HomeMy WebLinkAboutItem 8.1 Two-Year Strategic Plan Update and Final Report for Fiscal Years 2024-25 and 2025-26Agenda Item 8.1 STAFF REPORT CITY COUNCIL Page 1 of 5 DATE: July 21, 2026 TO: Honorable Mayor and City Councilmembers FROM: Colleen Tribby, City Manager SUBJECT: Two-Year Strategic Plan Update and Final Report for Fiscal Years 2024- 25 and 2025-26 Prepared by: Jordan Foss, Senior Management Analyst EXECUTIVE SUMMARY: The City Council will receive an update and final report on the City’s Two-Year Strategic Plan for Fiscal Years 2024-25 and 2025-26. STAFF RECOMMENDATION: Receive the report and presentation. FINANCIAL IMPACT: None. DESCRIPTION: The City Council adopted the City’s Two-Year Strategic Plan (Fiscal Years 2024-25 and 2025- 26) on April 2, 2024. This Plan sets the overall direction for the City, guiding resources and setting specific objectives. The City Manager assigns new work plan tasks as needed to implement the strategies and objectives. On August 19, 2025, the City Council received an update on the first year of the Strategic Plan, covering the period of July 1, 2024 through June 30, 2025. Key highlights for the first year can be found in Attachment 2. This report covers the second year of the Strategic Plan (July 1, 2025 through June 30, 2026) and serves as the final report to the City Council. A detailed discussion of the updates is provided in Attachment 1, with a summary below. To ensure transparency, existing items are not removed when completed; instead, they remain to reflect the eff orts made toward each objective. 474 Page 2 of 5 Key Accomplishments: July 1, 2025 – June 30, 2026 Strategy 1: Economic Development, Small Business Support, and Downtown Dublin  Staff collaborated with a consultant to conduct extensive outreach to inform the Marketing and Branding Strategy, including individual interviews with City Councilmembers, focus groups with industry stakeholders and regional partners, and a community survey.  Staff distributed a flyer promoting the Small Business Navigator Program in Hindi, Traditional Chinese, Simplified Chinese, and Spanish to ensure accessibility for a diverse business community.  The Business Concierge Program remained active, with the Economic Development Department responding to 559 requests for assistance.  Staff completed a comprehensive update to the "How to Start a Business" guide and developed a user-friendly handout to explain the business entitlement process.  The City published a Business Entitlement Process Guide in collaboration with internal departments and the Dublin San Ramon Services District, providing businesses with clear guidance on entitlement and permitting requirements, timelines, and agency coordination.  The cities of Dublin and Livermore agreed on a phased approach to the Dublin Boulevard – North Canyons Parkway Extension project, focusing initial efforts on roadway improvements within their respective jurisdictions, with the segment within unincorporated Alameda County to be addressed in a future phase when funding has been identified and secured. Strategy 2: Public Safety • Alameda County Fire Department and Public Works staff completed the installation of new fire station alerting systems at all three Dublin fire stations, f inishing a multi-year infrastructure upgrade. • The City purchased two mobile camera trailers equipped with license plate readers and live-feed video camera technology to enhance crime prevention and situational awareness capabilities. • Situational Awareness Cameras were installed at Arnold Road/Horizon Parkway and at designated intersections citywide, expanding the City’s public safety technology network. • Pedestrian signage was installed at various locations along Arnold Road to provide wayfinding for individuals released from Santa Rita Jail to the Dublin/Pleasanton BART station. • Dublin Police Services (DPS) and the National Coalition Against Prescription Drug Abuse hosted a prescription drug and fentanyl safety community forum at Emerald High School and subsequently installed a free Naloxone distribution box in the public lobby of the police station in partnership with Alameda County Health and the California Department of Health Care Services. • DPS hosted a Public Safety Fair at Emerald Glen Park, providing hands-on 475 Page 3 of 5 engagement with first responders and emergency preparedness resources. The event featured 33 vendors and drew approximately 600 community members. • Staff issued a Request for Qualifications for a functional and physical condition assessment of the City’s three fire stations, with statements of qualification s received from 10 consulting firms and consultant selection targeted before the end of the first quarter of Fiscal Year 2026-27. Strategy 3: Housing Inclusivity and Affordability • The City Council approved amendments to the Dublin Municipal Code implementing Housing Element Program B.15 (Replacement Housing) and Program D.1 (Remove Development