MITIGATION MONITORING PLAN:
EASTERN DUBLIN
SPECIFIC PLAN/GENERAL PLAN AMENDMENT
prepared by
WALLACE ROBERTS & TODD
May 7, 1993
A""~Me1JT b-;
.. .
~\ß,-r &
~
,..-...
City of Dublin
:May 7, 1993
E& _ Dublin Specific Plan & GP A EIR
Mitigation Moni~or:ing Plan
MITIGATION MONITORING PLAN
EASTERN DUBLIN SPECIFIC PLAN/GENERAL PLAN AMENDMENT
The State of California now requires public agencies to adopt a mitigation monitor.ing program for
changes to the 'project or conditions of approval which have been identified and adoPted as methods
to reduce environmental impacts. Thus with the certification of the Eastern Dublin EIR. and adoption
of the Specific Plan and General Plan Amendment, the City of Dublin is required to establish a
mitigation monitoring program for all approved mitigation measures.
In order to ensure that all adopted mitigation measures are implemented in a timely fashion, the
Mi~gation Monitoring Program provides the following information for each measure:
· Whv has the mitigation measure been recommended?
· Who is responsible for implementing the mitigation?
· What is the mitigation measure being monitored and how?
· ~ should mitigation monitoring be undertaken? What schedule is required?
· Comoletion: when should the mitigation measure be in place and monitoring be
completed?
· Verification: what agency is required to ensure that the mitigation measure was
implemented?
,
2
--
.---..
Eaa. :Dublin Specific Plan &I: GPA Em
Mitigation Monitoti:l1g Plan
CitT of Dublin
May 7, 1993
SEcrION 3:1 LAND USE
1. ImDacts Reauinne Mitieation
This section identifies the fallowing impacts requiring mitigation:
1M 3.1/G Potential Conflicts with Land Uses to the West
2. Mitieation Imolementation and Monitonne Proeram
Impact 3.1/G Potential Conflicts with Land Uses to the West
Miti1!a1ion Measure 3.1/1.0: Coordinalion of Plannin1! Activities with U-S. Armv
When:
To resolve potential land use conflicts between activities at CamP Parks and
proposed uses in the Project area
Planning Department/U.s. Army; Directorate of Engineering and Housing.
Establish a liaison committee between the City and the Army. Establish a
schedule for periodic meetings to discuss and provide updates on p1anning
and development efforts within the Project site and in Camp Parks. The
City of Dublin Planning Department will send to the base commander a
copy of new applications for development adjacent to Camp Parks for
review and comme~t. Projects will be considered by liaison committee at
request of Camp Parks.
Periodically. pursuant to agreed-upon calendar, and as required for review
of specific project proposa1s.
On-going. Specific project review will be considered complete when City
has received written comments from CamP Parks.
City of Dublin Planning Director.
Why:
Who:
What:
Completion:
Verification:
SEcrION 3.2: POPULATION. HOUSING AND EMPLOYMENT
This section provides baseline data related to population, housing and employment and does not
identify environmental impactS or related mitigation measures. No mitigation monitoring program
is required.
SECTION 3.3: TRAmC AND CIRCULA nON
1. Imnsets ReauiriDe Mitie:ation
This section identiÍIeS the following impacts requiring mitigation:
1M 3.1/G Potential Conflicts with Land Uses to the West
1M 3.3/B 1-580 Freeway; between 1-680 and Hacienda.
1M 3.3(C 1-580 Freeway; between Tassajara-Fallon-Airway
1M 3.3/D 1-680 Freeway; North of the 1-580 Interchange
1M 3.3/E Cumulative Freeway Impacts (1-580 west of 1-680; 1-580 east of Airway)
1M 3.3/F Dougherty Road and Dublin Boulevard
1M 3.3/G Hacienda Drive and 1-580 Eastbound Ramps
1M 3.3/H Tassajara Road and 1-580 Westbound Ramps
3
-
, ,
---....
Cit)' of Dublin
May '1, 1998
Ea.
Dubiïn Specific Plan ok GP A EIR
Mitig:ation Monitoring Piau
1M 3.3/1 Santa Rita Road & 1-580 Eastbound Ramps
1M 3.3/J Airway Boulevard and Dublin Boulevard
1M 3.3jK Akway Boulevard & 1-580 Westbound Ramps
1M 3.3/L Impediments to Truck Traffic on EI Charro Road ,
1M 33/M Cumulative Impacts on Dublin Boulevard (Dubtin/Hacienda; Dublin/Tassajara)
1M 3.3/N Cumulative Impacts on Tassajara Road (TassajarajFallon; Tassajara/Fallon;
Tassajara/Transit Spine)
1M 3.3/0 Transit Service Extensions
1M 3.3/p Street Crossings
2. Miti2'atioD ImÐlementatioD and MonitoriDt! Pr02ram
Daily Traffic Volumes (Year 2010 With Project)
Impact 3.3/B 1-580 Freeway; between 1-680 and Hacienda
Miti!!tllion Measure 33/2.0: TraJ'lS'lJorta!ion Svstems Mana!!ement (TSMJ
When:
Completion:
Verinc:ation:
To reduce project-generated vehicle trips
All non-residential projects with SO± employees.
Require compliance with BAAQMD Regulation 13 TransporttJlion Control
Measures Rule 1 to satisfaction of BAAQMD or City of Dublin (Public
Works Department)
Prior to occupancy
Upon issuance of Planning Department sign-off on compliance
City of Dublin Planning Director
Why:
Who:
What:
Miti!!ation Measure 33/2.1: Ref!Íonal TrtmsrJortalion Mitif!o.tion Pro!!rams
When:
To assist in the funding of improvements to Iegional transportation system
All approved projects
Proportionate monetary contribution to regional tranSportation mitigation
programs as approved by the City of Dublin.
As a condition of project approvaL When applying for a permit, the
applicant developer will be notified of this fee assessment:
Payments shall be made prior to issuance of building pennits
City of Dublin Department of Public Works
Why:
Who:
What:
Completion:
Verification:
Impact 3.3/C 1-580 Freewa.y; between Tassajara~FaJloD-Airway
Miti!!tltion Measure 3313.0: Construction of Auxiliarv Lanes
When:
To assist in the funding of the construction of auxiliary Janes on 1-580
between Tassajara and AirWay boulevards
Calttans/City of Dublin Public Works Department.
Payment of a regionally-assessed fee for all new development within the
Project area as approved by the City of Dublin.
As a condition of project approval. When applying for a permit, the
applicant developer will be notified of this fee ,assessment.
Why:
Who:
What:
4
-.
City of DubJin
:May 7, 1993
E&
DubliD Speçi5c: Plan &z: GP A Em
MitigatiOD :Monito~ Plan
Completion:
Verification:
Payments shall be made prior to issuance of building permits
City of Dublin Department of Public Works
Impact 3.3/D 1-680 Freeway; North of the 1-580 Interchange
Miti!!ation Measure 3.3/4.0: [-580/1-680 InleTchan1!e ImrJ70vements
Completion:
Verific:ation:
To establish funding for construction of future 1-580/1-680 Interchange
improvements.
Caltrans/City of Dublin Public Works Department.
Payment of a regionally-assessed fee for all new development within the
Project area as approved by the City of Dublin.
As a condition of project approval. the applicant developer will be notified
of this fee assessment.
Payments shall be-made prior to issuance of building permits
City of Dublin Department of Public Works
Why:
Who:
What:
When:
Daily Traffic Volumes (Cumulative Buildout with Project)
Impact 3.3/E Cumulative Freeway Impacts
Miti!!a1ion Measure 3.3/5.0: TranslJOTtaLion Svstems Manarrement (TSM I
Verific:atiou:
To es~lish funding for construction of auxiliary lanes on 1-580 east of
~y Boulevard
All approved development projects in the Project area/City of Dublin.
1) Proportionate monetary contribution to regional tranSPortation mitigation
programs as approved by the City of Dublin.
2) City coordination with other local jurisdictions to require that all future
development projects participate in regional tranSportation mitigation
programs.
1) The contribution to regional improvements will be implemented as a
condition· of project approval. Applicants will be notified of this fee
assessment.
1) Payments shall be made prior to issuance of builcling permits.
2) Coordination will be ongoing.
1) Fee payments will be verified by the City of Dublin Planning
Department.
2) CoordiDation will be the responsibility of the Department of Public Works
Why:
Who:
What:
When:
Completion:
Peak Hour Intersection Operation (Year 2010 with Project)
Impact 3.3/F Dougherty Road and Dublin Boulevard
MitiS!a1ion Measure 3.3/6.0: Construction of Additional Lanes
Who:
To ensure the funding and construction of improvements to the Dougherty
RoadjDub1.in Blvd. intersection as needed
City of Dublin Department of Public Works/All approved projects.
Why:
5
/0--",
.-
City of DubJiD
May 7, 1995
Ea.. ' Dublin Specific Plan tk GP A EIR
Mitigation MonitoriDg Plan
Completion:
1) Payment of fees towards the construction of adtÜtional lanes at the
intersection of Dougherty Road and Dublin Boulevard.
2) Monitoring of the need for intersection improvements and coordination
of their construction.
1) Fees will be collected as a condition of project approval. Applicants will
be notified of fees.
2) Monitoring will be ongoing annually.
3) Construction will occur prior to intersection declining to LOS F.
1) Payment of fees shall be made prior to issuance of building permits.
2) Monitoring of intersection level of service will be ongoing.
3) Construction will be complete with implementation of specific
improvements or equivalent as identified in mitigation measure.
1) City of Dublin Planning Department will verify paYD;1ent of fees.
2) Department of Public Works will be responsible for monitoring
calculating fees and construction.
What:
When:
VeriÏlCation:,
Impact 3.3/G Hacienda Drive and 1-580 Eastbound Ramps
MitŽ!!ation Measure 3.3/7.0: Widenin~ of Eastbound Off-RamD
Verific:ation:
To provide improvements that will prevent congestion on the eastbound off-
ramps from 1-580 at Hacienda Drive.
Caltrans/City of Pleasant on/City of Dublin Public W orksfProject Applicants
1) Payment of fee towards widening.
2) Coordination of improvement with Caltrans and the· City of Pleasanton.
1) Fees will be assessed as a condition of project approval.
2) Coordination will occur as needed prior to implementation of mitigation..
3) Construction will be underway prior to decline of level of service to
unacceptable.LOS E.
4) Monitoring and coordination will begin with development review
processing.
1) Payment of fees shall be made prior to issuance of builcting permits.
2) Mitigation will be complete with .implementation of widening described
in mitigation measure.
1) City of Dublin Planning Department will verify payment of fees.
2) Department of Public Works will be responsible for calculating fees and
coordination with other agencies.
