2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94060 Downtown Improvement Implementation COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
e
This project will fund several physical improvements in
the Downtown Specific Plan areas, including gateway
monuments, signage, public art, streetscape, entryway
features, pedestrian improvements and linkages between
commercial areas.
-
,
COMMENTS
Specific tasks of the project are identified below.
ESTIMATED TOTAL COSTS
Prior Yrs 2004-2005 2005-2006 Total
Gateway Monument/Landscaping
Gateway Archway
Pedestrian & Intersection Improvements-Completed
Lewis and Village Parkway Plaza-Completed
Secondary Gateway Marker
Arborist Report (Village Parkway)-Completed
Engineering Bridge Feasibility Study-Completed
Sidewalk Widening & Lighting Improvements
Total
$ 139,118
37,243
138,565
94,340
18,150
2,975
13,767
77,766 $ 712,753 $360,009
$ 521,924 $ 712,753 $360,009
$ 139,118
37,243
138,565
94,340
18,150
2,975
13,767
1,150,528
$ 1,594,686
The Village Parkway Sidewalk and Lighting Improvement project from Dublin Boulevard to Amador Valley Boulevard is
scheduled for construction in spring, 2005. Construction of the Gateway Monument and Gateway Archway projects are
being deferred until funds are secured.
FlNANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008·2009 Totals
Design ¡Inspection $ 288,259 001 $ 521,924 $ 675,598 $ 360,009 $ 1,557,531
Other Contract Services 95,608 300 37,155 37,155
Land I Right of Way 21,360
Improvements 1,186,247
Machinery I Equipment
Miscellaneous 3,212
TOTAL $ 1,594,686 $ 521,924 $ 712,753 $ 360,009 $ 1,594,686
PROJECT I STAFF 0.12 0.10
MANAGEMENT (FTE) CONTRACT
-28-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94226 Freeway Underpass Art at COMMUNITY IMPROVEMENTS
Dublin Boulevard & Amador Valley Boulevard
DESCRIPTION - LOCATION
6)
This project provides for the design and installation of
artwork and lighting at the freeway underpasses at
Dublin Boulevard and Amador Valley Boulevard.
r
-
1
COMMENTS
A painted mural was applied to both the approaches and the underpass. The project was completed in Fiscal Year
2003-2004 at a cost of $312,944. During Fiscal Year 2003-2004, lighting was also installed at the underpasses ata
cost of $175,955.
During Fiscal Year 2005-2006, it is recommended that the approaches also be lit at a cost of $37,620. Annual
operating/energy costs are estimated at $2,200.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design !Inspection $ 23,914 001 $ 486,180 $ 37,620 $ 523,800
Other Contract Services 47,563
Land I Right of Way
Improvements 443,914
Machinery I Equipment
Miscellaneous 8,409
TOTAL $ 523,800 $ 486,180 $ 37,620 $ 523,800
PROJECT I STAFF 0.06
MANAGEMENT (FTE) CONTRACT
-29-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94235 Arroyo Vista Project Improvements COMMUNITY IMPROVEMENTS
EVA Road Repair
DESCRIPTION - LOCA nON
e
This project provided funding to dig up and replace
approximately 640 feet of emergency vehicle
access (EVA) road along Alamo Creek. This road
repair is located at the north end of the Arroyo Vista
development.
COMMENTS
The erosion from the Alamo Creek bed had caused cracks and slipping on the existing road. The Housing Authority
Staff had been continuously patching and repairing, yet the road continued to deteriorate. This project provided a
new road at the north end of the Arroyo Vista development. When Park Sierra was constructed, an easement was
granted in return for EVA road repairs to the south end of the road. At that time, Shea Properties replaced this
portion of the road and it remains in good condition. The Housing Authority Staff similarly replaced the north end of
the same road.
The Housing Authority is scheduled to complete the improvements in FY 2004-2005. The City is providing $29,791 in
Community Development Block Grant (CDBG) funds to complete the improvements.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design ¡Inspection 209 $ 29,791 $ 29,791
Other Contract Services
Land I Right of Way
Improvements $ 29,791
Machinery I Equipment
Miscellaneous
TOTAL $ 29,791 $ 29,791 $ 29,791
PROJECT ¡STAFF
MANAGEMENT (FTE) CONTRACT
-30-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94250 Sidewalk Safety Repair Program COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
This program provides for the replacement of damaged curbs, gutters and sidewalks at various locations. The
sidewalk repairs are made by either removing and replacing concrete or by grinding the high side of the offset
sidewalk. The method is determined by the severity of the damage.