Constraints), and completed rezoning of properties with Planned Development Residential Zoning. • The Sunflower Hill at Grace Pointe project received Planning Commission approval on December 9, 2025. The project also received a Housing and Urban Development Fiscal Year 2025-26 Economic Development Initiative – Community Project Funding grant of $2 million, with federal funding support requested through a letter to Congressman Swalwell. • The City Council authorized the application for the Affordable Housing and Sustainable Communities Program grant for the 300-unit Amador Station Affordable Housing Project. • The City entered into an Indemnity Agreement with Alameda County to allow Tri-Valley regional preference points for the Regional Street Senior Affordable Housing project. • Staff conducted buyer meetings for families purchasing deed-restricted accessory dwelling units and Below Market Rate (BMR) Units at Francis Ranch, with four BMR families also receiving First-Time Home Buyer Loan Program funds from the City. The First-Time Home Buyer Loan Program was also amended to increase program utilization and ensure compatibility with other loan programs. • The City hosted the Tri-Valley Affordable Housing Fair at The Wave in collaboration with the cities of Livermore and Pleasanton, drawing more than 250 attendees and connecting residents with 18 agencies and organizations offering housing resources. Strategy 4: Inclusive and Effective Government • The City Council increased the Dublin Boulevard Extension Advance Reserve to $71,042,736 and the Downtown Reserve to $45,000,000 through contributions made as part of the Fiscal Year 2024-25 Fourth Quarter Financial Review. An additional $5 million was added to the Village Parkway Pavement Reconstruction Reserve to address an identified project funding shortfall. • Phase 1 of the Iron Horse Trail Open Space and Nature Park opened , delivering 1,700 feet of new multi-use trail connecting Amador Valley Boulevard to Stagecoach Park, with accessible paths, seating areas, bike racks and a repair station, and interpretive signage highlighting the site’s railroad history and natural ecology. • Forest Park opened to the community, featuring a multi-use sports court for basketball and futsal, a pollinator garden, a nature-inspired playground, a reservable picnic area, and a unique tree adoption program. 476 Page 4 of 5 • The City awarded $330,000 in Human Services Grants in Fiscal Year 2025-26 to 24 community benefit organizations, funding 28 programs throughout the Tri-Valley. • The Finance Department launched the OpenGov Budget Transparency Portal, enabling the public to access budget summary data, explore customizable graphical displays, and interact with detailed financial tables and charts. • The Dublin C.R.E.A.T.E.S. Cultural Event Program hosted three cultural celebration events attracting more than 8,000 attendees. The program was consolidated into a unified format approved by the Heritage and Cultural Arts Commission, and Diwali has been approved as an upcoming event with an estimated 6,000 attendees. • The City selected a consultant to develop a Municipal Fiber Optic Master Plan to guide the planning, funding, and management of the City’s broadband infrastructure assets. Strategy 5: Long-Term Infrastructure and Sustainability Investments • The City Council initiated Proposition 218 proceedings to establish a Street Light Assessment District to replace two existing Street Light Maintenance Districts, funding the ongoing operation, maintenance, and replacement of public street lighting and reducing reliance on the General Fund. • The City Council directed Staff to prepare a ballot measure for a phased increase to the City’s Transient Occupancy Tax rate to 12 percent for the 2026 General Election. • The adopted Fiscal Year 2026-27 and 2027-28 Budget included a $2 million General Fund contribution in each fiscal year to the Internal Services Fund for facility replacement, and the Five-Year Capital Improvement Program established $4.5 million annually for pavement management. • The City Council adopted the Electric Vehicle Infrastructure Plan, and Staff completed the Carbon Sequestration Pilot Project in partnership with StopWaste and the University of California, Merced. • The City adopted the Low Carbon Concrete Building Code and began implementation, advancing the City’s Climate Action Plan commitments. • The 2025 Annual Street Resurfacing project was substantially completed, including a slurry seal of 144 street segments totaling 3.7 million square feet. The 2026 Annual Street Resurfacing project was advertised for bid with construction planned for summer 2026. • Staff applied for the 2027 Pavement Technical Assistance Program grant and initiated the Pavement Management Program update, with program certification to commence summer 2026 and anticipated completion in spring 2027. • New citywide trash-capture devices were installed to meet the Municipal Regional Permit 100-percent trash load reduction requirement, and the Dublin Climate Challenge Online Community Engagement platform was launched to advance resident participation in sustainability efforts. A new Two-Year Strategic Plan covering the period of Fiscal Years 2026 -27 and 2027-28 was adopted by the City Council on April 21, 2026 (Resolution No. 22-26). 