Why:
Who:
What:
When:
Completion:
Impact 3.3/B Tassajara Road and 1-580 Westbound Ramps
Miti~ation Measure 3.3/8.0: WideninE' of 1-580 Westbound Ramos
Who:
What:
To fund and implement improvements necessary to ensure the efficient
operation of the intersection of Tassajara Road with the 1-580, westbound
ramps.
Caltrans/Pleasanton and Dublin Departments of Public Works/Developers
1) Payment of fee to fund design and construction of improvements,
including widening of the 1-580 westbound off-ramp and modification of
northbound approach to provide additional turn and through lanes.
2) Monitoring of service levels and coordination of construction.
Why:
6
",~...
-..,
Ease. ':>ub1in Specific Plan & GP A EIR
Mitigation Monitoring Plan
City of Dublin
May 1, 1.993
Veñfication:
1) Fees will be assessed as a condition of project approval.
2) Monitoring and coordination will be begin with development review
processing.
3) Construction will be underway prior to decline of level of service to
unacceptable level (LOS E).
1) Payment of fees shall be made prior to issuance of builclii1g permits.
2) Mitigation will be complete with implementation of widening described
in mitigation measure.
I) City of Dublin P1a.nIñng Department will verify payment of fees.
2) Department of Public Works will be responsible for coordinating
cons~ction.
When:
Completion:
Impact 3.3/1 Santa Rita Road" 1-580 EastboDnd Ramps
Mitirral.ion Measure 33/9.0: lmrJTo'Vemems to /-580 Eastbmmd Ram'Os
Verific:ation:
To fund and ,implement improvements necessary to ensure adequate service
levels on Santa Rita Road and 1-580 eastbound ramps.
CaltranS/Pleasanton and Dublin Departments of Public Works/Developers
1) Payment of fee to fund design and construction of improvements;
including widening of 1-580 eastbound off-ramps.
2) Monitoring of service levels and coordination of construction.
1) Fees will be assessed as 'a conditìon of project approval.
2) Monitoring and coordination will be begin with development review
processing.
3} Widening of eastbound ramps will occur prior to decline of level of
service to unacceptable level (LOS E).
1) Payment of fees shall be made prior to issuance of building permits.
2) Mitigation will be complete with implementation of widening described
in mitigation measure.
I) City of Dublin Planning Department will verify payment of fees.
2) City of Dublin Department of Public Works will be responsible for
coordinating improvements with the City of Pleasanton Department of
Public Works and CaltranS.
Why:
Who:
What:
When:
Completion:
Impact 3.3/K Airway BouleTard" 1-580 Westbound Ramps
Miti~aiion Measure 3.3/1] .0: Wideninv of Airwav Boulevard Overcrossin~
When:
To fund and implement improvements necessary to ensu.re adequate service
levels at the intersection of Airway Boulevard and the westbound ramps.
City of Dublin/CaltransjCity of Livennore¡Developers
1) Payment of fee to fund design and consttuction of improvements;
including the widening or replacement of the Airway Blvd. overcrossing and
the widening of the 1-580 westbound off-ramp.
2) Monitoring of service levels and coordination of construction.
1) Fees will be assessed as a condition of project approval
2} Monitoring and coordination will be begin with development review
process.
3} Improvements to ramps and overcrossing will occur prior to decline of
Why:
Who:
What:
7
~
"...-....
City of Dub1in
May 7, 1993
Eas,Dublin Specific Plan &; GPA Em.
Mitigation :Moni~g Plan
Completion:
level of service to unacceptable level (LOS E).
I) Payment of fees shall be made prior to issuance of building permits.
2) Mitigation will be complete with implementation of improvements
described in mitigation measure.
I} City of Dublin Planning Department will verify payment of fees.
2) City of Dublin Department of Public Works will be responsible for
coordinating improvements with the City of Livermore Department of
Public Works and Caltrans.
Verification:
Impact 3.3/L Impediments to Truck Traffic: on El Charro Road
Mititration Measzue 33/12.0: Provisions to Ensure Unimoeded Tnæk Traffic
Why:
To fund and implement improvements necessary to ensure unimpeded
movement of trucks to and from the qcarries on El Charro Road south of
.1-580.
City of Dublin/Caltrans/City of Pleasanton/Developers/City of Livermore
I) Payment of fees to fund design and construction of necessary
improvements.
2) Monitoring of service levels and coordination of improvements with
Caltrans and the City of Pleasanton Department of Public Works.
'1) Fees will be assessed as a condition of project approval.
2) Monitoring and coordination will begin with development review
processing.
3) Improvements will occur prior to decline of level of service to
unacceptable level (LOS E).
1) Payment of fees shall be made prior to.issuance of building permits.
2) Mitigation will be complete with implementation of improvements.
1) City of Dublin Planning Department will verify payment of fees.
2) City of Dublin Department of Public Works will be responsible for
coordinating improvements with the City of Pleasanton Department of
Public Worb and Caltrans and City of Livermore.
Who:
Wha1:
When:
Completion:
Verific:ation:
Impact 3.3/M Cumulative Impacts on Dublin Bouleurd
Mititration Measures 33/13.0: Maintain Adeouate Levels of Service at lntersections_
Why:
To identify, fund and implement improvements that will maintain adequate
service levels at the intersections Dublin Blvd with Hacienda Drive and
Tassajara Road with buildout of cwnulative projects.
City of Dublin
1) The City of Dublin will participate in the regularly-scheduled meetings
of the Congestion Management Agency and Tri- Valley Transportation
Council to determine long-term mitigation measures for cumulative impacts
on Dublin Boulevard.
2) Payment of fees to fund design and construction of necessary
improvements.
3) Monitormg of service levels and coordination of improvements with
Caltrans and the City of Pleasanton Department of Public Works.
I) Participation in the Tri- Valley Transportation Council is current and 00-
Who:
'What:
When:
8
,-
."-".
City ofDub1iD
May 1, 1993
Eas Dublin Specific: Plan .& GP A Em.
Mitigation Monitoring Plan
Completion:
going.
2} Fees will be assessed as a condition of project approval.
3) Monitoring and coordination will be begin with development review
process and continue through to identification and construction of necessary
improvements.
4} Construction will be underway prior to decline of level of service to
unacceptable level (LOS E).
I} Participation in the Tri-Valley Transportation Council is on-going.
2) Payment of fees shall be made prior to issuance of building permits.
3) Mitigation will be complete with implementation of improvements.
I) City of Dublin Planning Department will verify payment of fees.
2) City of Dublin Department of Public Works will be responsible for
coordinating Project area improvements resulting from regional growth.
Verific:ation:
Impact 3.3jN Cømwatin Impacts on Tassajara Road
Miti~uzlion Measure 3.3/14.0: Wideninsr of Tassa;ara ROM to Six Lanes
Why: To reserve sufficient right-of-way along Tassajara Road to accommodate
cumulative development of projects north of the Project area..
Who: City of Dublin Planning Department/City of Dublin Department Public
Works.
What ' Reservation of sufficient right-of-way to a.ccommodate six travel lanes on
Tassajara Road.
When: Reservation of right-of-way to be adopted prior to approval of tentative
map.
Completion: Dedication of right-of-way required prior to' filing of Fmal maps for
development projectS adjacent to the Tassajara Road corridor.
Verification: City of Dublin Planning Department.
Impact 3.3/0 Transit Service Extensions
MitlJration Measure 3.3 /15.0: Provision of Transit Service to Meet LAVT A standards
When:
To extend transit service within 1/4 mile of 95% of the Project area
population.
City of Dublin Planning DepartmentjDepartment of Public WorksfLA VT A
1) Meetings between the City of Dublin and LAVTA to coordinate
extension of bus service to the Project area.
~) Notification to LA VT A of development approvals involving potential for
100 or more employees or residents.
I) Initial meeting to review the plan and ultimate service needs should be
held within one year of plan adoption to allow LA VTA to plan for future
expansion. Thereafter, meetings should be held periodically at the request
of either the City or LA VT A.
On-going.
City of Dublin Planning Department.
Why:
Who:
What:
Completion:
Verification:
9
City of Dublin
May 7, 1993
.---
--.,
Eas Dublin Specific Plan ok GPA EIR
MitigatiOD MonitoriDg Plan
MitifUllion Measure 3.3/15.1: Bus Service to EmDlovment Centers with 100+ EmDlovees
Why:
Who:
What
When:
Completion:
Verification:
To provide transit service at a minimum frequency of one bus every 30
minutes during peak hours, to employment centers with 100 or more
employees.
City of Dublin Planning Department¡Department of Public Works/LA VT A
1) Meetings between the City of Dublin and LA VT A to coordinate
extension of bus service to employment centers.
2) Notification to LA VT A of development approva1s involving potential for
100 or more employees.
1) Meetings should be held periodically at the request of either the City or
LAVT A.
On-going.
City of Dublin Planning Department.
Miti1i!ation Measure 3.3115.2: Mone/an ContribuJion to SUDDorl Transi! Service Extensions
Why:
Who:
What:
When:
Completion:
Verification:
To provide funding in support of expansion of transit 'service to the Project
area.
City of Dublin Planning Department/Department of Public
Works/LA VT A (Developers
Payment of fees or construction of capital improvements to support
extension of transit service.
Fees/improvements will be identified· as a condition of project approval.
Prior to approval of Final Map.
City of Dublin Planning Department.
Mitiiration Measure 3.3 115.3: Feeder Transit Service to the East Dublin I Pleasanton BART
station
Why:
Who:
What:
When:
Completion:
Verification:
To coordinate provision of feeder bus service to the planned BART stations
from the Project area. ,
City of Dublin Planning Department/Department of Public
Works/LA VTA/BART
Meetings with :BART and LA VTA to coordinate feeder tranSit service to
BART.
Initial meeting to review the plan and ultimate service needs should be held
within one year of plan adoption to allow BART and LA VT A to plan for
future expansion. Thereafter, meetings should be held periodically at the
request of the City, BART, or LA VTA.
On-going.
City of Dublin Planning Department.
Impact 3.3jP Street Crossings
Miti!ration Measure 33/16.0: Provision of a Class I bicvclelDedestTian Dath
Why:
Who:
To provide a paved bicycle/pedestrian path along Tassajara Creek.
Developers in consultation with the City of Dublin Planning Department,
10
,-.
-..
City of Dublin
May 'I, 1993
Eu ·Dublin Specific Plan ok GP A Em.
Mitigation :Monitoring Plan
Completion:
Department of Public Works, and East Ba.y Regional Park District.
Design and construction of a Class I bicycle/pedestrian path along Tassajara
Creek. .
As a condition of approval for development projects adjacent to the
Tassajara Creek corridor.
Construction to occur prior to occupation of first phase of homes
responsible for providing the path.
City of Dublin Department of Public Works.
