HomeMy WebLinkAboutReso 180-10 Dougherty Rd ImprovRESOLUTION NO. 180 -10
A RESOLUTION OF THE CITY COUNCIL
OF THE CITY OF DUBLIN
*********
ESTABLISHING A NEW CAPITAL IMPROVEMENT PROGRAM PROJECT -
DOUGHERTY ROAD IMPROVEMENTS FROM SIERRA LANE TO NORTH CITY LIMIT
WHEREAS, the Circulation Element of the City General Plan has identified Dougherty
Road as a roadway requiring improvements to accommodate projected vehicular traffic; and
WHEREAS, improvements on Dougherty Road in the Capital Improvement Program
have been segmented into two projects: 1) Dougherty Road Improvements - Amador Valley
Boulevard to Houston Place (No Project Number) and 2) Dougherty Road Improvements -
Amador Valley Boulevard North to City Limits (Project Number 960019), are identified in the
City's Capital Improvement Program (CIP) but are not programmed within the 2010-2015 CIP
time frame due to insufficient funding; and
WHEREAS, . the City is proposing to revise the adopted 2010 - 2015 Capital
Improvement Program (CIP) by deleting the two Dougherty Road projects and including a single
project entitled Dougherty Road Improvements from Sierra Lane to North City Limit; and
WHEREAS, the first phase of work to be undertaken will be to initiate preliminary
engineering and perform environmental work which can be funded from local revenue sources;
and
WHEREAS, the Alameda County Transportation Commission (ACTC) has approved the
use of Measure B funding previously programmed for the Scarlett Drive/Iron Horse Trail
Extension Project in the amount of $6.27 million, on the future construction of the proposed
project; and
and
WHEREAS, the Scarlett Drive Project was also unfunded in the current CIP timeframe;
WHEREAS, it is necessary to revise the Scarlett Drive/Iron Horse Trail Extension Project
included in the CfP to recognize that the transportation sales tax funding of $6.267 million will
no longer be available for this project.
NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin
adopts this resolution to establish a new Capital Improvement Program Project - Dougherty
Road Improvements from Sierra Lane to North City Limit, as described in the attached Project
Description (Exhibit A). ~
BE IT FURTHER RESOLVED that this new project shall replace the Dougherty Road
Improvements - Amador Valley Boulevard to Houston Place and the Dougherty Road
Improvements - Amador Valley Boulevard North to City Limits presently included in the adopted
2010-2015 Capital Improvement Program.
Page 1 of 2
BE iT FURTHER RESOLVED that the Scarlett Drive Extension/Iron Horse Trail
Extension Project will be revised to delete the reference to the future availability of $6.267
million in Measure B transportation sales tax funding, as approved by the ACTC on May 27,
2010.
PASSED, APPROVED AND ADOPTED this 21St day of December, 2010, by the
following vote:
AYES: Councilmembers Biddle, Hart, Hildenbrand, Swalwell, and Mayor Sbranti
NOES: None
ABSENT: None
ABSTAIN: None
~/~/
~.
Mayor
ATTEST~:
~: ~~ ~~~
City Clerk
Reso No. 180-10, Adopted 12-21-10, Item s.2 Page 2 of 2
r
2010-2015 CAPITAL IMPROVEMENT PROGRAM
PROJECT NUMBER PROJECT DESCRIPTION ACTIVITY
~ 960025 Dougherty Road Improvements STREETS
Sierra Lane to North City Limit
DESCRIPTION - LOCATION
This project will perform preliminary engineering
to determine the precise alignment of Dougherty
Road from Sierra Lane to North City Limit that will
include six travel lanes, raised median, Class II
bicycle lanes and a separate pedestrian/bike path
along the east side of Qougherty Road. The work
will also include detailed cost estimates,
basemapping and environmental assessment.
e ' ` ~~~1-'
Y +
~ ~=~~~
° ,~.
,~.
PRFTA
•'' ~ . _ _ 1 t
e~
~ ~ ~~ s o
~
~ ~ , a
a,A4N~ g ousu e~vta. ~
t7vlc Ce
COMMENTS
The present configuration of Dougherty Road is four lanes (two lanes each direction) and a separate pedestrian/bike
path along the east side of Dougherty Road from the Iron Horse Trail to the North City Limit. The.Ciry of San Ramon
has recently widened Dougherty Road to six lanes to the City Limit and extended Dublin's pedestrian/bike path from
its northerly end to Old Ranch Road in San Ramon. This project will widen Dougherty Road to a six-lane divided
roadway plus Class II bicycle lanes with landscaped median within the limits of the project. The Alameda County
Transportation Improvement• Authority has approved $6267 Million (2009 dollars) of Measure B funds to widen
Dougherty Road including construction of Class II bike lanes from Scarlett Drive/Iron Horse Trail to the North City
Limit.