477 Page 5 of 5 STRATEGIC PLAN INITIATIVE: This report addresses all strategies of the Two-Year Strategic Plan. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. ATTACHMENTS: 1) Two-Year Strategic Plan Update and Final Report 2) August 19, 2025 City Council Staff Report (without attachments) 478 STRATEGIC PLAN YEAR 2 UPDATE Fiscal Years 2024-2026 City of Dublinc a l i f o r n i a Attachment 1 479 STRATEGIC PLAN On April 2, 2024, the Dublin City Council adopted the FY 2024-2026 Strategic Plan, outlining the City Council’s shared vision and values for Dublin’s future. The plan includes five key strategies and 25 objectives. Additionally, the City Manager identifies work plan items that align with the Strategic Plan’s goals and objectives. PROGRESS REPORT This report provides a quarterly update, highlighting progress made toward the Strategic Plan’s goals and objectives. DEPARTMENT KEY CD Community Development CC City Clerk CMO City Manager’s Office ED Economic Development FIN Finance FIRE Fire HR Human Resources IT Information Technology PCS Parks and Community Services POLICE Police PW Public Works STATUS KEY The following key indicates each project’s status: Completed, In Progress, Ongoing, Off Target, or Not Started. Completed: The task has been fully completed. /O Completed/Ongoing: The task has been completed, and incorporated into City operations. In Progress: Staff is actively working on the task, and it is on track to be completed on time. ■Off Target: Staff is working on the task, but it is behind schedule and may not be completed on time. X Not Started: Work on this item has not yet begun. CONTENTS Strategy 1: Economic Development, Small Business Support, and Downtown Dublin . . . . . . . 1 Strategy 2: Public Safety . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 2 Strategy 3: Housing Inclusivity and Affordability . . . . . . . . . . . . . . . . . . . . . 3 Strategy 4: Inclusive and Effective Government . . . . . . . . . . . . . . . . . . . . . . 4 Strategy 5: Long-Term Infrastructure and Sustainability Investments . . . . . . . . . . . . . . 5 Revision History . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 7 480 – 1 – ██ STRATEGY 1: ECONOMIC DEVELOPMENT, SMALL BUSINESS SUPPORT, AND DOWNTOWN DUBLIN OBJECTIVE 1.A: Support the implementation of the 2024 Economic Development Strategy, including pursuing growth industries. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Implement an economic development-tailored marketing and branding strategy.••ED  ii Focus existing business visitation program towards high-priority industries.••ED /O iii Collect information regarding specific regulatory barriers to changes of use in retail spaces.••ED, CD  iv Convene meetings with brokers, developers, and major property owners to provide updates regarding City efforts and resources.••ED /O OBJECTIVE 1.B: Work with ARA and Hines on the development of the Dublin Commons project, including associated public improvements, relocation of tenants, development agreement and appropriate incentives to effectuate physical changes to the area, as well as support for small businesses. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Update the Western Dublin Transportation Impact Fee program.*••PW, CMO, FIN ■ ii Draft Deal Terms for the Dublin Commons development agreement.*••ED  iii Draft the Dublin Commons development agreement.*••ED  * The developer of the proposed Dublin Commons project is working on a new design concept to present to the City. OBJECTIVE 1.C: Continue supporting the Fallon-East Economic Development Zone and associated agreements that effectuate the construction of the Dublin Boulevard extension. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Work with Fallon East Property Owners on development agreements.••ED, CD, PW /O ii Update the Eastern Dublin Transportation Impact Fee program.••PW, CMO, FIN  iii Work with RES on the mitigation of the Dublin Boulevard extension.••PW, CMO /O iv Work with Alameda County Transportation Commission on the Dublin Boulevard extension – Design phase.••PW, CMO /O v Oversee work on the Dublin Boulevard extension – Funding Plan Development with Alameda County Transportation Commission and Livermore.••PW, CMO /O OBJECTIVE 1.D: Continue to evaluate and implement small business programs that provide financial assistance, business development, permit processing, and support services to the community. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Expand the Small Business Navigator program, and other technical support programs.••ED /O ii Provide Business Concierge Services to support with the retention and growth of businesses.