Loading...
HomeMy WebLinkAboutPC Reso 18-12 PLPA-2016-00064 Phase 4-5 Blvd Project SDRRESOLUTION NO. 18-12 A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING SITE DEVELOPMENT REVIEW FOR SIX NEIGHBORHOODS WITHIN PHASES 4 AND 5 OF THE BOULEVARD PROJECT (PORTION OF ASSESSOR PARCEL NUMBER 986-0001-001-15) PLPA-2016-00064 WHEREAS, Dublin Crossing LLC is requesting approval to construct six new neighborhoods in the Boulevard (Dublin Crossing Specific Plan) development area ("Project Site"), which includes the construction of 510 townhomes, duets, and detached small -lot single family homes, landscape improvements, and street improvements for Phase 4/5 (the final phases of development); and WHEREAS, the Applicant is also requesting approval of Vesting Tentative Maps 8370, 8371, 8372, and 8373 to create individual neighborhoods and parcels on approximately 42.16 acres within Phase 4/5 of the Boulevard project area; and WHEREAS, the project site is located within the Dublin Crossing Specific Plan and the Dublin Crossing Zoning District; and WHEREAS, in accordance with the California Environmental Quality Act certain projects are required to be reviewed for environmental impacts and when applicable, environmental documents prepared; and WHEREAS, the project is located within the Dublin Crossing Specific Plan area (Specific Plan), which was the subject of an Environmental Impact Report (EIR) (SCH# 2012062009) prepared in accordance with the California Environmental Quality Act (CEQA) and certified by the City Council on November 5, 2013 (Resolution 186-13). Site Development Review was included as part of the project entitlements listed in the EIR. The EIR provides the CEQA environmental review for those future entitlements to implement the Specific Plan, unless the standards for subsequent or supplemental environmental review under CEQA are met. Pursuant to CEQA, the Site Development Review approval for this project is within the scope of the project analyzed in the EIR and no further CEQA review or document is required; and WHEREAS, the Site Development Review Project Plan Set, attached as Exhibit A to this Resolution defines this "Project" and is available and on file in the Community Development Department; and WHEREAS, a Staff Report was submitted recommending that the Planning Commission approve Site Development Review for Phase 4/5 of the Boulevard project; and WHEREAS, the Planning Commission did hold a noticed study session on April 10, 2018 and also did hold a public hearing on said application on May 8, 2018 for this project, at which time all interested parties had the opportunity to be heard; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and 1 of 13 WHEREAS, a Staff Report was submitted recommending that the Planning Commission approve Site Development Review for Phase 4/5 of the Boulevard project; and WHEREAS, the Planning Commission did hear and use independent judgment and considered all said reports, recommendations, and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED that the Planning Commission of the City of Dublin hereby makes the following findings and determinations regarding the proposed Site Development Review for Phase 4/5 of the Boulevard project: Findings required by the Dublin Crossing Specific Plan in accordance with Ordinance 07-13: A. The proposed development is in substantial compliance with all applicable aspects of the Dublin Crossing Specific Plan and is consistent with the applicable design guidelines and development standards contained therein because: 1) The project will not undermine the architectural character and scale of development in which the proposed project is to be located; 2) the project will provide unique, varied, and distinct housing opportunities within the Dublin Crossing Specific Plan area; 3) the project is consistent with the General Plan and Dublin Crossing Specific Plan Land Use designations of DC Medium -High Density Residential and DC Medium Density Residential; and 4) the project complies with the development standards established in the Dublin Crossing Zoning District. B. The proposed development is in compliance with the Dublin Crossing Infrastructure Master Plan because: 1) the sidewalks and bike lanes will eventually link up with the project common/open space areas, private pocket parks, the Community Park and Iron Horse Regional Trail; 2) all infrastructure including streets, parkways, pathways, sidewalks, and street lighting are proposed for construction in accordance with the Dublin Crossing Specific Plan and Boulevard Landscape Master Plan; and 3) development of this project will conform to the improvements standards allowing residents the safe and efficient use of these facilities. C. Approval of the proposed development will not result in new, significant unmitigated environmental impacts nor a significant increase in impacts previously identified in the Dublin Crossing Specific Plan Environmental Impact Report because the amount and intensity of development proposed is in conformance with the project analyzed in the Dublin Crossing EIR. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby approves the Site Development Review for Phase 4/5 of the Boulevard (Dublin Crossing) project based on findings that the proposed project is consistent with the General Plan, the Dublin Crossing Specific Plan, and the Dublin Crossing Zoning District, subject to the conditions included below. CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL.] Planning, [B] Building, [PO] Police, [PW] Public Works [P&CS] Parks & Community Services, [ADM] Administration/City Attorney, [FIN] Finance, [F] Alameda County Fire Department, [DSR] Dublin San Ramon Services District, [CO] Alameda County Department of Environmental Health, [Z7] Zone 7. 2of13 # CONDITION TEXT RESPON. WHEN AGENCY REQ'D Prior to: PLANNING CONDITIONS 1. Approval. This Site Development Review approval is for Phase 4/5 PL Ongoing (Neighborhoods 19-24) of Boulevard (Dublin Crossing) This approval shall be as generally depicted and indicated on the: 1. Project Plans prepared by William Hezmalhalch Architects, Bassenian Lagoni Architects, Woodley Architecture Group, Dahlin Group, RJA Engineers, MacKay & Somps, Gates + Associates Landscape Architects, Brookfield Residential, and Lennar/CalAtlantic Homes (attached to this Resolution as Exhibit A) — dated received April 27, 2018; and 2. Color and material boards prepared for each of the six neighborhoods. The plans are on file in the Community Development Department. The approval is as further specified as the following Conditions of Approval for this project. 