File #:2026-143 Agenda Date:10/20/2026 Agenda #:8.1.
Fiscal Years 2026-2028 Strategic Plan Progress Report - Year 1, Quarter 1
TO: Honorable Mayor and City Councilmembers
FROM:Colleen Tribby, City Manager
Prepared By:Jordan Foss, Senior Management Analyst
EXECUTIVE SUMMARY:
The City Council will receive a progress report on the City’s Two-Year Strategic Plan.
STAFF RECOMMENDATION:
Receive the report.
FINANCIAL IMPACT:
None.
DESCRIPTION:
The City Council adopted the City’s Two-Year Strategic Plan on April 7, 2026. This Plan sets the overall
direction for the City, guiding resources and setting specific objectives to drive City actions. The Plan
coincides with Fiscal Years 2026-27 and 2027-28.
The Strategic Plan Progress Report details the City Council’s eight strategic priorities and 33 objectives
along with Staff’s work plan for achieving each objective. Each work plan item includes a description,
anticipated fiscal years of activity, assigned department(s), and status. As progress is tracked
throughout the two-year period, items are updated to reflect whether they are completed,
completed/ongoing, in progress, off target, or not started.
The City Manager may also assign new work plan tasks as needed. To ensure transparency, existing
items are not removed from the Progress Report; instead, they remain to reflect the efforts made
toward each objective. Any changes to objectives or work plan items are recorded in the document’s
revision history. This report is the first quarterly Strategic Plan Progress Report, covering July 1, 2026
Page 1 of 4
110
File #:2026-143 Agenda Date:10/20/2026 Agenda #:8.1.
through September 30, 2026. Significant accomplishments for each priority are summarized below.
Priority 1: Public Safety, Health, and Welfare
•Dublin Police Services continued installing situational awareness cameras at key locations in
the City. In the first quarter, eight cameras were installed and permits for 24 more were
submitted to the City.
Priority 2: Fiscal Sustainability
•Proposition 218 balloting for Citywide Street Light Assessment District 2026-1 was completed,
and the results were reviewed by the City Council in July. The district did not receive majority
support from property owners, so it will not be formed, and the two existing Street Light
Maintenance Districts will remain in place.
•Staff overhauled the City’s volunteer program:
o The program guide is now organized around four areas: community programs,
community projects, special events, and sports leagues.
o A code of conduct, background check standards, and an online application are now
provided through NEOGOV.
•Staff evaluated the accessory dwelling unit (ADU) building permit fee waiver program, which
expires December 31, 2026. An informational report to the City Council is planned before the
end of the year.
Priority 3: Technology Innovation
•The City deployed Perry Weather’s weather monitoring system, which includes on-site stations
and real-time lightning and wind alerts. The City Manager’s Office uses it for emergency
management. Parks and Community Services uses it to close facilities and fields when needed,
and closures are posted on the City website.
•Staff launched an initial version of the City’s open data website with several geographic
information system maps and data layers. More public datasets will continue to be added as
needed.
Priority 4: Housing Affordability
•Staff submitted a $2 million U.S. Department of Housing and Urban Development (HUD) grant
application for Sunflower Hill at Grace Pointe, a 60-unit affordable housing project for people
with intellectual and developmental disabilities. Staff also drafted changes to the project’s
affordable housing agreement and lease to make it more competitive for State funding.
•The City amended its Affordable Housing Assistance Agreement with Related Companies for
Amador Station, a 300-unit affordable project. The amendment gives the developer more time
to secure construction funding.
•The City Council directed Staff to notify Alameda County of the City’s continued interest in
affordable housing on Dublin Transit Center Site D-1, which can hold approximately 99 units.
•The City approved two First-Time Homebuyer Loans for below-market-rate (BMR) buyers,
Page 2 of 4
111
File #:2026-143 Agenda Date:10/20/2026 Agenda #:8.1.
totaling $200,000. Staff also worked with Risewell Homes to feature the loan program in
marketing for the October release of BMR homes at Dublin Centre.
