HomeMy WebLinkAboutItem 8.2 Proposed Five-Year Capital Improvement Program 2026-2031 Agenda Item 8.2 STAFF REPORT CITY COUNCIL Page 1 of 5 DATE: April 21, 2026 TO: Honorable Mayor and City Councilmembers FROM: Colleen Tribby, City Manager SUBJECT: Proposed Five-Year Capital Improvement Program 2026-2031 and Budget Amendment to Advance Funding for the Green Stormwater Infrastructure Project, CIP No. ST0121 Prepared by: Michael Boitnott, Capital Improvement Program Manager EXECUTIVE SUMMARY: The City Council will receive a report on the proposed Five-Year Capital Improvement Program 2026-2031 and will consider a budget amendment to advance funding for the Green Stormwater Infrastructure Project, CIP No. ST0121. STAFF RECOMMENDATION: Take the following actions: 1) Receive the report and provide direction regarding the proposed Five-Year Capital Improvement Program 2026-2031, which is scheduled to be presented to the City Council for adoption no later than June 30, 2026; and 2) approve the budget change. FINANCIAL IMPACT: The proposed Five-Year Capital Improvement Program (CIP) 2026-2031 includes new funding for 18 projects totaling $79,554,654. Appropriations for Fiscal Years 2026-27 and 2027-28 are $12,992,000 and $38,020,654, respectively, net of developer- and other-agency-built improvements. DESCRIPTION: Every two years the City Council adopts the Five -Year Capital Improvement Program (CIP) that addresses the City’s public infrastructure needs in the following major categories: General Improvements, Public Art, Parks, Streets, and Future Projects. The Future Projects category identifies projects outside the current CIP timeframe for which a funding source may or may not be identified. 222 Page 2 of 5 Five-Year CIP Costs The total cost of the proposed Five-Year CIP 2026-2031 is $79,554,654. The table and graph below summarize expenditures by category. CATEGORY 2026-27 2027-28 2028-29 2029-30 2030-31 FIVE-YEAR General $500,000 $0 $1,700,000 $0 $0 $2,200,000 Public Art $250,000 $0 $0 $0 $0 $250,000 Parks $900,000 $3,278,654 $2,400,000 $2,250,000 $2,900,000 $11,728,654 Streets $11,342,000 $34,742,000 $6,292,000 $7,750,000 $5,250,000 $65,376,000 TOTAL $12,992,000 $38,020,654 $10,392,000 $10,000,000 $8,150,000 $79,554,654 Listed below are new (in italics) and existing CIP projects proposed to receive funding in Fiscal Years 2026-27 or 2027-28. Project details can be found in Attachment 1 (note that the full CIP book, which includes a glossary and funding source tables, will be presented at the final CIP budget adoption in June). • General Improvements o The Wave Pool Replastering (GI0006) • Public Art o Downtown Dublin (PA0123) • Parks o Emerald Glen Ball Field Renovation (PKNEW01) o Iron Horse Nature Park and Open Space (PK0422) o Restrooms Replacement (PK0321) o Sports Courts Resurfacing (PK0126) • Streets o Annual Street Resurfacing (ST0117) General 2.8%Public Art… Parks 14.7% Streets 82.2% 223 Page 3 of 5 o Citywide Bicycle and Pedestrian Improvements (ST0517) o Dublin Ranch Street Light Improvements (ST0417) o Gleason Drive Bridge Repair (STNEW01) o Local Street Resurfacing at I580 Interchanges (STNEW02) o Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School (ST0119) o Village Parkway Reconstruction (ST0323) Listed below are projects proposed to receive funding in the CIP beyond Fiscal Years 2026-27 and 2027-28. There are no new projects set to receive funding beyond the first two fiscal years. • General Improvements o Shannon Community Center Play Yard (GI0004) o The Wave Pool Resurfacing (GI0006) • Parks o Dublin Sports Grounds Rehabilitation (PK0002) o Fallon Sports Park – Artificial Turf Field Replacement (PK0003) o Kolb Park Renovation (PK0224) o Sports Courts Resurfacing (PK0126) • Streets o Annual Street Resurfacing (ST0117) o Citywide Bicycle and Pedestrian Improvements (ST0517) o Citywide Storm Drain Improvements (ST0124) o Dublin Ranch Street Light Improvements (ST0417) o Golden Gate Drive Intersection Improvements at Dublin Boulevard and St. Patrick Way (ST0423) 224 Page 4 of 5 Funding Sources The funding for the Five-Year CIP 2026-2031 comes from a variety of sources as summarized below. CATEGORY 2026-27 2027-28 2028-29 2029-30 2030-31 FIVE-YEAR General Fund $5,900,000 $6,350,000 $1,850,000 $1,850,000 $1,850,000 $17,800,000 Special Revenues $6,342,000 $3,942,000 $3,442,000 $3,400,000 $3,400,000 $20,526,000 Public Art Fund $250,000 $0 $0 $0 $0 $250,000 Internal Service Funds $500,000 $500,000 $4,100,000 $1,200,000 $2,900,000 $9,200,000 Grants $0 $1,500,000 $0 $0 $0 $1,500,000 Traffic Impact Fees $0 $0 $1,000,000 $0 $0 $1,000,000 Other (1) $0 $9,150,000 $0 $0 $0 $9,150,000 Unidentified $0 $16,578,654 $0 $3,550,000 $0 $20,128,654 TOTAL $12,992,000 $38,020,654 $10,392,000 $10,000,000 $8,150,000 $79,554,654 (1)Includes developer- and other-agency-built projects, and projects funded by the Transportation Improvement Program. Future Projects