2. Effective Date. This SDR approval becomes effective 10 days after action by the PL Ongoing Planning Commission unless otherwise appealed to the City Council. 3. Permit Expiration. Construction or use shall commence within one (1) year of PL One Year Permit approval or the Site Development Review shall lapse and become null and After Effective void. If there is a dispute as to whether the Permit has expired, the City may hold Date a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If a Permit expires, a new application must be made and processed according to the requirements of this Ordinance. 4. Time Extension. The original approving decision -maker may, upon the PL Prior to Applicant's written request for an extension of approval prior to expiration, upon Expiration the determination that all Conditions of Approval remain adequate and all Date applicable findings of approval will continue to be met, grant an extension of the approval for a period not to exceed six (6) months. All time extension requests shall be noticed and a public hearing shall be held before the original hearing body. 5. Compliance. The Applicant/Property Owner shall operate this use in compliance PL On -going with the Conditions of Approval of this Site Development Review Permit, the approved plans and the regulations established in the Zoning Ordinance. Any violation of the terms or conditions specified may be subject to enforcement action. 6. Revocation of Permit. The Site Development Review approval shall be PL On -going revocable for cause in accordance with Section 8.96.020.1 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this permit shall be subject to citation. 7. Requirements and Standard Conditions. The Applicant/ Developer shall Various Building comply with applicable City of Dublin Fire Prevention Bureau, Dublin Public Works Permit Department, Dublin Building Department, Dublin Police Services, Alameda County Issuance Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions required have been or will be met. 8. Required Permits. Developer shall obtain all permits required by other agencies PW Building including, but not limited to Alameda County Flood Control and Water Permit Conservation District Zone 7, California Department of Fish and Game, Army Issuance Corps of Engineers, Regional Water Quality Control Board, Caltrans and provide copies of the permits to the Public Works Department. 9. Fees. Applicant/Developer shall pay all applicable fees in effect at the time of Various Building building permit issuance, including, but not limited to, Planning fees, Building fees, Permit Traffic Impact Fees, TVTC fees, Dublin San Ramon Services District fees, Public Issuance Facilities fees, Dublin Unified School District School Impact fees, Fire Facilities Impact fees, Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water Connection fees; or any other fee that may be adopted and applicable. Approved Development Agreement supersedes where applicable. 3 of 13 10. Indemnification. The Developer shall defend, indemnify, and hold harmless the ADM On -going City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City to the extent such actions are brought within the time period required by Government Code Section 66499.37 or other applicable law; provided, however, that the Developer's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying the Developer of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or proceedings. 11. Clarification of Conditions. In the event that there needs to be clarification to the PW On -going Conditions of Approval, the Director of Community Development and the City Engineer have the authority to clarify the intent of these Conditions of Approval to the Developer without going to a public hearing. The Director of Community Development and the City Engineer also have the authority to make minor modifications to these conditions without going to a public hearing in order for the Developer to fulfill needed improvements or mitigations resulting from impacts to this project. 12. Mitigation Monitoring Program. The Applicant/Developer shall comply with the PL Ongoing Dublin Crossing Final Environmental Impact Report (EIR) certified by City Council Resolution 186-13, including all mitigation measures, action programs, and implementation measures contained therein. The EIR is on file with the Community Development Department. 13. Modifications. Modifications or changes to this Site Development Review PL On -going approval may be considered by the Community Development Director if the modifications or changes proposed comply with Section 8.104.100 of the Zoning Ordinance and with the Dublin Crossing Specific Plan. 14. Mailboxes. Location subject to USPS review and approval. PL Approval of Improvement Plans 15. On -street parking spaces (private streets): Counted for guest parking. PL, PW Ongoing Parking spaces on private streets in each neighborhood throughout the project area have been counted to satisfy the guest parking requirement for each neighborhood. None of the parking spaces on private streets shall be assigned or reserved to a specific unit or person and shall be open to use by any resident or guest to the project area. 16. Public Art. The Applicant/Developer is intending to acquire and install public art PL Public Art on the project site in accordance with Chapter 8.58 of the Dublin Municipal Code should be and in accordance with the Boulevard Project Area Public Art Master Plan, which installed in has been approved by the City Council. The value of the public art component is each required to equal or exceed 0.5% of the building valuation (exclusive of land) for neighborhood the project. For Phase 4/5, the total Public Art valuation is $898,858. This value, per the Public combined with the public art valuation for the other phases of the Boulevard Art Master project, shall be installed throughout the Boulevard project area in accordance with Plan prior to the approved Public Art Master Plan. All public art installations are subject to occupancy of approval of the City Council upon recommendation by the Heritage and Cultural the last unit in Arts Commission. each neighborhood. 