•Staff completed a building code update to the City’s ADU prototype plans as part of Senator
Glazer’s District 7 ADU Accelerator Program. Staff also processed a $7,500 rebate for an ADU
completed in August and submitted the program’s biannual progress report.
•Staff held two community meetings for Eden Housing at Francis Ranch and reviewed the
project’s Senate Bill (SB) 330 application.
Priority 5: City Infrastructure
•Exterior painting at Fire Station 16, Fire Station 17, and The Wave is complete. The new
cementitious siding at The Wave is also complete.
•Seal coating is complete on all streets and parking lots in the annual street and parking lot
resurfacing project.
•The City received the Metropolitan Transportation Commission (MTC) Pavement Management
Technical Assistance Program (P-TAP 27) grant. Under it, an MTC-funded consultant will survey
City streets and update the pavement condition ratings.
•For the Village Parkway Reconstruction:
o The California Transportation Commission confirmed the City is eligible to apply for an
SB 1 Local Partnership Program grant.
o Staff and the design consultant developed a plan for community outreach, subdivision
wall assessment, and water main replacement.
•Consultants completed condition assessments of the City’s green stormwater infrastructure
and full trash capture devices, and replacement filter media was received.
•The City executed a contract to train City and MCE staff on Asset Essentials, the new
computerized maintenance management system.
Priority 6: Downtown Dublin
•The City Council received an update in closed session, and Staff continues to work with the
property owner on next steps.
Priority 7: Fallon East Economic Development Zone
•For the Dublin Fallon 580 Project, Staff reviewed the third submittal for the commercial
portion, which includes the Dublin Boulevard - North Canyons Parkway Extension
improvements. Staff also held two community meetings on the residential portion.
•Staff met with the Righetti and Branaugh property owners about the Dublin Boulevard - North
Canyons Parkway Extension and their development agreements. This included several
meetings with Righetti on the development agreement terms.
Priority 8: Enhanced Customer Experience
•Staff began moving State-mandated fire inspections from paper to an electronic format to save
time and improve efficiency. Staff is working to integrate the process into the City’s EnerGov
Page 3 of 4
112
File #:2026-143 Agenda Date:10/20/2026 Agenda #:8.1.
permit system.
•Staff created two simplified Fire Operational Permits, one long-term and one short-term, which
are currently being tested.
•Staff completed training on Legistar ahead of the new online posting of agendas, minutes, and
videos.
•Staff published an Event Vendor Participation Guide that puts vendor and nonprofit
requirements in one place.
Attachment 1 is the Strategic Plan Progress Report - Year 1, Quarter 1.
STRATEGIC PLAN INITIATIVE:
None.
NOTICING REQUIREMENTS/PUBLIC OUTREACH:
The City Council Agenda was posted.
ATTACHMENTS:
1)Fiscal Years 2026-2028 Strategic Plan Progress Report - Year 1, Quarter 1
Page 4 of 4
113
STRATEGIC PLAN PROGRESS REPORT
YEAR 1, QUARTER 1 UPDATE
Fiscal Years 2026-2028
City of Dublinc a l i f o r n i a
Attachment 1
114
STRATEGIC PLAN
On April 7, 2026, the Dublin City Council adopted the FY 2026-2028 Strategic Plan, outlining the City
Council’s shared vision and values for Dublin’s future. The plan includes eight key priorities and 33 objectives.
Additionally, the City Manager identifies work plan items that align with the Strategic Plan’s goals and
objectives.
PROGRESS REPORT
This report provides a quarterly update, highlighting progress made toward the Strategic Plan’s goals and
objectives.
DEPARTMENT KEY
CC City Clerk
CDD Community Development
CMO City Manager’s Office
DPS Dublin Police Services
ED Economic Development
FIN Finance
FIRE Fire
HR Human Resources
IT Information Technology
PCS Parks and Community Services
PW Public Works
STATUS KEY
The following key indicates each project’s status: Completed, Completed/Ongoing, In Progress, Off Target, or
Not Started.