••ED /O iii Prepare a Business Entitlement Process Handout to help provide clarity on the City's process.••ED  481 – 2 – ██ STRATEGY 2: PUBLIC SAFETY OBJECTIVE 2.A: Work with County officials on Santa Rita Jail release procedures and services to improve the safety of adjacent neighborhoods. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Work with Alameda County Sheriff's Office Administration to discuss current practices and transportation options. ••POLICE /O ii Explore funding options from Alameda County to help mitigate concerns with inmate release procedures.••POLICE /O iii Install Flock Situational Awareness Cameras at Arnold Road/Horizon Parkway. •POLICE, IT  OBJECTIVE 2.B: Continue to invest in public safety technology and programs that advance proactive, community policing and protect citizens and law enforcement. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Install pedestrian signage to guide Santa Rita Jail releasees to Dublin/Pleasanton BART station.•POLICE  ii Develop and implement a bicycle and scooter safety and education program, including e-bikes and e-scooters, in collaboration with the Dublin Unified School District and residents.••POLICE  iii Install Flock Situational Awareness Cameras at designated intersections (rolling installations).••POLICE /O iv Engage with residents and local businesses to discuss crime prevention strategies and security enhancements.•POLICE /O v Host a community forum on substance use prevention and overdose awareness.•POLICE  OBJECTIVE 2.C: Establish a Business Watch program to collaboratively address commercial theft. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Partner with the Dublin Chamber of Commerce on the development of a Business Watch Program. ••POLICE /O ii Develop and host a Small Business and Public Safety Fair to support local businesses. •POLICE, ED  OBJECTIVE 2.D: Work with Alameda County Fire on upgrades to fire stations to improve safety and efficiency of operations. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Install new fire station alerting systems.••FIRE, PW  ii Complete facility condition assessments of Dublin fire stations.••PW  OBJECTIVE 2.E: Develop a more comprehensive security infrastructure for City facilities, including video surveillance, building access and improvements, and alarm systems. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Install citywide situational cameras at all City building facilities.••IT  ii Convert citywide electronic badging access to a single vendor.••IT  iii Implement a unified security vendor for all building alarms.••IT, PW  482 – 3 – ██ STRATEGY 3: HOUSING INCLUSIVITY AND AFFORDABILITY OBJECTIVE 3.A: Implement the goals, policies, and programs in the 2023-2031 Housing Element. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Prepare Zoning Ordinance Amendments that implement Housing Element programs.••CD  ii Prepare Rezoning Ordinance of properties with Planned Development Residential Zoning.•CD  iii Create or amend existing housing programs to implement Housing Element programs.••CD /O OBJECTIVE 3.B: Support efforts to produce housing affordable at all levels of income. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Implement the Dublin Centre project which includes 494 market rate units, 6 moderate income units, 105 low- and moderate-income accessory dwelling units, dedication of a 1.88- acre site for affordable housing, and contribution of $1 M to the First Time Homebuyer Loan Program.* ••CD /O ii Implement the Francis Ranch project which includes 555 market rate units, 18 moderate- income units, 50 low-income accessory dwelling units, dedication of a two-acre site for affordable housing, and payment of in-lieu fees.*••CD /O iii Implement the Regional Street Senior Affordable Housing Development which includes 113 units that are affordable to very low- and low-income households.*••CD /O iv Implement the Amador Station project which includes 300 units that will be affordable to extremely low-, low- and moderate-income households and built in four phases.••CD  v Work with Alameda County to secure Transit Center Site D-1 at no cost for a future affordable housing development with approximately 99-units.••CD  OBJECTIVE 3.C: Support programs that facilitate homeownership such as the First-Time Home Buyer Loan Program. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Complete Amendments to the First-Time Home Buyer Loan program to increase use of program and ensure compatibility with other loan programs.•CD  OBJECTIVE 3.D: Support development of housing types to support essential workers, younger buyers, and seniors. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Implement the Dublin Centre entry level townhomes project.*••CD /O ii Implement and assist Eden Housing with the Regional Street Senior Affordable Housing project permits, grants, and financing.*••CD /O iii Implement and assist the Related Companies with their Amador Station Affordable Housing project permit, grants, and financing.