Loading...
HomeMy WebLinkAbout8.2 Positano Hills Park-Site Modification AGENDA STATEMENT DCITY of PARKS AND COMMUNITY SERVICES COMMISSION UBLIN MEETING DATE: October 21, 2013 SUBJECT: Positano Hills Park—Site Modifications Prepared by Rosemary Alex, Parks and Facilities Development Coordinator ATTACHMENTS: 1. Play Area Modifications—Two Options RECOMMENDATION: 1. Receive presentation from Staff 2. Receive public comment on the site modifications 3. Recommend approval of a preferred option to the City Council. DESCRIPTION: On August 14, 2013 the Staff held a public meeting to review feedback received from an on-line survey and to solicit additional information from the public on their preferences for potential modifications to Positano Hills Park. Based on feedback from the public meeting and on-line survey the public priorities for site modifications included the following: Play Area for Children Ages 5-12 1) Additional climbing elements 2) Additional swings 3) Higher slide structure Site Shading 1) Shade elements installed adjacent to play area 2) Additional trees adjacent to play area Generally the public wants a larger play area with more play elements for children 5 to 12. In response to those preferences Staff worked with the Landscape Architect to develop two alternatives to add play components geared for children ages 5-12, which are depicted in Attachment 1 and described below. Alternative#1 Play Area This alternative includes the relocation of the existing rope bridge from the lower level play area and attaches it to the existing slide. The space opened up by the relocation of the rope bridge is modified and a typical two bay swing set is added. The existing climbing rock is realigned and the area expanded to add two additional climbing rocks that are up to 6' tall. COPIES TO: A Public Meeting notice was sent to residences within 500-feet of the proposed park parcel and to a list of interested parties from prior public meetings on the proposed site modifications. ITEM NO: 8.2 G:\COMMISSIONS&COMMITTEES\PARKS COMMISSION\AGNDSTMT\2013\10-21-13 Positano Hills Park-Site Modifications.doc Alternative#2 Play Area Includes the relocation of the existing rope bridge from the lower level play area and attaches it to the existing slide. The space opened up by the relocation of the rope bridge is modified and a tire swing is added. The existing rock is re-aligned and the area expanded to accommodate a more traditional play system with a 6' tall slide with climbing and access features. Cost Estimate including 10%contingency Play Area Option #1 Alternate 2D $138,160 Play Area Option#2 Alternate 2E $131,417 Available Budget for Construction $130,000 Since the cost estimate to do either of the two play area revisions exceeds the available budget, Staff recommends that the addition of trees or a shade element near the playground area be bid as an alternate item. Staff will explore low cost options to achieve more shade where possible. RECOMMENDATION: Staff recommends that the Parks and Community Services Commission receive the presentation from City Staff, receive public comment and recommend approval of a preferred playground alternative to the City Council. 2 of 2 ° F B + e C IIWII 'A V lk" z, .. iim': � � .. �"" � SLYI,RAT CCS x { f sa i r y k 3 S� NyyEa+x '^ Sarr. _s:':�o„uses L`. Y v . FS-,I nec.n.;aess F N ATTACHMENT 1 RECONFIGURED y" WALKWAYS a *NEW AND EXISTING ti ROCK CLIMBERS EXPANDED PLAY RELOCATED ROPE BRIDGE °Oc°pa it EXISTING ELEMENTS TO REMAIN t ,y NEW.ARCN SWING 4 EXPANDED PLAY AREAS T ENLARGEMENT AREA Playground Additions Alternate #1 LOCATION PLAN Aft£AftG6NENT r E�(,ROCk CLIMBER TO BE RELOCATED AND INCORPQRATED " _t t �� r ✓ v` INTO NEW STRUCTURE . , � RECONFURED WALKWAYS NEW CLIMBING&SLIDE Ej -\STRUCTURE L Heys LOCATION PLAN XI rj I I 1EXPANDED PLAY AREAS 0- A` ( " ��( `� � ,,/ �- l -, RELOCATED ROPE BRIDGE °pcc EXISTING ELEMENTS TO REMAIN / ( J` NEW-TIRE SWING Lei -- EXPANDED PLAY AREAS----- ' - ....... rx, SCALE: 1'=10' I I f+I lilli li��"�I�iiii III � IJ i I r , Playground Additions Alternate #2