Loading...
HomeMy WebLinkAboutAttachmt 7- Appdx 8.4 Att 6 ..--. . >-... MITIGATION MONITORING PLAN: EASTERN DUBLIN SPECIFIC PLAN/GENERAL PLAN AMENDMENT prepared by WALLACE ROBERTS & TODD May 7, 1993 A""~Me1JT b-; .. . ~\ß,-r & ~ ,..-... City of Dublin :May 7, 1993 E& _ Dublin Specific Plan & GP A EIR Mitigation Moni~or:ing Plan MITIGATION MONITORING PLAN EASTERN DUBLIN SPECIFIC PLAN/GENERAL PLAN AMENDMENT The State of California now requires public agencies to adopt a mitigation monitor.ing program for changes to the 'project or conditions of approval which have been identified and adoPted as methods to reduce environmental impacts. Thus with the certification of the Eastern Dublin EIR. and adoption of the Specific Plan and General Plan Amendment, the City of Dublin is required to establish a mitigation monitoring program for all approved mitigation measures. In order to ensure that all adopted mitigation measures are implemented in a timely fashion, the Mi~gation Monitoring Program provides the following information for each measure: · Whv has the mitigation measure been recommended? · Who is responsible for implementing the mitigation? · What is the mitigation measure being monitored and how? · ~ should mitigation monitoring be undertaken? What schedule is required? · Comoletion: when should the mitigation measure be in place and monitoring be completed? · Verification: what agency is required to ensure that the mitigation measure was implemented? , 2 -- .---.. Eaa. :Dublin Specific Plan &I: GPA Em Mitigation Monitoti:l1g Plan CitT of Dublin May 7, 1993 SEcrION 3:1 LAND USE 1. ImDacts Reauinne Mitieation This section identifies the fallowing impacts requiring mitigation: 1M 3.1/G Potential Conflicts with Land Uses to the West 2. Mitieation Imolementation and Monitonne Proeram Impact 3.1/G Potential Conflicts with Land Uses to the West Miti1!a1ion Measure 3.1/1.0: Coordinalion of Plannin1! Activities with U-S. Armv When: To resolve potential land use conflicts between activities at CamP Parks and proposed uses in the Project area Planning Department/U.s. Army; Directorate of Engineering and Housing. Establish a liaison committee between the City and the Army. Establish a schedule for periodic meetings to discuss and provide updates on p1anning and development efforts within the Project site and in Camp Parks. The City of Dublin Planning Department will send to the base commander a copy of new applications for development adjacent to Camp Parks for review and comme~t. Projects will be considered by liaison committee at request of Camp Parks. Periodically. pursuant to agreed-upon calendar, and as required for review of specific project proposa1s. On-going. Specific project review will be considered complete when City has received written comments from CamP Parks. City of Dublin Planning Director. Why: Who: What: Completion: Verification: SEcrION 3.2: POPULATION. HOUSING AND EMPLOYMENT This section provides baseline data related to population, housing and employment and does not identify environmental impactS or related mitigation measures. No mitigation monitoring program is required. SECTION 3.3: TRAmC AND CIRCULA nON 1. Imnsets ReauiriDe Mitie:ation This section identiÍIeS the following impacts requiring mitigation: 1M 3.1/G Potential Conflicts with Land Uses to the West 1M 3.3/B 1-580 Freeway; between 1-680 and Hacienda. 1M 3.3(C 1-580 Freeway; between Tassajara-Fallon-Airway 1M 3.3/D 1-680 Freeway; North of the 1-580 Interchange 1M 3.3/E Cumulative Freeway Impacts (1-580 west of 1-680; 1-580 east of Airway) 1M 3.3/F Dougherty Road and Dublin Boulevard 1M 3.3/G Hacienda Drive and 1-580 Eastbound Ramps 1M 3.3/H Tassajara Road and 1-580 Westbound Ramps 3 - , , ---.... Cit)' of Dublin May '1, 1998 Ea. Dubiïn Specific Plan ok GP A EIR Mitig:ation Monitoring Piau 1M 3.3/1 Santa Rita Road & 1-580 Eastbound Ramps 1M 3.3/J Airway Boulevard and Dublin Boulevard 1M 3.3jK Akway Boulevard & 1-580 Westbound Ramps 1M 3.3/L Impediments to Truck Traffic on EI Charro Road , 1M 33/M Cumulative Impacts on Dublin Boulevard (Dubtin/Hacienda; Dublin/Tassajara) 1M 3.3/N Cumulative Impacts on Tassajara Road (TassajarajFallon; Tassajara/Fallon; Tassajara/Transit Spine) 1M 3.3/0 Transit Service Extensions 1M 3.3/p Street Crossings 2. Miti2'atioD ImÐlementatioD and MonitoriDt! Pr02ram Daily Traffic Volumes (Year 2010 With Project) Impact 3.3/B 1-580 Freeway; between 1-680 and Hacienda Miti!!tllion Measure 33/2.0: TraJ'lS'lJorta!ion Svstems Mana!!ement (TSMJ When: Completion: Verinc:ation: To reduce project-generated vehicle trips All non-residential projects with SO± employees. Require compliance with BAAQMD Regulation 13 TransporttJlion Control Measures Rule 1 to satisfaction of BAAQMD or City of Dublin (Public Works Department) Prior to occupancy Upon issuance of Planning Department sign-off on compliance City of Dublin Planning Director Why: Who: What: Miti!!ation Measure 33/2.1: Ref!Íonal TrtmsrJortalion Mitif!o.tion Pro!!rams When: To assist in the funding of improvements to Iegional transportation system All approved projects Proportionate monetary contribution to regional tranSportation mitigation programs as approved by the City of Dublin. As a condition of project approvaL When applying for a permit, the applicant developer will be notified of this fee assessment: Payments shall be made prior to issuance of building pennits City of Dublin Department of Public Works Why: Who: What: Completion: Verification: Impact 3.3/C 1-580 Freewa.y; between Tassajara~FaJloD-Airway Miti!!tltion Measure 3313.0: Construction of Auxiliarv Lanes When: To assist in the funding of the construction of auxiliary Janes on 1-580 between Tassajara and AirWay boulevards Calttans/City of Dublin Public Works Department. Payment of a regionally-assessed fee for all new development within the Project area as approved by the City of Dublin. As a condition of project approval. When applying for a permit, the applicant developer will be notified of this fee ,assessment. Why: Who: What: 4 -. City of DubJin :May 7, 1993 E& DubliD Speçi5c: Plan &z: GP A Em MitigatiOD :Monito~ Plan Completion: Verification: Payments shall be made prior to issuance of building permits City of Dublin Department of Public Works Impact 3.3/D 1-680 Freeway; North of the 1-580 Interchange Miti!!ation Measure 3.3/4.0: [-580/1-680 InleTchan1!e ImrJ70vements Completion: Verific:ation: To establish funding for construction of future 1-580/1-680 Interchange improvements. Caltrans/City of Dublin Public Works Department. Payment of a regionally-assessed fee for all new development within the Project area as approved by the City of Dublin. As a condition of project approval. the applicant developer will be notified of this fee assessment. Payments shall be-made prior to issuance of building permits City of Dublin Department of Public Works Why: Who: What: When: Daily Traffic Volumes (Cumulative Buildout with Project) Impact 3.3/E Cumulative Freeway Impacts Miti!!a1ion Measure 3.3/5.0: TranslJOTtaLion Svstems Manarrement (TSM I Verific:atiou: To es~lish funding for construction of auxiliary lanes on 1-580 east of ~y Boulevard All approved development projects in the Project area/City of Dublin. 1) Proportionate monetary contribution to regional tranSPortation mitigation programs as approved by the City of Dublin. 2) City coordination with other local jurisdictions to require that all future development projects participate in regional tranSportation mitigation programs. 1) The contribution to regional improvements will be implemented as a condition· of project approval. Applicants will be notified of this fee assessment. 1) Payments shall be made prior to issuance of builcling permits. 2) Coordination will be ongoing. 1) Fee payments will be verified by the City of Dublin Planning Department. 2) CoordiDation will be the responsibility of the Department of Public Works Why: Who: What: When: Completion: Peak Hour Intersection Operation (Year 2010 with Project) Impact 3.3/F Dougherty Road and Dublin Boulevard MitiS!a1ion Measure 3.3/6.0: Construction of Additional Lanes Who: To ensure the funding and construction of improvements to the Dougherty RoadjDub1.in Blvd. intersection as needed City of Dublin Department of Public Works/All approved projects. Why: 5 /0--", .- City of DubJiD May 7, 1995 Ea.. ' Dublin Specific Plan tk GP A EIR Mitigation MonitoriDg Plan Completion: 1) Payment of fees towards the construction of adtÜtional lanes at the intersection of Dougherty Road and Dublin Boulevard. 2) Monitoring of the need for intersection improvements and coordination of their construction. 1) Fees will be collected as a condition of project approval. Applicants will be notified of fees. 2) Monitoring will be ongoing annually. 3) Construction will occur prior to intersection declining to LOS F. 1) Payment of fees shall be made prior to issuance of building permits. 2) Monitoring of intersection level of service will be ongoing. 3) Construction will be complete with implementation of specific improvements or equivalent as identified in mitigation measure. 1) City of Dublin Planning Department will verify paYD;1ent of fees. 2) Department of Public Works will be responsible for monitoring calculating fees and construction. What: When: VeriÏlCation:, Impact 3.3/G Hacienda Drive and 1-580 Eastbound Ramps MitŽ!!ation Measure 3.3/7.0: Widenin~ of Eastbound Off-RamD Verific:ation: To provide improvements that will prevent congestion on the eastbound off- ramps from 1-580 at Hacienda Drive. Caltrans/City of Pleasant on/City of Dublin Public W orksfProject Applicants 1) Payment of fee towards widening. 2) Coordination of improvement with Caltrans and the· City of Pleasanton. 1) Fees will be assessed as a condition of project approval. 2) Coordination will occur as needed prior to implementation of mitigation.. 3) Construction will be underway prior to decline of level of service to unacceptable.LOS E. 4) Monitoring and coordination will begin with development review processing. 1) Payment of fees shall be made prior to issuance of builcting permits. 2) Mitigation will be complete with .implementation of widening described in mitigation measure. 