 450.00 feet i POINT OF BEGINNING i ORTlONS OF THE PROPERTY REMAIN IN THE SFHA {This Additional Consideration applies to the preceding 1 f:~~~iS-f;~ie~~, ~~yn~~~: :~~~~~~~:~:~~:~~~:f~~~:~~~~1~Ut~:~~or;:~~~~~~~ ~~~j~f~~:::I, ;tatelCommonwealth, and local regulations for floodplain management. ;1 ',I" I , :1 t i,1 I ,I il I iE' . , achment provides addiUonal information regarding this request. If you have any questions about lhIs attachment, please oontact the FEMA Map , Center toll free at (877) 336-2627 (877-FEMA MAP) or by letter addressed to the Federal EmeJgency Management Agency, 3601 Eisenhower , Suite 600. Alexandria. VA 22304-6439. ~ Doug BeHomo. P.E., CFM, Acting Chief Hazard Identification Section, Mitigation Division Emergency Preparedness and Resoonse Directorate V..,..,inn 1 '\ '\ I- l~ 1n?A?IU"AUI TADDnA~ ,... "...-: " - /.i~. .~ .,,~J. i~~. ~Ir .:~lj:~ .~~. ..... .:~ Ii' . 'J;, " ~;:i' ;' .-" .... .' ~'Il ,. ~4 ..... .__ ".I ,~; .. ....-' .. J.~t ~ . ~! . Ol.lflt.:~N'e)lUlEVARD . '~f!t~~l; .-' ." . t .,L~: ,I . . \'\' I "_",:__'" .. 1~~,~~ " L..' :;I";~; ~~ ,1]1 o;i "'!I~ 35 , ~I'l' I: I' ,; ~.:; .. .. ';'~; .jCJi[ , r:~~ f".l J __'_"~ .1"- ,.. ,- - 'j;';J ...... I . . .' 'r ~ I 11m:. ASSESSOR PAACEI. NUWSER 'U-002?-OO' IS FOR 1M( PARCn PRIOf\ TO TRACT 7453 RtcOftOfD HQYENIEft 24. 2003. StRttS HD. 200301750, ~ COUKTY RECORDS. THE COUN1Y ASSt$SORS Of'FICE HAS NOT fSSum H[W ASStSSOfIt PARCEL HUW8ERS FOR THE: HEW PARCElS. t SECOND LOt.lR-f APPUCATlON OUeUN RANCH APN 985- 0009-015 APN 985-0027-001 DUBUN CAUfO/lN~ ............ COUHlY. .........- -- ~I!m _~u._ ...._.... .",........ 01 IlCI "0. 2n1J o 20t 4CO ~_.--- SCA~C ~... 200. -.tI\....,.,.~..... ____ _... - tJ ~ ~ Revised May, 2006 DEVELOPMENT PLAN - AREA H This is a Development Plan pursuant to Chapter 8.32 of the Dublin Zoning Ordinance for Dublin Ranch 'Area H' PA 98-070, located north of 1-580, east of Tassajara Road and south of future Dublin Boulevard (APN 985-0005-02). This Development Plan meets all of the requirements for Stage 1 review of the project. This Development Plan includes Site, Circulation and other Plans, exlnbits and written statements contained in a document dated received November 19, 1999, labeled Exhibit C-2 of Attachment 3, Area H to the Ordinance approving this Development Plan (City Council Ordinance No. 6-00), and on file in the Planning Department. The Planned Development District allows the fleXIbility needed to encourage innovative development while ensuring that the goals, policies, and action programs of the General Plan, Eastern Dublin Specific Plan, and provisions of Section 8.32 of the Zoning Ordinance are satisfied. 1. Zoning: PD Planned Development Zoning District Stage I (General / Specific Plan land use designations are as follows: General Connnercial, Campus Office) 2. Permitted and Conditional Uses: PD-General Commercial 1) Permitted Uses: The following are permitted uses for this PD/C-2 (Planned Development GenerarConnnercial zoning diStrict site): . a. Connnunity-serving retail uses including but not limited to: Auto parts Bookstore Clothing! appareVaccessories Drug store Electronics/computers General merchandise store Grocery/food store Hardwarelhome improvement store Hobby shop Home furnishings and appliances Other retail uses automatically permitted in the C-2 District Pets and pet supplies Shoe store Sporting goods . Stationary and office supplies Toy store b. Regionally-oriented, high volume, retail uses including but not limited to: Discount centers Factory stores Furniture outlets Home improvement centers Promotional centers EXHIBIT C-l OF ATTACHMENT 3 1 Revised May, 2006 c. Service uses including but not limited to: Administrative Office Bank, savings and loan and other financial institutions Barberlbeauty shop/nail salon Copying and