17. Satellite Dishes: The Applicant/Developer's Architect shall prepare a plan for PL Issuance of review and approval by the Director of Community Development and the Building building Official that provides a consistent and unobtrusive location for the placement of permit individual satellite dishes. Individual conduit will be run on the interior of the unit to the satellite location on the exterior of the home to limit the amount of exposed cable required to activate any satellite dish. The plan shall show a common and consistent location for satellite dish placement to eliminate the over proliferation, haphazard and irregular placement. 18. Neighborhood 20: Sheet C.2.1 notes which lots will be restricted to two-story P Issuance of homes, which lots have the option to be three-story, and which lots will be three- Building story. Each plot plan reviewed in this neighborhood will need to ensure Permit and conformance with this exhibit. approval of 4 of 13 plot plans for individual lots. 19. Affordable Housing. In accordance with the approved Development Agreement P Building (Ordinance 8-13), for all units above 1,600, the project shall conform to the Permit Inclusionary Zoning Regulations in Chapter 8.68. The Developer is required to Issuance for provide 20 affordable units for the 158 units above the previously allotted 1,600 any unit over units and enter in an affordable housing agreement imposing appropriate resale 1,600 controls and/or rental restrictions on the affordable units. The developer may propose that the affordable housing agreement include an alternate method of compliance to be approved by the City Council. PLANNING - LANDSCAPE 20. Chabot Creek adjacent parcel. The open space/equipment staging area shown P Ongoing on Sheet L.02 of the Project Plan Set (Exhibit A) shall be maintained by the Boulevard Homeowners Association for the benefit of and use by public agencies (City of Dublin, Zone 7 Water Agency) to stage equipment during on -site creek maintenance activities. No long-term equipment or material storage beyond that which is needed for the immediate repairs shall take place nor shall the area be utilized for public or private parking. 21. Private Pocket Parks. Several neighborhoods include a private pocket park that P Issuance of provides additional open space and recreational amenities for the neighborhood. building Design details for each pocket park shall be reviewed and approved through the permits for neighborhood landscape plans and site improvement plans. each neighborhood 22. Final landscape and irrigation system plans. All landscape submittals shall P Issuance of insure: building a. That plant material utilized will be capable of healthy growth within the given permit range of soil and climate. b. That proposed landscape screening is of a height and density so that it provides a positive visual impact within three years from the time of planting. c. All ground cover shall be a minimum of 1 gallon, shrubs shall be a mix of 1 and 5 gallon (at least 50% 5 gallon), and trees shall be a mix of 15 gallon and 24" box size. 36" box trees (or larger) shall be installed at key locations throughout each neighborhood. Public street trees shall be 24" box. d. That a plan for an automatic irrigation system be provided which assures that all plants get adequate water. e. That concrete curbing is to be used at the edges of all planters and paving surfaces unless otherwise designed. f. That all cut and fill slopes conform to the master vesting tentative map and conditions detailed in the Site Development Review packet. g. That all cut and fill slopes graded and not constructed by September 1, of any given year, are hydroseeded with perennial or native grasses and flowers, and that stockpiles of loose soil existing on that date are hydroseeded in a similar manner. h. Cut and/or fill slopes exceeding a 3:1 grade shall be stabilized with jute netting or approved equal to control erosion. Trees planted on slopes that exceed a 3:1 grade shall be installed with approved rock slope protection above and below the tree pit to catch grade. i. That the area under the drip line of all existing oaks, walnuts, etc., which are to be saved are fenced during construction and grading operations and no activity is permitted under them that will cause soil compaction or damage to the tree, if applicable. j. That a warranty from the owners or contractors shall be required to warranty all shrubs and ground cover, all trees, and the irrigation system for one year. A permanent maintenance agreement on all landscaping will be required from the owner insuring regular irrigation, fertilization and weed abatement, if applicable. 23. Water Efficient Landscaping Regulations. The Applicant shall meet all P Issuance of requirements of the City of Dublin's Water -Efficient Landscaping Regulations, the building Section 8.88 of the Dublin Municipal Code. permit 24. Open Space Areas. Private open space areas shall be planted and irrigated to P Issuance of create landscape that is attractive, conserves water, and requires minimal the building maintenance. permit 5 of 13 25. Stub street landscaping. For any private streets/courts in this SDR approval that P Issuance of are stub streets that provide access to a few units and whose terminus abuts a building public right of way, the depth of the landscape areas at the terminus shall be no permits for narrower than 3 feet of planting area. Design landscaping at the terminus of these each private streets/courts shall include trees and shrubs (as well as groundcover) that neighborhood will grow to a height and width to provide a visual screen and adequate buffer to the private streets and parking areas. 26. Plant Clearances. All trees planted shall meet the following clearances: P Approval of a. 6' from the face of building walls or roof eaves Final b. 7' from fire hydrants, storm drains, sanitary sewers and/or gas lines Landscape c. 5' from top of wing of driveways, mailboxes, water, telephone and/or electrical Plans for mains, public streets d. 15' from stop signs, street or curb sign returns and individual e. 20' from either side of a streetlight neighborhood f. Plant clearances may be modified with approval from the Community S. Development Director on a case by case basis. 