1) City of Dublin Planning Department will verify payment of fees. 2) Department of Public Works will be responsible for calculating fees and coordination with other agencies. Why: Who: What: When: Completion: Impact 3.3/B Tassajara Road and 1-580 Westbound Ramps Miti~ation Measure 3.3/8.0: WideninE' of 1-580 Westbound Ramos Who: What: To fund and implement improvements necessary to ensure the efficient operation of the intersection of Tassajara Road with the 1-580, westbound ramps. Caltrans/Pleasanton and Dublin Departments of Public Works/Developers 1) Payment of fee to fund design and construction of improvements, including widening of the 1-580 westbound off-ramp and modification of northbound approach to provide additional turn and through lanes. 2) Monitoring of service levels and coordination of construction. Why: 6 ",~... -.., Ease. ':>ub1in Specific Plan & GP A EIR Mitigation Monitoring Plan City of Dublin May 1, 1.993 Veñfication: 1) Fees will be assessed as a condition of project approval. 2) Monitoring and coordination will be begin with development review processing. 3) Construction will be underway prior to decline of level of service to unacceptable level (LOS E). 1) Payment of fees shall be made prior to issuance of builclii1g permits. 2) Mitigation will be complete with implementation of widening described in mitigation measure. I) City of Dublin P1a.nIñng Department will verify payment of fees. 2) Department of Public Works will be responsible for coordinating cons~ction. When: Completion: Impact 3.3/1 Santa Rita Road" 1-580 EastboDnd Ramps Mitirral.ion Measure 33/9.0: lmrJTo'Vemems to /-580 Eastbmmd Ram'Os Verific:ation: To fund and ,implement improvements necessary to ensure adequate service levels on Santa Rita Road and 1-580 eastbound ramps. CaltranS/Pleasanton and Dublin Departments of Public Works/Developers 1) Payment of fee to fund design and construction of improvements; including widening of 1-580 eastbound off-ramps. 2) Monitoring of service levels and coordination of construction. 1) Fees will be assessed as 'a conditìon of project approval. 2) Monitoring and coordination will be begin with development review processing. 3} Widening of eastbound ramps will occur prior to decline of level of service to unacceptable level (LOS E). 1) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of widening described in mitigation measure. I) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating improvements with the City of Pleasanton Department of Public Works and CaltranS. Why: Who: What: When: Completion: Impact 3.3/K Airway BouleTard" 1-580 Westbound Ramps Miti~aiion Measure 3.3/1] .0: Wideninv of Airwav Boulevard Overcrossin~ When: To fund and implement improvements necessary to ensu.re adequate service levels at the intersection of Airway Boulevard and the westbound ramps. City of Dublin/CaltransjCity of Livennore¡Developers 1) Payment of fee to fund design and consttuction of improvements; including the widening or replacement of the Airway Blvd. overcrossing and the widening of the 1-580 westbound off-ramp. 2) Monitoring of service levels and coordination of construction. 1) Fees will be assessed as a condition of project approval 2} Monitoring and coordination will be begin with development review process. 3} Improvements to ramps and overcrossing will occur prior to decline of Why: Who: What: 7 ~ "...-.... City of Dub1in May 7, 1993 Eas,Dublin Specific Plan &; GPA Em. Mitigation :Moni~g Plan Completion: level of service to unacceptable level (LOS E). I) Payment of fees shall be made prior to issuance of building permits. 2) Mitigation will be complete with implementation of improvements described in mitigation measure. I} City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating improvements with the City of Livermore Department of Public Works and Caltrans. Verification: Impact 3.3/L Impediments to Truck Traffic: on El Charro Road Mititration Measzue 33/12.0: Provisions to Ensure Unimoeded Tnæk Traffic Why: To fund and implement improvements necessary to ensure unimpeded movement of trucks to and from the qcarries on El Charro Road south of .1-580. City of Dublin/Caltrans/City of Pleasanton/Developers/City of Livermore I) Payment of fees to fund design and construction of necessary improvements. 2) Monitoring of service levels and coordination of improvements with Caltrans and the City of Pleasanton Department of Public Works. '1) Fees will be assessed as a condition of project approval. 2) Monitoring and coordination will begin with development review processing. 3) Improvements will occur prior to decline of level of service to unacceptable level (LOS E). 1) Payment of fees shall be made prior to.issuance of building permits. 2) Mitigation will be complete with implementation of improvements. 1) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating improvements with the City of Pleasanton Department of Public Worb and Caltrans and City of Livermore. Who: Wha1: When: Completion: Verific:ation: Impact 3.3/M Cumulative Impacts on Dublin Bouleurd Mititration Measures 33/13.0: Maintain Adeouate Levels of Service at lntersections_ Why: To identify, fund and implement improvements that will maintain adequate service levels at the intersections Dublin Blvd with Hacienda Drive and Tassajara Road with buildout of cwnulative projects. City of Dublin 1) The City of Dublin will participate in the regularly-scheduled meetings of the Congestion Management Agency and Tri- Valley Transportation Council to determine long-term mitigation measures for cumulative impacts on Dublin Boulevard. 2) Payment of fees to fund design and construction of necessary improvements. 3) Monitormg of service levels and coordination of improvements with Caltrans and the City of Pleasanton Department of Public Works. I) Participation in the Tri- Valley Transportation Council is current and 00- Who: 'What: When: 8 ,- ."-". City ofDub1iD May 1, 1993 Eas Dublin Specific: Plan .& GP A Em. Mitigation Monitoring Plan Completion: going. 2} Fees will be assessed as a condition of project approval. 3) Monitoring and coordination will be begin with development review process and continue through to identification and construction of necessary improvements. 4} Construction will be underway prior to decline of level of service to unacceptable level (LOS E). I} Participation in the Tri-Valley Transportation Council is on-going. 2) Payment of fees shall be made prior to issuance of building permits. 3) Mitigation will be complete with implementation of improvements. I) City of Dublin Planning Department will verify payment of fees. 2) City of Dublin Department of Public Works will be responsible for coordinating Project area improvements resulting from regional growth. Verific:ation: Impact 3.3jN Cømwatin Impacts on Tassajara Road Miti~uzlion Measure 3.3/14.0: Wideninsr of Tassa;ara ROM to Six Lanes Why: To reserve sufficient right-of-way along Tassajara Road to accommodate cumulative development of projects north of the Project area.. Who: City of Dublin Planning Department/City of Dublin Department Public Works. What ' Reservation of sufficient right-of-way to a.ccommodate six travel lanes on Tassajara Road. When: Reservation of right-of-way to be adopted prior to approval of tentative map. Completion: Dedication of right-of-way required prior to' filing of Fmal maps for development projectS adjacent to the Tassajara Road corridor. Verification: City of Dublin Planning Department. Impact 3.3/0 Transit Service Extensions MitlJration Measure 3.3 /15.0: Provision of Transit Service to Meet LAVT A standards When: To extend transit service within 1/4 mile of 95% of the Project area population. City of Dublin Planning DepartmentjDepartment of Public WorksfLA VT A 1) Meetings between the City of Dublin and LAVTA to coordinate extension of bus service to the Project area. ~) Notification to LA VT A of development approvals involving potential for 100 or more employees or residents. I) Initial meeting to review the plan and ultimate service needs should be held within one year of plan adoption to allow LA VTA to plan for future expansion. Thereafter, meetings should be held periodically at the request of either the City or LA VT A. On-going. City of Dublin Planning Department. Why: Who: What: Completion: Verification: 9 City of Dublin May 7, 1993 .--- --., Eas Dublin Specific Plan ok GPA EIR MitigatiOD MonitoriDg Plan MitifUllion Measure 3.3/15.1: Bus Service to EmDlovment Centers with 100+ EmDlovees Why: Who: What When: Completion: Verification: To provide transit service at a minimum frequency of one bus every 30 minutes during peak hours, to employment centers with 100 or more employees. City of Dublin Planning Department¡Department of Public Works/LA VT A 1) Meetings between the City of Dublin and LA VT A to coordinate extension of bus service to employment centers. 2) Notification to LA VT A of development approva1s involving potential for 100 or more employees. 1) Meetings should be held periodically at the request of either the City or LAVT A. On-going. City of Dublin Planning Department. Miti1i!ation Measure 3.3115.2: Mone/an ContribuJion to SUDDorl Transi! Service Extensions Why: Who: What: When: Completion: Verification: To provide funding in support of expansion of transit 'service to the Project area. City of Dublin Planning Department/Department of Public Works/LA VT A (Developers Payment of fees or construction of capital improvements to support extension of transit service. Fees/improvements will be identified· as a condition of project approval. Prior to approval of Final Map. City of Dublin Planning Department. Mitiiration Measure 3.3 115.3: Feeder Transit Service to the East Dublin I Pleasanton BART station Why: Who: What: When: Completion: Verification: To coordinate provision of feeder bus service to the planned BART stations from the Project area. , City of Dublin Planning Department/Department of Public Works/LA VTA/BART Meetings with :BART and LA VTA to coordinate feeder tranSit service to BART. Initial meeting to review the plan and ultimate service needs should be held within one year of plan adoption to allow BART and LA VT A to plan for future expansion. Thereafter, meetings should be held periodically at the request of the City, BART, or LA VTA. On-going. City of Dublin Planning Department. Impact 3.3jP Street Crossings Miti!ration Measure 33/16.0: Provision of a Class I bicvclelDedestTian Dath Why: Who: To provide a paved bicycle/pedestrian path along Tassajara Creek. Developers in consultation with the City of Dublin Planning Department, 10 ,-. -.. City of Dublin May 'I, 1993 Eu ·Dublin Specific Plan ok GP A Em. Mitigation :Monitoring Plan Completion: Department of Public Works, and East Ba.y Regional Park District. Design and construction of a Class I bicycle/pedestrian path along Tassajara Creek. . As a condition of approval for development projects adjacent to the Tassajara Creek corridor. Construction to occur prior to occupation of first phase of homes responsible for providing the path. City of Dublin Department of Public Works. What When: VerificatioD: MitŽ!!ation Measure 3.3/16.1: Signalized Bicvcle/Pedestrian Intersections Why: Who: What: When: Completion: Verification: To provide for safe pedestrian/bicycle crossings of major arter.ial streets. DevelopersjDepartment of Public Works Locate pedestrian and bicycle crossings at signalized intersections. As a condition of project approval Final approval of detailed improvement plans. Department of Public Works. SECTION 3.4: COMMUNITY SERVICES AND FACILITIES Prior to annroval of orezonine.1. Imltacts Reauirin2 Mitieation This section identifies the following impacts requiring mitigation: 1M 3.4/A Demand for Increased Police Services. 