Completed: The task has been fully completed.
/O Completed/Ongoing: The task has been completed and incorporated into City operations.
In Progress: Staff is actively working on the task, and it is on track to be completed on time.
■Off Target: Staff is working on the task, but it is behind schedule and may not be completed on time.
X Not Started: Work on this item has not yet begun.
CONTENTS
Priority 1: Public Safety, Health, and Welfare . . . . . . . . . . . . . . . . . . . . . . . . 1
Priority 2: Fiscal Sustainability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2
Priority 3: Technology Innovation . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 3
Priority 4: Housing Affordability . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 4
Priority 5: City Infrastructure . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Priority 6: Downtown Dublin . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7
Priority 7: Fallon East Economic Development Zone . . . . . . . . . . . . . . . . . . . . . 8
Priority 8: Enhanced Customer Experience . . . . . . . . . . . . . . . . . . . . . . . . . 9
Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 10 115
– 1 –
██ PRIORITY 1: PUBLIC SAFETY, HEALTH, AND WELFARE
OBJECTIVE 1.A: Maintain adequate public safety staffing resources to provide for the needs of the community.
Work Plan Fiscal Years Department(s)Status26/27 27/28
1A-1 Adopt a multi-year staffing forecast tied to the City population, housing, and
commercial development projections. ••DPS X
1A-2 Explore and secure funding to add a position to the Behavioral Health Unit for
counseling and field-based de-escalation and crisis intervention. ••DPS X
OBJECTIVE 1.B: Strengthen and expand outreach, tools, and resources to protect homes and enhance community
emergency preparedness.
Work Plan Fiscal Years Department(s)Status26/27 27/28
1B-1 Host an annual Community Health and Safety Fair. ••DPS, CMO
1B-2 Continue to strengthen DPS’s Neighborhood Watch program throughout the City. ••DPS
1B-3 Track residential burglary circumstances and property characteristics to identify trends.
Make these findings available to the public on an annual basis. ••DPS
OBJECTIVE 1.C: Increase investment in police technologies that aid in crime prevention and rapid response.
Work Plan Fiscal Years Department(s)Status26/27 27/28
1C-1 Continue working with Public Works, 4 Leaf, and Flock Safety to finish the installation
of Situational Awareness and ALPR cameras. •DPS
1C-2 Increase staffing in the DPS Real Time Information Center (RTIC) and explore Drone
as a First Responder (DFR). ••DPS X
OBJECTIVE 1.D: Enhance education, outreach, and enforcement of micro-mobility rules in the City.
Work Plan Fiscal Years Department(s)Status26/27 27/28
1D-1 Continue using social media platforms to educate the public on micro-mobility devices
and local ordinances governing their use in the City of Dublin. ••DPS
1D-2 Conduct targeted enforcement to provide education/cite violators. ••DPS
OBJECTIVE 1.E: Seek opportunities and partnerships to provide enhanced mental health programs and resources to the
community.
Work Plan Fiscal Years Department(s)Status26/27 27/28
1E-1 Maintain in-house QPR (Question, Persuade, Refer) instructor certification enabling
the Department to deliver nationally recognized suicide prevention training directly to
City staff and youth, including the Youth Advisory Council, without relying solely on
outside resources. This builds local capacity for ongoing mental health education and
awareness, particularly during Mental Health Awareness Month.
••PCS
OBJECTIVE 1.F: Support and promote programs that enhance business safety and crime prevention.
Work Plan Fiscal Years Department(s)Status26/27 27/28
1F-1 Continue working with high-density shopping centers on retail enforcement operations. ••DPS
1F-2 Continue to expand the Business Watch Program with local businesses.••DPS
116
– 2 –
██ PRIORITY 2: FISCAL SUSTAINABILITY
OBJECTIVE 2.A: Advance economic development strategies that diversify and strengthen the City’s tax base.
