Loading...
HomeMy WebLinkAboutReso 19-13 Dougherty Rd Mit Neg Dec RESOLUTION NO. 19 - 13 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ADOPTING THE MITIGATED NEGATIVE DECLARATION AND APPROVING PRELIMINARY ENGINEERING PLANS FOR THE DOUGHERTY ROAD IMPROVEMENTS PROJECT WHEREAS, the Circulation Element of the City of Dublin's General Plan has for more than two decades called for the expansion of Dougherty Road to a six-lane arterial; and WHEREAS, the City of Dublin's Bikeways Master Plan calls for the addition of on-street (Class II) bike lanes on Dougherty Road from the Contra Costa County line south to Dublin Boulevard; and WHEREAS, through previously approved Capital Improvements Program, the City has designated funding for preliminary engineering and environmental review of plans to expand Dougherty Road consistent with the Circulation Element; and WHEREAS, preliminary engineering of Dougherty Road improvements consistent with the above plans has proceeded for the section of Dougherty Road between Sierra Lane and the north City limit, including proposed roadway, median, and bicycle/pedestrian path improvements; and WHEREAS, consistent with all requirements of the California Environmental Quality Act, the City prepared and circulated an environmental Initial Study and Proposed Mitigated Negative Declaration on the Dougherty Road Improvements Project for a 30 day public review period; and WHEREAS, during the public review period, the City received four written comments on the project and the environmental review, none of which identify any new or significantly worsened environmental impacts beyond those already identified; and WHEREAS, although not required by CEQA, the City prepared written responses to the comments, which comments and responses are included in a Proposed Mitigated Negative Declaration (MND) dated February, 2013 and incorporated herein by reference. The MND includes a revised Initial Study reflecting the comments and responses and including minor technical revisions; and WHEREAS, in accordance with the comments and responses, the revised Initial Study also includes modifications to certain biology mitigation measures, These modifications refine and clarify permitting and timing provisions of the measures and provide additional detail to update the measures for current CDFW protocols. Mitigation Measure BIO-5 in the revised Initial Study replaces the prior measure but does not constitute a "substitute" measure for the purposes of CEQA Guidelines section 15074.1 because the revised measure contains the basic elements of the original measure, and adds detail consistent with current CDFW standards; and Page 1 of 2 WHEREAS, all mitigation measures have been compiled in a Mitigation Monitoring and Reporting Program dated January 2013 and incorporated herein by reference; and WHEREAS, the City determined that the comments and responses did not constitute or require substantial revisions to the MND, and no recirculation was required pursuant to CEQA Guidelines section 15073.5; and WHEREAS, the Revised Initial Study, the comments received during the public review period, the City's responses to the comments as compiled in the Proposed Mitigated Negative Declaration dated February 2013, together with the Mitigation Monitoring and Reporting Program dated January 2013 collectively comprise the Mitigated Negative Declaration for the Project; and WHEREAS, the preliminary engineering plans were developed in a manner consistent with the City's Circulation Element, Capital Improvement Program and Bikeways Master Plan; and WHEREAS, the City Council has reviewed a Staff Report and the Mitigated Negative Declaration at their meeting on February 19, 2013 prior to taking action on the project; and WHEREAS, the location and custodian of the Mitigated Negative Declaration and other documents that constitute the record of proceedings for the project is the Public Works Department, 100 Civic Plaza, Dublin, CA, 94568 Attn: Ferd Del Rosario. NOW, THEREFORE, BE IT RESOLVED that the City Council finds that on the basis of the whole record before it (including the Revised Initial Study, comments and responses) that there is no substantial evidence that the project as mitigated will have a significant effect on the environment and that the Mitigated Negative Declaration reflects the City's independent judgment and analysis. BE IT FURTHER RESOLVED that after reviewing and considering the Mitigated Negative Declaration and the preliminary engineering plans, the City Council of the City of Dublin does hereby adopt the Mitigated Negative Declaration (including the Mitigation Monitoring and Reporting Program) for the Dougherty Road Improvements Project and approves the preliminary engineering plans. PASSED, APPROVED AND ADOPTED this 19th day of February, 2013, by the following vote: AYES: Councilmembers Biddle, Gupta, Hart, Haubert, and Mayor Sbranti NOES: None ABSENT: None ABSTAIN: None Mayor • ATTEST: CA.474. fi City Clerk Reso No. 19-13, Adopted 2-19-13, Item 7.1 Page 2 of 2 I