1M 3.4/B Police Services Accessibility 1M 3.4/C Demand for Increased Fire Services 1M 3.4/D Fire Response to Outlying Areas 1M 3.4/E Exposure to Wild1ands Hazards 1M 3.4/F Demand for New ClassToom Space IM 3.4/G Demand for Junior High School Space 1M 3.4/H Overcrowding of Schools 1M 3.4/I Impact on School District Jurisdiction 1M 3.4/1 Financial Burden on Schoo) Districts 1M 3.4/K Demand for Park Facilities 1M 3.4jL Park Facilities Fiscal Impact IM 3.4jM Impact on Regional Trail System 1M 3AIN Impact on OpenSpa.ee Connections 1M 3.4/0 Increased Solid Waste Production IM 3.4/p Impact on Solid Waste Disposal Facilities IM 3.4/Q Demand for Utility Extensions 1M 3.4/R Utility Extension: Visual and Biological Impacts IM 3.4/S Consumption of Non-Renewable Natural Resources 1M 304fT Demand for Increased Postal Service 1M 3.4/U Demand for Increased Library Service 11 City of Dublin May 7, 1993 '-" Eas. ,Dublin Specific: Plan k GP A EIR Mitigation Monitoring Plan 2. Miti!!atioD Imnlementation and MODUOnD!! Proeram Police Services Impact 3.4/ A Demand for Increased Police Services Impact 3.4/B Police Sernces Accessibility Miti~ation Measure 3.4/1.0: Additional Personnel. Facilities and "Beats" When: Completion: Verification: ,To provide additional personnel, facilities. and procedures to police service standards. City of Dublin Police DepartmentjPlanning Department. 1) Police Department will hire· and train new sworn and civilian staff, revise "beat" system to serve eastern Dublin. and estimate and schedule projected facility needs in eastem Dublin. 2) Planning Department to notify Police Department of development approvaIs to assist the Police Department in its annual budget f onnuJation. On-going. Annually as part of the Police Department's planning and budgetary process. Chief of Police. Why: Who: What: Miti~ation Measure 3.4/2.0: Coordination of eXDansion of Police services " When: Completion: Verification: To provide the Police Department information needed to adequately plan for expansion of services. Planning Department/City of Dublin Police Department. Notification to the Police Department of the timing, of annexation and approved development. During processing of prezonmg and annexation applications. Ongoing. . Planning Department Why: Who: What: Miti~ation Mel2Sure 3.4/3.0: Police De1)artment Review When: CompletioD: Verification: To provide for Police Department input into the design of proposed development. City of Dublin Police Department/planning Department. Police Department review of proposed development plans for safety issues, and provide the Planning Department with recommendations for inclusion in the Ímal plans. During development review process. Prior to final site plan approval. Chief of Police or representative. Why: Who: What: Mitieation Measure 3.4/4.0: Budf!etin!' for Police Services Who: To prepare a budget strategy to hire the required additional personnel and implement necessary changes in the "beat" system. . City of Dublin/City of Dublin Police Department Why: 12 CitJ of Dublin May '2', 1993 What: When: Completion: Verification: ,---. .-... Eas Dublin specific Plan & GP A Em MitigatiOD Monitoring Plan 1) Police Department will estimate projected personnel and facility needs for eastern Dublin and develop a budget strategy to meet these needs. 2) Plamring Department will notify Police Department of development approvals in order to assist the Police Department in its annual budget formulation. On-going. Annually as part of the Police Department's planning and budgetary process. Chief of Police. Miti1!ation Measur.e 3.4/5.0: Police DeDOTtment Review Why: . Who: What: When: Completion: Verific:ation: FIre Protection To ensure Police Department ,review of proposed development for safety issues. City of Dublin Police DepartmentjPlanning Department. Police Department review of proposed development plans for safety issues. During development review process. Prior to final site plan approv31. Chief of Police or representative. Impact 3.4/C Demand for Increased Fire Services Impact 3.4/D FlJ'e Response to Outlying Areas Impact 3.4/E Exposure to Wildlands Hazards Mitif{ation Measure 3.4/6.0: Construction of New Fire Facilities Why: Who: What Whe-n: Completion: Verification: To provide for the constrUction of new facilities coincident with new service demand in eastern Dublin. DevelopersjDougherty Regional Fire Authority Design and Construction of New Facilities Condition of tentative map and/or development review approval Construction of 11I'e statîon(s) will occur concurrently with new service demand not addressed by other agreements. DRF A/City Planning Department. Mžtif!ation Measw.e 3.4/7.0: Fundinf! of New Fire Facilities Why: Who: What: When: Completion: Verific:ation: To establish appropriate funding mechanisms to cover up-front costs of capital improvements. City of Dublin City Manager's Office/DRF A. Establish funding mechanism for capits1 improvements. Condition of tentative map and/or development review approval Construction of fire station(s) will occur concurrently with new service demand not addressed by other agreements. City of Dublin City Manager responsible for establishing funding mechanisms; Planning Department responsible for verifying completion prior to project approval. 13 City of Dublin May 1, 1995 --, ,-. Eæ. Dublin Specific Plan &; GPA Em Miûgation MODitormg Plan Mitif!01ion Measure 3.4/8.0: Sites for New Fire Facilities Why: Who: What: When: Completion: Verification: To ensure acquisition of sites for construction of new fire stations. City of Dublin Planning Department in consultation with DRF A. Identification and acquisition of sites for new fire statiODS. Condition of tentative map and/or development review approval Construction of fire station(s) wiU occur concurrently with new service demand not addressed by other agreements. City of Dublin Planning Department. Mitiflation Measure 3.4/9.0: Fire DerJa.rrment Review Why: Who: What: When: Completion: Verification: To ensure DRF A input on project design relating to access, water pressure, rJI'e safety and prevention. DRF A/City of Dublin Planning Department. Review of proposed devèlopments by DRFA for nre safety. Incorporation of DRF A recommendations into project conditions by Planning Department. During development review process. Prior to development review and/or Final Map approval. Fire Chief or representative to provide recommendations; Planning Department to verify, incorporation of DRF A recommendations as conditions of project approval. Mititration Measure 3.4/10.0: Urban /O"en, SrJace Interftree Manaf!ement Why: Who: What: When: Completion: Verification: To ensure that a mechanism is in place to provide long-term maintenance for the urban/open space interlace. DevelopersjDRF A/City of Dublin P1annmg Department. Establishment of an assessment district or other suitable mech~n;~ to maintain safe rue conditions along the urban/open space interface. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. Miti~ation Measure 3.4/11.0: Fire Trails/ODen SDace Svstem Why: Who: What: When: Completion: Veñfication: To integrate fire trails and nre breaks into the open space trail system. City of Dublin Planning Department/City of Dublin Recreation Department/DFRA/Developers. Design and dedication of fire trails and fire breaks. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. Miti~ation Measure 3.4/12.0: Wildfire Mana~eme7!t Pltzn Why: To prepare a wildfire management plan for the Project area in order to 14 City of Dublin May 1, 1993 Who: What: When: Completion: Verifieaüon: .- '-... Eas-. Dublin Specific Pian &t GPA EIR Mitigation MonitoriDg Plan reduce the risk of impact related to wildland fire. City of Dublin/DRF A. Prepare a wildfire management plan. During prezoning and anDexation application processing. Prior to approval.of any development in lands adjacent to land designated for permanent open space or rural residential/agriculture. City of Dublin Planning Departm~nt. Miti1!a1ion Measure 3.4/13.0 Sites for Fire Facilities for the CPA lncremeni Why: Who: What: When: Completion: Verification: Schools To determine the number ,location and timing of additional iIre stations for areas within the Project area yet outside the Specific Plan area. DRF A/City of Dublin Planning Department. Identification of future fire station sites. During prezoning and annexation application processing. Prior to development approvals in the areas outside the Specific Plan area. City of Dublin Planning Department. Inipad 3.4jF Demand for New Classroom Space Impact 3.4jG Demand for Junior IDgh School Space Miti1!a1ion Measure 3.4/13.0: Dedication of New School Sites Why: Who: What: When: Completion: Verificauon: To reserve school sites within the Project area as designated in the Specific Plan and GP A. Developers/City of Dublin Planning Department/DUSD/L VJUSD Identification of new school sites. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. Mitit!ation Measure 3.4/14.0: Planninf! for Additional Junior Hieh School CaDacit'V Why: Who: What: When: Completion: Verification: To ensure that adequate capacity is provided for junior high school age students. DUSD. Planning for projected junior high school demand within two proposed sites and/or provide for a third site'in tbe Future Study Area to the east of the Project area. During planning and design of the rust Junior High School site. Prior to final map approval for the first junior high school. City of DublinjDUSD. 