COMMENTS
State Law provides that sidewalk repair is the responsibility of the property owner, yet cities are also held liable for
hazards associated with sidewalks in need of repair. This program reduces liability exposure for property owners, as
well as for the City. Dublin's program has been funded by the City on a year-to-year basis.
This program is funded through General Fund (001). In Fiscal Year 2005-2006, $9,765 has been allocated from
Community Development Block Grant (CDBG) funds for the construction of approximately 5 pedestrian curb ramps.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005·2006 2006-2007 2007-2008 2008-2009 Totals
Design !Inspection $ 76,410 001 Annual $ 54,477 $ 66,200 $ 65,720 $ 65,720 $ 65,720 $ 317,837
Other Contract Services 209 Annual 9,765 9,765
Land! Right of Way 224 Annual 15,137 15,137
Improvements 264,902
Machinery! Equipment
Miscellaneous 1,427
TOTAL $ 342,739 $ 69,614 $ 75,965 $ 65,720 $ 65,720 $ 65,720 $ 342,739
PROJECT STAFF 0.13 0.17 0.13 0.13 0.13
MANAGEMENT (FTE) CONTRACT
-31-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
94252 Bus Shelters COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
e
This project provides for the replacement of existing
LAVTA standard bus shelters in the downtown area with
artist inspired bus shelters.
.....
1
tJ. \ l' ..,..........-
\......~~_....
COMMENTS
During Fiscal Year 2001-2002, five artists were selected to develop models of bus shelter designs. In Fiscal Year
2002-2003, the preferred design was selected and the artist prepared plans and specifications for the bus shelters.
During Fiscal Year 2002-2003, three of the bus shelters were fabricated and installed. LAVTA contributed $6,000
towards the cost of each shelter, for a total of $18,000.
Six additional bus shelters are recommended for replacement. It is recommended that a new artist or artists be
selected to commission additional bus shelters. In Fiscal Year 2006-200, the artist selection process will be
undertaken and a design{s) selected. In Fiscal Year 2007-2008, the shelters at Dublin Boulevard at Village Parkway
and Amador Valley Boulevard at Donohue Drive are recommended for replacement. In Fiscal Year 2008-2009, the
shelters at Dublin Boulevard at Civic Plaza, Dublin Boulevard at Sierra Court and the shelters at Dublin Court north
and south are recommended for replacement.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design I Inspection $ 648 001 $ 116,100 $ 30,500 $ 60,200 $ 120,300 $ 327,100
Other Contract Services 100,723
Land I Right of Way
Improvements 225,000
Machinery I Equipment
Miscellaneous 729
TOTAL $ 327,100 $ 116,100 $ 30,500 $ 60,200 $ 120,300 $ 327,100
PROJECT I STAFF
MANAGEMENT (FTE) CONTRACT
-32-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
Not Yet Assigned City Entrance Sign Modifications COMMUNITY IMPROVEMENTS
This project would construct nine City entrance
signs located at every entry way into the City.
.....
1
~,-
\ ~
\ ,
\ I '
0~
;
DESCRIPTION - LOCATION
9
COMMENTS
It is anticipated that the first new granite-faced City entrance sign will be located on Hacienda Drive near 1-580 in
Fiscal Year 2006-2007, as part of the adjacent development improvements. The City currently has five existing
entrance signs located on San Ramon Road, Village Parkway and Dougherty Road with the concrete facades. In
order to be consistent with the new granite finish sign proposed at Hacienda Drive (IKEA to construct entrance sign),
this project would replace the existing signs with the new granite-faced signs. In addition, four entrance signs will be
included with this project to cover every entry way into the City.
This project is included in the Housing Incentive Program (HIP) grant application submitted to the Metropolitan
Transportation Commission for funding.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design ¡Inspection $ 20.371 001 $ 200,000 $ 200,000
Other Contract Services
Land I Right of Way
Improvements 179,093
Machinery I Equipment
Miscellaneous 536
TOTAL $ 200,000 $ 200,000 $ 200,000
PROJECT I STAFF 0.08
MANAGEMENT (FTE) CONTRACT
-33-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
Not Yet Assigned San Ramon Road Landscape Renovation COMMUNITY IMPROVEMENTS
DESCRIPTION - LOCATION
e
This project would renovate the landscaping along
the San Ramon Road bike path, from West Vomac
Road to Alcosta Boulevard, removing the existing
Baccharis and soil and installing new topsoil and
plant material. The plants proposed are rosemary,
society garlic, and a variety of ivy.