27. Irrigation System Warranty. The applicant shall warranty the irrigation system P Final sign -off and planting for a period of one year from the date of installation. The applicant on Sitework shall submit for the Dublin Community Development Department approval a Permit landscape maintenance plan for the Common Area landscape including a reasonable estimate of expenses for the first five years 28. Walls, Fences and Mailboxes. Walls and fences installed within the P Issuance of neighborhoods shall be in accordance with this SDR approval and the fence/walls Sitework designs shown on Sheet L.04 of the Project Plan Set (Exhibit A). Final details of Permits or the walls and fences shall be reviewed and approved by Planning through approval of neighborhood -specific Improvement Plans and/or Master Building Plan checks. Final Mailbox locations shall be integrated within the landscape and shall comply with Landscape USPS requirements. Plans, whichever comes first 29. Sustainable Landscape Practices. The landscape design shall demonstrate P Approval of compliance with sustainable landscape practices as detailed in the Bay -Friendly Final Landscape Guidelines by earning a minimum of 60 points or more on the Bay- Landscape Friendly scorecard, meeting 9 of the 9 required practices and specifying that 75% Plans of the non -turf planting only requires occasional, little or no shearing or summer water once established. Final selection and placement of trees, shrubs and ground cover plants shall ensure compliance with this requirement. Herbaceous plants shall be used along walks to reduce maintenance and the visibility of the sheared branches of woody ground cover plants. Planters for medium sized trees shall be a minimum of six feet wide. Small trees or shrubs shall be selected for planting areas less than six feet wide. 30. Copies of Approved Plans. The Applicant shall provide the City with one full size P Issuance of copy, one reduced (1/2 sized) copy and one electronic copy of the approved any building landscape plans prior to construction. permit 31. Plan Coordination. Civil Improvement Plans, Joint Trench Plans, Street Lighting P Approval of Plans and Landscape Improvement Plans shall be submitted on the same size Final sheet and plotted at the same drawing scale for consistency, improved legibility Landscape and interdisciplinary coordination. Plans 32. Utility Placement and Coordination: Utilities shall be coordinated with proposed P Approval of tree locations to eliminate conflicts between trees and utilities. Submit typical utility Final plans for each house type to serve as a guide during the preparation of final Landscape grading, planting and utility plans. Utilities may have to be relocated in order to Plans provide the required separation between the trees and utilities. The applicant shall submit a final tree/utility coordination plan as part of the construction document review process to demonstrate that this condition has been satisfied. PLANNING COMMISSION CONDITION 33. The applicant shall work with staff to provide articulation over the garage for all P Issuance of plan types in Neighborhood 24 using an awning as shown on Sheet A4.45 or other the building design feature as appropriate, and where feasible so as not to conflict with utility permit for easements, etc. Neighborhood 24 6 of 13 BUILDING CONDITIONS 34. Building Codes and Ordinances. All project construction shall conform to all B Through building codes and ordinances in effect at the time of building ermit. Completion 35. Phased Occupancy Plan. If any building occupancy is requested to occur in B Occupancy of phases, then all physical improvements serving that building shall be required to any affected be completed prior to occupancy except for items specifically excluded in an building approved Phased Occupancy Plan, or minor handwork items, approved by the Department of Community Development. The Phased Occupancy Plan shall be submitted to the Directors of Community Development and Public Works for review and approval a minimum of 45 days prior to the request for occupancy of any building covered by said Phased Occupancy Plan. Any phasing shall provide for adequate vehicular access to all parcels in each phase, and shall substantially conform to the intent and purpose of the subdivision approval. No individual building shall be occupied until the improvements intended to serve the building are finished, safe, accessible, and provided with all reasonable expected services and amenities, and separated from remaining additional construction activity. Subject to approval of the Director of Community Development, the completion of landscaping may be deferred due to inclement weather with the posting of a bond for the value of the deferred landscaping and associated improvements. 36. Building Permits. To apply for building permits, Applicant/Developer shall submit B Issuance of five (5) sets of construction plans to the Building & Safety Division for plan check. Building Each set of plans shall have attached an annotated copy of these Conditions of Permits Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participation non -City agencies prior to the issuance of building ermits. 37. Construction Drawings. Construction plans shall be fully dimensioned (including B Issuance of building elevations) accurately drawn (depicting all existing and proposed building conditions on site), and prepared and signed by a California licensed Architect or permits Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape plan and details shall be consistent with each other. 38. Separate Permits. Site accessory structures (entry portals, trellises, sound walls, B Issuance of etc.) will require a separate building permit. Please indicate this on the cover sheet building of plans.permits 39. Air Conditioning Units & HVAC Systems. Units shall be permanently installed B Occupancy of on concrete pads or other non -movable materials approved by the Chief Building Unit Official and Director of Community Development. Air conditioning units shall be located such that each dwelling unit has one side yard with an unobstructed width of not less than 36 inches and the units shall be screened with aesthetically - complementary materials. Air conditioning units shall be located in accordance with approved plot plans. 