••CD  iv Work with Grace Point at Dublin Centre on entitlements and financing.••CD  v Work with Francis Ranch to implement their Affordable Housing Agreement.••CD /O vi Work with Alameda County to secure the Transit Center site D-1 for affordable housing.••CD  OBJECTIVE 3.E: Support efforts to address housing for special needs communities. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Work with Grace Point at Dublin Centre on entitlements and financing.••CD  ii Work with Francis Ranch to implement their Affordable Housing Agreement.••CD /O * Under construction 483 – 4 – ██ STRATEGY 4: INCLUSIVE AND EFFECTIVE GOVERNMENT OBJECTIVE 4.A: Set reserves aside for major infrastructure investments which are key to the City’s economic future. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Continue to build the Dublin Boulevard extension Advance Reserve.••FIN /O ii Continue funding the Downtown Reserve.••FIN /O iii Continue to build the Village Parkway Pavement Reconstruction Reserve.••FIN /O OBJECTIVE 4.B: Develop policies and procedures to address transition to District-based elected officials. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Transition to District-based election for the November 2024 election.••CC  ii Include the topic “city governance with district representation” at the City Council Team-building Workshop to receive feedback for the drafting of policies and procedures.••CMO  OBJECTIVE 4.C: Implement DEI Action Plan and continue to use a diversity, equity, and inclusion lens in organizational development and programming. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Implement adaptive swimming lessons and recreation swimming opportunities at The Wave. ••PCS  ii Install communication boards at The Wave and other facilities to provide access and raise public awareness about special education. ••PCS  iii Provide Human Services Grants to community benefit organizations in the Tri-Valley.••PCS  iv Continue efforts in hiring practices and training that promotes inclusion, connection, belonging, and safety for staff and prospective employees.••HR /O OBJECTIVE 4.D: Conduct ongoing outreach and garner feedback on services and programs to meet the community’s needs. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Manage the Francis Ranch Development Neighborhood Parks projects.••PCS  ii Undertake the Eastern Dublin Wireless Telecommunication Facility project.••CMO /O iii Evaluate the feasibility of a program to recognize cultural celebrations in the community.••CMO, PCS /O OBJECTIVE 4.E: Evaluate ways to increase transparency in finance, policing, and development and infrastructure projects. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Develop and host a Small Business and Public Safety Fair.••POLICE, ED  ii Implement online transparency tool for capital projects.••PW, FIN /O iii Implement a new weekly community newsletter.••CMO /O OBJECTIVE 4.F: Continue proactive evaluation of policies and procedures and ensure cybersecurity infrastructure and practices are sufficient to protect the City’s assets. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Develop IT training curriculum for new, ongoing, and executive staff.••IT  ii Review existing technology policies and procedures as they relate to digital acceptable use, remote access, and city-owned vs. personal device usage of City networks and systems.••IT  iii Continue to execute quarterly penetration testing with the City's cyber insurance contractor.••IT /O iv Develop a Municipal Fiber Optic Master Plan to guide the planning, funding, and management of the City’s fiber optic assets and broadband infrastructure.•IT  484 – 5 – ██ STRATEGY 5: LONG-TERM INFRASTRUCTURE AND SUSTAINABILITY INVESTMENTS OBJECTIVE 5.A: Continue to explore funding mechanisms for capital and ongoing maintenance needs. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Identify and pursue grant funding opportunities for capital and maintenance projects.••CMO, PW /O ii Execute contributions from the General Fund to the Internal Services Funds for facility replacements in both FY 2024-25 & FY 2025-26 budgets.••FIN /O iii Manage ongoing Pavement Management Reserve funding designations.••FIN /O iv Initiate a Street Light Assessment District to fund the operation, maintenance, and replacement of public street lighting.•PW  v Prepare a ballot measure to increase the City’s Transient Occupancy Tax rate for the 2026 General Election.•CMO, CC  vi Evaluate Parks and Community Services user fees to ensure appropriate cost recovery.•PCS  OBJECTIVE 5.B: Focus on major street improvements to assist in improving safety and traffic movement, including Village Parkway, Tassajara Road, and the Dublin Boulevard extension. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Carry out Citywide Signal Communications upgrade.••PW  ii Work with Alameda County Transportation Commission on the Dublin Boulevard extension – Design phase.