RESOLUTION NO. 11 – 23
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
APPROVING THE COOPERATIVE AGREEMENT WITH ALAMEDA COUNTY
TRANSPORTATION COMMISSION FOR THE GREEN STORMWATER INFRASTRUCTURE
PROJECT
WHEREAS, the City is performing preliminary engineering, environmental clearance and
permitting, and final design phase for the Green Stormwater Infrastructure – Iron Horse Trail,
South of Amador Valley Boulevard project, CIP No. ST0121, (City Project) to treat stormwater
runoff from the adjacent neighborhoods prior to discharge into South San Ramon Creek and
Alamo Creek; and
WHEREAS, Alameda County Transportation Commission (Alameda CTC) is the lead
agency implementing the Project Approval and Environmental Document, Plans, Specifications &
Estimate and Right of Way phases of the SR84 Expressway Widening and SR84/I-680
Interchange Improvements project (Alameda CTC Project), including the improvements to meet
stormwater treatment and flow control requirements specified in the San Francisco Bay Regional
Water Quality Control Board (RWQCB) Clean Water Act Permit 401 Certification No.
WDID#2CW435077; and
WHEREAS, the California Department of Transportation (Caltrans) and the RWQCB have
approved off-site stormwater treatment and flow control for the Alameda CTC Project; and
WHEREAS, the City Project can accommodate the above-referenced requirements of the
Alameda CTC Project, if the City Project incorporates certain modifications to increase the
tributary area of impervious surface and incorporate flow control; and
WHEREAS, the City is willing to modify the City Project to assist Alameda CTC in meeting
these requirements, so long as Alameda CTC reimburses the City for the additional costs, further
described in the Cooperative Agreement, Alameda CTC Agreement No. A23-0012, attached
hereto as Exhibit A.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin hereby
approves the Cooperative Agreement with Alameda CTC, attached hereto as Exhibit A.
BE IT FURTHER RESOLVED that the City Manager is authorized to execute the
agreement and make any necessary, non-substantive changes to carry out the intent of this
Resolution.
{Signatures on the following page}
Reso. No. 11-23, Item 4.5, Adopted 02/07/2023 Page 2 of 2
PASSED, APPROVED AND ADOPTED this 7th day of February 2023, by the following
vote:
AYES: Councilmembers Hu, Josey, McCorriston, Qaadri and Mayor Hernandez
NOES:
ABSENT:
ABSTAIN:
______________________________
Mayor
ATTEST:
_________________________________
City Clerk
Alameda CTC Agreement No. A23-0012
1
COOPERATIVE AGREEMENT
BETWEEN
ALAMEDA COUNTY TRANSPORTATION COMMISSION
AND
CITY OF DUBLIN
Caltrans Project: SR84 Expressway Widening and SR84/I-680 Interchange Improvements
Dublin Project: Green Stormwater Infrastructure – Iron Horse Trail, South of Amador
Valley Boulevard
This COOPERATIVE AGREEMENT (“Agreement”), dated for reference purposes only as of
January __, 2023, is entered into by and between the City of Dublin (“City”), a municipal
corporation, and Alameda County Transportation Commission (“Alameda CTC”), a joint powers
agency. This Agreement shall become effective on the date the same is fully-executed by both
parties (“Effective Date”).
RECITALS
A.City is performing preliminary engineering, environmental clearance and permitting, and
final design phase for the Green Stormwater Infrastructure – Iron Horse Trail, South of
Amador Valley Boulevard project (“City Project”) to treat stormwater runoff from the
adjacent neighborhoods prior to discharge into South San Ramon Creek and Alamo Creek.
B.Alameda CTC is the lead agency implementing for Project Approval and Environmental
Document (PA&ED), Plans, Specifications & Estimate (PS&E) and Right of Way phases
of the SR84 Expressway Widening and SR84/I-680 Interchange Improvements project
(“Alameda CTC Project”), including the improvements to meet stormwater treatment
and flow control requirements specified in the San Francisco Bay Regional Water Quality
Control Board (“RWQCB”) Clean Water Act Permit 401 Certification No.
WDID#2CW435077.
C.The California Department of Transportation (“Caltrans”) and the RWQCB have
approved off-site stormwater treatment and flow control for the Alameda CTC Project.
D.City Project can accommodate the above-referenced requirements of the Alameda CTC
Project, if the City Project incorporates certain modifications to increase the tributary area
of impervious surface and incorporate flow control.
E.City is willing to modify the City Project to assist Alameda CTC in meeting these
requirements, so long as Alameda CTC reimburses City for the additional costs.
F.The total estimated cost for the preliminary engineering, environmental clearance and
Alameda CTC Agreement No. A23-0012
2
permitting, and final design phases for the City Project, as modified to accommodate the
requirements of the Alameda CTC Project related to stormwater treatment and flow
control, is $314,250.