printing Dry cleaner (no plant on premises) Fonnal wear -rental In-Patient and Out-Patient Health Facilities as licensed by State Department of Health Services Laboratory Laundromat Locksmith Photographic studio Real estate/title office Shoe repair Tailor Travel agency Watch and clock repair d. Eating, drinking and entertainment establishments including but not limited to: Bagel shop Ba:rf~o-cktaiI-lounge Cafe Coffee house Delicatessen Ice cream/yogurt Microbrewery Restaurant - no drive-through Theater - indoor (Dinner, Movie, Live Play, etc.) 2) Conditional Uses: * Animal hospital (no kennel) (PC) Day Care Center (PC) Drive-through/drive-in facility (PC) Hotel and motel(PC) Nightclub (ZA) Other uses which could meet the intent of the General Connnercialland use designation per the determination of the Connnunity Development Director (PC) Recreational facility/indoor (ZA) Service station (PC) 2 Revised May, 2006 3) Temporary Uses: Arts and crafts fair Christmas tree sales Fanners' market FestivaVstreet fair Parking Lot Sales Sidewalk sales Temporary construction trailer Tract and sales office/model home complex 4) Residential Uses: Mixed-use developments including residential uses may be permitted at a Stage 2 Planned Development/Development Plan application iflocation and design ensure compatib11ity and if the incorporation of residential uses meets the intent of the Eastern Dublin Specific Plan. PD-Campns Office 1) Permitted Uses: The following are permitted for this PD/C-O (Planned Development Campus Office zoning district site): Administrative headquarters Ancillary uses that provide support services to businesses and employees mclUamgoul ndt11mlteatO: restaurants, convenience shopping, copying services, blueprinting, printing and branch banks. Business and corrnnercial services Business, professional and administrative offices Laboratory Research and development 2) Conditional Uses: * Day Care Center (PC) Health services/clinics (ZA) HoteVmotel (PC) HospitaVmedical center (PC) Limited light manufacturing, assembly, warehousing and distnbution activities (uses that do not produce noxious odors, hazardous materials, or excessive noise) (PC) Other uses that could meet the intent of the Campus Office land use designation as determined by the Connnunity Development Director (PC) Recreational facility/indoor (ZA) Service Station (PC) 3) Temporary Uses*: Arts and crafts fair Festival/street fair Temporary construction trailer Tract and sales office/model home complex 3 Revised May, 2006 4) Residential Uses: Mixed use developments including residential uses may be pennitted at a Stage 2 Planned Development if the following conditions are met: a. If the development meets a specific housing need in the connnunity. b. If the established traffic levels of service are not exceeded. Appropriate traffic study(s) may be required to make the proper determination regarding traffic levels of servtce. c. If the development creates a pedestrian orientated attractive environment. d. That the project is consistent with the intent of the Specific Plan and does not result in adverse environmental or service impacts. e. Residential uses may not occupy more than 50% of the developed area * Key/Decision Maker Authority: ZA Zoning Administrator, PC Planning Commission 3. Dublin Zoning Ordinance - Applicable Requirements: Except as specifically modified by the provisions of this PD District RezonelDevelopment Plan., all applicable general requirements and procedures of the Dublin Zoning Ordinance shall be applied to the land uses designated in this PD District Rezone. 