40. Temporary Fencing. Temporary Construction fencing shall be installed along the B Through perimeter of all work under construction. Completion 41. Addressing. Site address signage shall be reviewed by the Chief Building Official B a. Prior to for each neighborhood. release of a) Provide a site plan with the City of Dublin's address grid overlaid on the plans addresses (1 to 30 scale). Highlight all exterior door openings on plans (front, rear, b. Prior to garage, etc.). The site plan shall include a single large format page showing permitting the entire project and individual sheets for each neighborhood. Three copies c. Prior to on full size sheets and five copies reduced sheets. permitting b) Provide plan for display of addresses. The Chief Building Official shall approve d. Occupancy plan prior to issuance of the first building permit. (Prior to permitting) of any Unit c) Addresses will be required on the front of the dwellings. Addresses are also e. Occupancy required above the garage door opening if the opening is not on the same side of any Unit of the dwelling as the front door. f. Prior to d) Townhomes / Condos are required to have address ranges posted on street permit side of the buildings. issuance, e) Address signage shall be provided as per the Dublin Residential Security and Code. through corn pletion 7 of 13 f) Exterior address numbers shall be backlight and be posted in such a way that g. Prior to they may be seen from the street. permit g) Driveways servicing more than one (1) individual dwelling unit shall have a issuance, minimum of 4 inch high identification numbers, noting the range of unit and numbers placed at the entrance to each driveway at a height between 36 and through 42 inches above grade. The light source shall be provided with an completion uninterruptible AC power source or controlled only by photoelectric device. h. Prior to h) Driveways servicing more than one (1) individual dwelling unit shall have a permit minimum of 4 inch high identification numbers, noting the range of unit issuance numbers placed at the entrance to each driveway at a height between 36 and and 42 inches above grade. The light source shall be provided with an through uninterruptible AC power source or controlled only by photoelectric device. copmpletio n 42. Engineer Observation. The Engineer of record shall be retained to provide B Scheduling observation services for all components of the lateral and vertical design of the the final building, including nailing, hold-downs, straps, shear, roof diaphragm and frame structural frame of building. A written report shall be submitted to the City Inspector inspection rior to scheduling the final frame inspection. 43. Foundation. Geotechnical Engineer for the soils report shall review and approve B Permit the foundation design. A letter shall be submitted to the Building Division on the issuance approval. 44. CAL Green Building Standards Code B a. Through a. Green Building measures as detailed in the SDR package may be adjusted Completion prior to master plan check application submittal with prior approval from the b. Prior to first City's Green Building Official provided the design of the project complies with permit the City of Dublin's Green Building Ordinance and State Law as applicable. In c. Through addition, all changes shall be reflected in the Master Plans. (Through Completion Completion) d. Project b. The Green Building checklist shall be included in the master plans. The e. Prior to checklist shall detail what Green Points are being obtained and where the approval of information is found within the master plans. (Prior to first permit). the c. Prior to each unit final, the project shall submit a completed checklist with landscape appropriate verification that all Green Points required by 7.94 of the Dublin plans by Municipal Code have been incorporated. (Through Completion) the City of d. Homeowner Manual — if Applicant takes advantage of this point the Manual Dublin shall be submitted to the Green Building Official for review or a third party f. Prior to reviewer with the results submitted to the City. (Project) approval of e. Landscape plans shall be submitted to the Green Building Official for review. the (Prior to approval of the landscape plans by the City of Dublin) landscape f. Developer may choose self -certification or certification by a third party as plans by permitted by the Dublin Municipal Code. Applicant shall inform the Green the City of Building Official of method of certification prior to release of the first permit in Dublin each subdivision / nei hborhood. 45. Cool Roofs. Flat roof areas shall have their roofing material coated with light B Through colored gravel or painted with light colored or reflective material designed for Cool Completion Roofs. 46. Electric Vehicle Charging Stations. Provide Electric Vehicle Charging Stations B Through mandated for new residential construction (multifamily dwellings). Include the Completion number and location of EV charging stations on plans. Design and review will be coordinated under the site work permit. 47. Solar Zone - CA Energy Code. Show the location of the Solar Zone on the site B Through plan. Detail the orientation of the Solar Zone. This information shall be shown in Completion the master plan check on the overall site plan, the individual roof plans and the plot plans. For the Recreation Center, this information shall be shown in the plan check and overall site plan as well as the individual roof plan(s). This condition of approval will be waived if the project meets the exceptions provided in the CA Energy Code. 48. Accessibility for On Site Parking and Accessible Units B a. Issuance of a. The required number of public parking stalls, the design and location of the Building accessible parking stalls shall be as required by Chapter 11A of the California Permits Building Code. (Prior to Issuance of Building Permits) b. Through Completion 8 of 13 b. Multifamily projects shall require a minimum of 10% of the units meet the accessibility regulations of Chapter 11A of the CBC. The ten percent (10%) accessible