••PW, CMO  iii Oversee work on the Dublin Boulevard extension – Funding Plan Development with Alameda County Transportation Commission and Livermore.••PW, CMO /O iv Manage Tassajara Road Improvements – North Dublin Ranch Drive to Quarry Lane School.••PW  v Execute design phase for Tassajara Road Realignment and Widening – Fallon Road to North City Limit – Design.••PW  vi Continue work on Village Parkway Reconstruction – Design phase.••PW  OBJECTIVE 5.C: Continue to make progress on the Climate Action Plan and sustainable operations. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Launch Dublin Climate Challenge Online Community Engagement platform.••PW /O ii Adopt the Low Carbon Concrete Building Code.•CD, PW  iii Develop Building Electrification Plan.••PW  iv Develop Electric Vehicle Infrastructure Plan.••PW  v Oversee and continue Citywide Energy Efficiency and Infrastructure projects.••PW /O vi Manage the maintenance of the Green Stormwater Infrastructure – Iron Horse Trail, South of Amador Valley Boulevard.••PW /O vii Manage the implementation of Green Stormwater Infrastructure – Citywide Trash Capture Devices.••PW /O viii Develop a Fleet Electrification Plan through the Metropolitan Transportation Commission’s Public Fleet Electrification Planning Assistance Program.••PW  ix Undertake the Carbon Sequestration Pilot Project in partnership with StopWaste and the University of California Merced.•PW /O Strategy 5 continued on next page... 485 – 6 – OBJECTIVE 5.D: Evaluate options for a sustainable pavement management program. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Complete First Cape Seal Street Resurfacing.••PW  ii Undertake the 2024 Annual Street Resurfacing project.••PW  iii Undertake the 2025 Annual Street Resurfacing project.••PW /O iv Update the Pavement Management program.••PW  v Undertake the 2026 Annual Street Resurfacing project.•PW  OBJECTIVE 5.E: Evaluate use of General Fund reserves to address asset replacement needs. Work Plan Fiscal Years Department(s)Status24/25 25/26 i Continue to evaluate Pavement Management Reserve funding designations.••FIN /O Strategy 5 continued... 486 – 7 – ██ REVISION HISTORY March 2025 • Added Department Key • Added Off Target category to Status Key • Added Revision History page June 2025 • Updated document title to “Year 1 Update” • Added item 5. C viii August 2025 • Added Completed/Ongoing category to the status key October 2025 • Changed Objective 1.B: i to Off Target • Changed Objective 1.C: ii to Off Target • Changed Objective 2.B: ii to Completed/Ongoing • Changed Objective 2.D: ii to In Progress • Changed Objective 5.B: iv to In Progress • Changed Objective 5.B: vi to In Progress • Changed Objective 5.C: vi to In Progress • Changed Objective 5.D: iv to In Progress January 2026 • Updated document title to “Year 2, Q2 Update” • Changed Objective 1.B: i to Off Target and added a footnote • Changed Objective 1.B: ii to In Progress and added a footnote • Changed Objective 1.B: iii to In Progress and added a footnote • Changed Objective 2.D: i to Completed • Changed Objective 3.D: iv to Completed • Changed Objective 3.D: v to Completed/Ongoing • Changed Objective 3.E: i to Completed • Changed Objective 3.E: ii to Completed/Ongoing • Changed Objective 5.B: ii to In Progress • Changed Objective 5.C: vii to Completed/Ongoing • Added Objective 5.C: ix • Added Objective 5.D: v April 2026 • Changed Objective 1.D: i to Completed/Ongoing • Changed Objective 1.D: iii to Completed/Ongoing • Changed Objective 2.B: ii to Completed • Changed Objective 5.D: iii to Completed/Ongoing • Added Objective 2.B: iv • Added Objective 2.B: v • Added Objective 4.F: iv • Added Objective 5.A: iv • Added Objective 5.A: v • Added Objective 5.A: vi July 2026 • Changed Objective 1.C: ii to In Progress • Changed Objective 1.D: iii to Completed • Changed Objective 4.C: iii to Completed • Changed Objective 5.A: ii to Completed/Ongoing • Changed Objective 5.A: iv to Completed • Changed Objective 5.A: v to In Progress • Changed Objective 5.C: iv to Completed • Changed Objective 5.C: vi to Completed/Ongoing 487 488 STAFF REPORT CITY COUNCIL Page 1 of 4 Agenda Item 7.1 DATE: August 19, 2025 TO: Honorable Mayor and City Councilmembers FROM: Colleen Tribby, City Manager SUBJECT: Two-Year Strategic Plan: Year 1 Progress Report Prepared by: Jordan Foss, Senior Management Analyst EXECUTIVE SUMMARY: The City Council will receive the Year 1 progress report on the City’s Two-Year Strategic Plan, along with key highlights from Fiscal Year 2024-25. STAFF RECOMMENDATION: Receive the report. FINANCIAL IMPACT: None. DESCRIPTION: Every two years, the City Council adopts a Strategic Plan comprising the City’s Mission, Vision, and Values, as well as strategies and objectives which guide the City’s work for the current two-year period. To accomplish the objectives outlined in the Strategic Plan, the City Manager identifies work plan items that align with its goals