NOW, THEREFORE, THE PARTIES DO HEREBY AGREE AS FOLLOWS:
SECTION I
ALAMEDA CTC AGREES:
A. To fund 75% of $314,250 for the preliminary engineering, environmental clearance and
permitting, and final design phase costs for the City Project, as modified to accommodate the
requirements of the Alameda CTC Project related to stormwater treatment and flow control.
B. To remit payment to City within thirty (30) days of receipt of an invoice from City for
reimbursement of City’s consultant costs incurred in performing the preliminary engineering,
environmental clearance and permitting, and final design work for the City Project, as
modified to accommodate the requirements of the Alameda CTC Project related to stormwater
treatment and flow control.
C. To review and provide comments on draft documents produced during the preliminary
engineering, environmental clearance and permitting, and final design phases to ensure
consistency with the mitigation requirements, and provide comments thereon to City within
thirty (30) days after receipt thereof
D. To assist in obtaining the review and approval from Caltrans and RWQCB, as necessary, for
any documents produced during the preliminary engineering, environmental clearance and
permitting, and final design phases that may require review and/or approval from such
agencies.
E. To enter into an agreement with City for the construction and construction management
phases of City Project, as modified to accommodate the requirements of the Alameda CTC
Project related to stormwater treatment and flow control.
F. To enter into an agreement with the City for the long-term maintenance and establish Alameda
ATC funding for the City Project, as modified to accommodate the requirements of the
Alameda CTC Project related to stormwater treatment and flow control. The long-term
maintenance agreement shall include various compliance requirements of the 401 Certification
issued by the RWQCB.
SECTION II
Alameda CTC Agreement No. A23-0012
3
CITY AGREES:
A. To oversee and complete preliminary engineering, environmental clearance and permitting,
and final design phase for City Project, as modified to accommodate the requirements of the
Alameda CTC Project related to stormwater treatment and flow control.
B. To inform Alameda CTC of progress and key findings as they are developed and seek input
during preliminary engineering, environmental clearance and permitting, and final design.
C. To invoice Alameda CTC for reimbursement of City’s consultant costs incurred in performing
the preliminary engineering, environmental clearance and permitting, and final design.
D. To enter into an agreement with Alameda CTC for the construction and construction
management phases of City Project, as modified to accommodate the requirements of the
Alameda CTC Project related to stormwater treatment and flow control.
E. To respond to comments provided by Alameda CTC, RWQCB, and Caltrans on draft
documents.
G. To enter into a long-term maintenance agreement with Alameda CTC to establish Alameda
CTC funding for the City Project, as modified to accommodate the requirements of the
Alameda CTC Project related to stormwater treatment and flow control. The long-term
maintenance agreement shall include various compliance requirements of the 401 Certification
issued by the RWQCB.
F. City shall require the professional consultant(s) and subconsultants performing the work
required hereunder to name Alameda CTC, its governing body, officers, employees and
consultants as additional insureds on the same terms as City is so named on all insurance
required by City for the City Project.
SECTION III
IT IS MUTUALLY AGREED:
A. This Agreement constitutes the entire agreement between the parties regarding the subject
matter hereof and any oral discussions or written or oral agreements with respect thereto
preceding the effective date of this Agreement are superseded hereby. No amendment,
alteration or variation of the terms of this Agreement shall be valid unless made in writing
and signed by the parties hereto, and no oral understanding or agreement not incorporated
herein shall be binding on any of the parties hereto.
B. Alameda CTC and the City each render their services under this Agreement as independent
agencies. None of the agents or employees of either shall be deemed agents or employees
of the other.
C. Any notice given under this Agreement shall be in writing and shall be deemed given if
Alameda CTC Agreement No. A23-0012
4
delivered personally or mailed by registered or certified mail or commercial overnight
courier, return receipt or confirmation of delivery requested, or by facsimile transmission
with voice confirmation of receipt, the parties at the following addresses (or at such other
address for a party as shall be specified by like notice):
If to City:
If to Alameda CTC:
Linda Smith, City Manager
City of Dublin
100 Civic Plaza
Dublin, CA 94568
linda.smith@dublin.ca.gov
Tess Lengyel, Executive Director
Alameda County Transportation Commission
1111 Broadway, Suite 800
Oakland, CA 94607
tlengyel@alamedactc.org
[signatures on following page]
Alameda CTC Agreement No. A23-0012
5
In witness whereof, the parties hereto have executed this Agreement by their duly authorized
officers.
CITY OF DUBLIN ALAMEDA COUNTY
TRANSPORTATION COMMISSION
By: By:
Linda Smith Tess Lengyel
City Manager Executive Director
Approved as to form: Recommended for Approval:
By By:
John Bakker Gary Huisingh
City Attorney Deputy Executive Director of Projects
Reviewed as to Budget/Financial Controls:
By: ______________________________
Patricia Reavey
Deputy Executive Director of Finance and
Administration
Approved as to form and procedure:
By:
Fennemore Wendel
Legal Counsel for Alameda CTC
5248119.1