HomeMy WebLinkAboutItem 5.8 Iron Horse Nature Park and Open Space - Phase 1 Project, CIP No. PK0422 Acceptance of Work Agenda Item 5.8 STAFF REPORT CITY COUNCIL Page 1 of 5 DATE: July 21, 2026 TO: Honorable Mayor and City Councilmembers FROM: Colleen Tribby, City Manager SUBJECT: Iron Horse Nature Park and Open Space - Phase 1 Project, CIP No. PK0422 Acceptance of Work Prepared by: Vatsal Patel, Assistant Public Works Director/City Engineer EXECUTIVE SUMMARY: The City Council will consider accepting the Iron Horse Nature Park and Open Space - Phase 1 Project, CIP No. PK0422. The project constructed the first phase of the 12.13-acre Iron Horse Nature Park and Open Space, located adjacent to the existing Iron Horse Regional Trail and Amador Valley Boulevard. STAFF RECOMMENDATION: Adopt the Resolution Accepting the Iron Horse Nature Park and Open Space - Phase 1 Project, CIP No. PK0422. FINANCIAL IMPACT: Funding and expenditures for the Iron Horse Nature Park and Open Space - Phase 1 Project, CIP No. PK0422, were as follows: Funding Sources General Fund $86,800 State Park Grant $2,294,000 Public Facility Fees $7,010,446 Unidentified $2,778,654 Total Funding $12,169,900 201 Page 2 of 5 Expenditures Construction Contract $3,324,491 Change Orders $970,004 Contract Services, Design, Salary, Environmental Clearance, etc. $1,837,086 Total Expenditures $6,131,581 Remaining Funds $6,038,319 The remaining funds will be used for future phases in accordance with the Iron Horse Nature Park and Open Space Master Plan. This will occur after the City acquires the necessary right- of-way and easements from Alameda County and the Alameda County Flood Control and Water Conservation District. Based on the estimated construction cost for the complete project, there is a projected funding shortfall of $2,778,654. Staff is working on identifying grant funding opportunities to address this shortfall. DESCRIPTION: On October 17, 2023 the City Council awarded a construction contract in the amount of $3,324,491 to Goodfellow Bros. California, LLC for the Iron Horse Nature Park and Open Space – Phase 1 Project, CIP No. PK0422 (Project). The Project constructed approximately 2,000 linear feet of new trail and removed contaminated soil and a hazardous wooden trestle (a relic of its former use as a railroad corridor). The Project also constructed and installed seating and gathering spaces, a shade structure, a bike rack and repair station, benches, interpretive signs, trail connections to Stagecoach Park and the Iron Horse Regional Trail , and a small arch culvert bridge. Lastly, the Project replaced sidewalk along Amador Valley Boulevard at the trail crossing and mitigated for wetland. During construction, additive and deductive change orders were issued for a net increase of $970,004 to include: changes to materials testing services; additional work for roadways, signs, and utilities; time related overhead; removal of materials; additional compensation fees for restocking and storage of materials; revisions to curb ramps in accordance with the Americans with Disabilities Act; installation of additional fencing, irrigation, and drainage; and adjustments for the actual field installed quantities. The improvements have been completed in accordance with plans and specifications to the satisfaction of the City Engineer. Staff recommends that the City Council accept the Project to begin the warranty period. Photos of the project before, during, and after construction are below. 202 Page 3 of 5 Photo 1. Project area, before construction Photo 2. Project area, during construction 203 Page 4 of 5 Photo 3. Project area, after construction Photo 4. Project area, after construction STRATEGIC PLAN INITIATIVE: None. 204 Page 5 of 5 NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. A copy of this Staff Report was provided to Goodfellow Bros. California, LLC. ATTACHMENTS: 1) Resolution Accepting the Iron Horse Nature Park and Open Space – Phase 1 Project, CIP No. PK0422 2) CIP No. PK0422 - Iron Horse Nature Park and Open Space 205 Attachment 1 Reso. No. XX-26, Item X.X, Adopted 07/21/2026 Page 1 of 1 RESOLUTION NO. XX – 26 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ACCEPTING THE IRON HORSE NATURE PARK AND OPEN SPACE - PHASE 1 PROJECT, CIP NO. PK0422 WHEREAS, on October 17, 2023 the City Council awarded a construction contract in the amount of $3,324,491 to Goodfellow Bros. California, LLC for the Iron Horse Nature Park and Open Space – Phase 1 Project, CIP No. PK0422; and WHEREAS, said improvements have been completed in accordance with plans and specifications, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin; and WHEREAS, as a condition of the construction contract, Goodfellow Bros. California, LLC is required to warranty the improvements for a period of one year following the completion of the work and maintain a maintenance bond in the amount of 10 percent of the final contract value. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the Iron Horse Nature Park and Open Space – Phase 1 Project, CIP No. PK0422, and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to release the maintenance bond at the end of the one -year warranty period. PASSED, APPROVED, AND ADOPTED BY the City Council of the City of Dublin, on this 21st day of July, 2026 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk 206 $2,446,027 $1,248,800 $2,235,941 $2,778,654 $0 $0 $0 $2,381,226 $196,505 $0 $0 $0 $0 $0 $365,500 $0 $255,000 $0 $0 $0 $0 $210,247 $52,000 $0 $0 $0 $0 $0 Iron Horse Nature Park and Open Space 2024-2029 Five-Year Capital Improvement Program Update | DublinPage 79 Attachment 2 207 ⚪ $3,056,000 $1,463,505 $2,490,941 $0 $0 $0 $0 $0 $0 $0 $2,778,654 $0 $0 $0 $2,294,000 $0 $0 $0 $0 $0 $0 $53,000 $33,800 $0 $0 $0 $0 $0 Table of ContentsIron Horse Nature Park and Open Space 2024-2029 Five-Year Capital Improvement Program Update | Dublin Page 80 208