15 City of DubHn May 7, 1995 --. \ --. Eas. 'Dublin Specific Plan && GPAEIB. Mitigation Monitoring Plan 1M 3.4/H Overcrowding of SchoolS Mitií!ation Measure 3.4115.0: Provision of Adeauate Schools to Serve the Proiect site Why: Who: What: Wben: Completion: Veñfiçation: To ensure that adequate classroom space is provided prior to the development of new homes. DUSD/City of Dublin Planning Department. I) Coordination between City of Dublin and DUSD to monitor available school çapacity and proposed development. 2) DUSD sign-off on available capacity to accommodate new development. Coordination to occur during development review process. with written sign-off from DUSD submitted prior to tentative map approval Prior to occupancy approval. City of Dublin Planning Department. Impact 3.4/1 Impact on School District Juñsdiction Mitií!ation Measure 3.4116.0: Resolution of School District Jurisdiction Issue Why: Who: What: When: Completion: Verification: To resolve the jurisdictional issue of which school district{s) will provide service to the Project area. City of Dublin/DUSD/L VJUSD. City,will assist with resolution of District bonndary dispute. Within two years of plan adoption. Prior to occupancy of residential units within the Project area. City of Dublin PlanD.ÏD:g Department. Impact 3.4/.1 Financial Burden OD School Districts Mitisration Measure 3.4117.0: Full mitií!ation of Proiect imDact on school facilities Why: Who: What: When: Completion: VerificatioD: To ensure that adequate school facilities are available prior to development in the Project area to the extent permitted by law. City of Dublin/DUSD/L VJUSD. Establish liaison between City of Dublin and school districts. Ongoing as part of development review process. On-going. City of Dublin PlannÏIig Department with input from school districts. MitÌ!!ation Measure 3.4/18.0: Provision of School Sites Why: Who: What: When: Completion: Verific:atioD: To ensure that the development of new facilities is provided for through the dedication of school sites and/or payment of development fees by developers. Developers/City of Dublin/DUSD/L VJUSD. Dedication of School SitesfPayment of Development Fees. Condition of Tentative Map Approval Prior to occupancy approval. City of Dublin Planning Department. 16 Ciq. of Dublin May 1, 1998 , .-... -- Bas, . Dublin Specific Plan &: GP A Em Mitigation MOJÛtoriDg Plan Mitifla1ion Measure 3.4/19.0: Fzmdinfl of New Schools Why: Who: What: When: CompletioD: Verification: Parks ud Recreation Park Facilities To establish appropriate funding mechanisms, such as Mello Roes Community Facilities District, development impact fees, or a general obligation bond measure, to fund new school development in eastern Dublin. City of Dublin/DUSDjL VJUSD. Creation of funding mechanism(s). During processing of prezoning and annexation applications. Prior to occupancy of residential units within the Project area. City of Dublin Planning Department. Impact 3.4/K Demand for Park Facilities Mitisration Measure 3.4/20.0: EXDDnsion of lJtl7k tl7ea (Guidin!! PoliC'V. No m07J.itorinsr aDDlicable or reouired.) Mitisration Measure 3.4/21.0: Maintenance and imDrovement of ouldoor facilities in conformtl7lce with Park and Recreation Master Plan (Guidin!rPolicv. No monitorinsr aDDlicable or reauired.) Mitisration Measure 3.4/22.0: Provide adeauoJe active Darks and facilities (Guidinsr Polic'V . No monitorinrr alJDlicable or reQUired.) MitÌf!ation Measure 3.4/23.0: Acouire and imDro~e 'OtlTklands Why: Who: What: When: Completion: Verifiution: To acquire and improve parklands in conformance with the priorities and phasing recommended in the City's Park and Recreation Master Plan. City of Dublin Planning Department/Dublin Recreation Department. Coordination between the Planning Department and Recreation Department to ensme adherence with standards of Park and Recreation Master Plan. Ongoing as part of the development review process. Ongoing. City of Dublin Planning Department. Miti!!ation Measw-e 3.4/24.0: Land dedication and Dtl7ks imDro'Pements/Collection of in-lieu Dark fees Why: Who: What: When: Completion: Verification: To require land dedication and improvements as designated in the GP A and collect in-lieu fees per City standards. City of Dublin Planning Department/Recreation Department. Require land dedication or payment of in-lieu fees as condition of approval for individual projects. Condition of tentative map approval. Prior to Final Map approval. City of Dublin Planning Department. 17 City of DubJin May '1, 1993 .--... . , .-. Eas. . Dablin Specific Plan .It GP A Em Miti¡ation Monitormg Plan Mitif!ation Measure 3.4/25.0: Park ACrellf!e Dedication Why: Who: What: When: Completion: Verification: To provide an adequate ratio of developed parldands to population. Developers/City of Dublin PlannÏ11g Department. Park dedication. Condition of tentative map approval. Prior to imal map approval. City of Dublin Planning Department. Mitif!tltÏon Measure 3.4/26.0: STJecific Park Acreaf!l! Dedication Why: Who: What: When: Completion: Verifh:ation: To provide an adequate ratio of developed parldands to population. Developers/City of Dublin Planning Department. Park dedication. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Mitiflation Measure 3.4 /27.0: Park standards Why: Who: What When: Completion: Verification: To ensure that park development is consistent with;,:the standards and phasing recommended in the City's Park and Recreation Master Plan. Developers/City of Dublin Recreation Department. Monitor individUal project conformance with standards ,in Master Plan. Condition of ~tative map approval. Prior to ímal map approval. City of Dublin Recreation Department. Mitif!ation Measure 3.4 /28.0: ImlJ/ementation of Specific Plan policies related to the 'Drovision of ODen SlJtlCe. Why: Who: What: When: Com pletion: Verificatioi1: Park Financing To ensure the provision of open space, access and areas for public recreatioD. Developers/City of Dublin Planning Department. Monitor individual project conformance with open space policies. ConditioD of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Impact 3.4/L Park Facilities FIScal Impact Mitžflation Measw:e 3.4/29.0: Provision of Fair Share of Park SlJace Why: To ensure that each new development reserves the open space and parkland designated in the Plan. 18 City or Dublin May 7, 1993 Who: What When: Compleûon: Verifica.ûon: ,- .....-.... E~, ' Dublin Specific: Plan ok GPA Em Mitigation MonitoziDg Plan Developers/City of Dublin Planning Department Review each development proposal against the Specific Plan/GP A to ensure that designated park and open space is set aside. Condition of tentative map approval Prior to imal map approval City of Dublin Planning Department. Mitirration Measure 3.4/30.0: Parks lml'lementation Plan Why: Who: What When: Completion: Veñfica.tion: To develop a Parks Implementation P1an for eastern DubJin. Dublin Recreation Department Preparation of a Parks Implementation Plan. Within two years of Plan adoption or prior to any significant residential developmen~ whichever occurs first. Prior to final map approval on the first residential projects. Dublin Recreation Department. Miti1!ation Measure 3.4/31.0: Calculation and Assessment of In-Lieu Park Fees Why: Who: What When: Completion: Verificaûon: To calculate and assess in-lieu park fees. City of Dublin Planning Department Assessment of In-Lieu Park Fees. Notification at time of permit application. Condition of tentative map approval. Payment a1 time of final map approval City of Dublin Planning Department. Impact 3.4/M 1mpact on Regional Trail System Mitifration Measure 3.4/32.0: Trail Linka1!e and Access Why: Who: What: When: Completion: Verification: To establish a trail system with connections' to planned regional and subregional system. Developers/City of Dublin Planning Department Dedication of trail rights-or-way. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Impa<:t 3.4/N Impact 00 Opeo Space Conoections Mi!Îfralion Mea.sur.e 3.4/33.0: Establish a comDrehensive iran network Why: Who: What: To establish a comprehensive, integrated trail network that permits safe and convenient pedestrian and bicycle access. Developers/City of Dublin Planning Department/City of Dublin Recreation Department. Provide guidelines to developers on right-of-way alignment and design 19 City of Dublin May 7, 1993 When: Completion: Verification: --. ,- ~ Dublin Specific: Plan " GPA Em Mitigation :Monitoring Plan standards, and ensure implementation. Condition of tentative map approval. Prior to Ímal map approval. City of Dublin Planning Department. Mitif!aiion Measure 3.4/34.0: Establish a connntlOU$ oDen SDaee network Why: Who: What: When: Completion: VerificatiolC To establish a continuous open space network that integrates large natUral open space areas, stream corridors~ and developed parks and recreation areas. Developers/City of Dublin PJanning Department/City of Dublin Recreation Department. Ensure dedication/preservation of designated open space areas. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. MitŽ1iration Measure 3.4/35.0: Provision of access to ODen sDace areas Why: Who: What: When: Completion: Verificatiou: To provide convenient pedestrian connections between developed areas and designated open space areas and trails. Developers/City of Dublin Planning Department/City of Dublin Recreation Department. Ensure designation of appropriately located trails and access points as part of development review. Condition of tentative map approval. Prior to final ma.p approval. City of Dublin Planning Department. Mitif!a1ion Measure 3.4/36.0.· Reouire lJUblic tlJ:ceSS easements Why: Who: What: When: Completion: VerificatioD: Solid Waste To require developers to dedicate public access easements along ridgetop5 and stream corridors to accommodate the development of trails and staging areas. Developers/City of Dublin Planning Department. Ensure dedication of public access easements. Condition of tentative map approval. Prior to final map approval. City of Dublin Planning Department. Impact 3.4/0 Increased Solid Waste Production Impact 3.4/P Impact on Solid Waste Disposal Facilities 20 City or Dublin May 1, 1993 , ..