What
When:
VerificatioD:
MitŽ!!ation Measure 3.3/16.1: Signalized Bicvcle/Pedestrian Intersections
Why:
Who:
What:
When:
Completion:
Verification:
To provide for safe pedestrian/bicycle crossings of major arter.ial streets.
DevelopersjDepartment of Public Works
Locate pedestrian and bicycle crossings at signalized intersections.
As a condition of project approval
Final approval of detailed improvement plans.
Department of Public Works.
SECTION 3.4: COMMUNITY SERVICES AND FACILITIES
Prior to annroval of orezonine.1. Imltacts Reauirin2 Mitieation
This section identifies the following impacts requiring mitigation:
1M 3.4/A Demand for Increased Police Services.
1M 3.4/B Police Services Accessibility
1M 3.4/C Demand for Increased Fire Services
1M 3.4/D Fire Response to Outlying Areas
1M 3.4/E Exposure to Wild1ands Hazards
1M 3.4/F Demand for New ClassToom Space
IM 3.4/G Demand for Junior High School Space
1M 3.4/H Overcrowding of Schools
1M 3.4/I Impact on School District Jurisdiction
1M 3.4/1 Financial Burden on Schoo) Districts
1M 3.4/K Demand for Park Facilities
1M 3.4jL Park Facilities Fiscal Impact
IM 3.4jM Impact on Regional Trail System
1M 3AIN Impact on OpenSpa.ee Connections
1M 3.4/0 Increased Solid Waste Production
IM 3.4/p Impact on Solid Waste Disposal Facilities
IM 3.4/Q Demand for Utility Extensions
1M 3.4/R Utility Extension: Visual and Biological Impacts
IM 3.4/S Consumption of Non-Renewable Natural Resources
1M 304fT Demand for Increased Postal Service
1M 3.4/U Demand for Increased Library Service
11
City of Dublin
May 7, 1993
'-"
Eas. ,Dublin Specific: Plan k GP A EIR
Mitigation Monitoring Plan
2. Miti!!atioD Imnlementation and MODUOnD!! Proeram
Police Services
Impact 3.4/ A Demand for Increased Police Services
Impact 3.4/B Police Sernces Accessibility
Miti~ation Measure 3.4/1.0: Additional Personnel. Facilities and "Beats"
When:
Completion:
Verification:
,To provide additional personnel, facilities. and procedures to police service
standards.
City of Dublin Police DepartmentjPlanning Department.
1) Police Department will hire· and train new sworn and civilian staff, revise
"beat" system to serve eastern Dublin. and estimate and schedule projected
facility needs in eastem Dublin.
2) Planning Department to notify Police Department of development
approvaIs to assist the Police Department in its annual budget f onnuJation.
On-going.
Annually as part of the Police Department's planning and budgetary process.
Chief of Police.
Why:
Who:
What:
Miti~ation Measure 3.4/2.0: Coordination of eXDansion of Police services
"
When:
Completion:
Verification:
To provide the Police Department information needed to adequately plan for
expansion of services.
Planning Department/City of Dublin Police Department.
Notification to the Police Department of the timing, of annexation and
approved development.
During processing of prezonmg and annexation applications.
Ongoing. .
Planning Department
Why:
Who:
What:
Miti~ation Mel2Sure 3.4/3.0: Police De1)artment Review
When:
CompletioD:
Verification:
To provide for Police Department input into the design of proposed
development.
City of Dublin Police Department/planning Department.
Police Department review of proposed development plans for safety issues,
and provide the Planning Department with recommendations for inclusion
in the Ímal plans.
During development review process.
Prior to final site plan approval.
Chief of Police or representative.
Why:
Who:
What:
Mitieation Measure 3.4/4.0: Budf!etin!' for Police Services
Who:
To prepare a budget strategy to hire the required additional personnel and
implement necessary changes in the "beat" system. .
City of Dublin/City of Dublin Police Department
Why:
12
CitJ of Dublin
May '2', 1993
What:
When:
Completion:
Verification:
,---.
.-...
Eas Dublin specific Plan & GP A Em
MitigatiOD Monitoring Plan
1) Police Department will estimate projected personnel and facility needs
for eastern Dublin and develop a budget strategy to meet these needs.
2) Plamring Department will notify Police Department of development
approvals in order to assist the Police Department in its annual budget
formulation.
On-going.
Annually as part of the Police Department's planning and budgetary process.
Chief of Police.
Miti1!ation Measur.e 3.4/5.0: Police DeDOTtment Review
Why:
. Who:
What:
When:
Completion:
Verific:ation:
FIre Protection
To ensure Police Department ,review of proposed development for safety
issues.
City of Dublin Police DepartmentjPlanning Department.
Police Department review of proposed development plans for safety issues.
During development review process.
Prior to final site plan approv31.
Chief of Police or representative.
Impact 3.4/C Demand for Increased Fire Services
Impact 3.4/D FlJ'e Response to Outlying Areas
Impact 3.4/E Exposure to Wildlands Hazards
Mitif{ation Measure 3.4/6.0: Construction of New Fire Facilities
Why:
Who:
What
Whe-n:
Completion:
Verification:
To provide for the constrUction of new facilities coincident with new
service demand in eastern Dublin.
DevelopersjDougherty Regional Fire Authority
Design and Construction of New Facilities
Condition of tentative map and/or development review approval
Construction of 11I'e statîon(s) will occur concurrently with new service
demand not addressed by other agreements.
DRF A/City Planning Department.
Mžtif!ation Measw.e 3.4/7.0: Fundinf! of New Fire Facilities
Why:
Who:
What:
When:
Completion:
Verific:ation:
To establish appropriate funding mechanisms to cover up-front costs of
capital improvements.
City of Dublin City Manager's Office/DRF A.
Establish funding mechanism for capits1 improvements.
Condition of tentative map and/or development review approval
Construction of fire station(s) will occur concurrently with new service
demand not addressed by other agreements.
City of Dublin City Manager responsible for establishing funding
mechanisms; Planning Department responsible for verifying completion
prior to project approval.
13
City of Dublin
May 1, 1995
--,
,-.
Eæ. Dublin Specific Plan &; GPA Em
Miûgation MODitormg Plan
Mitif!01ion Measure 3.4/8.0: Sites for New Fire Facilities
Why:
Who:
What:
When:
Completion:
Verification:
To ensure acquisition of sites for construction of new fire stations.
City of Dublin Planning Department in consultation with DRF A.
Identification and acquisition of sites for new fire statiODS.
Condition of tentative map and/or development review approval
Construction of fire station(s) wiU occur concurrently with new service
demand not addressed by other agreements.
City of Dublin Planning Department.
Mitiflation Measure 3.4/9.0: Fire DerJa.rrment Review
Why:
Who:
What:
When:
Completion:
Verification:
To ensure DRF A input on project design relating to access, water pressure,
rJI'e safety and prevention.
DRF A/City of Dublin Planning Department.
Review of proposed devèlopments by DRFA for nre safety. Incorporation
of DRF A recommendations into project conditions by Planning Department.
During development review process.
Prior to development review and/or Final Map approval.
Fire Chief or representative to provide recommendations; Planning
Department to verify, incorporation of DRF A recommendations as
conditions of project approval.
Mititration Measure 3.4/10.0: Urban /O"en, SrJace Interftree Manaf!ement
Why:
Who:
What:
When:
Completion:
Verification:
To ensure that a mechanism is in place to provide long-term maintenance
for the urban/open space interlace.
DevelopersjDRF A/City of Dublin P1annmg Department.
Establishment of an assessment district or other suitable mech~n;~ to
maintain safe rue conditions along the urban/open space interface.
Condition of tentative map approval.
Prior to Final Map approval.
City of Dublin Planning Department.
Miti~ation Measure 3.4/11.0: Fire Trails/ODen SDace Svstem
Why:
Who:
What:
When:
Completion:
Veñfication:
To integrate fire trails and nre breaks into the open space trail system.
City of Dublin Planning Department/City of Dublin Recreation
Department/DFRA/Developers.
Design and dedication of fire trails and fire breaks.
Condition of tentative map approval.
Prior to Final Map approval.
City of Dublin Planning Department.
Miti~ation Measure 3.4/12.0: Wildfire Mana~eme7!t Pltzn
Why:
To prepare a wildfire management plan for the Project area in order to
14
City of Dublin
May 1, 1993
Who:
What:
When:
Completion:
Verifieaüon:
.-
'-...
Eas-. Dublin Specific Pian &t GPA EIR
Mitigation MonitoriDg Plan
reduce the risk of impact related to wildland fire.
City of Dublin/DRF A.
Prepare a wildfire management plan.
During prezoning and anDexation application processing.
Prior to approval.of any development in lands adjacent to land designated
for permanent open space or rural residential/agriculture.
City of Dublin Planning Departm~nt.
Miti1!a1ion Measure 3.4/13.0 Sites for Fire Facilities for the CPA lncremeni
Why:
Who:
What:
When:
Completion:
Verification:
Schools
To determine the number ,location and timing of additional iIre stations for
areas within the Project area yet outside the Specific Plan area.
DRF A/City of Dublin Planning Department.
Identification of future fire station sites.
During prezoning and annexation application processing.
Prior to development approvals in the areas outside the Specific Plan area.
City of Dublin Planning Department.
Inipad 3.4jF Demand for New Classroom Space
Impact 3.4jG Demand for Junior IDgh School Space
Miti1!a1ion Measure 3.4/13.0: Dedication of New School Sites
Why:
Who:
What:
When:
Completion:
Verificauon:
To reserve school sites within the Project area as designated in the Specific
Plan and GP A.
Developers/City of Dublin Planning Department/DUSD/L VJUSD
Identification of new school sites.
Condition of tentative map approval.
Prior to Final Map approval.
City of Dublin Planning Department.
Mitit!ation Measure 3.4/14.0: Planninf! for Additional Junior Hieh School CaDacit'V
Why:
Who:
What:
When:
Completion:
Verification:
To ensure that adequate capacity is provided for junior high school age
students.
DUSD.
Planning for projected junior high school demand within two proposed sites
and/or provide for a third site'in tbe Future Study Area to the east of the
Project area.
During planning and design of the rust Junior High School site.
Prior to final map approval for the first junior high school.
City of DublinjDUSD.
15
City of DubHn
May 7, 1995
--.
\
--.
Eas. 'Dublin Specific Plan && GPAEIB.
Mitigation Monitoring Plan
1M 3.4/H Overcrowding of SchoolS
Mitií!ation Measure 3.4115.0: Provision of Adeauate Schools to Serve the Proiect site
Why:
Who:
What:
Wben:
Completion:
Veñfiçation:
To ensure that adequate classroom space is provided prior to the
development of new homes.
DUSD/City of Dublin Planning Department.
I) Coordination between City of Dublin and DUSD to monitor available
school çapacity and proposed development.