and objectives. The City Council adopted the latest Two-Year Strategic Plan on April 2, 2024, covering Fiscal Years 2024 -25 and 2025-26. On February 18, 2025, the City Council received an update from staff on the newly redesigned Strategic Plan Progress Report format. At this meeting, the City Council provided direction on the proposed progress report and requested changes. The City Council’s requested changes were incorporated into the report (Attachment 1), which details the City Council’s five strategies and 25 objectives along with Staff’s work plan for achieving each objective. Each work plan item includes a description, anticipated fiscal years of activity, assigned department(s), and status. As progress is tracked throughout the two-year period, items are updated to reflect whether they are completed, in progress, off target, or not started. 489 Page 2 of 4 Additionally, the City Manager may also assign new work plan tasks as needed. To ensure transparency, existing items are not removed from the progress report; instead, they remain to reflect the efforts made toward each objective. Any changes to objectives or work plan items are recorded in the document’s revision history. Completed items from Fiscal Year 2024-25 are included in this report. Below are key highlights from Fiscal Year 2024-25. Key Highlights: July 1, 2024 – June 30, 2025 Strategy 1: Economic Development, Small Business Support, and Downtown Dublin  The City Council approved an agreement with a consultant to lead the City’s marketing and branding strategy, and a project kick-off meeting was held to initiate the effort.  Staff developed a new flyer to promote the Small Business Navigator program, which was translated into Hindi, Traditional Chinese, Simplified Chinese, and Spanish, and posted on the City website. It will be mailed to businesses in the next quarter.  The Business Concierge Program remained active throughout the year, with Economic Development Staff responding to more than 320 requests for assistance.  The City Council received an update on the Dublin Boulevard Extension project on January 14, 2025. Strategy 2: Public Safety  The City installed pedestrian signage along Arnold Road that guides Santa Rita Jail releasees to the Dublin/Pleasanton BART station.  The City installed Flock situational awareness cameras at designated intersections.  Dublin Police Services hosted a Community Safety Fair at Emerald Glen Park on May 17, 2025. The event was well attended and featured 33 vendors who provided valuable information on safety, wellness, emergency medical response, and emergency preparedness.  Dublin Police Services presented a report on current laws and enforcement efforts related to electronic bicycles and electronic scooters and recommended the codification of bicycle laws into the Dublin Municipal Code, which will be presented to the City Council later this year. Strategy 3: Housing Inclusivity and Affordability  Staff prepared the rezoning of properties with planned development residential zoning to multi-family residential in response to the certified General Plan Housing Element.  The City Council approved amendments to the First-Time Home Buyer Loan Program, which will increase the use of the program and ensure compatibility with other loan programs.  Staff worked with Eden Housing to finalize their funding and building permits, which enabled them to break ground on the Regional Street Senior Affordable Housing project.  Staff prepared Zoning Ordinance amendments to implement recent changes in state law and certain programs of the General Plan Housing Element.  Staff continued working with Dublin Centre and Grace Pointe on the transfer of land and grant funding for the Sunflower Hill affordable housing project for individuals with intellectual and developmental disabilities. 490 Page 3 of 4 Strategy 4: Inclusive and Effective Government  The City transitioned to District-based elections for the November 2024 election.  The Parks and Community Services Department installed communication boards at The Wave and other facilities to provide access and raise public awareness about special education.  Staff continued to provide Human Services Grants to community benefit organizations in the Tri-Valley that were approved by the City Council.  The Parks and Community Services Department implemented adaptive swimming lessons and recreation swimming opportunities at The Wave.  The Community Engagement Division (rebranded and expanded from the Communications Division) launched the weekly Dublin Digest to keep the community informed more frequently about City news. Strategy 5: Long-Term Infrastructure and Sustainability Investments  The City Council approved contributions from the General Fund to the Internal Services Funds for facility replacements in both the FY 2024 -25 and FY 2025-26 budgets.  The Public Works Department launched the Dublin Climate Challenge, an online community engagement platform.  