--.. ,-, Eas Dublin Speci:ÏlC Plan I: GP A EIR Mitigation Mcmi;œing Plan Miti1!D1ion MetlSW'e 3.4/37.0: PreDaration of Solid Waste Mana~ement Plan Why: . Who: What: When: Completion: VerificatioD.: To prepare/update a Solid Waste Management Plan as needed to address eastern Dublin. Dublin City Manager's Office. Prepare plan. Within two years of the adoption of the Eastern Dublin Specific Plan/GP A. Prior to issuance of building peI1IÛts. Dublin City Manager's Office. Mitisuztion Measure 3.4/38.0: Revise Waste Generation Proiections Why: Who: What: When: Completion: Verification: To revise waste generation projections of the City's SRRE/HHWE as needed to reflect the population and commercial land use projections of the adopted Project. Dublin City Manager's Office. Revise projections and update solid waste generation and disposaJ capacity characteristics. Within two years of the adoption of the Eastern Dublin Specific Plan/GPA. Prior to issuance of building permits. Dublin City Manager's Office. I Miti1!D1ion Measure 3.4/39.0: Inte1!ra1ion of Eastern Dublin Solid Waste Plan into Citv's SRRE/HHWE Why: Who: What: WheE Completion: VerificatioD: To ensure that the Solid Waste Management Plan for Eastern Dublin addresses and incorporates the goaIs, objectives, and programs of Dublin's SRRE and HHWE. ' Dublin City Manager's OfficejPublic Works Department. Updating of SRRE/ffiiWE to reflect Project. Within two years of the adoption of the Eastern Dublin Specific Plan/GPA. Prior to issuance of building permits. Dublin City Manager's Office. Miti1!ation Measure 3.4.40: Assessmem of Landfill CaDtæžrv Why: Who: What: When: Completion: Verific:ation: To ensure that adequate landiùl capacity is available to accommodate project waste. City Manager's Office/City Planning Department/Alameda County Solid Waste Management Authority. Determine the adequacy of available disposal capacity. As a condition of Tentative Map approval. Prior to Final Map approval. City of Dublin Planning Department. 21 City of Dublin May 1, 1993 ,.-...... ---- ~ Dublin Specific Plan &: GP A EIR Mitigation Momtoring Plan ) Electricity, Natural Gas and Telephone Service Impact 3.4/Q Demand for Utility Extensions Impact 3.4/R Utility Extension: VISual and Biologica.l Impacts Mitisration Measure 3.4/41.0: Provision of documentation that electric. Has and tele'Ohone service con be lJro."ided. Wh-y: Who: What: Wheu: . Completion: Verific:ation: To require project app1icants to provide documentation that electric, gas, and telephone service can be provided to all new development. Developers/City of Dublin Planning Department. Submit documentation from utilities providers. As a condition of Tentative Map approval. Prior to final map approval. City of Dublin Planning Department. Mitieation Measure 3.4/42.0: Underf!roundinf! of Utilities Wh-y: Who: What: ' When: Completion: Verificanon: To require all utilities to be located below grade where feasible and designed to City standards. City of Dublin Public Wodes Department. Require developers to provide for installation of utilities below grade. Prior to issuance of building permits. ConstrUction of infrastrUcture improvements. City of Dublin Public Works Department. Mitif!ation Measure 3.4/43.0: Avoidance of InfrastruCture Im'Oacts on Sensitive HabitD.1 Why: Who: What: When: Completion: Veñfication: To mitigate the effects of utilities expansio~ the city will work with PG&E to plan the undergrounding of all new electric lines and to route infrastructure away from sensitive habitat and open space lands. Developers/City of Dublin Public Works Department¡pG&E. Coordinate routing of electric lines. During site design phase. Prior to final map approval. City of Dublin Public Works Department. Mžtif!a1ion Measure 3.4/44.0: Submittal of Service Reoort Wh-y: Who: What: When: Completion: Verification: To require project applicants to submit a utilities service report to the City prior to Public Improvement P1an approval. Project Applicants/City of Dublin Planning Department. Submittal of utilities service report. Prior to approval of Public Improvement Plan. Prior to issuance of building permits. City of Dublin Planning Department. 22 City of DubliD May 7, 1993 ,- -, Eaa ,Dublin Specific Plan & GP A EIR Mitigation Monitoring Plan Impact 3.4/5 Consumption of Non-Renewable Natural Resources Miti!!atiol'l Measure 3.4145.(}: Demonstration Pro;ects Why: Who: What: When: Completiou: VerificatioJa: To require the installation of a demonstration project(s) of cost-effective energy conservation techniques. Developers/pG&E/City of Dublin Planning Department. Meet with major land owners and PG&E to determine how to set up an Energy Conservation Demonstration Project within the Project area. During development review process. Prior to occupancy approval. City of Dublin Planning Department. Mitifalion Measure 3.4/46.0: Site Planniní!. Build;"!! Desim and LandscaDiní! Why: Who: What: When: Completion: Verificatioo: Postal Service To require developers to demonstrate the incorporation of energy conservation measures into the design, construction, and operation of proposed development. Developers/City of Dublin Planning Department. Preparation of an Energy Conservation Plan. Upon ïiling of tentative map. , Prior to building permit approval. City of Dublin Planning Department. Impact 304fT Demand for Increased Postal Service Miti!!ation Measure 3.4/47.0:·Pruvision of a Post Office in Eastern Dublin Why: Who: What: When: Completion: Verific:ation: To provide for the creation of a post office with tbe eastern Dublin Town Center. Developer/City of Dublin Planning Department. The City will work with developers of Town Center and the U.S. Postal Service to determine need and procedures for implementation. Prior to tentative map approval for the Public/Semi-Public designated uea in the Town Center subarea. Prior to approval of Final Map. City of Dublin Planning Department. Milif!ation Measure 3.4/48.0: Coordination wiLh U.s. Postal Service Why: Who: What: When: To provide for the creation of a post office with the eastern Dublin Town Center. Developer/City of Dublin Planning Department. The City will work with developers of Town Center and the U.S. Postal Service to determine need and procedures for implementation. Prior to tenta:tive map approval for the Public/Semi-Public designated area in the Town Center subarea. 23 City of DubJin May 7, 1993 Completion: VeriOc:ation: Library Service -'. .' Eas, Dublin Specific Plan ok CPA Em Mitigation Mcmtoring Plan Prior to approval of Final Map. City of Dublin Planning Department. Impact 3.4jU Demand for IDcreased Library Senice Mitieotion Measure 3.4/49.0: Provision of AdeOUl11e Librarv Services Why: Who: What: When: Completion: Verification: To provide a library(ies) and associated services for eastem Dublin. Alameda County Library System/City of Dublin Planning Department. Assessment of eastern Dublin library needs and formuJation of strategy to meet these needs. During processing of prezoning and annexation applications. Prior to Final Map approval City of Dublin Planning Department. Mitieation Measure 3.4 /50.0: Coordinalion with Alameda Countv Librarv Svstem Why: Who: What: When: Completion: Verification: To provide a library(ies) and associated services for eastern Dublin. Alameda County Library System/City of Dublin Planning Department. Assessment of eastern Dublin library needs and formulation of strategy to meet these needs. During processing of prezouing and annexation applications. Prior to Final Map approval. City of Dublin Planning Department. Mitieation Measure 3.4/51.0: SlJecific Site Selection for New Librarv Why: Who: What: When: Completion: Verification: To have the City Library Task Force identify appropriate location and timing for development of new library(ies). City Library Task Force. Assessment of site requirements and timing of projected need. During processing of prezoning and annexation applications. Prior to Final Map approval. City of Dublin Planning Department. SEcrION 3.5: SEWER. WATER AND STORM DRAINAGE 1. ¡museu Reouirine MitiestioD This section identifies the following impacts requiring mitigation: 1M. 3.5/B Lack of a Wastewater Collection System 1M. 3.SIC Extension of Sewer Trunk Line 1M 3.5/D Current Limited Treatment Plant Capacity 1M 3.5 IE Future Lack of Wastewater Treatment Plant Capacity 1M 3.5/F Increase in Energy Usage Through Increased Wastewater Treatment 24 City of Dublin May '1, 1995 .,.-...... -" Eas Dublin Specific Plan ok GP A Em Mitigation Monitoring Plan " 1M 3.5/G Lack of Current Wastewater Disposal Capacity 1M 3.5/H Increase in Energy Usage Through Increased Wastewater Disposal 1M 3.5/1 Potential Failure of Export Disposal System 1M 3.5/J Pump Station Noise and Odors 1M 3.5jK Storage Basin Odors and Potential Failure 1M 3.5/L Recycled Water System Operation 1M 3.5/M Recycled Water Storage Failure 1M 3.5/N Loss of Recycled Water System Pressure 1M 3.5/0 Secondary Impacts from Recycled Water System Operation IM·3.5/p Overdraft of Local Groundwater Resources 1M 3.5/Q Increase in Demand for Water 1M 3.5JR Additional Water Treatment Plant Capacity 1M 3.5/S Lack of Water Distribution System 1M 3.5fT Inducement of Substantial Growth and Concentration of Population 1M 3.5jU Increase iIi Energy Usage Through Operation of the Water Distribution System 1M 3.5jV Potential Water Storage Reservoir Failure 1M 3.5 /W Potential Loss of System Pressure 1M 3.5¡X Potential Pump Station Noise 1M 3.5jY Potential Flooding 1M 3.5/Z Reduced Groundwater Recharge 1M 3.5/ AA Non-Point Sources of Polluûon 2. Mitigation Imnlementatiou and Monitoñn2 Proeram Impact 3.5/B Lack 01 a Wastewater Collection System Mitigation Measure 3.5/I.Oa: EXlJansion of DSRSD Service Boundaries Why: Who: What: When: Completion: Verification: To provide for the expansion of DSRSD's service boundaries to include the Project area. DSRSD. DSRSD will revise its service area boundaries. Prior to approval of any development outside the current service boundaries. Prior to tentative map approval. City of Dublin Department of Public Works. MitiJU21iolt Measure 3.5 /1.0: Connection 1.0 Public Sewers Why: Who: What: When: Completion: Verific:ation: To require that a11 development within the Project area be connected to public sewers. City of Dublin Department of Public Works/DSRSD. Require connection to public sewers. Condition of approval for tentative map. 