2) DUSD sign-off on available capacity to accommodate new development.
Coordination to occur during development review process. with written
sign-off from DUSD submitted prior to tentative map approval
Prior to occupancy approval.
City of Dublin Planning Department.
Impact 3.4/1 Impact on School District Juñsdiction
Mitií!ation Measure 3.4116.0: Resolution of School District Jurisdiction Issue
Why:
Who:
What:
When:
Completion:
Verification:
To resolve the jurisdictional issue of which school district{s) will provide
service to the Project area.
City of Dublin/DUSD/L VJUSD.
City,will assist with resolution of District bonndary dispute.
Within two years of plan adoption.
Prior to occupancy of residential units within the Project area.
City of Dublin PlanD.ÏD:g Department.
Impact 3.4/.1 Financial Burden OD School Districts
Mitisration Measure 3.4117.0: Full mitií!ation of Proiect imDact on school facilities
Why:
Who:
What:
When:
Completion:
VerificatioD:
To ensure that adequate school facilities are available prior to development
in the Project area to the extent permitted by law.
City of Dublin/DUSD/L VJUSD.
Establish liaison between City of Dublin and school districts.
Ongoing as part of development review process.
On-going.
City of Dublin PlannÏIig Department with input from school districts.
MitÌ!!ation Measure 3.4/18.0: Provision of School Sites
Why:
Who:
What:
When:
Completion:
Verific:atioD:
To ensure that the development of new facilities is provided for through the
dedication of school sites and/or payment of development fees by
developers.
Developers/City of Dublin/DUSD/L VJUSD.
Dedication of School SitesfPayment of Development Fees.
Condition of Tentative Map Approval
Prior to occupancy approval.
City of Dublin Planning Department.
16
Ciq. of Dublin
May 1, 1998
, .-...
--
Bas, . Dublin Specific Plan &: GP A Em
Mitigation MOJÛtoriDg Plan
Mitifla1ion Measure 3.4/19.0: Fzmdinfl of New Schools
Why:
Who:
What:
When:
CompletioD:
Verification:
Parks ud Recreation
Park Facilities
To establish appropriate funding mechanisms, such as Mello Roes
Community Facilities District, development impact fees, or a general
obligation bond measure, to fund new school development in eastern Dublin.
City of Dublin/DUSDjL VJUSD.
Creation of funding mechanism(s).
During processing of prezoning and annexation applications.
Prior to occupancy of residential units within the Project area.
City of Dublin Planning Department.
Impact 3.4/K Demand for Park Facilities
Mitisration Measure 3.4/20.0: EXDDnsion of lJtl7k tl7ea (Guidin!! PoliC'V. No m07J.itorinsr
aDDlicable or reouired.)
Mitisration Measure 3.4/21.0: Maintenance and imDrovement of ouldoor facilities in
conformtl7lce with Park and Recreation Master Plan (Guidin!rPolicv. No monitorinsr aDDlicable
or reauired.)
Mitisration Measure 3.4/22.0: Provide adeauoJe active Darks and facilities (Guidinsr Polic'V . No
monitorinrr alJDlicable or reQUired.)
MitÌf!ation Measure 3.4/23.0: Acouire and imDro~e 'OtlTklands
Why:
Who:
What:
When:
Completion:
Verifiution:
To acquire and improve parklands in conformance with the priorities and
phasing recommended in the City's Park and Recreation Master Plan.
City of Dublin Planning Department/Dublin Recreation Department.
Coordination between the Planning Department and Recreation Department
to ensme adherence with standards of Park and Recreation Master Plan.
Ongoing as part of the development review process.
Ongoing.
City of Dublin Planning Department.
Miti!!ation Measw-e 3.4/24.0: Land dedication and Dtl7ks imDro'Pements/Collection of in-lieu
Dark fees
Why:
Who:
What:
When:
Completion:
Verification:
To require land dedication and improvements as designated in the GP A and
collect in-lieu fees per City standards.
City of Dublin Planning Department/Recreation Department.
Require land dedication or payment of in-lieu fees as condition of approval
for individual projects.
Condition of tentative map approval.
Prior to Final Map approval.
City of Dublin Planning Department.
17
City of DubJin
May '1, 1993
.--...
. ,
.-.
Eas. . Dablin Specific Plan .It GP A Em
Miti¡ation Monitormg Plan
Mitif!ation Measure 3.4/25.0: Park ACrellf!e Dedication
Why:
Who:
What:
When:
Completion:
Verification:
To provide an adequate ratio of developed parldands to population.
Developers/City of Dublin PlannÏ11g Department.
Park dedication.
Condition of tentative map approval.
Prior to imal map approval.
City of Dublin Planning Department.
Mitif!tltÏon Measure 3.4/26.0: STJecific Park Acreaf!l! Dedication
Why:
Who:
What:
When:
Completion:
Verifh:ation:
To provide an adequate ratio of developed parldands to population.
Developers/City of Dublin Planning Department.
Park dedication.
Condition of tentative map approval.
Prior to final map approval.
City of Dublin Planning Department.
Mitiflation Measure 3.4 /27.0: Park standards
Why:
Who:
What
When:
Completion:
Verification:
To ensure that park development is consistent with;,:the standards and
phasing recommended in the City's Park and Recreation Master Plan.
Developers/City of Dublin Recreation Department.
Monitor individUal project conformance with standards ,in Master Plan.
Condition of ~tative map approval.
Prior to ímal map approval.
City of Dublin Recreation Department.
Mitif!ation Measure 3.4 /28.0: ImlJ/ementation of Specific Plan policies related to the 'Drovision
of ODen SlJtlCe.
Why:
Who:
What:
When:
Com pletion:
Verificatioi1:
Park Financing
To ensure the provision of open space, access and areas for public
recreatioD.
Developers/City of Dublin Planning Department.
Monitor individual project conformance with open space policies.
ConditioD of tentative map approval.
Prior to final map approval.
City of Dublin Planning Department.
Impact 3.4/L Park Facilities FIScal Impact
Mitžflation Measw:e 3.4/29.0: Provision of Fair Share of Park SlJace
Why:
To ensure that each new development reserves the open space and parkland
designated in the Plan.
18
City or Dublin
May 7, 1993
Who:
What
When:
Compleûon:
Verifica.ûon:
,-
.....-....
E~, ' Dublin Specific: Plan ok GPA Em
Mitigation MonitoziDg Plan
Developers/City of Dublin Planning Department
Review each development proposal against the Specific Plan/GP A to ensure
that designated park and open space is set aside.
Condition of tentative map approval
Prior to imal map approval
City of Dublin Planning Department.
Mitirration Measure 3.4/30.0: Parks lml'lementation Plan
Why:
Who:
What
When:
Completion:
Veñfica.tion:
To develop a Parks Implementation P1an for eastern DubJin.
Dublin Recreation Department
Preparation of a Parks Implementation Plan.
Within two years of Plan adoption or prior to any significant residential
developmen~ whichever occurs first.
Prior to final map approval on the first residential projects.
Dublin Recreation Department.
Miti1!ation Measure 3.4/31.0: Calculation and Assessment of In-Lieu Park Fees
Why:
Who:
What
When:
Completion:
Verificaûon:
To calculate and assess in-lieu park fees.
City of Dublin Planning Department
Assessment of In-Lieu Park Fees.
Notification at time of permit application. Condition of tentative map
approval.
Payment a1 time of final map approval
City of Dublin Planning Department.
Impact 3.4/M 1mpact on Regional Trail System
Mitifration Measure 3.4/32.0: Trail Linka1!e and Access
Why:
Who:
What:
When:
Completion:
Verification:
To establish a trail system with connections' to planned regional and
subregional system.
Developers/City of Dublin Planning Department
Dedication of trail rights-or-way.
Condition of tentative map approval.
Prior to final map approval.
City of Dublin Planning Department.
Impa<:t 3.4/N Impact 00 Opeo Space Conoections
Mi!Îfralion Mea.sur.e 3.4/33.0: Establish a comDrehensive iran network
Why:
Who:
What:
To establish a comprehensive, integrated trail network that permits safe and
convenient pedestrian and bicycle access.
Developers/City of Dublin Planning Department/City of Dublin Recreation
Department.
Provide guidelines to developers on right-of-way alignment and design
19
City of Dublin
May 7, 1993
When:
Completion:
Verification:
--.
,-
~ Dublin Specific: Plan " GPA Em
Mitigation :Monitoring Plan
standards, and ensure implementation.
Condition of tentative map approval.
Prior to Ímal map approval.
City of Dublin Planning Department.
Mitif!aiion Measure 3.4/34.0: Establish a connntlOU$ oDen SDaee network
Why:
Who:
What:
When:
Completion:
VerificatiolC
To establish a continuous open space network that integrates large natUral
open space areas, stream corridors~ and developed parks and recreation
areas.
Developers/City of Dublin PJanning Department/City of Dublin Recreation
Department.
Ensure dedication/preservation of designated open space areas.
Condition of tentative map approval.
Prior to final map approval.
City of Dublin Planning Department.
MitŽ1iration Measure 3.4/35.0: Provision of access to ODen sDace areas
Why:
Who:
What:
When:
Completion:
Verificatiou:
To provide convenient pedestrian connections between developed areas and
designated open space areas and trails.
Developers/City of Dublin Planning Department/City of Dublin Recreation
Department.
Ensure designation of appropriately located trails and access points as part
of development review.
Condition of tentative map approval.
Prior to final ma.p approval.
City of Dublin Planning Department.
Mitif!a1ion Measure 3.4/36.0.· Reouire lJUblic tlJ:ceSS easements
Why:
Who:
What:
When:
Completion:
VerificatioD:
Solid Waste
To require developers to dedicate public access easements along ridgetop5
and stream corridors to accommodate the development of trails and staging
areas.
Developers/City of Dublin Planning Department.
Ensure dedication of public access easements.
Condition of tentative map approval.
Prior to final map approval.
City of Dublin Planning Department.
Impact 3.4/0 Increased Solid Waste Production
Impact 3.4/P Impact on Solid Waste Disposal Facilities
20
City or Dublin
May 1, 1993
, ..--..
,-,
Eas Dublin Speci:ÏlC Plan I: GP A EIR
Mitigation Mcmi;œing Plan
Miti1!D1ion MetlSW'e 3.4/37.0: PreDaration of Solid Waste Mana~ement Plan
Why:
. Who:
What:
When:
Completion:
VerificatioD.:
To prepare/update a Solid Waste Management Plan as needed to address
eastern Dublin.
Dublin City Manager's Office.
Prepare plan.
Within two years of the adoption of the Eastern Dublin Specific Plan/GP A.
Prior to issuance of building peI1IÛts.
Dublin City Manager's Office.