The Future Projects category identifies projects that are beyond the current CIP timeframe of General Fund 22.4% Internal Service Funds 11.6% Grants 1.9% Public Art Fund 0.3%Special Revenues 25.8% Traffic Impact Fees 1.3% Other 11.5% Unidentified 25.3% 225 Page 5 of 5 June 30 2031, for which a funding source may or may not yet be identified. The total cost of all projects beyond the CIP timeframe is estimated at $2 05.3 million. Future Projects are listed below, with (future phase) identifying those associated with a current CIP project. • General Improvements ($3,575,000) o Corporation Yard Equipment Wash Pad o Electric Vehicle Charging Stations (future phase) o Waste Enclosure Upgrades (future phase) • Parks ($25,250,000) o Downtown Dublin Town Square Park (future phase) o Sports Courts Resurfacing (future phase) o Dublin Sports Grounds - Phase 5 Renovation o Emerald Glen Recreation and Aquatic Complex - Phase 2 • Streets ($176,147,306) o Downtown Dublin Street Grid Network (future phase) o Dublin Boulevard Extension (Unfunded portions of current project, future phases) o City Entrance Signs o Eastern Dublin Transportation Impact Fee Program o Western Dublin Transportation Impact Fee Program Advance Funding for Green Stormwater Infrastructure Project (ST0121) In the proposed Five-Year CIP 2026-2031, there is funding in the amount of $450,000 for the Green Stormwater Infrastructure project, CIP Project No. ST0121 in Fiscal Year 2026 -27. Staff is requesting that that funding be advanced to the current year to allow for additional treatment facilities in other areas of the City to begin before June 30, address additional compliance items, and demonstrate fiscal readiness to help secure potential grant opportunities. The project cost being advanced is funded by the Climate Action Plan Reserve, which has an adequate fund balance available in the current year. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. ATTACHMENTS: 1) Proposed Five-Year Capital Improvement Program 2026-2031 (project pages only) 2) Budget Change Form 226 Audio Visual System Upgrade Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0421 Project Location Description This project provides for the planning, design, and construction of the audio visual-system upgrades in Ambrose Hall and adjoining conference room at Shannon Community Center, Alamilla Springs Ballroom at the Senior Center, Program Room at the Civic Center Library, Emergency Operations Center at the Public Safety Complex, Bray Community Room at the Civic Center. These upgrades include replacement of equipment to improve the service quality for rentals, meetings, corporate events, and staff use. In addition to those major staff/public AV facilities, smaller, citywide staff conference room hardware will be modernized, replaced, and/or updated. All these upgrades will bring the City’s audio-visual systems up to current industry standards and ADA compliance.  Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.67M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.67M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9600 - Equipment $985,790 $0 $0 $0 $0 $0 $0 $985,790 9200 - Contract Services $504,026 $0 $0 $0 $0 $0 $0 $504,026 9500 - Miscellaneous $158,000 $0 $0 $0 $0 $0 $0 $158,000 9100 - Salaries & Benefits $23,224 $0 $0 $0 $0 $0 $0 $23,224 Total $1,671,040 $0 $0 $0 $0 $0 $0 $1,671,040 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6605 – IT Fund $898,000 $0 $0 $0 $0 $0 $0 $898,000 1001 - General Fund $473,040 $0 $0 $0 $0 $0 $0 $473,040 2811 - Cable TV Facilities $300,000 $0 $0 $0 $0 $0 $0 $300,000 Total $1,671,040 $0 $0 $0 $0 $0 $0 $1,671,040 Audio Visual System Upgrade 2026-2031 Five-Year Capital Improvement Program | Dublin Page 16 227 Project Timeline ●07/1/2025 The project preliminary designs were complete and implementation began. ●07/1/2026 The project has currently upgraded approximately 40 percent of the spaces, and completion is anticipated in 2027. Audio Visual System Upgrade 2026-2031 Five-Year Capital Improvement Program | Dublin Page 17 228 Citywide Energy Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0121 Project Location Description This project provides for the planning (Investment Grade Audit), design, and construction of various energy upgrades, efficiency improvements, lighting upgrades, energy generation, solar photovoltaic (PV) systems, and energy storage projects at facilities, parks, street rights-of-way, and other City-owned properties.  The project includes lighting and controls upgrades at Mape Memorial Park, Alamo Creek Park, Ted Fairfield Park, Bray Commons Park, Dolan Park, Emerald Glen Park, Fallon Sports Park, Heritage Park, and Shannon Park, as well as interior and exterior building lighting and controls upgrades at the Library, Corporation Yard, Heritage Park and Museums facilities, Shannon Community Center, The Wave, and Fire Stations 16, 17, and 18. The project also includes the conversion of approximately 1,626 streetlights in Streetlight Assessment District 1999-1 to LED. Lastly, the project will upgrade various mechanical, HVAC and controls upgrades at the following facilities: Library, Senior Center, Heritage Park and Museums, The Wave, and Fire Stations 16, 17, and 18.   