units shall be constructed concurrently with the project. Certificate of Occupancies may be withheld by the Chief Building Official's determination at any time that the 10% requirements are not being met. (Through Completion) 49. Options. Selected options that affect the square footage of the dwellings shall be B Through listed on the building permit application. Selected options that affect the footprint Completion of the dwelling shall be shown on the plot plan. 50. Mailbox Lighting. Mailboxes shall be provided with lighting meeting the B Through requirements of the City's Residential building security requirements. Completion 51. Copies of Approved Plans. Applicant shall provide City with one (1) reduced B 30 days after (1/2 size) copies of the City of Dublin Building Plans stamped "approved" and one permit and (1) electronic copy of the same. each revision issuance 52. Electronic File: The applicant/developer shall submit all building drawings and B Issuance of specifications for this project in an electronic format to the satisfaction of the Chief the final Building Official prior to the issuance of building permits. Additionally, all revisions occupancy made to the building plans during the project shall be incorporated into an "As Built" electronic file and submitted prior to the issuance of the final occupancy. FIRE PREVENTION 53. No fire service lines shall pass beneath buildings. F Approval of Improvement Plans 54. Fire apparatus roadways shall have a minimum unobstructed width of 20 feet and F Approval of an unobstructed vertical clearance of not less than 13 feet 6 inches. Roadways Improvement under 36 feet wide shall be posted with signs or shall have red curbs painted with Plans labels on one side; roadways under 28 feet wide shall be posted with signs or shall have red curbs painted with labels on both sides of the street as follows: "NO STOPPING FIRE LANE - CVC 22500.1". Where the vertical distance between the grade plane and the highest roof surface exceeds 30 feet, approved aerial fire apparatus access roads shall be provided. For purposes of this section, the highest roof surface shall be determined by measurement to the eave of a pitched roof, the intersection of the roof to the exterior wall, or the top of parapet walls, whichever is greater or as approved by Fire Department. Aerial fire apparatus access roads shall have a minimum unobstructed width of 26 feet exclusive of shoulders. At least one of the required access routes meeting this condition shall be located within a minimum of 15 feet and a maximum of 30 feet from the building, and shall be positioned parallel to one entire side of the building. 55. Fire Sprinkler system for R2 units will be in accordance with 2016 CBC 903.3.1.1 F Permit = N.F.P.A.13 issuance 56. Fire hydrant laterals shall be shown from water main. F Permit issuance 57. Project shall comply with 2016 CBC / CFC / CRC / CEC / Dublin Ordinances F Permit issuance 58. New Fire Sprinkler System & Monitoring Requirements. In accordance with F Permit The Dublin Fire Code, fire sprinklers shall be installed in the building. The system issuance shall be in accordance with the NFPA 13, 13R, or 13D, the CA Fire Code and CA Building Code. Plans and specifications showing detailed mechanical design, cut sheets, listing sheets and hydraulic calculations shall be submitted to the Fire Department for approval and permit prior to installation. This may be a deferred submittal 59. Fire Sprinkler Monitoring System (Not Fire Alarm System). Alarm, F Permit supervisory and trouble signals shall be distinctly different and shall be issuance automatically transmitted to an approved supervising station. One EXTERIOR approved audible device, located on the exterior of the building in an approved location shall be connected to each automatic sprinkler system. Such sprinkler water -flow devices shall be activated by water flow equivalent to the flow of a single sprinkler of the smallest orifice size installed in the system. Visible alarm notification appliances shall not be required except when required by California Fire Code section 907. 9 of 13 60. Allowable Area -Building Setbacks. Buildings on the same property must be F Permit included in the allowable area calculations or setback from assumed property lines issuance in accordance with Table 503 of the Building Code. Either provide an allowable area calculation/analysis for the aggregate total for all buildings on the property or show assumed property lines between the buildings that will be in compliance with the setback requirements of Table 503. The construction classification, occupancy classification, and building use shall be provided for each building. In addition, if the setback of buildings from the property line or assumed property line is such that a fire rated wall or opening protection would be required, the plans shall note the location and rating of openings, the rating of the exterior wall and if the wall has a parapet. 61. Site Plan. The site plan needs to show sufficient detail to reflect an accurate and F Permit detailed layout of the site for review and record purposes. The site plan will need issuance a scale that will allow sufficient details for review purposes and include, but not be limited to the following: A. The site parking and circulation layout including fences, gates, fire lane locations and turnarounds. B. Location of all fire appliances including fire hydrants, fire connections, fire sprinkler risers, and fire control valves. C. The location of all building openings including the exit discharge pathway for building exits. Note the location of exit lighting for these pathways as well. D. The location of any overhead obstructions and their clearances. E. The location of property lines and assumed property lines between buildings on the same property as well as any easements. The site plan will also need to note the location and distance of fire hydrants that are along the property frontage as well as the closest hydrants to each side of the property that are located along the access roads that serves the property. In addition, the improved face of curb to face of curb or edge of pavement width of the access road that serves the property will need to be noted. 