Mitisuztion Measure 3.4/38.0: Revise Waste Generation Proiections
Why:
Who:
What:
When:
Completion:
Verification:
To revise waste generation projections of the City's SRRE/HHWE as needed
to reflect the population and commercial land use projections of the adopted
Project.
Dublin City Manager's Office.
Revise projections and update solid waste generation and disposaJ capacity
characteristics.
Within two years of the adoption of the Eastern Dublin Specific Plan/GPA.
Prior to issuance of building permits.
Dublin City Manager's Office.
I
Miti1!D1ion Measure 3.4/39.0: Inte1!ra1ion of Eastern Dublin Solid Waste Plan into Citv's
SRRE/HHWE
Why:
Who:
What:
WheE
Completion:
VerificatioD:
To ensure that the Solid Waste Management Plan for Eastern Dublin
addresses and incorporates the goaIs, objectives, and programs of Dublin's
SRRE and HHWE. '
Dublin City Manager's OfficejPublic Works Department.
Updating of SRRE/ffiiWE to reflect Project.
Within two years of the adoption of the Eastern Dublin Specific Plan/GPA.
Prior to issuance of building permits.
Dublin City Manager's Office.
Miti1!ation Measure 3.4.40: Assessmem of Landfill CaDtæžrv
Why:
Who:
What:
When:
Completion:
Verific:ation:
To ensure that adequate landiùl capacity is available to accommodate
project waste.
City Manager's Office/City Planning Department/Alameda County Solid
Waste Management Authority.
Determine the adequacy of available disposal capacity.
As a condition of Tentative Map approval.
Prior to Final Map approval.
City of Dublin Planning Department.
21
City of Dublin
May 1, 1993
,.-......
----
~ Dublin Specific Plan &: GP A EIR
Mitigation Momtoring Plan
)
Electricity, Natural Gas and Telephone Service
Impact 3.4/Q Demand for Utility Extensions
Impact 3.4/R Utility Extension: VISual and Biologica.l Impacts
Mitisration Measure 3.4/41.0: Provision of documentation that electric. Has and tele'Ohone
service con be lJro."ided.
Wh-y:
Who:
What:
Wheu: .
Completion:
Verific:ation:
To require project app1icants to provide documentation that electric, gas,
and telephone service can be provided to all new development.
Developers/City of Dublin Planning Department.
Submit documentation from utilities providers.
As a condition of Tentative Map approval.
Prior to final map approval.
City of Dublin Planning Department.
Mitieation Measure 3.4/42.0: Underf!roundinf! of Utilities
Wh-y:
Who:
What: '
When:
Completion:
Verificanon:
To require all utilities to be located below grade where feasible and designed
to City standards.
City of Dublin Public Wodes Department.
Require developers to provide for installation of utilities below grade.
Prior to issuance of building permits.
ConstrUction of infrastrUcture improvements.
City of Dublin Public Works Department.
Mitif!ation Measure 3.4/43.0: Avoidance of InfrastruCture Im'Oacts on Sensitive HabitD.1
Why:
Who:
What:
When:
Completion:
Veñfication:
To mitigate the effects of utilities expansio~ the city will work with PG&E
to plan the undergrounding of all new electric lines and to route
infrastructure away from sensitive habitat and open space lands.
Developers/City of Dublin Public Works Department¡pG&E.
Coordinate routing of electric lines.
During site design phase.
Prior to final map approval.
City of Dublin Public Works Department.
Mžtif!a1ion Measure 3.4/44.0: Submittal of Service Reoort
Wh-y:
Who:
What:
When:
Completion:
Verification:
To require project applicants to submit a utilities service report to the City
prior to Public Improvement P1an approval.
Project Applicants/City of Dublin Planning Department.
Submittal of utilities service report.
Prior to approval of Public Improvement Plan.
Prior to issuance of building permits.
City of Dublin Planning Department.
22
City of DubliD
May 7, 1993
,-
-,
Eaa ,Dublin Specific Plan & GP A EIR
Mitigation Monitoring Plan
Impact 3.4/5 Consumption of Non-Renewable Natural Resources
Miti!!atiol'l Measure 3.4145.(}: Demonstration Pro;ects
Why:
Who:
What:
When:
Completiou:
VerificatioJa:
To require the installation of a demonstration project(s) of cost-effective
energy conservation techniques.
Developers/pG&E/City of Dublin Planning Department.
Meet with major land owners and PG&E to determine how to set up an
Energy Conservation Demonstration Project within the Project area.
During development review process.
Prior to occupancy approval.
City of Dublin Planning Department.
Mitifalion Measure 3.4/46.0: Site Planniní!. Build;"!! Desim and LandscaDiní!
Why:
Who:
What:
When:
Completion:
Verificatioo:
Postal Service
To require developers to demonstrate the incorporation of energy
conservation measures into the design, construction, and operation of
proposed development.
Developers/City of Dublin Planning Department.
Preparation of an Energy Conservation Plan.
Upon ïiling of tentative map.
, Prior to building permit approval.
City of Dublin Planning Department.
Impact 304fT Demand for Increased Postal Service
Miti!!ation Measure 3.4/47.0:·Pruvision of a Post Office in Eastern Dublin
Why:
Who:
What:
When:
Completion:
Verific:ation:
To provide for the creation of a post office with tbe eastern Dublin Town
Center.
Developer/City of Dublin Planning Department.
The City will work with developers of Town Center and the U.S. Postal
Service to determine need and procedures for implementation.
Prior to tentative map approval for the Public/Semi-Public designated uea
in the Town Center subarea.
Prior to approval of Final Map.
City of Dublin Planning Department.
Milif!ation Measure 3.4/48.0: Coordination wiLh U.s. Postal Service
Why:
Who:
What:
When:
To provide for the creation of a post office with the eastern Dublin Town
Center.
Developer/City of Dublin Planning Department.
The City will work with developers of Town Center and the U.S. Postal
Service to determine need and procedures for implementation.
Prior to tenta:tive map approval for the Public/Semi-Public designated area
in the Town Center subarea.
23
City of DubJin
May 7, 1993
Completion:
VeriOc:ation:
Library Service
-'.
.'
Eas, Dublin Specific Plan ok CPA Em
Mitigation Mcmtoring Plan
Prior to approval of Final Map.
City of Dublin Planning Department.
Impact 3.4jU Demand for IDcreased Library Senice
Mitieotion Measure 3.4/49.0: Provision of AdeOUl11e Librarv Services
Why:
Who:
What:
When:
Completion:
Verification:
To provide a library(ies) and associated services for eastem Dublin.
Alameda County Library System/City of Dublin Planning Department.
Assessment of eastern Dublin library needs and formuJation of strategy to
meet these needs.
During processing of prezoning and annexation applications.
Prior to Final Map approval
City of Dublin Planning Department.
Mitieation Measure 3.4 /50.0: Coordinalion with Alameda Countv Librarv Svstem
Why:
Who:
What:
When:
Completion:
Verification:
To provide a library(ies) and associated services for eastern Dublin.
Alameda County Library System/City of Dublin Planning Department.
Assessment of eastern Dublin library needs and formulation of strategy to
meet these needs.
During processing of prezouing and annexation applications.
Prior to Final Map approval.
City of Dublin Planning Department.
Mitieation Measure 3.4/51.0: SlJecific Site Selection for New Librarv
Why:
Who:
What:
When:
Completion:
Verification:
To have the City Library Task Force identify appropriate location and
timing for development of new library(ies).
City Library Task Force.
Assessment of site requirements and timing of projected need.
During processing of prezoning and annexation applications.
Prior to Final Map approval.
City of Dublin Planning Department.
SEcrION 3.5: SEWER. WATER AND STORM DRAINAGE
1. ¡museu Reouirine MitiestioD
This section identifies the following impacts requiring mitigation:
1M. 3.5/B Lack of a Wastewater Collection System
1M. 3.SIC Extension of Sewer Trunk Line
1M 3.5/D Current Limited Treatment Plant Capacity
1M 3.5 IE Future Lack of Wastewater Treatment Plant Capacity
1M 3.5/F Increase in Energy Usage Through Increased Wastewater Treatment
24
City of Dublin
May '1, 1995
.,.-......
-"
Eas Dublin Specific Plan ok GP A Em
Mitigation Monitoring Plan
"
1M 3.5/G Lack of Current Wastewater Disposal Capacity
1M 3.5/H Increase in Energy Usage Through Increased Wastewater Disposal
1M 3.5/1 Potential Failure of Export Disposal System
1M 3.5/J Pump Station Noise and Odors
1M 3.5jK Storage Basin Odors and Potential Failure
1M 3.5/L Recycled Water System Operation
1M 3.5/M Recycled Water Storage Failure
1M 3.5/N Loss of Recycled Water System Pressure
1M 3.5/0 Secondary Impacts from Recycled Water System Operation
IM·3.5/p Overdraft of Local Groundwater Resources
1M 3.5/Q Increase in Demand for Water
1M 3.5JR Additional Water Treatment Plant Capacity
1M 3.5/S Lack of Water Distribution System
1M 3.5fT Inducement of Substantial Growth and Concentration of Population
1M 3.5jU Increase iIi Energy Usage Through Operation of the Water Distribution System
1M 3.5jV Potential Water Storage Reservoir Failure
1M 3.5 /W Potential Loss of System Pressure
1M 3.5¡X Potential Pump Station Noise
1M 3.5jY Potential Flooding
1M 3.5/Z Reduced Groundwater Recharge
1M 3.5/ AA Non-Point Sources of Polluûon
2. Mitigation Imnlementatiou and Monitoñn2 Proeram
Impact 3.5/B Lack 01 a Wastewater Collection System
Mitigation Measure 3.5/I.Oa: EXlJansion of DSRSD Service Boundaries
Why:
Who:
What:
When:
Completion:
Verification:
To provide for the expansion of DSRSD's service boundaries to include the
Project area.
DSRSD.
DSRSD will revise its service area boundaries.
Prior to approval of any development outside the current service boundaries.
Prior to tentative map approval.
City of Dublin Department of Public Works.
MitiJU21iolt Measure 3.5 /1.0: Connection 1.0 Public Sewers
Why:
Who:
What:
When:
Completion:
Verific:ation:
To require that a11 development within the Project area be connected to
public sewers.
City of Dublin Department of Public Works/DSRSD.
Require connection to public sewers.
Condition of approval for tentative map.
'Prior to final map a.pproval.
Department of Public Works.
25
City of Dublin
Yay 1, 1993
,---'
..---...,
Eas. Dublin Speciúc Plan k GPA EIR
Mitigation :Mcmitoring Plan
Miti1ration Mea$W'e 3.5 /2.0: Wastewate,. Collection Svstem Master Plan
Why:
Who:
What
When:
Completion:
Verification:
To have DSRSD update its wastewater conection system master plan
computer model to reflect the adopted Specific Plan/GPA.