Furthermore, renewable, resiliency, and disaster preparedness improvements to prepare for future PG&E Public Safety Power Shutoff events and other emergency events will be provided with back-up generators at the Library, Shannon Community Center, Civic Center, Fire Stations 16, 17, and 18, while battery back-up or hydrogen fuel cell resiliency will be provided at 22 major street intersections throughout the city.  Solar PV and EV charging will be provided at Dublin Sports Grounds and Public Safety Complex. Solar PV with battery energy storage systems will be provided at the Civic Center, The Wave, Corporation Yard, and Senior Center. Solar PV will be provided at the Library, Fallon Sports Park, and Fire Stations 17 and 18.  The new solar PV and replacement HVAC systems on the Library roof require a portion of the roof to be replaced, and to support the additional solar PV canopies at the Civic Center, portions of the parking lot will be reconfigured. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $25.5M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $25,016,850 $0 $0 $0 $0 $0 $0 $25,016,850 9200 - Contract Services $412,514 $0 $0 $0 $0 $0 $0 $412,514 9100 - Salaries & Benefits $84,406 $0 $0 $0 $0 $0 $0 $84,406 9500 - Miscellaneous $500 $0 $0 $0 $0 $0 $0 $500 Total $25,514,270 $0 $0 $0 $0 $0 $0 $25,514,270 Citywide Energy Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 18 229 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $25.5M Project Timeline ●07/1/2025 The project was in various stages of design or construction. ●07/1/2026 The project is substantially complete except for the improvements at the Civic Center, which are anticipated to be completed in 2027. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 7102 - Energy Improve. Lease Bond $20,656,074 $0 $0 $0 $0 $0 $0 $20,656,074 1001 - General Fund $2,497,420 $0 $0 $0 $0 $0 $0 $2,497,420 6205 - Internal Service Fund - Facilities Replacement $1,500,000 $0 $0 $0 $0 $0 $0 $1,500,000 2705 - Street Light District East Dublin 1999-1 $860,776 $0 $0 $0 $0 $0 $0 $860,776 Total $25,514,270 $0 $0 $0 $0 $0 $0 $25,514,270 Citywide Energy Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 19 230 Civic Center Elevator Modernization Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0126 Project Location 100 Civic Plaza Description This project will provide for the design and construction to upgrade the three existing elevators located within the Civic Center (two at City Hall and one at Dublin Arts Center). Most elevators are built to provide about 30 to 40 years of service. The modernization process includes upgrading the critical parts of the elevators for them to accommodate new technology, have better performance, less energy consumption, and improved safety. This upgrade also includes the replacement of interior panels and controls within the elevator cars.  Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $900K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $900K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $750,000 $0 $0 $0 $0 $0 $0 $750,000 9200 - Contract Services $100,040 $0 $0 $0 $0 $0 $0 $100,040 9600 - Equipment $25,000 $0 $0 $0 $0 $0 $0 $25,000 9100 - Salaries & Benefits $24,960 $0 $0 $0 $0 $0 $0 $24,960 Total $900,000 $0 $0 $0 $0 $0 $0 $900,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $900,000 $0 $0 $0 $0 $0 $0 $900,000 Total $900,000 $0 $0 $0 $0 $0 $0 $900,000 Civic Center Elevator Modernization 2026-2031 Five-Year Capital Improvement Program | Dublin Page 20 231 Project Timeline ●07/1/2026 This project is anticipated to begin in 2027. Civic Center Elevator Modernization 2026-2031 Five-Year Capital Improvement Program | Dublin Page 21 232 Civic Center Rehabilitation Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0122 Project Location 100 Civic Plaza Description This project provides for the planning, design, and construction of various rehabilitation and renovation projects at the Civic Center. The rehabilitation includes renovation of all restrooms, showers, kitchenettes, and the employee break room, modifications to conference rooms, lighting and ceiling replacement, site improvements to the parking lot area and surrounding walkways of the Civic Center, plaza and landscaping improvements, building security evaluation and upgrades, repainting, and Americans with Disabilities Act (ADA) and Building Code upgrades. This project also includes the partitioning of three spaces into six on the second floor of the Civic Center.   This project is funded by General Fund Reserves. Other potential funding sources for the building security upgrades may include Federal and State public safety grants. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $2.24M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $2.24M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $1,525,000 $0 $0 $0 $0 $0 $0 $1,525,000 9200 - Contract Services $611,590 $0 $0 $0 $0 $0 $0 $611,590 9100 - Salaries & Benefits $80,140 $0 $0 $0 $0 $0 $0 $80,140 9500 - Miscellaneous $20,000 $0 $0 $0 $0 $0 $0 $20,000 Total $2,236,730 $0 $0 $0 $0 $0 $0 $2,236,730 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1101 - General Fund Designated Reserve $2,236,730 $0 $0 $0 $0 $0 $0 $2,236,730 Total $2,236,730 $0 $0 $0 $0 $0 $0 $2,236,730 Civic Center Rehabilitation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 22 233 Project Timeline ●07/1/2025 The project was in various stages of design or construction. Interior repainting in select areas was completed during construction of the Civic Center HVAC and Roof Replacement Project. The partitioning of three spaces into six on the second floor of the Civic Center was completed. ●07/1/2026 The project construction continues, which includes the parking lot and walkway improvements that are being constructed in conjunction with the Dublin Arts Center Project, the removal of the Parks and Community Services (PCS) counters, and relocation of the first-floor door beyond the sliding partition will begin once PCS staff are relocated to the Dublin Arts Center in late 2026. Civic Center Rehabilitation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 23 234 Condition Assessment of Water Features Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0225 Project Location Description This project is a comprehensive condition assessment for outdoor water features, including fountains and splash pads at the Civic Center, Shannon Center, Emerald Glen Park, Senior Center, and Devany Square. This includes examining structural integrity, plumbing systems, water quality, and overall functionality. Through detailed inspections and evaluations, potential issues such as wear and tear, corrosion, or outdated technology can be identified. Following this assessment, a strategic project can be developed to address the findings, which may include developing plans for either replacing the existing water features with modern and sustainable designs, incorporating advanced water circulation systems, or considering other alternatives that align with the evolving needs and preferences of the community.  Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $50K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $50K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9200 - Contract Services $45,000 $0 $0 $0 $0 $0 $0 $45,000 9100 - Salaries & Benefits $5,000 $0 $0 $0 $0 $0 $0 $5,000 Total $50,000 $0 $0 $0 $0 $0 $0 $50,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $50,000 $0 $0 $0 $0 $0 $0 $50,000 Total $50,000 $0 $0 $0 $0 $0 $0 $50,000 Condition Assessment of Water Features 2026-2031 Five-Year Capital Improvement Program | Dublin Page 24 235 Project Timeline ●07/1/2026 This project is anticipated to begin in 2027. Condition Assessment of Water Features 2026-2031 Five-Year Capital Improvement Program | Dublin Page 25 236 Corporation Yard Equipment Wash Pad Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0003 Project Location Description This project provides for the design and construction of a vehicle and equipment wash pad at the Corporation Yard. The wash pad will capture wash water and solid waste, separate fluids from solids, and filter the fluids prior to discharge or storage for reuse. The wash pad will reduce water usage and ensure equipment is maintained using the best management practices required by the Municipal Regional Stormwater Permit and EPA. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total $475K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total $475K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $0 $0 $0 $0 $0 $0 $315,000 $315,000 9200 - Contract Services $0 $0 $0 $0 $0 $0 $125,000 $125,000 9100 - Salaries & Benefits $0 $0 $0 $0 $0 $0 $35,000 $35,000 Total $0 $0 $0 $0 $0 $0 $475,000 $475,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $0 $0 $0 $0 $0 $0 $475,000 $475,000 Total $0 $0 $0 $0 $0 $0 $475,000 $475,000 Corporation Yard Equipment Wash Pad 2026-2031 Five-Year Capital Improvement Program | Dublin Page 26 237 Project Timeline ●07/1/2026 This project is anticipated to begin in 2032. Corporation Yard Equipment Wash Pad 2026-2031 Five-Year Capital Improvement Program | Dublin Page 27 238 Dublin Ar ts Center Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0120 Project Location Description This project provides for the design and improvements of an approximately 13,000-square-foot Cultural Arts Center on the first floor of the Civic Center, which was formerly occupied by Dublin Police Services. The Parks & Recreation Master Plan identifies a Cultural Arts Center that will serve as a multi-use facility that affords cultural, educational, and social opportunities for the community, which includes an art gallery, Black Box theater space, multi-purpose art and music classrooms, a dance studio, and restrooms. The project also provides for the replacement of the heating, ventilation, and air conditioning (HVAC) systems, HVAC controls, roof replacement, major upgrades to the main telecommunication room, and the relocation of the Parks and Community Services Department offices to the second floor of the Dublin Arts Center. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $15.4M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $10,700,317 $0 $0 $0 $0 $0 $0 $10,700,317 9200 - Contract Services $3,678,519 $0 $0 $0 $0 $0 $0 $3,678,519 9600 - Equipment $800,000 $0 $0 $0 $0 $0 $0 $800,000 9100 - Salaries & Benefits $199,945 $0 $0 $0 $0 $0 $0 $199,945 9500 - Miscellaneous $18,254 $0 $0 $0 $0 $0 $0 $18,254 Total $15,397,035 $0 $0 $0 $0 $0 $0 $15,397,035 Dublin Arts Center 2026-2031 Five-Year Capital Improvement Program | Dublin Page 28 239 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $15.4M Project Timeline ●07/1/2025 The project was under construction. ●07/1/2026 The project construction continues and will be completed concurrently with the Civic Center portion of the Exterior Improvements Project, which is anticipated for late 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1101 - General Fund Designated Reserve $7,214,197 $0 $0 $0 $0 $0 $0 $7,214,197 4100 - Public Facility Fees $5,889,200 $0 $0 $0 $0 $0 $0 $5,889,200 6205 - Internal Service Fund - Facilities Replacement $1,543,638 $0 $0 $0 $0 $0 $0 $1,543,638 6305 - Internal Service Fund - Equipment Replacement $500,000 $0 $0 $0 $0 $0 $0 $500,000 6605 – IT Fund $250,000 $0 $0 $0 $0 $0 $0 $250,000 Total $15,397,035 $0 $0 $0 $0 $0 $0 $15,397,035 Dublin Arts Center 2026-2031 Five-Year Capital Improvement Program | Dublin Page 29 240 Electric Vehicle (EV) Charging Stations Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0219 Project Location Description This project provides for the design and construction of at least two electric vehicle (EV) charging spaces at The Wave, Emerald Glen Park, and the underground infrastructure for future expansion. Additionally, two direct-current (DC) EV fast chargers will be installed at the Dublin Sports Grounds. In future years, the project may include design and construction of EV charging spaces at other City facilities.  Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $727K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $289,640 $0 $0 $0 $0 $0 $110,000 $399,640 9600 - Equipment $94,107 $0 $0 $0 $0 $0 $100,000 $194,107 9200 - Contract Services $30,211 $0 $0 $0 $0 $0 $75,000 $105,211 9100 - Salaries & Benefits $12,620 $0 $0 $0 $0 $0 $15,000 $27,620 9500 - Miscellaneous $881 $0 $0 $0 $0 $0 $0 $881 Total $427,459 $0 $0 $0 $0 $0 $300,000 $727,459 Electric Vehicle (EV) Charging Stations 2026-2031 Five-Year Capital Improvement Program | Dublin Page 30 241 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $727K Project Timeline ●07/1/2025 The project completed installation of the EV chargers at The Wave. The City received an Energy Efficiency Conservation Block Grant from the U.S. Department of Energy, which partially funded the installation of the two DC EV fast chargers at the Dublin Sports Grounds. ●07/1/2026 The project completed installation of the two DC fast EV chargers at the Dublin Sports Grounds and they are now in operation. The project continues with the design and construction of EV charging stations at other City facilities. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $0 $0 $0 $0 $0 $0 $300,000 $300,000 1101 - General Fund Designated Reserve $282,229 $0 $0 $0 $0 $0 $0 $282,229 2920 - Federal Grants - General $127,230 $0 $0 $0 $0 $0 $0 $127,230 2207 - Transportation for Clean Air $18,000 $0 $0 $0 $0 $0 $0 $18,000 Total $427,459 $0 $0 $0 $0 $0 $300,000 $727,459 Electric Vehicle (EV) Charging Stations 2026-2031 Five-Year Capital Improvement Program | Dublin Page 31 242 Exterior Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0226 Project Location Description This project will provide for design and construction of various exterior improvements and preventative maintenance at City facilities which include the Civic Center, Library, Clock Tower, Kolb House Museum, Kolb House Restroom, Sunday School Barn, Murray Schoolhouse Museum and outbuildings, Old St. Raymond’s Church, the Senior Center, The Wave, and Fire Stations 16, 17, and 18.  Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $15M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $15M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $11,590,000 $0 $0 $0 $0 $0 $0 $11,590,000 9200 - Contract Services $2,760,000 $0 $0 $0 $0 $0 $0 $2,760,000 9600 - Equipment $450,000 $0 $0 $0 $0 $0 $0 $450,000 9100 - Salaries & Benefits $200,000 $0 $0 $0 $0 $0 $0 $200,000 Total $15,000,000 $0 $0 $0 $0 $0 $0 $15,000,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $9,050,000 $0 $0 $0 $0 $0 $0 $9,050,000 1101 - General Fund Designated Reserve $5,000,000 $0 $0 $0 $0 $0 $0 $5,000,000 1001 - General Fund $500,000 $0 $0 $0 $0 $0 $0 $500,000 6305 - Internal Service Fund - Equipment Replacement $450,000 $0 $0 $0 $0 $0 $0 $450,000 Total $15,000,000 $0 $0 $0 $0 $0 $0 $15,000,000 Exterior Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 32 243 Project Timeline ●12/2/2025 This project was created on December 2, 2025. ●07/1/2026 The project is currently in various stages of design and construction and it is anticipated to be complete in 2027. Exterior Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 33 244 Facilities Parking Lot Resurfacing Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0325 Project Location Description This project provides for design and construction to resurface parking lots at various City facilities and make renovations to comply with the current requirements of the Americans with Disabilities Act (ADA) and parking lot standards. This includes work at Alamo Creek Park, Emerald Glen Park, Senior Center, and Shannon Community Center. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $680,000 $0 $0 $0 $0 $0 $0 $680,000 9200 - Contract Services $280,000 $0 $0 $0 $0 $0 $0 $280,000 9100 - Salaries & Benefits $40,000 $0 $0 $0 $0 $0 $0 $40,000 Total $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 Total $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 Facilities Parking Lot Resurfacing 2026-2031 Five-Year Capital Improvement Program | Dublin Page 34 245 Project Timeline ●07/1/2025 This project was in design. The resurfacing of the Alamo Creek Park and Emerald Glen Park parking lots were be incorporated into the 2026 Annual Street Resurfacing Project. ●07/1/2026 The resurfacing of the Alamo Creek Park and Gleason Drive side of the Emerald Glen Park parking lots is currently under construction and is anticipated to be completed in 2026. The parking lots at the Senior Center and Shannon Community Center will begin design in 2027 and will be incorporated into the 2028 Annual Street Resurfacing Project. Facilities Parking Lot Resurfacing 2026-2031 Five-Year Capital Improvement Program | Dublin Page 35 246 Financial System Replacement Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0319 Project Location 100 Civic Plaza Description This project provides for the replacement of the City's Enterprise Resource Planning (ERP) system and other related technological projects that support the City Council’s initiative to “Become a 24/7 City Hall to Enhance Resident and Business Engagement,”. This project includes the OpenGov financial transparency software and upgrades to the City’s Laserfiche document management software.  The City's ERP system serves as the primary software platform for Finance, Human Resources, Public Works, Community Development, and all core transactions. The outgoing system was implemented in 2008 and has reached the end of its 10- year lifespan. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $2.52M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $2.52M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9600 - Equipment $1,511,821 $0 $0 $0 $0 $0 $0 $1,511,821 9200 - Contract Services $1,002,679 $0 $0 $0 $0 $0 $0 $1,002,679 9500 - Miscellaneous $500 $0 $0 $0 $0 $0 $0 $500 Total $2,515,000 $0 $0 $0 $0 $0 $0 $2,515,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $1,860,000 $0 $0 $0 $0 $0 $0 $1,860,000 6305 - Internal Service Fund - Equipment Replacement $655,000 $0 $0 $0 $0 $0 $0 $655,000 Total $2,515,000 $0 $0 $0 $0 $0 $0 $2,515,000 Financial System Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 36 247 Project Timeline ●07/1/2025 The project implementation began in spring 2021. The Finance Module went live in July 2022, the Human Resources and Payroll modules went live in April 2023, and the Permitting and Licensing modules went live in July 2024. ●07/1/2026 The project technical configuration and training will continue and is anticipated to be complete in 2027. Financial System Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 37 248 Irrigation System Upgrades Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0224 Project Location Description This project will include the planning, design, and installation of approximately 85 new irrigation controllers along streets, in parks and  at facilities. System-wide communication upgrades with the Central Irrigation System will improve water conservation in response to daily weather conditions. Additionally, consultant services will be utilized to improve system optimization including site-specific scheduling for up to 25 of the City's large landscapes. A series of training sessions will be held with the City's Maintenance Division to ensure the ongoing operation of the system.  