Work Plan Fiscal Years Department(s)Status26/27 27/28
2A-1 Advance redevelopment and reinvestment opportunities in key commercial areas. ••ED
2A-2 Conduct proactive business retention and expansion visits to identify risks, expansion
opportunities, and operational challenges. ••ED
OBJECTIVE 2.B: Identify and pursue new ongoing revenue sources to support long-term fiscal stability.
Work Plan Fiscal Years Department(s)Status26/27 27/28
2B-1 Revamp the City’s fee assistance program to improve access to recreation programs
for residents who may otherwise face financial barriers. Incorporate a donation and
solicitation component as a revenue source to maintain the program’s long-term
financial sustainability.
••PCS
OBJECTIVE 2.C: Update and regularly evaluate fees to balance cost recovery with community access to programs and
services.
Work Plan Fiscal Years Department(s)Status26/27 27/28
2C-1 Evaluate the building permit ADU fee waiver program set to expire December 31,
2026. •CDD
2C-2 Develop a cost recovery framework establishing recovery targets by program category
to guide fee setting across department programs and services.••PCS
2C-3 Update City Fees and City Impact Fees annually based on CPI increases. ••FIN X
OBJECTIVE 2.D: Complete formation of Street Light Assessment District 2026-1 to ensure sustainable funding for street
lighting infrastructure.
Work Plan Fiscal Years Department(s)Status26/27 27/28
2D-1 Balloting for Proposed Citywide Street Light Assessment District.•PW
OBJECTIVE 2.E: Complete updates to the Public Facilities Fee, Western Dublin Traffic Impact Fee, and Eastern Dublin Traffic
Impact Fee to ensure alignment with proposed infrastructure and development needs.
Work Plan Fiscal Years Department(s)Status26/27 27/28
2E-1 Continue work on Eastern Dublin Traffic Impact Fee.•PW
OBJECTIVE 2.F: Implement operational cost control measures, where feasible, while maintaining a high level of service to
the community.
Work Plan Fiscal Years Department(s)Status26/27 27/28
2F-1 Collect and analyze comprehensive athletic field utilization, revenue, and maintenance
expenditure data to identify opportunities that improve cost recovery and support
long-term financial sustainability, while preserving equitable access to recreation
spaces.
••PCS
2F-2 Prioritize the City’s volunteer efforts and develop a framework for individuals and
organizations to volunteer with the City.••PCS
117
– 3 –
██ PRIORITY 3: TECHNOLOGY INNOVATION
OBJECTIVE 3.A: Adopt and implement an Information Technology Roadmap that standardizes technology across City
departments and prioritizes cybersecurity, data protection, and resiliency.
Work Plan Fiscal Years Department(s)Status26/27 27/28
3A-1 Develop and adopt a five-year Technology Roadmap for the City.••IT X
3A-2 Select a new IT services partner through a competitive bid process.••IT
3A-3 Modernize the City’s data backup and recovery systems.••IT
3A-4 Keep the City’s phone system current and fully supported. ••IT
3A-5 Study options for moving City phones to a modern cloud-based service. •IT X
3A-6 Update and adopt the City’s technology use policies, including a new policy for
responsible use of artificial intelligence. •IT
3A-7 Strengthen data protection requirements in vendor contracts. ••IT
3A-8 Expand emergency preparedness exercises and training for City technology systems.••IT
3A-9 Replace aging computer systems before they become security risks. ••IT
3A-10 Support the City Clerk’s records retention program to improve how City data is
organized, retained, and reduced. ••CC
3A-11 Move additional City systems to secure government cloud services where practical and
cost-effective. •IT
3A-12 Complete study of IT job titles and duties (with Human Resources). ••HR
3A-13 Evaluate creating a technology steering committee for Citywide coordination. •IT X
3A-14 Standardize wireless internet across all City facilities. •IT
OBJECTIVE 3.B: Integrate smart technologies into infrastructure, City operations, and public safety to improve efficiency
and allow for data-informed decision-making.