62. Fire Access During Construction. F a. Storage of a. Fire and Emergency Access Roads approved for construction sites shall be combustible all weather -surface (first lift of asphalt) and the access shall be approved by materials on the Department of Public Works prior to commencement of combustible the site or storage or any construction on the site. construction b. Access roads, turnarounds, pullouts, and fire operation areas are Fire Lanes commencin and shall be maintained clear and free of obstructions, including the parking g of vehicles. b.Ongoing c. Entrances to job sites shall not be blocked, including after hours, other than c. Ongoing by approved gates/barriers that provide for emergency access. d. Storage of d. Site utilities that would require the access road to be dug up or made combustible impassible shall be installed prior to combustible construction commencing. materials on e. Entrance flare, angle of departure, width, turning radii, grades, turnaround, the site or vertical clearances, road surface, bridges/crossings, gates/key-switch, & construction required 150 -ft. distance to Fire Lane must be maintained during construction. commencin f. Approved route to furthermost portion of exterior wall. Route width, slope, g surface, obstructions must be considered for ensuring personnel access in case e.Ongoing of emergency. f. Ongoing 63. Fire apparatus roadways shall have a minimum unobstructed width of 20 feet and F Permit an unobstructed vertical clearance of not less than 13 feet 6 inches. Roadways issuance under 36 feet wide shall be posted with signs or shall have red curbs painted with labels on one side; roadways under 28 feet wide shall be posted with signs or shall have red curbs painted with labels on both sides of the street as follows: "NO STOPPING FIRE LANE - CVC 22500.1". 1. Fire apparatus roadways must extend to within 150 ft. of the most remote first floor exterior wall of any building. 2. The maximum grade for a fire apparatus roadway is 12%. 3. Fire apparatus roadways in excess of 150 feet in length must make provisions fora roved a aratus turnarounds. 64. Hydrants & Fire Flows. Show the location of any on -site fire hydrants and any F Occupancy of fire hydrants that are along the property frontage as well as the closest hydrants any building to each side of the property that are located along the access roads that serves 10 of 13 this property. Provide a letter from DSRSD indicating what the available fire flow is to this property. 65. FD Building Key Box. Building Access. A Fire Department Key Box shall be F Occupancy of installed at the main entrance to the Building. Note these locations on the plans. any building The key box should be installed approximately 5 1/2 feet above grade. The box shall be sized to hold the master key to the facility as well as keys for rooms not accessible by the master key. Specialty keys, such as the fire alarm control box key and elevator control keys shall also be installed in the box. 66. Gate Approvals. Fencing and gates that cross pedestrian access and exit paths F Details to be as well as vehicle entrance and exit roads need to be approved for fire department shown on access and egress as well as exiting provisions where such is applicable. Plans building need to be submitted that clearly show the fencing and gates and details of such. and/or This should be clearly incorporated as part of the site plan with details provided as sitework necessary. permit; installation to be complete prior to occupancy of an buildin 67. Addressing. Addressing shall be illuminated or in an illuminated area. The F Occupancy of address characters shall be contrasting to their background. If address is placed any building on glass, the numbers shall be on the exterior of the glass and a contrasting background placed behind the numbers. Building Address. The building shall be provided with all addresses or the assigned address range so as to be clearly visible from either direction of travel on the street the address references. The address characters shall not be less than 5 inches in height by 1 -inch stroke. Larger sizes may be necessary depending on the setbacks and visibility. Multi -Tenants. Where a building has multiple tenants, address shall also be provided near the main entrance door of each tenant space. The address shall be high enough on the building to be clearly visible from the driveway, street or parking area it faces even when vehicles are parked in front of the tenant space. The address shall not be less than 5 -inches in height with a' -inch stroke. 68. Fire Safety During Construction and Demolition F Ongoing A. Clearance to combustibles from temporary heating devices shall be during maintained. Devices shall be fixed in place and protected from damage, construction dislodgement or overturning in accordance with the manufacturer's and instructions. demolition B. Smoking shall be prohibited except in approved areas. Signs shall be posted "NO SMOKING" in a conspicuous location in each structure or location in which smoking is prohibited. C. Combustible debris, rubbish and waste material shall be removed from buildings at the end of each shift of work. Flammable and combustible liquid storage areas shall be maintained clear of combustible vegetation and waste materials. DUBLIN SAN RAMON SERVICES DISTRICT (DSRSD) 69. Complete improvement plans shall be submitted to DSRSD that conform to the DSRSD Issuance of requirements of the Dublin San Ramon Services District Code, the DSRSD "Standard any building Procedures, Specifications and Drawings for Design and Installation of Water and permit Wastewater Facilities", all applicable DSRSD Master Plans and all DSRSD policies. 70. All mains shall be sized to provide sufficient capacity to accommodate future flow DSRSD Issuance of demands in addition to each development project's demand. Layout and sizing of any building mains shall be in conformance with DSRSD utility master planning.permit 71. Sewers shall be designed to operate by gravity flow to DSRSD's existing sanitary DSRSD Issuance of sewer system. Pumping of sewage is discouraged and may only be allowed under any building extreme circumstances following a case by case review with DSRSD staff. Any permit pumping station will require specific review and approval by DSRSD of preliminary design reports, design criteria, and final plans and specifications. The DSRSD reserves the right to require payment of present worth 20 year maintenance costs as well as other conditions within a separate agreement with the applicant for any project that requires a pumping station. 