'Prior to final map a.pproval. Department of Public Works. 25 City of Dublin Yay 1, 1993 ,---' ..---..., Eas. Dublin Speciúc Plan k GPA EIR Mitigation :Mcmitoring Plan Miti1ration Mea$W'e 3.5 /2.0: Wastewate,. Collection Svstem Master Plan Why: Who: What When: Completion: Verification: To have DSRSD update its wastewater conection system master plan computer model to reflect the adopted Specific Plan/GPA. Department of Public Works;DSRSD. Public Works will request DSRSD to update Master Plan. DSRSD will be responsible to update the Master Plan. As soon as possible after the adoption of the Specific Plan/GPA. Before approval of any detailed wastewater improvement plans. Department of Public Works/DSRSD. Mitigation Measure 3.5 /3.0: On-site Wastewater Treatment Why: Who: What: When: Completion: Verification: To discourage the use of on-site package plants and septic systems within the Project area. Departmènt of Public WorksjDSRSD. Communicate to project applicants the City's desire that all projects be connected to the'DSRSD sewer system. Ongoing', as part of the development application process. Prior to tentative map riling. Department of Public Works. Mitivation Measure 3.5 /4.0: DSRSD Service Why: Who: What: When: , Completion: Verification: To require a -will serve" Jetter from DSRSD prior to permit approval for gr8dmg. Department of Public Works/DSRSD. ConÏmn receipt of a "will-serve" letter for all proposed projects. Prior to tentative map approval. Prior to issuance of grading permit. Department of Public Works. Why: Mitigation Measure 3.5/5.0: DSRSD Standards Who: What: When: Completion: Veñfication: To require that design and construction of all wastewater systems is in conformance with DSRSD standards. Department of Public WorksjDSRSD. ConIum that wastewater system meet DSRSD standards. Prior to issuance of building permits. Approval of improvement plans. Department of Public Works/DSRSD. Impact 3.5/C ExtensioD of Sewer Truak Line Mitigatžon Measure 3.5/6.0: Sizžne of Wastewater Svstem Why: To ensure that the planned wastewater collection system has been sized to accommodate only the development within the Project area. 26 City of DubJin May 7, 1995 Who: What: Wheo: Completion: VeñficatioD: ,-- --. EaSI Dublin Specific: Plan ok GPA Em Mitigation Monitodng Plan DSRSD. Engineer wastewater capacity for Projéct site capacity only. Wastewater system design phase. Prior to installation of Project area sewer system. DSRSD. Impact 3.5/D CurreDt Limited Treatment Plut Capacity Mitif!aJion Measure 3.5/7.0: Desirrn L~el Wastewater lmestirration Wh')': Who: What: When: Completion: Verification: To require project applicants to prepare detailed wastewater capacity investigations, including means to mtn;m;7'.e wastewater flows. Applicants in coordination with DSRSD. Prepare a detailed wastewater capacity investigation. Preparation of prelim;n ¡ry Public Improvement Plan. Fmal Public Improvement Plan Approval. DSRSD/Department of Public Works. MitiflaJion Measure 3.5/7.1: DSRSD Service Why: Who: What: When: Completion: Verification: To require a "will serve" letter from DSRSD prior to permit approval for gracling. Department of Public Works/DSRSD. Conium receipt of a "will-serve" letter for all proposed projects. Prior to tentative map approval. Prior to issuance of grading permit. Department of Public Works. Impact 30SIE Future Lack of Wastewater Treatment Plant Capacity Mitif!aJion Measure 3.5/8.0: Ensure Adeauate WastewaJer Treatment C(l~acitv Wh')': Who: What When: Completion: Verification: To ensure that wastewater treatment and disposal facilities are available to meet the needs of future development in eastern Dublin. Department of Public WorksfDSRSD· DSRSD will prepare a Master Plan including growth projections and facility expansion needs and timing to meet the needs of projected development. As soon as possible after adoption of the Specific Plan/GP A. Prior to approval of any development. Department of Public Works. Mitiflation Measure 3.5/9.0: Wastewater Treatment Plant ExDa1tSion Schedule Why: Who: What: To ensure that proposed development is consistent with wastewater treatment plant expansion as set forth in DSRSD's master plan. DSRSD/Department of Public Works. The City must confirm that proposed development is consistent with the capacity and timing identified in DSRSD's Master Plan 27 City of Dublm May 7, 1993 When: Completion: Verification: "-,, ~ Bas DubIiD Specific Plan & GPAEIR Miûgation Monitoring Plan During review of tentative map. Prior to approval of Final Map. Department of Public Works. Impact 3.S/F Increase in Energy Usage Through Increased Wastewater Treatment Miti~ation Measure 3.5/10.0: Use of Enerev-Efficient Trea1ment Svstem Why: Who: What: When: Completioa: Verification: To include energy efficient treatment systems in any wastewater treatment plant expansion and operate the plant to take advantage of off -peak energy. DSRSD Design and construct energy-efficient treatment systems. Design phase for WWTP expansion. On-going. DSRSD. Impact 3.S/G Lack of Carrent Wastewater Disposal Capacity Mitieation Measure 3.5/11.0: fProeram 9H) EXlJOrt Pi Deline Why: Who: What: When: Completion: Verification: To support TWA in its current efforts to implement a new wastewater export pipeline system. Tri- Valley Wastewater Authority/Dublin City Managei-"s Office. Support implementation of new export pipeline. ' Ongoing. Approval of TW A improvement plans. Dublin City Managers Office. Mitieation Measure 3.5/12.0: (Policv 9-5) Construction of Recvcled Water Svstem Why: Who: What: When: Completion: Verification: To promote recycled water use for landscape irrigation m eastern Dublin through upgrading of treatment and construction of a recycled water distribution and storage system in eastern Dublin. DSRSD. Promote recycled water use. During development review process. Ongoing. DSRSD. Mitž~ation Measure 3.5/13.0: (Proeram 9J} Recvcled Water Distribution Svstem Why: Who: What: When: Completion: To have DSRSD update its proposed recycled water distribution system computer model to reflect the adopted Specific Plan/GP A. Department of Public WorksjDSRSD. Public Works will request DSRSD to update its computer model. DSRSD will be responsible to update the model. M soon as possible after the adoption of the Specific Plan/GP A. Before approval of any detailed wastewater improvement plans. 28 City or Dublin May 7, 1993 Verification: /- ,- Eas. . Dublin Spec:ÜÍç PJ~ Ii: GP A EIR Mitigation Mcmi~oring Plan Department of Public WorksJDSRSD. MitÎl!aljon Measure 3.5/14.0:rProf!Tam 9K) Wastewater Recvclinv and Reuse Why: Who: What: When: Completion: VerifieaôoD: To support the efforts of the Tri- Valley Water Recycling Task Force Study through Zone 7, encouraging wastewater recycling and reuse for landscape irrigation. City of Dublin Department of Public Works/Zone 7. Encourage wastewater recycling as detailed in the Tri- Valley Water Recycling Task Force Study. As soon as possible after the adoption of the Specific Plan/GPA. Ongoing. ~p~entofPublicWor~. Impact 3.SjH Increase in Energy Usage Through Increased Wastewater Disposal Mitil!alion Measure 3.5/15.0: Enerf!"V for EXTJort DisDosal Why: Who: What: When: Completion: Verification: To encourage LA VWMA to continue its program of off-peak pumping of wastewater to balance electric demands in the PG&E system. City of Dublin/LA VWMA. Encourage off-peak pumping. Upon adoption of the Specific Plan/GP A. On-going. Department of Public Wor~. Mitil!ation Measure 3.5/16.0: Enert!v for DislJosal thrOUl!h Recvcled Water Svstem Why: Who: What: When: Completion: Yerification: To ensure that the recycled water treatment system is planned, designed and constructed for energy efficiency in operation. City of Dublin Department of Public Works/DSRSD Design, construction, and operation of energy-efficient system. Upon agreement to use a recycled water treatment syste~. On-going. DSRSD. Impact 3.5/1 Potential Failure of Export Disposal System Mitit!t21ion Measure 3.5/17.0: Redundancv in Emrineerill!! Why: Who: What: When: Completion: Verific:ation: To avoid potential failure in the operation of the pumps in the TWA wastewater collection system. TWA Incorporate engineering redundancy into· the design of the pump stations and provide emergency power generators. Design and construction phase of export system. Approval of export system improvement plans. Department of Public Works. 29 ,--- .-, CRy or Dublin May 1,1993 Eas, , Dublm Specific Plan &1: GP A Em Mitiption Monitoring Plan Impact 3.5/J Pump Station Noise and Odors Mirillation Measure 3.5/18.0: Desif!7l of PumD { J1d Motors When: CompletiolC Verification: To ensure that pump station design minimizes potential for impacts related to noise and odors. TWA Design pump and motors to meet local noise standards. Install odor control equipment. Design phase of export system. Approval of export system improvement plans. Department of Public Works. Why: Who: What: Impact 3.5/K Storage Basin Odors and Potential Failure Mitillation Measure 3.5/19.0: DesŽJrn/Em!