4. Site Plan: (See attached Stage 1 site plan. contained in Exlubit C-2 of Attachment 3, Development Plan, Area H.) This Development Plan applies to the General Commercial and Campus Office parcels encompassing 73.1 acres shown on this plan. The 10.5 acres ofland located in the south-west quadrant of-Area Hwith a-General I Specific Plan-land use designationof6enerat€ommercialmay be developed with Campus Office uses to be determined at the Stage 2 Planned Development Application Process. Any modifications to the project shall be substantially consistent with these plans and of equal or superior site design quality. 5. Density: The maximum square footage of the proposed development for the General Commercial and Campus Office parcels covered under this Development Plan (shown on the Stage 1 site plan) are as follows. General Commercial: 18.7 Ae. Gross 203,643 Sq. Ft. Campus Office: 43.9 Ac. Gross 860,528 Sq. Ft. 10.5 acres of additional land designated for General Commercial uses located in the southwest quadrant of Area H may be developed with either Campus Office or General Commercial uses pursuant to a Stage 2 PD Application Process: 10 .5 Ac Gross 205, 821 Sq. Ft. (Campus Office) 114,345 Sq. Ft. (Gen. Commercial) 6. Phasing Plan: Refer to attached Phasing Plan included in Exhibit C-2 of Attachment 3, Development Plan, Area H. 4 Revised May, 2006 7. Design Concepts and Themes: Refer to attached Connnunity Planning and Design Guidelines (pages 1-1 to 1-3) contained in Exhibit C-2 of Attachment 3, Development Plan, Area H. 8. Master Neighborhood Landscaping Plan: Exhibit C-2 of Attachment 3, Area H, Connnunity Landscape Design Guidelines (pages U-1 to II-3) identifies the landscaping concept for Area H. These Guidelines satisfy the requirements of Section 8.32.040 A 5 of the Zoning Ordinance. A Preliminary Landscaping Plan shall be submitted with the Stage 2 Planned Development / Development Plan Application for the Stage 1 PD area, to include public streets, entry statements and perimeter site landscaping areas. 9. School Mitigation Fee: The developer shall mitigate the impacts of the development on the school facilities of the Dublin Unified School District in accordance with the School Mitigation Agreement, dated October 1997. The mitigation agreement establishes the level of mitigation necessary, the amount of school impact fees, the time of payment of such fees and the required dedication of property for use as school sites. 10. Inclusionary Zoning Ordinance: The current project does not include residential uses, however, residential uses may be considered at the Stage 2 Planned Development / Development Plan application. If residential uses are proposed at the Stage 2 Planned Development / Development Plan application, the project shall be consistent with the Inclusionary Zoning Ordinance. \: \pa#\980070\devplan. 5 AREA H 1:\ 16034-30\photoJllustrations\fgh\nov99\H-rev2stage 1_05-1 0-06.psd __J ,.------ ,,---- J : [ J /' co ..... ./ r J .J <:; AppI'O\'ul of this application c..rHtrs thr '1IHabl1lty for the 10.~ aue panel to e 1'10 as eltbl'I' aU GC 01' all CO. -----~-'"C-~--I=580 - ~y- -..~.."..- -.:...-==.:.:..-==::: STAGE 1 DEVELOPMENT PLAN Land Use Summary Alter.!1l!tin'\ :l\bxjmum C!)/~1iI1!n1UnGC S~t'11l1rio Commercial Land Use Gross Acre !\:et Acre F.A.R. OOice Sq. Ft. CO 54.4 40.7 0.45 1,066,349 GC 18.7 16.7 0.25 203,643 TOTAL 73.1 67.9 1.269.992 !'Iter..l!ath'e 2;J~linimull1_C;Q/l\1axlmum 9_C Scenario Commercial Land Use Gross Acre Net Aere F.A.R. OOice Sq. Ft. CO GC TOTAL 43.9 29.2 73.1 40.7 16.7 67.9 0.45 0.25 860,528 318,000 1,178.528 Legend GC General Commercial !\:C Neighborhood Commercial CO Camolls Omce DUBLIN RANCH AREA H PLANNED DEVELOPMENT DISTRICT EASTERN DUBLIN PLAN SPEClFIC AMENDMENT Dublin, California December 11. /998 revised August, 1999 revised May, 2006 ~ ~ North o 100' 200' 400' 600' 100' MacKay & Somps - Engineering & Planning William Hezmalhalth Architects. Inc. Architecture and Planning 1\ UVIS - Landscape Architecture