11 of 13 72. Domestic and fire protection waterline systems for Tracts or Commercial DSRSD Issuance of Developments shall be designed to be looped or interconnected to avoid dead end any building sections in accordance with requirements of the DSRSD Standard Specifications permit and sound engineering practice. 73. DSRSD policy requires public water and sewer lines to be located in public streets DSRSD Issuance of rather than in off-street locations to the fullest extent possible. If unavoidable, then any building public sewer or water easements must be established over the alignment of each permit public sewer or water line in an off-street or private street location to provide access for future maintenance and/or replacement. 74. Prior to approval by the City of a grading permit or a building permit, the locations DSRSD Issuance of and widths of all proposed easement dedications for water and sewer lines shall any grading be submitted to and approved by DSRSD. permit or a site development permit 75. Prior to issuance by the City of any Building Permit or Construction Permit by the DSRSD Issuance of Dublin San Ramon Services District, whichever comes first, all utility connection any building fees including DSRSD and Zone 7, plan checking fees, inspection fees, connection permit fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules established in the DSRSD Code. 76. Prior to issuance by the City of any Building Permit or Construction Permit by the DSRSD Issuance of Dublin San Ramon Services District, whichever comes first, all improvement plans any building for DSRSD facilities shall be signed by the District Engineer. Each drawing of permit improvement plans shall contain a signature block for the District Engineer indicating approval of the sanitary sewer or water facilities shown. Prior to approval by the District Engineer, the applicant shall pay all required DSRSD fees, and provide an engineer's estimate of construction costs for the sewer and water systems, a performance bond, a one-year maintenance bond, and a comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The applicant shall allow at least 15 working days for final improvement drawing review by DSRSD before signature by the District Engineer. 77. No sewer line or waterline construction shall be permitted unless the proper utility DSRSD Issuance of construction permit has been issued by DSRSD. A construction permit will only any building be issued after all of the items in Condition No. 66 have been satisfied.permit 78. The applicant shall hold DSRSD, its Board of Directors, commissions, employees, DSRSD Ongoing and agents of DSRSD harmless and indemnify and defend the same from any litigation, claims, or fines resulting from the construction and completion of the project. 79. Improvement plans shall include recycled water improvements as required by DSRSD Issuance of DSRSD. Services for landscape irrigation shall connect to recycled water mains, any building Applicant must obtain a copy of the DSRSD Recycled Water Use Guidelines and permit conform to the requirements therein. 80. Above -ground backflow prevention devices/double detector check valves shall be DSRSD Issuance of installed on fire protection systems connected to the DSRSD water main. The any building Applicant shall collaborate with the Fire Department and DSRSD to size and permit and configure the fire system. The Applicant shall minimize the number of backflow ongoing prevention devices/double-detector check valve through strategic placement and landscaping. 81. Development plans will not be approved until landscape plans are submitted for DSRSD Approval of DSRSD review and approval. Final Landscape Plans 82. Grading for construction shall be done with recycled water. DSRSD Ongoing 83. Temporary potable irrigation meters in areas with recycled water service shall only DSRSD Ongoing be allowed for cross -connection and coverage testing for a maximum of 14 days. 84. Several sections of this project are shown to be high density development with DSRSD Issuance of narrow streets, motorcourts, short stub -streets, and cul-de-sacs. These features any building can cause special problems with access to DSRSD easements and facilities for permit and future maintenance. The Developer shall pay particular attention to DSRSD's ongoing standard specifications regarding water and sewer line easements and spacing. No water meters or other DSRSD facilities shall be under building overhangs and 12 of 13 not DSRSD water mains can be located within motorcourts. DSRSD recommends that the Developer use "master" water meters for motorcourt and condominium style products. 85. The project is located within DSRSD's recycled water use service area. Section DSRSD Approval of 3.20.110 of the District Code describes the Developer's duty to connect for Final recycled water service and the applicable procedures. Developer shall submit Landscape landscape irrigation plans to DSRSD for review and approval. All irrigation Plans facilities shall be in compliance with the District's "Recycled Water Use Guidelines" and Department of Health Services requirements for recycled water irrigation design. 86. Neighborhoods multi -unit, multi story buildings in Phase 4/5 will require the use of DSRSD Approval of data transponders for the supervisory control and data acquisition (SCADA) from Final DSRSD's Advanced Metering Infrastructure (AMI) water meters. DSRSD will Landscape require and produce a propagation study using submitted plans to locate and Plans design the appropriate pole -mounted AMI transponders. Cost of the propagation study, poles, and transponders will be borne by the Developer. Designs of the poles and transponders will need to meet City of Dublin approval for appearance/location and should be included in the landscape plans. PASSED, APPROVED AND ADOPTED this 8th day of May 2018 by the following vote: AYES: Bhuthimethee, Kothari, Mittan, Qureshi, Wright NOES: ABSENT: ABSTAIN: Planning Commission Chair ATTEST: Assistant Community a lopment Director 13 of 13