The $1.38 million identified as "State Grant" is from the State of California - Department of Water Resources Urban Community Drought Relief Grant, which was awarded to Alameda County Flood Control and Water Conservation District, Zone 7, as part of a grant application that included several projects from local sponsors in the Livermore-Amador Valley. All activities to implement the project must be completed by December 31, 2026, to be eligible for State Grant funding.  Details Type of Project:Refurbishment Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.84M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $721,000 $0 $0 $0 $0 $0 $0 $721,000 9600 - Equipment $650,000 $0 $0 $0 $0 $0 $0 $650,000 9200 - Contract Services $350,000 $0 $0 $0 $0 $0 $0 $350,000 9100 - Salaries & Benefits $104,000 $0 $0 $0 $0 $0 $0 $104,000 9500 - Miscellaneous $15,000 $0 $0 $0 $0 $0 $0 $15,000 Total $1,840,000 $0 $0 $0 $0 $0 $0 $1,840,000 Irrigation System Upgrades 2026-2031 Five-Year Capital Improvement Program | Dublin Page 38 249 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.84M Project Timeline ●07/1/2025 The project design was completed and construction began in 2025. ●07/1/2026 The project is in construction and it is anticipated to be complete by late 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2921 - State Grants - General $1,380,000 $0 $0 $0 $0 $0 $0 $1,380,000 1001 - General Fund $460,000 $0 $0 $0 $0 $0 $0 $460,000 Total $1,840,000 $0 $0 $0 $0 $0 $0 $1,840,000 Irrigation System Upgrades 2026-2031 Five-Year Capital Improvement Program | Dublin Page 39 250 IT Infrastructure Improvement Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0117 Project Location 100 Civic Plaza Description This project allows for the replacement and upgrade of aging network hardware as well as the implementation of centralized Information Technology management tools that will increase efficiency in City operations.  Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.24M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.24M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9600 - Equipment $666,391 $0 $0 $0 $0 $0 $0 $666,391 9200 - Contract Services $302,886 $0 $0 $0 $0 $0 $0 $302,886 9400 - Repairs/Improvements $273,644 $0 $0 $0 $0 $0 $0 $273,644 9500 - Miscellaneous $679 $0 $0 $0 $0 $0 $0 $679 Total $1,243,600 $0 $0 $0 $0 $0 $0 $1,243,600 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6605 – IT Fund $1,150,000 $0 $0 $0 $0 $0 $0 $1,150,000 1101 - General Fund Designated Reserve $93,600 $0 $0 $0 $0 $0 $0 $93,600 Total $1,243,600 $0 $0 $0 $0 $0 $0 $1,243,600 IT Infrastructure Improvement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 40 251 Project Timeline ●07/1/2025 The project began equipment replacement as it reached the end of its useful life. ●07/1/2026 This project continues and equipment will be replaced as it reaches the end of its useful life. IT Infrastructure Improvement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 41 252 Library Tenant Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0521 Project Location 200 Civic Plaza Description This project provides for the design and construction of tenant improvements to the Dublin Library, including completion of 5,150 square feet of currently unoccupied space within the Library building. The 37,000 square-foot Library building was completed in 2002, however only 30,000 square feet was occupied. In 2017, a tenant improvement project was completed which opened an additional 1,850 square feet of space adjacent to the children's area. This project will improve the remaining 5,150 square feet of building area for library and community use, which includes a large flex space, new small group study rooms, expansion of the children’s area, modification of shelving and fixtures, carpet replacement, repainting, and the refurbishing of select systems and interior surfaces.  Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $4 .84M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $4 .84M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $3,560,270 $0 $0 $0 $0 $0 $0 $3,560,270 9200 - Contract Services $1,052,885 $0 $0 $0 $0 $0 $0 $1,052,885 9100 - Salaries & Benefits $202,510 $0 $0 $0 $0 $0 $0 $202,510 9500 - Miscellaneous $20,000 $0 $0 $0 $0 $0 $0 $20,000 Total $4,835,665 $0 $0 $0 $0 $0 $0 $4,835,665 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $2,090,000 $0 $0 $0 $0 $0 $0 $2,090,000 4100 - Public Facility Fees $1,745,665 $0 $0 $0 $0 $0 $0 $1,745,665 1001 - General Fund $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 Total $4,835,665 $0 $0 $0 $0 $0 $0 $4,835,665 Library Tenant Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 42 253 Project Timeline ●07/1/2025 The project planning and preliminary design began in 2023 and schematic design began in 2024 but was paused to accommodate the Exterior Improvement Project. ●07/1/2026 The project design is anticipated