Work Plan Fiscal Years Department(s)Status26/27 27/28
3B-1 Complete the Citywide Fiber Optic Master Plan study. ••IT
3B-2 Create rules so future street and construction projects can include fiber conduit at low
cost. •IT X
3B-3 Present funding and partnership options for a City fiber network. •IT X
3B-4 Extend IT technical management of security protections to support the traffic signal
network.•IT X
3B-5 Continue upgrading audio/visual systems in City meeting rooms and public spaces. ••IT
3B-6 Continue expanding security cameras and electronic door access at City facilities. ••IT
3B-7 Deploy Perry Weather’s professional weather monitoring system, including on-site
stations, real-time alerts, and accurate localized forecasts, publishing conditions directly
to the City’s website and fields page. ••PCS /O
OBJECTIVE 3.C: Launch a modernized City website that increases transparency, expands community engagement, and
improves usability.
Work Plan Fiscal Years Department(s)Status26/27 27/28
3C-1 Launch a centralized public website where residents can explore City maps, data, and
interactive tools in one place, improving transparency and making City information
easier to access. •PW
118
– 4 –
██ PRIORITY 4: HOUSING AFFORDABILITY
OBJECTIVE 4.A: Advance implementation of the Housing Element to increase the production of affordable housing.
Work Plan Fiscal Years Department(s)Status26/27 27/28
4A-1 Conduct outreach to developers to identify opportunities for and barriers to the
development of “missing middle” housing product types. Work with Planners to
identify potential “missing middle” housing product types that could be built in Dublin
to increase the amount of affordable housing available.
•CDD X
4A-2 Create or amend existing housing programs to implement Housing Element programs. ••CDD
4A-3 Continue to seek Housing Choice Vouchers for Dublin to fund additional affordable
housing for some of the most vulnerable residents.••CDD
4A-4 Evaluate the development standards to remove barriers to the production of affordable
housing.••CDD
4A-5 Work with developers to provide a diversity of housing types and sizes to meet the
City’s housing needs as part of residential development proposals.••CDD
OBJECTIVE 4.B: Promote the First-Time Homebuyer Loan Program and identify future funding sources for its continued
success.
Work Plan Fiscal Years Department(s)Status26/27 27/28
4B-1 Evaluate additional funding sources beyond City impact fees and loan repayment such
as additional funding through grants or similar sources through the County and/or the
State. •CDD X
4B-2 Work with Risewell Homes to promote the First-Time Homebuyer Loan Program
(FTHLP) to increase the use of the program established for the Dublin Centre project. ••CDD
4B-3 Continue to promote the FTHLP online and at City Hall and evaluate additional
promotion opportunities.••CDD
OBJECTIVE 4.C: Proactively identify and facilitate opportunities to attract multi-family housing development on key sites.
Work Plan Fiscal Years Department(s)Status26/27 27/28
4C-1 Work with Alameda County to secure Dublin Transit Center Site D-1 at no cost for a
future affordable housing development with approximately 99 units. ••CDD
4C-2 Implement and assist Sunflower Hill at Grace Pointe, which includes 60 units of
affordable housing to support people with intellectual and developmental disabilities,
with permits, grants, and financing.••CDD
4C-3 Work with the property owner of Dublin Place shopping center to develop multi-
family housing as part of the implementation of the Downtown Dublin Preferred
Vision. ••CDD
4C-4 Work with Eden Housing at Francis Ranch on entitlements and financing.••CDD
4C-5 Implement and assist the Related Companies with Amador Station, which includes 300
units that will be affordable to extremely low-, low-, and moderate-income households
on their permits, grants, and financing.•CDD
4C-6 Conduct outreach to developers to provide information on development opportunities
on developable land and inform them of incentives and assistance with development.••CDD
OBJECTIVE 4.D: Promote and provide outreach to the community on all City programs and services that address housing
accessibility and affordability.