Department of Public Works;DSRSD.
Public Works will request DSRSD to update Master Plan. DSRSD will be
responsible to update the Master Plan.
As soon as possible after the adoption of the Specific Plan/GPA.
Before approval of any detailed wastewater improvement plans.
Department of Public Works/DSRSD.
Mitigation Measure 3.5 /3.0: On-site Wastewater Treatment
Why:
Who:
What:
When:
Completion:
Verification:
To discourage the use of on-site package plants and septic systems within
the Project area.
Departmènt of Public WorksjDSRSD.
Communicate to project applicants the City's desire that all projects be
connected to the'DSRSD sewer system.
Ongoing', as part of the development application process.
Prior to tentative map riling.
Department of Public Works.
Mitivation Measure 3.5 /4.0: DSRSD Service
Why:
Who:
What:
When:
, Completion:
Verification:
To require a -will serve" Jetter from DSRSD prior to permit approval for
gr8dmg.
Department of Public Works/DSRSD.
ConÏmn receipt of a "will-serve" letter for all proposed projects.
Prior to tentative map approval.
Prior to issuance of grading permit.
Department of Public Works.
Why:
Mitigation Measure 3.5/5.0: DSRSD Standards
Who:
What:
When:
Completion:
Veñfication:
To require that design and construction of all wastewater systems is in
conformance with DSRSD standards.
Department of Public WorksjDSRSD.
ConIum that wastewater system meet DSRSD standards.
Prior to issuance of building permits.
Approval of improvement plans.
Department of Public Works/DSRSD.
Impact 3.5/C ExtensioD of Sewer Truak Line
Mitigatžon Measure 3.5/6.0: Sizžne of Wastewater Svstem
Why:
To ensure that the planned wastewater collection system has been sized to
accommodate only the development within the Project area.
26
City of DubJin
May 7, 1995
Who:
What:
Wheo:
Completion:
VeñficatioD:
,--
--.
EaSI Dublin Specific: Plan ok GPA Em
Mitigation Monitodng Plan
DSRSD.
Engineer wastewater capacity for Projéct site capacity only.
Wastewater system design phase.
Prior to installation of Project area sewer system.
DSRSD.
Impact 3.5/D CurreDt Limited Treatment Plut Capacity
Mitif!aJion Measure 3.5/7.0: Desirrn L~el Wastewater lmestirration
Wh')':
Who:
What:
When:
Completion:
Verification:
To require project applicants to prepare detailed wastewater capacity
investigations, including means to mtn;m;7'.e wastewater flows.
Applicants in coordination with DSRSD.
Prepare a detailed wastewater capacity investigation.
Preparation of prelim;n¡ry Public Improvement Plan.
Fmal Public Improvement Plan Approval.
DSRSD/Department of Public Works.
MitiflaJion Measure 3.5/7.1: DSRSD Service
Why:
Who:
What:
When:
Completion:
Verification:
To require a "will serve" letter from DSRSD prior to permit approval for
gracling.
Department of Public Works/DSRSD.
Conium receipt of a "will-serve" letter for all proposed projects.
Prior to tentative map approval.
Prior to issuance of grading permit.
Department of Public Works.
Impact 30SIE Future Lack of Wastewater Treatment Plant Capacity
Mitif!aJion Measure 3.5/8.0: Ensure Adeauate WastewaJer Treatment C(l~acitv
Wh')':
Who:
What
When:
Completion:
Verification:
To ensure that wastewater treatment and disposal facilities are available to
meet the needs of future development in eastern Dublin.
Department of Public WorksfDSRSD·
DSRSD will prepare a Master Plan including growth projections and facility
expansion needs and timing to meet the needs of projected development.
As soon as possible after adoption of the Specific Plan/GP A.
Prior to approval of any development.
Department of Public Works.
Mitiflation Measure 3.5/9.0: Wastewater Treatment Plant ExDa1tSion Schedule
Why:
Who:
What:
To ensure that proposed development is consistent with wastewater
treatment plant expansion as set forth in DSRSD's master plan.
DSRSD/Department of Public Works.
The City must confirm that proposed development is consistent with the
capacity and timing identified in DSRSD's Master Plan
27
City of Dublm
May 7, 1993
When:
Completion:
Verification:
"-,,
~
Bas DubIiD Specific Plan & GPAEIR
Miûgation Monitoring Plan
During review of tentative map.
Prior to approval of Final Map.
Department of Public Works.
Impact 3.S/F Increase in Energy Usage Through Increased Wastewater Treatment
Miti~ation Measure 3.5/10.0: Use of Enerev-Efficient Trea1ment Svstem
Why:
Who:
What:
When:
Completioa:
Verification:
To include energy efficient treatment systems in any wastewater treatment
plant expansion and operate the plant to take advantage of off -peak energy.
DSRSD
Design and construct energy-efficient treatment systems.
Design phase for WWTP expansion.
On-going.
DSRSD.
Impact 3.S/G Lack of Carrent Wastewater Disposal Capacity
Mitieation Measure 3.5/11.0: fProeram 9H) EXlJOrt Pi Deline
Why:
Who:
What:
When:
Completion:
Verification:
To support TWA in its current efforts to implement a new wastewater
export pipeline system.
Tri- Valley Wastewater Authority/Dublin City Managei-"s Office.
Support implementation of new export pipeline. '
Ongoing.
Approval of TW A improvement plans.
Dublin City Managers Office.
Mitieation Measure 3.5/12.0: (Policv 9-5) Construction of Recvcled Water Svstem
Why:
Who:
What:
When:
Completion:
Verification:
To promote recycled water use for landscape irrigation m eastern Dublin
through upgrading of treatment and construction of a recycled water
distribution and storage system in eastern Dublin.
DSRSD.
Promote recycled water use.
During development review process.
Ongoing.
DSRSD.
Mitž~ation Measure 3.5/13.0: (Proeram 9J} Recvcled Water Distribution Svstem
Why:
Who:
What:
When:
Completion:
To have DSRSD update its proposed recycled water distribution system
computer model to reflect the adopted Specific Plan/GP A.
Department of Public WorksjDSRSD.
Public Works will request DSRSD to update its computer model. DSRSD
will be responsible to update the model.
M soon as possible after the adoption of the Specific Plan/GP A.
Before approval of any detailed wastewater improvement plans.
28
City or Dublin
May 7, 1993
Verification:
/-
,-
Eas. . Dublin Spec:ÜÍç PJ~ Ii: GP A EIR
Mitigation Mcmi~oring Plan
Department of Public WorksJDSRSD.
MitÎl!aljon Measure 3.5/14.0:rProf!Tam 9K) Wastewater Recvclinv and Reuse
Why:
Who:
What:
When:
Completion:
VerifieaôoD:
To support the efforts of the Tri- Valley Water Recycling Task Force Study
through Zone 7, encouraging wastewater recycling and reuse for landscape
irrigation.
City of Dublin Department of Public Works/Zone 7.
Encourage wastewater recycling as detailed in the Tri- Valley Water
Recycling Task Force Study.
As soon as possible after the adoption of the Specific Plan/GPA.
Ongoing.
~p~entofPublicWor~.
Impact 3.SjH Increase in Energy Usage Through Increased Wastewater Disposal
Mitil!alion Measure 3.5/15.0: Enerf!"V for EXTJort DisDosal
Why:
Who:
What:
When:
Completion:
Verification:
To encourage LA VWMA to continue its program of off-peak pumping of
wastewater to balance electric demands in the PG&E system.
City of Dublin/LA VWMA.
Encourage off-peak pumping.
Upon adoption of the Specific Plan/GP A.
On-going.
Department of Public Wor~.
Mitil!ation Measure 3.5/16.0: Enert!v for DislJosal thrOUl!h Recvcled Water Svstem
Why:
Who:
What:
When:
Completion:
Yerification:
To ensure that the recycled water treatment system is planned, designed and
constructed for energy efficiency in operation.
City of Dublin Department of Public Works/DSRSD
Design, construction, and operation of energy-efficient system.
Upon agreement to use a recycled water treatment syste~.
On-going.
DSRSD.
Impact 3.5/1 Potential Failure of Export Disposal System
Mitit!t21ion Measure 3.5/17.0: Redundancv in Emrineerill!!
Why:
Who:
What:
When:
Completion:
Verific:ation:
To avoid potential failure in the operation of the pumps in the TWA
wastewater collection system.
TWA
Incorporate engineering redundancy into· the design of the pump stations
and provide emergency power generators.
Design and construction phase of export system.
Approval of export system improvement plans.
Department of Public Works.
29
,---
.-,
CRy or Dublin
May 1,1993
Eas, , Dublm Specific Plan &1: GP A Em
Mitiption Monitoring Plan
Impact 3.5/J Pump Station Noise and Odors
Mirillation Measure 3.5/18.0: Desif!7l of PumD {J1d Motors
When:
CompletiolC
Verification:
To ensure that pump station design minimizes potential for impacts related
to noise and odors.
TWA
Design pump and motors to meet local noise standards. Install odor control
equipment.
Design phase of export system.
Approval of export system improvement plans.
Department of Public Works.
Why:
Who:
What:
Impact 3.5/K Storage Basin Odors and Potential Failure
Mitillation Measure 3.5/19.0: DesŽJrn/Em!ÍneerinJ! of Storaf!e Basins
When:
Completion:
Verification:
To ensure that wastewater storage basins are designed to control odors and
minimize the risk of failure in the event of an earthquake.
TWA
Design storage basins to meet seismic codes, and limit odors by burying
tanks and incorporating odor control equipment.
Design phase of export system.
Approval of export system improvement plans.
Department of Public Works.
Why:
Who:
What:
Impact 3.5/L Recycled Water System Operation
Mitillation MeaslRe 3.5/20.0: Construction of RecvcledWater Distribution Svstem
When:
Completion:
Verification:
To require that constrUction of the recycled water distribution system be in
accordance with all applicable State and local regu]ations.
DSRSD
Require compliance of recycled water distribution system with applicable
regulations of the DHS and the SFBR WQCB.
Condition of approval for recycled water distribution system.
Approval of improvement plans.
DSRSD.
Why:
Who:
What
Impact 3.5fM Recycled Water Storage Failure
Mitil!ation Me~e 3.5/21.0: Desirtn/Enl!ineerinl! of Water Storal!e Basins
When:
To ensure that reservoir construction meets an applicable standards of
DSRSD and appropriate health agencies.
DSRSDjDepartment of Public Works.
Confirm the reservoir design and construction meets all applicable
standards.
Design phase.
Why:
Who:
What:
30
City of Dublin
May 7,199'S
Completion:
Verification:
. --..,
,-,
Eas Dublin Specific Plan & GPA Em
Mitigation MoDitoring Pbm
Approval of improvement plans.