The preliminary engineering work will include more detailed design and cost estimates and will identify the next phase
of work based on available funds. Mitigation contributions (Fund 4309) collected for this project will be used to pay for
preliminary engineering work. A total of $646,234 (as of June 30, 2010) in mitigation contributions is available for use
and the remaining funds needed for design and construction are anticipated to come from the Dougherty Valley and
Eastern Dublin Traffic Impact Fees.
FINANCING/YEARS SCHEDULE
ESTIMATED COSTS Fund Prior Years 2010-2011 2011-2012 2012-20~3 2013-2014 2014-2015 Totals
Design / Inspection $ 775,551
OtherContractServices 868,662 4305 137,514 361,618 499,132
Land / Right of Way 522,000 4309 510,860 135,374 646,234
Improvements 10,979,579
Machinery / Equipment Alameda County Transporfation Improvement Authority Approved Funding 6,267,000
Miscellaneous 399,398 Insuffcient Funding within CIP Time Frame 6,132,824
TOTAL " $ 13,545,190 $ 648,374 $ 496,992 ~ $13,545,190
PROJECT STAFF. 0.35 0.30
MANAGEMENT(FTE) CONTRACT ~
12J7l2010 7135 AM
EXH I B IT ~l
To the Resolution
CITY OF DUBLIN . . ~ ~~~ ~
BUDGET CHANGE FORM . .
New Appropriations (City Council Approval Required):
X From Unappropriated Reserves
From New Revenues
Budget Transfers:
CHANGE EORM #
From Budgeted Contingent Reserve
(1001.1901-81101) _
Within Same Department Activi4y
Betweerr Departments~ (City Council Approval Reqd)
(~thar • •
}p ~ ~ ,
~ . ;
~ ~ ~ °I : ~ ~lh' i~ e : ~ ~~. i ' ii ' ~ i . ~ rwQ~jI
; ~ %wti1Ml~ !
ry ~~~a ~
~ •~~ ,~ ~ . s : i~' fi m. yF~»p~~~ .:.5 y
~r 4
'+~. i ~ ,: ~
~a i'+1y°!,
F4
, M
Name: EXPENDITURE: General Fund - Name: EXPENDITURE: Traffic Impact Fee
Engineering Operating Dept - Staff $44,370 Dougherty Valley TIF -Dougherty Rd $ 44,370
Salaries (Will be expended in Project) Project - Staff Salary/Benefits ••..
ACCt #: 1001.8301.51101 Proj. Account # 960025.99 00.9101.4305 ,
Name: EXPENDITURE: Traffic Impact Fee ' ~
Mitigation Furid -Dougherty Rd Project -. $107,253
Utility Connection Filing Fees
Pro'. Account # 960025.9500.95Q2.4309
Name: EXPENDITURE: Traffic lmpact Fee
Dougherty Valley TIF -Doughe~ty Rd $ 91,144
. Project - Contract Services - Design
Pro'. Account # 960025.9200.9202.4305
Name: EXPENDITURE: Traffic Impact Fee
Mitigation Funii -Doughertjr Rd Project -~ $403,607
Contract Services - Design '
Pro'. Account.# 960025.9200.9202.4309
Name: EXPENDtTURE: Traffic impact Fee
Dougherty Valley TIF -Dougherty Rd
Project - Miscellaneous - Printing $ 2,000
Proj. Account # 960025.9500.95Q3.4305
Transfer Out:
Dougherty TIF # 4305.1901.89101 $137,514
Mitigation TIF # 4309.1901.89101 $510,860
Transfer In:
Streets CIP: #3600.9601.49999 $648,374
ASD/Fin Mgr
Signature
Date / ~ f O
REASON FOR BUDGET CHANGE ENTRY: This budget change will reflect appropriations in
Fiscal Year 2010/11 for a new Capital Improvement Project - Dougherty Road from Sierra Lane
to North City Limit, as presented at the City Council meeting December 21, 2010. The project
will be funded from Mitigation Traffic Impact Fees and Dougherty Valley Traffic Impact Fees.
Staff time currently budgeted in the General Fund will be expended on the project.
City Manager:
Signature
Date
As approved at the City Council Meeting on: Date 12/21/2010
Mayor:
Signature
Date
Posted By: Date
Signature