Work Plan Fiscal Years Department(s)Status26/27 27/28
4D-1 Promote the Tri-Valley Affordable Housing Fair and increase its awareness through
coordination with participating agencies and organizations. ••CDD
4D-2 Ensure that City affordable housing programs such as the First-Time Homebuyer Loan
Program, information on BMRs, and information on the Minor Home Repair Program
are highlighted at the Tri-Valley Affordable Housing Fair. ••CDD
119
– 5 –
4D-3 Promote the County’s outreach and implementation of the Minor Home Repair
Program.••CDD
4D-4 Participate in Senator Glazer’s District 7 ADU Accelerator Program and proactively
provide information to residents on the program. •CDD
4D-5 Support, and when possible fund, local and regional efforts to address the housing
needs of individuals in Dublin who previously experienced homelessness.••CDD X
4D-6 See work plan item 4C-4.••CDD
4D-7 See work plan item 4C-2.••CDD
Objective 4.D continued...
120
– 6 –
██ PRIORITY 5: CITY INFRASTRUCTURE
OBJECTIVE 5.A: Strategically prioritize capital improvement projects to effectively leverage finite City resources.
Work Plan Fiscal Years Department(s)Status26/27 27/28
5A-1 Continue work on Exterior Improvements CIP – Construction phase. ••PW
5A-2 Continue work on Annual Street Resurfacing and Facilities Parking Lot Resurfacing CIP
– Construction phase.••PW
5A-3 Citywide Signal Communications upgrade. ••PW
5A-4 Continue work on Tassajara Road Improvements – N. Dublin Ranch Dr. to Quarry
Lane School CIP – Construction phase. ••PW
5A-5 Conduct functional and physical facility assessment of fire stations to determine
current and future needs, and plan for near-term and long-term maintenance and
capital improvements. ••PW X
5A-6 Continue coordinating with The Dublin Centre development to complete modifications
along project frontages on Tassajara Rd., Dublin Blvd., Gleason Dr., Central Pkwy., and
Brannigan Dr. The project scope includes roadway widening, traffic signal modification
at seven signalized intersections, and bicycle and pedestrian improvements.
••PW
OBJECTIVE 5.B: Invest in proactive and preventative maintenance to preserve City infrastructure and extend asset life
cycles.
Work Plan Fiscal Years Department(s)Status26/27 27/28
5B-1 See work plan item 5A-1. ••PW
5B-2 Continue work on Irrigation Systems Upgrades CIP – Construction phase. ••PW
5B-3 Conduct condition assessments of green stormwater infrastructure facilities. ••PW
5B-4 Conduct condition assessments of stormwater full trash capture devices. ••PW
5B-5 Continue implementation of The Wave’s preventative maintenance plan to proactively
maintain critical aquatic and facility infrastructure, reduce unplanned equipment
failures, and extend the useful life of major assets. Utilize preventative maintenance
findings, equipment condition assessments, and lifecycle data to identify and prioritize
future projects and long-term replacement needs.
••PCS
OBJECTIVE 5.C: Implement an asset management system to assist in long-term planning.
Work Plan Fiscal Years Department(s)Status26/27 27/28
5C-1 Implement Computerized Maintenance Management System (CMMS) to
comprehensively manage City infrastructure maintenance activities by enabling better
preventative maintenance scheduling, tracking of work order costs against facility
assets, and planning for asset lifecycle replacements.
••PW
5C-2 Received the Pavement Management Technical Assistance Program (P-TAP 27) grant.
Coordinate with the consultant to survey streets, update PCI in StreetSaver, identify
needs, and determine optimal pavement management scenarios. ••PW
5C-3 Develop a plan and schedule to collect data for the storm drain system including
location, size, material, and condition assessment to be used to inform future
stormwater asset management efforts. ••PW X
5C-4 Develop and implement a comprehensive digital asset inventory and identification
system for The Wave to support preventative maintenance, asset tracking, and long-
term facility planning. ••PCS
OBJECTIVE 5.D: Advance the Village Parkway Reconstruction Project.