Staff issued a request for qualifications for functional and conditional assessment services for the three City of Dublin fire stations.  On June 17, 2025, the City Council approved an update to the Five-Year Capital Improvement Program (CIP), which included a new format for the CIP that utilizes ClearGov as the online transparency tool and platform.  The City Council awarded the construction contract for the Irrigation Systems Upgrade project, which includes $1.38M grant funding from the California Water Resources Urban Community Drought Relief Grant Program.  The City Council adopted the Low Carbon Concrete Building Code, which became effective on January 1, 2025.  The City received notification of receipt of a grant through the Metropolit an Transportation Commission (MTC) Technical Assistance for Fleet Electrification program, which provides up to $100,000 of funding for MTC consultants to assist with public fleet electrification planning.  Street resurfacing projects were completed, with the Cape Seal project bringing a new, more sustainable resurfacing treatment to the community. Attachment 1 is the complete Strategic Plan Year 1 Progress Report. STRATEGIC PLAN INITIATIVE: None. 491 Page 4 of 4 NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. ATTACHMENTS: 1) FY 2024-2026 Strategic Plan Year 1 Progress Report 492 Two-Year Strategic Plan: Final Report July 21, 2026 493 Background 2 Years Covered 5 Strategies 25 Objectives FY2024–26 Reporting Period •The current Two-Year Strategic Plan was adopted by the City Council on April 2, 2024. •The Plan covers the period July 1, 2024 through June 30, 2026. •This report serves as the final report for the current Plan. •The Year 1 Update was presented to the City Council on August 19, 2025. •A new Two-Year Strategic Plan (FY 2026–27 and FY 2027–28)was adopted by the City Council on April 21, 2026. This final report closes out the Plan and reflects on two years of citywide progress across all five strategies. 494 Strategy 1: Economic Development, Small Business Support, and Downtown Dublin Marketing & Branding Strategy Conducted extensive outreach — Councilmember interviews, stakeholder focus groups, and a community survey —to shape the City's new brand. Business Concierge Program Responded to 559 requests for assistance, up sharply from the prior year. Business Entitlement Process Guide Published with DSRSD and internal partners, giving businesses clear guidance on permitting timelines and coordination. Dublin Boulevard –North Canyons Parkway Extension Agreed, with Livermore, to a phased approach, advancing roadway improvements in each jurisdiction. 495 Strategy 2: Public Safety Fire Station Alerting Systems Completed a multi-year upgrade to new alerting systems at all three Dublin fire stations. Expanded Camera Network Installed two mobile camera trailers and new situational awareness cameras to strengthen citywide crime prevention. Fentanyl & Naloxone Safety Initiative Hosted a community safety forum and installed a free Naloxone distribution box at the Public Safety Complex lobby. Public Safety Fair Hosted 33 vendors and approx. 600 community members at Emerald Glen Park for hands-on safety engagement. 496 Strategy 3: Housing Inclusivity and Affordability Housing Element Implementation The City Council approved code amendments and completed rezoning to support replacement housing goals. Sunflower Hill at Grace Pointe Approved by the Planning Commission and awarded a $2 million federal HUD community project grant. Amador Station Affordable Housing City Council authorized a grant application to help fund the 300-unit project. Tri-Valley Affordable Housing Fair Hosted with Livermore and Pleasanton, drawing 250+ attendees and 18 partner agencies to The Wave. 497 Strategy 4: Inclusive and Effective Government Two New Community Parks Opened the Iron Horse Nature Park and Open Space Phase 1 (1,700 ft. of new trail) and Forest Park. $330,000 in Human Services Grants Funded 28 programs across 24 community benefit organizations serving the Tri-Valley. Budget Transparency Portal Finance launched OpenGov, giving the public interactive access to budget data and financial reports. New Cultural Events Three celebrations drew more than 8,000 attendees under a newly consolidated program format. 498 Strategy 5: Long-Term Infrastructure and Sustainability Investments Annual Street Resurfacing 144 street segments (3.7 million sq. ft.) were slurry sealed; the 2026 project is anticipated to begin construction this summer. EV Infrastructure & Carbon Pilot Council adopted the EV Infrastructure Plan; the Carbon Sequestration Pilot with UC Merced was completed. Long-Term Capital Funding The FY 2026-28 budget commits $2M/year for facility replacement and $4.5M/year for pavement management. Street Light Assessment District Council initiated Prop. 218 proceedings to fund streetlight operations without relying on the General Fund. 499 Staff Recommendation •Receive the report •Questions? 500