Loading...
HomeMy WebLinkAboutReso 52-23 Adopting a List of Projects Funded in Fiscal Year 2023-24 by Senate Bill 1, the Road Repair and Accountability Act of 2017 Reso. No. 52-23, Item 4.10, Adopted 06/06/2023 Page 1 of 3 RESOLUTION NO. 52 – 23 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ADOPTING A LIST OF PROJECTS FUNDED IN FISCAL YEAR 2023-24 BY SENATE BILL 1, THE ROAD REPAIR AND ACCOUNTABILITY ACT OF 2017 WHEREAS, Senate Bill 1 (SB 1), the Road Repair and Accountability Act of 2017 (Chapter 5, Statutes of 2017), was passed by the Legislature and signed into law by the Governor in April 2017 to address the significant multi-modal transportation funding shortfalls statewide; and WHEREAS, SB 1 includes accountability and transparency provisions that will ensure the residents of our City are aware of the projects proposed for funding in our community and which projects have been completed each fiscal year; and WHEREAS, the City must adopt by resolution a list of projects proposed to receive fiscal year funding from the Road Maintenance and Rehabilitation Account (RMRA), created by SB 1, which must include a description and the location of each proposed project, a proposed schedule for the project’s completion, and the estimated useful life of the improvement; and WHEREAS, the City, will receive an estimated $1,834,514 in RMRA funding in Fiscal Year 2023-24 from SB 1; and WHEREAS, this is the seventh year in which the City is receiving SB 1 funding and will enable the City to continue essential road maintenance and rehabilitation projects, safety improvements, repairing and replacing aging bridges, and increasing access and mobility options for the traveling public that would not have otherwise been possible without SB 1; and WHEREAS, the City has undergone a robust public process to ensure public input into our community’s transportation priorities/the project list; and WHEREAS, the City used the Capital Improvement Program and a Pavement Management System to develop the SB 1 project list to ensure revenues are being used on the most high-priority and cost-effective projects that also meet the community’s priorities for transportation investment; and WHEREAS, the funding from SB 1 will help the City maintain and rehabilitate streets and help add active transportation infrastructure through the City this year and into the future; and WHEREAS, the 2022 California Statewide Local Streets and Roads Needs Assessment found that the City’s streets and roads are in “very good” condition and this revenue will help us increase and maintain the overall quality of our road system and enhance pedestrian and bicycle safety and mobility within the City; and WHEREAS, the SB 1 project list and overall investment in our local streets and roads infrastructure with a focus on basic maintenance and safety, investing in complete streets infrastructure, and using cutting-edge technology, materials and practices, will have significant positive benefits to the lifespan of our local streets and enhance pedestrian and bicycle mobility and safety with co-benefits statewide. DocuSign Envelope ID: 91E18C8B-6332-4E18-B969-926165A93030 Reso. No. 52-23, Item 4.10, Adopted 06/06/2023 Page 2 of 3 NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby approve the following project to be funded in Fiscal Year 2023-24 with Road Maintenance and Rehabilitation Account revenues: Project Title: Annual Street Resurfacing (CIP No. ST0117) for Fiscal Year 2023-24 Project Description: This project provides a variety of pavement resurfacing treatments and repairs to existing City streets. The project is budgeted annually to help maintain the substantial investment the City has in the public street system. This Fiscal Year’s resurfacing treatments include slurry seal, pavement overlays, and base repairs at the locations described below. Project Location: This project provides slurry seal maintenance of collector and residential streets surrounding Silvergate Drive between San Ramon Road and Dublin Boulevard. Streets include: Alegre Drive, Amarillo Court, Amarillo Road, Barn Hollow Court, Bay Laurel Court, Bay Laurel Street, Betlen Drive, Buckeye Court, Calle Verde Road, Casa Linda Court, Castle Court, Castle Drive, Circle Way, Corto Court, Cresta Lane, Dillon Way, Estrella Court, Hansen Drive, Kingston Place, Kolb Place, Ladera Court, Ladera Drive, Las Palmas Court, Las Palmas Way, Luna Court, Mancini Court, Manzanita Lane, Mape Way, Meadow Court, Peppertree Road, Prow Way, Rampart Drive, Reilly Court, San Sabana Court, San Sabana Road, Shadow Drive, Shadow Place, Silvergate Drive, and Tina Place. Additional locations for slurry seal maintenance include two segments along Tamarack Drive, between Village Parkway and Burnham Way and between Doreen Street and Brighton Drive. Locations for pavement overlays include John Monego Court and Dublin Court. Dublin Boulevard west of Silvergate Drive and Village Parkway are locations for base repairs. Estimated Project Schedule: Construction starts summer 2023 – completion fall/winter 2023 Estimated Project Useful Life: Surface treatments that will be completed as part of this project will have a useful life of between seven and 20 years. {Signatures on the following page} DocuSign Envelope ID: 91E18C8B-6332-4E18-B969-926165A93030 Reso. No. 52-23, Item 4.10, Adopted 06/06/2023 Page 3 of 3 PASSED, APPROVED AND ADOPTED this 6th day of June 2023, by the following vote: AYES: Councilmembers Hu, Josey, McCorriston, Qaadri and Mayor Hernandez NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk DocuSign Envelope ID: 91E18C8B-6332-4E18-B969-926165A93030