Department of Public Works/DSRSD.
Impact 3.SjN Loss of Recycled Water System Pressure
Mitží!OÍŽon Measure 3.5 /22.0: Comoliance with DSRSD sttmdards
Why:
Who:
What:
When:
Completion:
Verific:ation:
To ensure that proposed recycled watet' pump stations meet all applicable
standards of DSRSD and include emergency power generation.
DSRSDjDepartment of Public Works.
Confirm compliance of pump station desìgn with D,SRSD standards, and
include emergency power generators.
Design phase.
Approval of improvement plans.
Department of Public Works.
Impact 3.5/0 Secoudary Impacts from Recycled Water System Operation
Mitií!ation Measure 3.5/23.0: Salt Reduction
Why:
Who:
What:
When:
Completion:
Verific:ation:
To ensure that recycled water projects meet any applicable salt mitigation
requirements of Zone 7.
DSRSD.
Coordinate with Zone 7 to confirm whether or not a recycled water system
iIi the Project area would require demineralization. '
Design Phase.
Approval of improvement plaDs.
DSRSD.
Impact 3.SjP Overdraft of Local Groundwater Resources
Mitií!ation Measure 3.5/24.0: (Policy 9-2) Annexation of SDecific Plan area it> DSRSD
Why:
Who:
What:
When:
Completiou:
VerificatioD:
To expand DSRSD service boundaries to encompass the entire eastern
Dublin Specific PlanjGPA area.
DSRSD.
Development or annexation application.
Condition of approval for planned development prezoning.
Prior to approval of detailed improvement plans.
DSRSD.
Mitií!ation Measure 3.5/25.0: Connection to DSRSD Water Svstem
Why:
Who:
What:
When:
To encourage all development in the Project area to connect to the DSRSD
water system.
City of Dublin Public Works Department/DSRSD.
Inform all project applicants of preference for connection of new
development to the DSRSD system.
During preparation of tentative map.
31
City of Dublin
May 1, 1993
Completion:
Verification:
,.---
--"'.
Eas Dublin Specific Plan &: GPA Em
Mitigation Monitor.ing Plan
Prior to approval of final IDaþ.
City of Dublin Department of Public Works.
Impact 3.5/Q Increase in Demand 'for Water .
Miti,ation Measure 3.5 /26.0: (Pror:rram 9A) Water COnu.Tvatz07l
Why:
Who:
What:
When:
Completion:
Verification:
To require water conservation measures to be designed into individual
projects.
Developers/City of Dublin Public Works Department/DSRSD.
Review project applications for incorporation of water conservation
measures.
Condition of approval for tentative map.
Prior to approval of imal map.
Department of Public Works.
Mitiflation Measure 3.5/27.0: (Proflram 9BJ Water Recvclinfl
Why:
Who:
What:
When:
Completion:
Verification:
To require water recycling measures be incorporated into individual
projects.
Developers/City of Dublin Public Works DepartmentjDSRSD.
Review projects for incorporation of DSRSD and Zone 7 recommendations
relating to the use of recycled water.
Condition of approval for tentative map.
Approval of detailed improvement plans.
Dublin Department of Public Works.
Mitiflation Measure 3.5/28.0: Zone 7 lmDrOllements
Why:
Who:
What:
When:
Completion:
Verification:
To ensure that Zone 7 has water supply needed 'to meet requirements of the
Project.
Public Works Department/DSRSD/Zone 7.
ConÏxrm status of Zone 7 water supply improvements.
Condition of approval for "will serve" letter.
Prior to approval of final map.
DSRSDjPublic Works Department.
Miti1!ation Measure 3.5/29.0: New Zone 7 Turnouts
Why:
Who:
What:
When:
Completion:
Verification:
To provide for the construction of two additional turnOuts from the Zone
7 Cross Valley Pipeline to serve the Eastern Dublin area.
Zone 7 fDSRSD.
Construction of two additional turnouts.
As needed to provide adequate service to new development.
Ongoing.
DSRSD.
32
City of Dublin
May 7, 1993
.'---'
-"
EasDubliD Specific Plan & GPA EIB.
Mitigation MonitorlDg Plan
Miti!!a1ion Measure 3.5/30: [l11erconnections with Exžstin1l Svstems
Wh)':
Who:
What:
When:
Completion:
Verificatioa:
To provide for increased water source reliability, the Project water system
should be interconnected with existing adjoining systems.
DSRSDJPublic Works Department.
Plan water system to interconnect with existing systems.
Ongoing as system within the Project area is built out.
Ongoing.
Public Works Department.
Mitž1laiion Measure 3.5/31.0: Reimbw-sement for New DSRSD Grmmdwater Wells
Wh)':
Who:
What:
When:
Completion:
Verificatioa:
To provide a backup source of water supply to its Zone 7 source, DSRSD
will reimburSe City of Pleasanton for construction and operation of new
groundwater wells 'south of the Project area.
DSRSD/City of Pleasanton.
DSRSD will reimburse City of Pleasanton for groundwater wells.
On schedule to be determined by DSRSD and the City of PleasantOJl.
Ongoing.
DSRSD.
Impact 3.5/R Additional Water Treatment Plant Capacity
Mitif!a1ion Measure 3.5./32.0: Zone 7 Phasinf! for Water Treatment Svstem lmlJroyements
Why:
Who:
What:
When:
Completion:
Verification:
To meet increasfng demands on its water system, Zone 7. has established a
phasing for water treatment system improvements.
Zone 7.
Implementation of phased improvements.
Pursuant to established schedule.
Pursuant to established schedule.
Zone 7.
Miti1!aižon Measure 3.5/33.0: ConstructÌ01I of New Chlorinmion/FluoridDlion Stations
Why:
Who:
What:
When:
Completion:
Verification:
To meet increased demand resulting from the project. DSRSD should
construct two new chlorination/fluoridation stations at the two proposed
Zone 7 turnouts to eastern Dublin.
DSRSD/Zone 7.
ConstrUCtion of two new stations.
As needed to provide adequate service. with the western turnout being
developed first. The eastern turnout would not be developed until
development of the eastern portion of the Project area.
On schedule to be determined by DSRSD and Zone 7.
DSRSD.
33
City of Dubtm
Maf '1, 1993
-.
-',
Eas. .i>ublin Specific Plan & GP A EIR
Mitigation Monitoring Plan
Impact 3.5/8 Lack of a Water Distribution System
Mitif!ati01l Measure 3.5/34.0: (Policv 9-1 J Provision of an AdeQUate Water SUDDlv System
Why:
Who:
What:
When:
Completion:
Verification:
To provide an adequate water supply system and related improvements and
storage facilities for all new development in the Project area.
DSRSD¡Developers.
Require new development to build the water supply system needed per
DSRSD.Master PJan and service standards.
Condition of approval for tentative map.
Prior to approval of Final Public Improvements Plan.
DSRSDjDepartment of Public Works.
·Mitif!ation Measure 3.5/35.0: (ProtTram 9C) Water Svstem Mastl~r Plan
Why:
Who:
What
When:
Completion:
Verification:
To ensure that DSRSD updates its water system master plan computer model
to reflect the adopted Specific Plan/GPA land uses.
City of DublinjDSRSD
Request that DSRSD update its water system master plan computer model.
As soon as possible after adoption of the Specific Plan/GP A.
Prior to the approval of a Public Improvement Plan for any new
development.
Public Works Department.
Mitif!ation Measure 3.5/36.0: r PrOtTTam 9D) CombinintT of WaJ.er Svstems
Why:
Who:
What
When:
Completion:
Verification:
To consolidate the Camp Parks and Alameda County water systems and
turnouts with the DSRSD system.
City of Dublin Public Works Department/Camp Parks/ Alameda
County jDSRSD.
Encourage agencies to combine water systems with DSRSP.
Ongomg from date of Project adoption.
Ongoing.
DSRSD.
Why:
Mili!!alion Measure 3.5/37.0: DSRSD Standards
Who:
What:
When:
Completion:
Verificatiou:
To require that design and construction of all water system facility
improvements be in accordance with DSRSD standards.
City of Dublin Public Works Depamnent/DSRSD/Developers
Review each development proposal to verify that all water system facility
improvements conform to DSRSD standards.
Condition of approval for Public Improvements Plan.
Prior to approval of Fmal Public Improvements Plan.
Public Works Department.
34
City of Dublin
May 7, 1993
..-
."'---
Eas\ i)ublin Specific Plan &: GPA Em
Mitiption MoDitoring PJan
Mitie-ation Measure 3.5/38.0: DSRSD Service
Why:
Who:
What:
When:
Completion:
Verification:
To require a "will serve· letter from DSRSD prior to issuance of a grading
permit.
City of DublinjDSRSDjDeveloper.
Coníl1'1I1 receipt of a "will-serve" letter from DSRSD.
Condition of approval for tentative map.
Prior to approval of ímal map.
Planning Department.
Impact 3!S/T laducemeøt of Sabstanüal Growth and Concentration of Population
Mitie-ation Measure 3.5/39.0: Sizin~ of Water DistribJJlion Svstem
Why:
Who:
What:
When:
Completion:
Verification:
To reduce the growth-inducing potential of water system expansion, the
water distribution system will be sized to accommodate only the estimated
water demands from approved land uses within the Project.
DSRSD.
Limit capacity of water distribution system to serve only the Project site.
Update of DSRSD water system master plan computer model.
Prior to the approval of a Public Improvement Plan for any new
development in the Project area.
Department of Public Works.
Impact 3.5/U Increase in Euergy Usage through Operation of the Water Distribution System
Mitie-tltÌon Measure 3.5/40.0: Ener!!v-Efficient O"eration of Water Disuibulion Svstem
Why:
Who:
What:
When:
CompletioJl:
Verification:
To ensure that the water distribution system is planned, designed and
constructed for energy-efficient operation.
City of DublinjDSRSD.
Design and operation of energy efficient water distribution system.
Ongoing.
On-going.
Public Works Department.
Impact 3.S/V Potential Water Storage Reservoir Failure
MitiJration MeQSU1'2 3.5/41.0: Desi!!n/En!!inEeri7U! of Wal2T Storae-e Basins
Why:
Who:
What:
When:
Completion:
Verific:ation:
To require all reservoir construction to meet all the applicable standards,of
DSRSD. to meet current seismic buildmg standards, and to provide adequate
site drainage.
DSRSD.
Design basins to reduce failure potential.
Design phase.
Approval of improvement plans.
DSRSD.
35
City ofDublm
May 'T, 1993
-.
,-.
Eas:. Dublin Specific Plan &: GP A Em
MitigatiOD Monitoring Plan
Impact 3.5/W Potential Loss of System Pressure
Mitisralžon Measure 3.5/42.0: ComDlianæ With All DSRSD Standards
Why:
Who:
What:
When:
Completion:
VerificatioD:
To require the proposed new water pump stations to meet all the applicable
standards of DSRSD and include emergency power generators at each pump
station.