Work Plan Fiscal Years Department(s)Status26/27 27/28
5D-1 Continue work on Village Parkway Reconstruction in Design phase. ••PW
5D-2 Continue to address project budget funding needs by increasing funds into the Village
Parkway Pavement Reconstruction Reserve. ••FIN
121
– 7 –
██ PRIORITY 6: DOWNTOWN DUBLIN
OBJECTIVE 6.A: Continue to advance the key tenets of the Downtown Dublin Preferred Vision: siting of a central park,
establishment of a new street grid, and creation of the Downtown character.
Work Plan Fiscal Years Department(s)Status26/27 27/28
6A-1 Explore design concepts and phased development approaches that balance the
Preferred Vision with site conditions, market feasibility, infrastructure needs, and
property-owner objectives. ••CDD
6A-2 Continue to work with the property owner of Dublin Place shopping center to identify
the location of the Town Square park and supporting development. ••CDD
OBJECTIVE 6.B: Promote a balanced mix of uses to support the Preferred Vision.
Work Plan Fiscal Years Department(s)Status26/27 27/28
6B-1 Identify opportunities to support retail, dining, entertainment, residential, and other
complementary uses that contribute to an active Downtown. ••ED
OBJECTIVE 6.C: Continue to plan for targeted City investment to catalyze development in Downtown Dublin.
Work Plan Fiscal Years Department(s)Status26/27 27/28
6C-1 Continue funding the Downtown Public Improvement Reserve. ••FIN
122
– 8 –
██ PRIORITY 7: FALLON EAST ECONOMIC DEVELOPMENT ZONE
OBJECTIVE 7.A: Finalize the purchase and sale agreement for the nature park on the GH PacVest parcel to satisfy parkland
requirements.
Work Plan Fiscal Years Department(s)Status26/27 27/28
7A-1 Resolve outstanding business with GH PacVest for acquisition of the future nature
parkland, including mitigation obligations, deed-restricted areas, access, and ownership
responsibilities. ••PCS
7A-2 Coordinate with Finance and other applicable departments to implement the executed
agreement, including establishing escrow, payment, accounting, title, and other financial
and administrative requirements necessary to complete the acquisition of the parkland. •PCS, FIN X
OBJECTIVE 7.B: Facilitate infrastructure improvements that support the Fallon East Economic Development Zone.
Work Plan Fiscal Years Department(s)Status26/27 27/28
7B-1 Coordinate with property owners on the Dublin Boulevard – North Canyons Parkway
Extension.••CMO, PW
7B-2 Work with Fallon East Property Owners on implementation of development
agreements.••CDD, PW, CMO
OBJECTIVE 7.C: Advance development consistent with the Fallon East Economic Development Zone vision.
Work Plan Fiscal Years Department(s)Status26/27 27/28
7C-1 Work with GH PacVest on entitlements for the Dublin Fallon 580 Project.••CDD, PW
7C-2 Work with Righetti on entitlements.••CDD, PW
7C-3 See work plan item 7B-2.••CDD, PW, CMO
123
– 9 –
██ PRIORITY 8: ENHANCED CUSTOMER EXPERIENCE
OBJECTIVE 8.A: Support the implementation of the 2024 Economic Development Strategy, including pursuing growth
industries.
Work Plan Fiscal Years Department(s)Status26/27 27/28
8A-1 Track progress on Economic Development Strategy actions and provide periodic
implementation updates to City leadership. ••ED
8A-2 Develop and begin implementing a targeted business attraction plan focused on
priority growth industries identified in the Economic Development Strategy. ••ED X
OBJECTIVE 8.B: Improve the City permitting process to provide timely service to the community.
Work Plan Fiscal Years Department(s)Status26/27 27/28
8B-1 Create two new Fire Operational Permits with a more streamlined, user-friendly
design that improves efficiency for office staff and reduces processing time. •CDD, FIRE
8B-2 Evaluate and review AI software that can enhance the permitting system, streamline
processes, and improve overall operational efficiency. ••CDD
8B-3 Review the Zoning Clearance process to streamline the Planning review of new
businesses. ••CDD X
8B-4 Create a new process for performing State-mandated fire inspections. ••CDD, FIRE
8B-5 Implement a standardized vendor selection committee and rating scale, streamlining
vendor review and reducing subjective back-and-forth in the approval process. •PCS X
8B-6 Evaluate and streamline encroachment permit timelines based on scope of work.