MOos
1
~ \ '\ ......--...-
\. \ .....-...
\ '< .,..--
C. \ _--~
COMMENTS
Most of the landscaping in th is area was installed 13 to 15 years ago, and has reached the end of its life expectancy.
This project is currently included in the Housing Incentive Program (HIP) grant application submitted to the
Metropolitan Transportation Commission (MTC) for funding.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design I Inspection $ 14,676 001 $ 136,381 $ 136,381
Other Contract Services
Land I Right of Way
Improvements 121,500
Machinery I Equipment
Miscellaneous 205
TOTAL $ 136,381 $ 136,381 $ 136,381
PROJECT I STAFF 0.08
MANAGEMENT (FTE) CONTRACT
-34-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New Dougherty Assessment District COMMUNITY IMPROVEMENTS
Fence Painting
DESCRIPTION - LOCATION
e
This project would provide maintenance repainting for
the wrought iron fence located along Fall Creek and
Wildwood Roads in the Dougherty Landscape
Assessment District.
M'"
1
COMMENTS
The fence provides a decorative barrier between the two collector roads and the Alamo Creek channel. This fence
needs periodic repainting as a maintenance item to preserve the fence and provide an attractive appearance. This
project is proposed to be phased over a two-year period, with the cost to be paid from the Dougherty Maintenance
Assessment District reserve.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design ¡Inspection 713 $ 32,920 $ 32,920
Other Contract Services $ 4,680
Land ¡ Right of Way
Improvements 27,540
Machinery I Equipment
Miscellaneous 700
TOTAL $ 32,920 $ 32,920 $ 32,920
PROJECT I STAFF
MANAGEMENT (FTE) CONTRACT 0.03
-35-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New San Ramon Road Concrete Sound Wall COMMUNITY IMPROVEMENTS
Maintenance
DESCRIPTION - LOCATION
e
This project would provide maintenance for the
westerly face of a concrete soundwall that was built in
1990 as part of the San Ramon Road Widening
project. This soundwall is the short wall adjacent to the
northbound lanes on San Ramon Road between
Shannon Avenue and Silvergate Drive.
Mies
1
COMMENTS
The lower portion of the wall is cast-in-place concrete and serves as a barrier for off-the-road accidents. The top
portion of the wall is split-face concrete block and is in good condition. The lower portion of the wall has weathered,
and cracks have formed where the vertical reinforcing bars are located inside the wall.
This project would repair the cracks and paint the surface of the wall with a waterproof treatment to protect the
reinforcing steel from rust damage. The concrete surface would also be restored to a more uniform color.
FINANCINGNEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design ¡Inspection $ 5.350 001 $ 26,000 $ 26,000
Other Contract Services
Land ¡ Right of Way
Improvements 20,000
Machinery ¡ Equipment
Miscellaneous 650
TOTAL $ 26,000 $ 26,000 $ 26,000
PROJECT I STAFF 0.05
MANAGEMENT (FTE) CONTRACT
-36-
2004-2009 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
New San Ramon Road Wooden Sound Wall COMMUNITY IMPROVEMENTS
Maintenance
DESCRIPTION - LOCATION
e
This project provides maintenance for the wooden
soundwall along the residential backyards on the
western side of San Ramon Road between Alcosta
Boulevard and Silvergate Drive. The project would
repaint the fence facing San Ramon Road.
MIoo
,
COMMENTS
This soundwall was constructed in 1988 as a noise mitigation for the widening of San Ramon Road from two lanes to
four. When the City built the fence, easements were obtained to construct the fence, and the City retained the right,
but not the responsibility, to maintain the road side of the fence.
At the time of construction, the fence was painted with two shades of brown wood stain. Over the years, the color
has faded and the wood has weathered. This project would repaint the fence to bring back the original color and
extend the life of the wood.
FINANCINGIYEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2004-2005 2005-2006 2006-2007 2007-2008 2008-2009 Totals
Design I Inspection $ 6,350 001 $ 30,300 $ 30,300
Other Contract Services
Land ¡ Right of Way
Improvements 23,300
Machinery I Equipment
Miscellaneous 650
TOTAL $ 30,300 $ 30,300 $ 30,300
PROJECT I STAFF 0.05
MANAGEMENT (FTE) CONTRACT
-37-