City of Dublin/DSRSD.
Engineering provisions for emergency conditions.
Design phase.
Approval of final improvement plans.
Public Works Department.
Impact 3.S4/X Potential PIODP Station Noise
Mitit!ation Measure 3.5/43.0: Reduction of Potential Noise
Why:
Who:
What:
When:
Completion:
Verification:
To include design provisions to pump stations that will reduce sound levels
from operating pump motors and emergency generators.
DSRSD.
Incorporate necessary engineering provisions in design of pump stations to
minimize operational noise.
Design phase.
Approval of ïmal improvement plan$.
Public Works Department.
Impact 3.5/Y Potential Flooding
Mitisrol.ion Measure 3.5/44.0: (Policv 9-7) Provision of Draina!!e Facilities
Why:
Who:
What:
When:
Completion:
Verification:
To provide drainage facilities that will minimize any increased potential for
erosion or flooding.
DevelopersfDSRSD.
Review drainage facilities design to verify that erosion/flooding potential
will be minimized.
Condition of tentative map approval.
Approval of final grading and improvement plans.
Public Works Department.
Mitisration Measure 3.5/45.0: (Policv 9-8) Natural Channel lmDrovements
Why:
Who:
What:
When:
Completion:
Verification:
To require channel improvements consisting of natural creek bottoms and
side slopes with natural vegetation where possible.
Developers/Zone 7.
Review requÍIed channel improvements for theÍI' attempt to maintain
natural-appearing conditions while addressing the drainage requirements.
Condition of tentative map approvaL
Prior to final grading plan approval.
Department of Public Works with input from Zone 7.
36
CRy of Dublin
May 7, 1993
.-..
,-
Bas. . Dublin Specific Plan &i: GP A Em.
MUiptioÞ MoDitoriDg Plan
Mitieation Measure 3.5 /46.0: (Prorrram 9R) Storm Drainafle Master Plan
Why:
Who:
What:
When:
Completion:
Veñfic:atioø:
To require the preparation of a Master Drainage Plan for each development.
Developers.
Preparation of Storm Drainage Master Plan.
Condition of tentative map approvaL
Prior to ïmal map approval.
Public Works Department.
Mitirration Measure 3.5/47.0: (Pro!!TlU/1 9S) Flood Co1l1ToI
Why:
Who:
What:
When:
Com.pletion:
Veñfication:
To require Project area development to provide facilities to alleviate
potential downstream flooding due to Project area development.
Developers.
Provision of flood control improvements.
Condition of tentative map approval.
Prior to ïmal map approval.
Public Works Department.
Mitif!ation Measure 3.5/48.0: Construction of Storm Drairtarre Facilities
Why:
Who:
What:,
When:
Completion:
Verification:
To require the construction of the backbone drainage facilities consistent
with the Storm Drainage Master Plan.
Developers.
Construction of storm drainage facilities.
Condition of tentative map approval.
Prior to final map approval.
Public Works Department.
Impact 3.5/Z Redu.ced Groundwater Recharge
Mitžrratžon Measure 3.5/49.0: (Policv 9-9) Protection and Enhancement of Water ResOUT.ces
Why:
Who:
What:
When:
Completion:
Verific:ation:
To plan facilities and management practices that protect and enhance water
Quality.
City of Dublin Public Works Department/Zone 7.
Oversight of facilities to protect and enhance water quality.
Condiûon of tentative map approval.
Prior to final map approval.
Public Works Department.
Mžtiflation Measure 3.5/50.0: Zone 7 Groundwater Recharrre Proeram
Why:
Who:
What:
To protect groundwater resources, Zone 7 supports an ongoing groundwater
recharge program for the Central Basin.
City of Dublin Public Works Department.
Support Zone 7 groundwater recharge program, by encouraging recharge
areas within the Project area where feasible.
37
c:ü," of Dublin
:May 7, 1993
WheE
CompletioE
Verification:
~.
-.
E~.. Dub6n Specific Plan && GP A EIR
Mitig:t.tion Monitoring Plan
COndition of tentative map approvaL
Prior to [mal map approval.
Public Works Department.
Impact 3.5/ AA Non-Pomt Sources of Pollution
Mitisra!ion MeastDe 3.5/52.0: Communitv EducaJ.ion Proí!rams
Why:
Who':
What:
WheE
Completion:
Veñfication:
To develop community-based programs to educate local residents and
businesses on methods' to reduce non-point sources of pollution, and
coordinate such programs with current AJameda County programs·
City of Dublin Public Works Department.
Development/dissemination of information to reduce non-point sources of
pollution.
Condition of tentative map approval
On-going
Public Works Department.
MitiJration Measure 3.5/53.0: "Best Mana~emenl Practices"
Why:
Who:
What:
When:
Completion:
Verification:
To require all development to meet the requirements of the City of Dublin's
"Best Management Practices" to mitigate storm water pollution.
City of Dublin Publiç Works Department.
Review proposed development plans to ensure that "Best Management
Practices" have been incorporated to reduce pollution.
During development review processing.
Prior to buildÍng permit approval.
Public Works Department.
Mitilration Measure 3.5 /54.0: Notiontll Pallulion Disckarlre Elimination Svstem ReQUirements
Why:
Who:
What:
Wheø:
Completion:
Verification:
To require all development to meet the water quality requirements of the
City of Dubfui's NPDES permit.
City of Dublin Public Works Department.
Review proposed development plans to ensure that NPDES requirements
have been incorporated to reduce pollution.
During development review processing.
Prior to building permit approval.
Public Works Department.
Mitií!a1ion Measure 3.5/55.0: Urban Rzma" Clean Wate" Prolrram Ret1UÌl'ements
Why:
Who:
What:
When:
To require all development to meet the water quality requirements of the
Alameda County Urban Runoff Clean Water Program.
City of Dublin Public Works Department.
Review proposed development plans to ensure that the requirements of the
County~s Urban Runoff Clean Water Program have been incorporated to
reduce pollution.
During development review processing.
38
City o£DubliD
May 7, 1995
Completion:
Verification: ,
,-",
~
,
Ea. . Dublin Specific Plan dI; GPA EIR
Mif;~on Monitoring Plaza
Prior to building permit approval.
Public Works Department.
SECTION 3.6: SOILS. GEOLOGY AND SEISMICITY
1. IIDBaets ReouiriD:e Miti:eatiou
This section identifies the following impactS requiring mitigation:
1M 3.6jB Earthquake Ground Shaking: Primary Effects
1M 3.6/C Earthquake Ground Shaking: Secondary Effects
1M 3.6/D Substantial Alteration to Project Site Landforms
1M 3.6{F Groundwater ImpactS
1M 3.6/G Groundwater Impåcts Associated with Irrigation
1M 3.6/H Shrinking and Swelling of Expansive Soils and Bedrock
1M 3.6/1 Natural Slope Stability
1M 3.6/1 Cut-and-Fill Slope Stability
1M 3.6/K Erosion and Sedimentation: Construction-Related
1M 3.6/L Erosion and Sedimentation: Long-Term
2. Miö2atioD ImBlementation and MODitoriDE ProBam
Impact 3.6/B Earthquake Ground Shaking: Primary Effects
Miti1!ation Measure 3.6/1.0: lm'Dlementation of Cw-rent Seismic Desinz Standards
Why:
Who:
What:
When:
Completion:
Verification:
To require the use of modem seismic design in construction of development
projects, and build in accordance with Uniform Building code and
applicable county and city code reqmrements.
DevelopersjPublic Works Department.
. Review plans to ensure conformance to UBC and all other applicable codes.
Condition of tentative map approval.
Prior to final improvement plan/grading plan approval.
Public Works Department.
Impact 3.6/C Earthquake Ground Shaking: Secondary Effects
Miti1!ano71 Measure 3.6/2.0: Desi1m R.eouirements for Flat Areas
Why:
Who:
What:
When:
Completion:
Verification:
To provide setbacks from or'modification of unstable and potentially
unstable landforms, and use of appropriate design to ensure seismic safety.
DevelopersjPublic Works Department.
Verify that improvements have been located away from unstable landforms;
that potentially unstable landforms have been stabilized; and that
develoøment plans conform to UBC and all other applicable codes.
Condition of tentative map approval.
Prior to final improvement plan/grading plan approval.
Public Works Department.
39
City or Dublin
May 7, 1993
,-,
-
Eaa.. Dublin Specific Plan & GP A Em
Mitigation MoDitoriDg Plan
Mitirra1žon Measure 3.6/3.0: Desi1!1l Reouirements for Hillside Areas
Why:
Who:
What:
When:
Completion:
VerificatÌon:
To require appropriate grading and design to completely remove unstable
and potentially unstable materials in hillside areas where development may
require substantial grading.
DevelopersjPublic Works Department.
Verlfy that grading and design will remove unstable materials.
Condition of tentative map approval.
Prior to final improvement plan/grading plan approval.
Public: Works Department.
Mitirration Measure 3.6/4.0: Desim Reouirements for Hillside Fills
Why:
Who:
What:
When:
Completion:
Verification:
To use engineering techniques and improvements~ such as retention
structnres~ drainage improvements, properly designed keyways, and
adequate' compaction to improve the stability of íill areas and reduce
seismically induce fill settlement. '
DevelopersjPublic Works Department.
Require engineered retention :strUctures, surface and subsurface drainage
improvements.
Condition of tentative map approval.
Prior to ímal improvement plan/grading plan approval.
Public Works Dep~ent.
Mitirraižon Measure 3.6/5.0: DesÌJrn Reouir.ements for Fill Settlement
Why:
Who:
What:
When:
Completion:
Verification:
"
To use engineering techniques and improvements, such as retention
structures, drainage improvements, properly designed keyways~ and
adequate compaction to improve the stability of íill areas and reduce
seismically induce fill settlement.
Developers/Public Works Department.
Require engineered retention structures~ surface and subsurfac:e drainage
improvements.
Condition of tentative map approval.
Prior to ímal improvement plan/grading plan approval.
Public Works Department.
Mitirra!ion Measure 3.6/6.0: DesifnZ Reauirements (roads. structural fmmdations and
rmderrrrmmd utilities) for Fill Settlement
Why:
Who:
What:
When:
Completion:
To design roads, structural foundations~ and underground utilities to
accommodate estimated settlement without failure, especially across
tranSitions between nlls and cuts, and to remove or reconstruct poten1ia11y
unstable stock pond embankments in development areas.
DevelopersjPublic Works Department.
Verify the effectiveness of improvements to ensure the stability of proposed
roads, structural foundations and underground utilities.
Condition of tentative map approval.
Prior to ímal improvement plan/grading plan approval.
40