Prioritize simpler permits and homeowner utility repair permits to a maximum two-
week review time. ••PW X
8B-7 Evaluate a tiered fee structure for Public Works referral fees on building permits. ••PW X
OBJECTIVE 8.C: Continue offering programs that provide financial assistance, business development, and support services to
small businesses.
Work Plan Fiscal Years Department(s)Status26/27 27/28
8C-1 Continue administering and promoting the Small Business Navigator Program and
other business assistance programs. ••ED
8C-2 Increase awareness of available grants, incentives, and support programs. ••ED
8C-3 Introduce a lower-cost sponsorship tier in the Special Events Sponsorship Program to
give small businesses an affordable way to gain visibility at Citywide events. ••PCS
OBJECTIVE 8.D: Enhance the community’s connection to City business through improved online access to public meetings.
Work Plan Fiscal Years Department(s)Status26/27 27/28
8D-1 Implement Legistar and new online posting of agendas, minutes, and videos.•CC
8D-2 Install new cameras in Council Chamber and implement live online streaming of
Commission meetings held in the Chamber. •CC
124
– 10 –
██ REVISION HISTORY
125
126
Strategic Plan Progress
Report:Year 1, Quarter 1
October 20, 2026
127
Background
Years Covered Priorities Objectives July –September 2026
•The FY 2026–2028 Strategic Plan was adopted by the City Council on .
•The Plan covers .
•This is the , covering .
•Items are tracked as completed, completed/ongoing, in progress, off target, or not started.
Work plan items are never removed from the report; changes are recorded in its revision history.
128
Priority 1: Public Safety, Health, and Welfare
Dublin Police Services continues installing cameras at key locations citywide.
Cameras installed this quarter Additional camera permits submitted
129
Priority 2: Fiscal Sustainability
Prop. 218 balloting is
complete. The new district
will not be formed; the two
existing districts remain.
A new program guide, code
of conduct, and online
application through
NEOGOV.
Waiver expires December
31, 2026. An informational
report to the City Council is
planned by year end.
130
Priority 3: Technology Innovation
On-site stations with real-time lightning
and wind alerts support emergency
management and field closures.
Initial version launched with GIS maps
and data layers. More public datasets will
be added over time.
131
Priority 4: Housing Affordability
$2M U.S. Department of Housing
and Urban Development grant
application submitted for 60
affordable units.
Agreement amended to allow more
time to secure construction
funding.
Alameda County notified of the
City’s continued interest (~99
units).
Two loans approved totaling
$200,000 for Below-Market-Rate
buyers.
Prototype plans updated and a
$7,500 rebate processed.
Two community meetings held;
Senate Bill (SB)330 application
reviewed.
132
Priority 5: City Infrastructure
Painting done at Fire Stations 16 and 17 and The
Wave
All streets and parking lots in this year’s project
MTC-funded street survey and pavement ratings
update
Eligible for SB 1 grant; outreach and design plans
set
Green infrastructure and trash capture devices
assessed
Asset Essentials training contract executed
133
Priorities 6 & 7: Downtown Dublin and Fallon East
The City Council received a closed
session update. Staff continues working
with the property owner on next steps.
Third commercial submittal reviewed; two residential
community meetings held.
Met on the Dublin Boulevard –North Canyons Parkway
Extension and development agreements.
134
Priority 8: Enhanced Customer Experience
State-mandated inspections are moving from
paper to electronic, with EnerGov integration
underway.
New long-term and short-term permits are
currently being tested.
Staff completed training ahead of new online
agendas, minutes, and videos.
A new participation guide puts vendor and
nonprofit requirements in one place.
135
Staff Recommendation
•Receive the Report
•Comments/Questions?
136