ÍneerinJ! of Storaf!e Basins When: Completion: Verification: To ensure that wastewater storage basins are designed to control odors and minimize the risk of failure in the event of an earthquake. TWA Design storage basins to meet seismic codes, and limit odors by burying tanks and incorporating odor control equipment. Design phase of export system. Approval of export system improvement plans. Department of Public Works. Why: Who: What: Impact 3.5/L Recycled Water System Operation Mitillation MeaslRe 3.5/20.0: Construction of RecvcledWater Distribution Svstem When: Completion: Verification: To require that constrUction of the recycled water distribution system be in accordance with all applicable State and local regu]ations. DSRSD Require compliance of recycled water distribution system with applicable regulations of the DHS and the SFBR WQCB. Condition of approval for recycled water distribution system. Approval of improvement plans. DSRSD. Why: Who: What Impact 3.5fM Recycled Water Storage Failure Mitil!ation Me~e 3.5/21.0: Desirtn/Enl!ineerinl! of Water Storal!e Basins When: To ensure that reservoir construction meets an applicable standards of DSRSD and appropriate health agencies. DSRSDjDepartment of Public Works. Confirm the reservoir design and construction meets all applicable standards. Design phase. Why: Who: What: 30 City of Dublin May 7,199'S Completion: Verification: . --.., ,-, Eas Dublin Specific Plan & GPA Em Mitigation MoDitoring Pbm Approval of improvement plans. Department of Public Works/DSRSD. Impact 3.SjN Loss of Recycled Water System Pressure Mitží!OÍŽon Measure 3.5 /22.0: Comoliance with DSRSD sttmdards Why: Who: What: When: Completion: Verific:ation: To ensure that proposed recycled watet' pump stations meet all applicable standards of DSRSD and include emergency power generation. DSRSDjDepartment of Public Works. Confirm compliance of pump station desìgn with D,SRSD standards, and include emergency power generators. Design phase. Approval of improvement plans. Department of Public Works. Impact 3.5/0 Secoudary Impacts from Recycled Water System Operation Mitií!ation Measure 3.5/23.0: Salt Reduction Why: Who: What: When: Completion: Verific:ation: To ensure that recycled water projects meet any applicable salt mitigation requirements of Zone 7. DSRSD. Coordinate with Zone 7 to confirm whether or not a recycled water system iIi the Project area would require demineralization. ' Design Phase. Approval of improvement plaDs. DSRSD. Impact 3.SjP Overdraft of Local Groundwater Resources Mitií!ation Measure 3.5/24.0: (Policy 9-2) Annexation of SDecific Plan area it> DSRSD Why: Who: What: When: Completiou: VerificatioD: To expand DSRSD service boundaries to encompass the entire eastern Dublin Specific PlanjGPA area. DSRSD. Development or annexation application. Condition of approval for planned development prezoning. Prior to approval of detailed improvement plans. DSRSD. Mitií!ation Measure 3.5/25.0: Connection to DSRSD Water Svstem Why: Who: What: When: To encourage all development in the Project area to connect to the DSRSD water system. City of Dublin Public Works Department/DSRSD. Inform all project applicants of preference for connection of new development to the DSRSD system. During preparation of tentative map. 31 City of Dublin May 1, 1993 Completion: Verification: ,.--- --"'. Eas Dublin Specific Plan &: GPA Em Mitigation Monitor.ing Plan Prior to approval of final IDaþ. City of Dublin Department of Public Works. Impact 3.5/Q Increase in Demand 'for Water . Miti,ation Measure 3.5 /26.0: (Pror:rram 9A) Water COnu.Tvatz07l Why: Who: What: When: Completion: Verification: To require water conservation measures to be designed into individual projects. Developers/City of Dublin Public Works Department/DSRSD. Review project applications for incorporation of water conservation measures. Condition of approval for tentative map. Prior to approval of imal map. Department of Public Works. Mitiflation Measure 3.5/27.0: (Proflram 9BJ Water Recvclinfl Why: Who: What: When: Completion: Verification: To require water recycling measures be incorporated into individual projects. Developers/City of Dublin Public Works DepartmentjDSRSD. Review projects for incorporation of DSRSD and Zone 7 recommendations relating to the use of recycled water. Condition of approval for tentative map. Approval of detailed improvement plans. Dublin Department of Public Works. Mitiflation Measure 3.5/28.0: Zone 7 lmDrOllements Why: Who: What: When: Completion: Verification: To ensure that Zone 7 has water supply needed 'to meet requirements of the Project. Public Works Department/DSRSD/Zone 7. ConÏxrm status of Zone 7 water supply improvements. Condition of approval for "will serve" letter. Prior to approval of final map. DSRSDjPublic Works Department. Miti1!ation Measure 3.5/29.0: New Zone 7 Turnouts Why: Who: What: When: Completion: Verification: To provide for the construction of two additional turnOuts from the Zone 7 Cross Valley Pipeline to serve the Eastern Dublin area. Zone 7 fDSRSD. Construction of two additional turnouts. As needed to provide adequate service to new development. Ongoing. DSRSD. 32 City of Dublin May 7, 1993 .'---' -" EasDubliD Specific Plan & GPA EIB. Mitigation MonitorlDg Plan Miti!!a1ion Measure 3.5/30: [l11erconnections with Exžstin1l Svstems Wh)': Who: What: When: Completion: Verificatioa: To provide for increased water source reliability, the Project water system should be interconnected with existing adjoining systems. DSRSDJPublic Works Department. Plan water system to interconnect with existing systems. Ongoing as system within the Project area is built out. Ongoing. Public Works Department. Mitž1laiion Measure 3.5/31.0: Reimbw-sement for New DSRSD Grmmdwater Wells Wh)': Who: What: When: Completion: Verificatioa: To provide a backup source of water supply to its Zone 7 source, DSRSD will reimburSe City of Pleasanton for construction and operation of new groundwater wells 'south of the Project area. DSRSD/City of Pleasanton. DSRSD will reimburse City of Pleasanton for groundwater wells. On schedule to be determined by DSRSD and the City of PleasantOJl. Ongoing. DSRSD. Impact 3.5/R Additional Water Treatment Plant Capacity Mitif!a1ion Measure 3.5./32.0: Zone 7 Phasinf! for Water Treatment Svstem lmlJroyements Why: Who: What: When: Completion: Verification: To meet increasfng demands on its water system, Zone 7. has established a phasing for water treatment system improvements. Zone 7. Implementation of phased improvements. Pursuant to established schedule. Pursuant to established schedule. Zone 7. Miti1!aižon Measure 3.5/33.0: ConstructÌ01I of New Chlorinmion/FluoridDlion Stations Why: Who: What: When: Completion: Verification: To meet increased demand resulting from the project. DSRSD should construct two new chlorination/fluoridation stations at the two proposed Zone 7 turnouts to eastern Dublin. DSRSD/Zone 7. ConstrUCtion of two new stations. As needed to provide adequate service. with the western turnout being developed first. The eastern turnout would not be developed until development of the eastern portion of the Project area. On schedule to be determined by DSRSD and Zone 7. DSRSD. 33 City of Dubtm Maf '1, 1993 -. -', Eas. .i>ublin Specific Plan & GP A EIR Mitigation Monitoring Plan Impact 3.5/8 Lack of a Water Distribution System Mitif!ati01l Measure 3.5/34.0: (Policv 9-1 J Provision of an AdeQUate Water SUDDlv System Why: Who: What: When: Completion: Verification: To provide an adequate water supply system and related improvements and storage facilities for all new development in the Project area. DSRSD¡Developers. Require new development to build the water supply system needed per DSRSD.Master PJan and service standards. Condition of approval for tentative map. Prior to approval of Final Public Improvements Plan. DSRSDjDepartment of Public Works. ·Mitif!ation Measure 3.5/35.0: (ProtTram 9C) Water Svstem Mastl~r Plan Why: Who: What When: Completion: Verification: To ensure that DSRSD updates its water system master plan computer model to reflect the adopted Specific Plan/GPA land uses. City of DublinjDSRSD Request that DSRSD update its water system master plan computer model. As soon as possible after adoption of the Specific Plan/GP A. Prior to the approval of a Public Improvement Plan for any new development. Public Works Department. Mitif!ation Measure 3.5/36.0: r PrOtTTam 9D) CombinintT of WaJ.er Svstems Why: Who: What When: Completion: Verification: To consolidate the Camp Parks and Alameda County water systems and turnouts with the DSRSD system. City of Dublin Public Works Department/Camp Parks/ Alameda County jDSRSD. Encourage agencies to combine water systems with DSRSP. Ongomg from date of Project adoption. Ongoing. DSRSD. Why: Mili!!alion Measure 3.5/37.0: DSRSD Standards Who: What: When: Completion: Verificatiou: To require that design and construction of all water system facility improvements be in accordance with DSRSD standards. City of Dublin Public Works Depamnent/DSRSD/Developers Review each development proposal to verify that all water system facility improvements conform to DSRSD standards. Condition of approval for Public Improvements Plan. Prior to approval of Fmal Public Improvements Plan. Public Works Department. 34 City of Dublin May 7, 1993 ..- ."'--- Eas\ i)ublin Specific Plan &: GPA Em Mitiption MoDitoring PJan Mitie-ation Measure 3.5/38.0: DSRSD Service Why: Who: What: When: Completion: Verification: To require a "will serve· letter from DSRSD prior to issuance of a grading permit. City of DublinjDSRSDjDeveloper. Coníl1'1I1 receipt of a "will-serve" letter from DSRSD. Condition of approval for tentative map. Prior to approval of ímal map. Planning Department. Impact 3!S/T laducemeøt of Sabstanüal Growth and Concentration of Population Mitie-ation Measure 3.5/39.0: Sizin~ of Water DistribJJlion Svstem Why: Who: What: When: Completion: Verification: To reduce the growth-inducing potential of water system expansion, the water distribution system will be sized to accommodate only the estimated water demands from approved land uses within the Project. DSRSD. Limit capacity of water distribution system to serve only the Project site. Update of DSRSD water system master plan computer model. Prior to the approval of a Public Improvement Plan for any new development in the Project area. Department of Public Works. Impact 3.5/U Increase in Euergy Usage through Operation of the Water Distribution System Mitie-tltÌon Measure 3.5/40.0: Ener!!v-Efficient O"eration of Water Disuibulion Svstem Why: Who: What: When: CompletioJl: Verification: To ensure that the water distribution system is planned, designed and constructed for energy-efficient operation. City of DublinjDSRSD. Design and operation of energy efficient water distribution system. Ongoing. On-going. Public Works Department. Impact 3.S/V Potential Water Storage Reservoir Failure MitiJration MeQSU1'2 3.5/41.0: Desi!!n/En!!inEeri7U! of Wal2T Storae-e Basins Why: Who: What: When: Completion: Verific:ation: To require all reservoir construction to meet all the applicable standards,of DSRSD. to meet current seismic buildmg standards, and to provide adequate site drainage. DSRSD. Design basins to reduce failure potential. Design phase. Approval of improvement plans. DSRSD. 35 City ofDublm May 'T, 1993 -. ,-. Eas:. Dublin Specific Plan &: GP A Em MitigatiOD Monitoring Plan Impact 3.5/W Potential Loss of System Pressure Mitisralžon Measure 3.5/42.0: ComDlianæ With All DSRSD Standards Why: Who: What: When: Completion: VerificatioD: To require the proposed new water pump stations to meet all the applicable standards of DSRSD and include emergency power generators at each pump station. City of Dublin/DSRSD. Engineering provisions for emergency conditions. Design phase. Approval of final improvement plans. Public Works Department. Impact 3.S4/X Potential PIODP Station Noise Mitit!ation Measure 3.5/43.0: Reduction of Potential Noise Why: Who: What: When: Completion: Verification: To include design provisions to pump stations that will reduce sound levels from operating pump motors and emergency generators. DSRSD. Incorporate necessary engineering provisions in design of pump stations to minimize operational noise. Design phase. Approval of ïmal improvement plan$. Public Works Department. Impact 3.5/Y Potential Flooding Mitisrol.ion Measure 3.5/44.0: (Policv 9-7) Provision of Draina!!e Facilities Why: Who: What: When: Completion: Verification: To provide drainage facilities that will minimize any increased potential for erosion or flooding. DevelopersfDSRSD. Review drainage facilities design to verify that erosion/flooding potential will be minimized. Condition of tentative map approval. Approval of final grading and improvement plans. Public Works Department. Mitisration Measure 3.5/45.0: (Policv 9-8) Natural Channel lmDrovements Why: Who: What: When: Completion: Verification: To require channel improvements consisting of natural creek bottoms and side slopes with natural vegetation where possible. Developers/Zone 7. Review requÍIed channel improvements for theÍI' attempt to maintain natural-appearing conditions while addressing the drainage requirements. Condition of tentative map approvaL Prior to final grading plan approval. Department of Public Works with input from Zone 7. 36 CRy of Dublin May 7, 1993 .-.. ,- Bas. . Dublin Specific Plan &i: GP A Em. MUiptioÞ MoDitoriDg Plan Mitieation Measure 3.5 /46.0: (Prorrram 9R) Storm Drainafle Master Plan Why: Who: What: When: Completion: Veñfic:atioø: To require the preparation of a Master Drainage Plan for each development. Developers. Preparation of Storm Drainage Master Plan. Condition of tentative map approvaL Prior to ïmal map approval. Public Works Department. Mitirration Measure 3.5/47.0: (Pro!!TlU/1 9S) Flood Co1l1ToI Why: Who: What: When: Com.pletion: Veñfication: To require Project area development to provide facilities to alleviate potential downstream flooding due to Project area development. Developers. Provision of flood control improvements. Condition of tentative map approval. Prior to ïmal map approval. Public Works Department. Mitif!ation Measure 3.5/48.0: Construction of Storm Drairtarre Facilities Why: Who: What:, When: Completion: Verification: To require the construction of the backbone drainage facilities consistent with the Storm Drainage Master Plan. Developers. Construction of storm drainage facilities. Condition of tentative map approval. Prior to final map approval. Public Works Department. Impact 3.5/Z Redu.ced Groundwater Recharge Mitžrratžon Measure 3.5/49.0: (Policv 9-9) Protection and Enhancement of Water ResOUT.ces Why: Who: What: When: Completion: Verific:ation: To plan facilities and management practices that protect and enhance water Quality. City of Dublin Public Works Department/Zone 7. Oversight of facilities to protect and enhance water quality. Condiûon of tentative map approval. Prior to final map approval. Public Works Department. Mžtiflation Measure 3.5/50.0: Zone 7 Groundwater Recharrre Proeram Why: Who: What: To protect groundwater resources, Zone 7 supports an ongoing groundwater recharge program for the Central Basin. City of Dublin Public Works Department. Support Zone 7 groundwater recharge program, by encouraging recharge areas within the Project area where feasible. 37 c:ü," of Dublin :May 7, 1993 WheE CompletioE Verification: ~. -. E~.. Dub6n Specific Plan && GP A EIR Mitig:t.tion Monitoring Plan COndition of tentative map approvaL Prior to [mal map approval. Public Works Department. Impact 3.5/ AA Non-Pomt Sources of Pollution Mitisra!ion MeastDe 3.5/52.0: Communitv EducaJ.ion Proí!rams Why: Who': What: WheE Completion: Veñfication: To develop community-based programs to educate local residents and businesses on methods' to reduce non-point sources of pollution, and coordinate such programs with current AJameda County programs· City of Dublin Public Works Department. Development/dissemination of information to reduce non-point sources of pollution. Condition of tentative map approval On-going Public Works Department. MitiJration Measure 3.5/53.0: "Best Mana~emenl Practices" Why: Who: What: When: Completion: Verification: To require all development to meet the requirements of the City of Dublin's "Best Management Practices" to mitigate storm water pollution. City of Dublin Publiç Works Department. Review proposed development plans to ensure that "Best Management Practices" have been incorporated to reduce pollution. During development review processing. Prior to buildÍng permit approval. Public Works Department. Mitilration Measure 3.5 /54.0: Notiontll Pallulion Disckarlre Elimination Svstem ReQUirements Why: Who: What: Wheø: Completion: Verification: To require all development to meet the water quality requirements of the City of Dubfui's NPDES permit. City of Dublin Public Works Department. Review proposed development plans to ensure that NPDES requirements have been incorporated to reduce pollution. During development review processing. Prior to building permit approval. Public Works Department. Mitií!a1ion Measure 3.5/55.0: Urban Rzma" Clean Wate" Prolrram Ret1UÌl'ements Why: Who: What: When: To require all development to meet the water quality requirements of the Alameda County Urban Runoff Clean Water Program. City of Dublin Public Works Department. Review proposed development plans to ensure that the requirements of the County~s Urban Runoff Clean Water Program have been incorporated to reduce pollution. During development review processing. 38 City o£DubliD May 7, 1995 Completion: Verification: , ,-", ~ , Ea. . Dublin Specific Plan dI; GPA EIR Mif;~on Monitoring Plaza Prior to building permit approval. Public Works Department. SECTION 3.6: SOILS. GEOLOGY AND SEISMICITY 1. IIDBaets ReouiriD:e Miti:eatiou This section identifies the following impactS requiring mitigation: 1M 3.6jB Earthquake Ground Shaking: Primary Effects 1M 3.6/C Earthquake Ground Shaking: Secondary Effects 1M 3.6/D Substantial Alteration to Project Site Landforms 1M 3.6{F Groundwater ImpactS 1M 3.6/G Groundwater Impåcts Associated with Irrigation 1M 3.6/H Shrinking and Swelling of Expansive Soils and Bedrock 1M 3.6/1 Natural Slope Stability 1M 3.6/1 Cut-and-Fill Slope Stability 1M 3.6/K Erosion and Sedimentation: Construction-Related 1M 3.6/L Erosion and Sedimentation: Long-Term 2. Miö2atioD ImBlementation and MODitoriDE ProBam Impact 3.6/B Earthquake Ground Shaking: Primary Effects Miti1!ation Measure 3.6/1.0: lm'Dlementation of Cw-rent Seismic Desinz Standards Why: Who: What: When: Completion: Verification: To require the use of modem seismic design in construction of development projects, and build in accordance with Uniform Building code and applicable county and city code reqmrements. DevelopersjPublic Works Department. . Review plans to ensure conformance to UBC and all other applicable codes. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. Impact 3.6/C Earthquake Ground Shaking: Secondary Effects Miti1!ano71 Measure 3.6/2.0: Desi1m R.eouirements for Flat Areas Why: Who: What: When: Completion: Verification: To provide setbacks from or'modification of unstable and potentially unstable landforms, and use of appropriate design to ensure seismic safety. DevelopersjPublic Works Department. Verify that improvements have been located away from unstable landforms; that potentially unstable landforms have been stabilized; and that develoøment plans conform to UBC and all other applicable codes. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public Works Department. 39 City or Dublin May 7, 1993 ,-, - Eaa.. Dublin Specific Plan & GP A Em Mitigation MoDitoriDg Plan Mitirra1žon Measure 3.6/3.0: Desi1!1l Reouirements for Hillside Areas Why: Who: What: When: Completion: VerificatÌon: To require appropriate grading and design to completely remove unstable and potentially unstable materials in hillside areas where development may require substantial grading. DevelopersjPublic Works Department. Verlfy that grading and design will remove unstable materials. Condition of tentative map approval. Prior to final improvement plan/grading plan approval. Public: Works Department. Mitirration Measure 3.6/4.0: Desim Reouirements for Hillside Fills Why: Who: What: When: Completion: Verification: To use engineering techniques and improvements~ such as retention structnres~ drainage improvements, properly designed keyways, and adequate' compaction to improve the stability of íill areas and reduce seismically induce fill settlement. ' DevelopersjPublic Works Department. Require engineered retention :strUctures, surface and subsurface drainage improvements. Condition of tentative map approval. Prior to ímal improvement plan/grading plan approval. Public Works Dep~ent. Mitirraižon Measure 3.6/5.0: DesÌJrn Reouir.ements for Fill Settlement Why: Who: What: When: Completion: Verification: " To use engineering techniques and improvements, such as retention structures, drainage improvements, properly designed keyways~ and adequate compaction to improve the stability of íill areas and reduce seismically induce fill settlement. Developers/Public Works Department. Require engineered retention structures~ surface and subsurfac:e drainage improvements. Condition of tentative map approval. Prior to ímal improvement plan/grading plan approval. Public Works Department. Mitirra!ion Measure 3.6/6.0: DesifnZ Reauirements (roads. structural fmmdations and rmderrrrmmd utilities) for Fill Settlement Why: Who: What: When: Completion: To design roads, structural foundations~ and underground utilities to accommodate estimated settlement without failure, especially across tranSitions between nlls and cuts, and to remove or reconstruct poten1ia11y unstable stock pond embankments in development areas. DevelopersjPublic Works Department. Verify the effectiveness of improvements to ensure the stability of proposed roads, structural foundations and underground utilities. Condition of tentative map approval. Prior to ímal improvement plan/grading plan approval. 40