to resume in 2026 with construction anticipated to begin in 2027. Library Tenant Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 43 254 Municipal Fiber Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0323 Project Location Description This project provides for the planning, design, and construction to improve and extend the existing City fiber optic network cabling and infrastructure. This project includes laying the foundation for future high-speed networking capability, improving existing networking speeds at City facilities, and improving reliability by interconnecting City facilities from the Civic Center to Heritage Park and Museums, Shannon Community Center, Senior Center, and the Corporation Yard. An approximate 13-mile loop is anticipated to connect these facilities. This project will also assist in improving Traffic Operations with faster fiber optic networks that support smart and adaptive traffic signal software. Additionally, Dublin Police Services' ability and effectiveness in crime prevention will be enhanced with faster connections to the situational awareness cameras, license plate readers, and major intersection video streaming. Lastly, this project will improve Citywide Wi-Fi access, performance, and security. Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $140K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9200 - Contract Services $119,200 $0 $0 $0 $0 $0 $0 $119,200 9100 - Salaries & Benefits $20,800 $0 $0 $0 $0 $0 $0 $20,800 Total $140,000 $0 $0 $0 $0 $0 $0 $140,000 Municipal Fiber 2026-2031 Five-Year Capital Improvement Program | Dublin Page 44 255 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $140K Project Timeline ●07/1/2025 The preliminary planning phase began in 2022 with identifying the locations citywide of existing infrastructure. A Request for Proposals was issued for consulting services for the development of a five- year fiber optic master plan and feasibility study, which will assess the existing City network infrastructure and the required build out. ●07/1/2026 The master plan is currently underway and is anticipated to be complete in 2027. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $140,000 $0 $0 $0 $0 $0 $0 $140,000 Total $140,000 $0 $0 $0 $0 $0 $0 $140,000 Municipal Fiber 2026-2031 Five-Year Capital Improvement Program | Dublin Page 45 256 Resiliency and Disaster Preparedness Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0221 Project Location Description Beginning in the end of December 2022 through the first few weeks of 2023, Dublin and much of California experienced damage due to a series of rainfall events that were declared a major disaster in Alameda County by the President in January 2023. The City experienced damage at various sites, including street rights-of-way, parks and open space, facilities, and buildings. This project provides for the planning, design, environmental permitting, if necessary, and construction to make the repairs at various sites that were impacted by the storms. The following locations and types of repairs have been identified:  Dougherty Hills Open Space, Crossridge Road Trailhead – slide repair Dublin Boulevard, between Inspiration Drive and Silvergate Drive – slide repair Mape Memorial Park – Pathway Relocation Koopman Canyon Creek at Shannon Community Center/San Ramon Road – channel and culvert improvements Martin Canyon Creek at Silvergate Drive – channel improvements Koopman Canyon Creek at Fenwick Court – trash rack repair and channel improvements Clark Canyon Creek at Padre Way – track rack repair and channel improvements The City has applied for grants for this project through the Federal Emergency Management Agency (FEMA) and California Office of Emergency Services (CalOES). Details Type of Project:Replacement Resiliency and Disaster Preparedness Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 46 257 Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $3.41M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $3.41M Project Timeline ●01/17/2023 The clean-up effort immediately following the storm events was completed and the preliminary engineering for the permanent repair began in 2023. The project preliminary engineering, design, and construction phases were underway. ●07/1/2025 The slide repair projects and Mape Memorial Park pathway relocation were completed. ●07/1/2026 The remaining projects are currently in various stages of design and permitting, with construction expected to begin in 2027 pending resource agency permit approvals. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $2,485,000 $0 $0 $0 $0 $0 $0 $2,485,000 9200 - Contract Services $800,000 $0 $0 $0 $0 $0 $0 $800,000 9100 - Salaries & Benefits $129,189 $0 $0 $0 $0 $0 $0 $129,189 Total $3,414,189 $0 $0 $0 $0 $0 $0 $3,414,189 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $3,414,189 $0 $0 $0 $0 $0 $0 $3,414,189 Total $3,414,189 $0 $0 $0 $0 $0 $0 $3,414,189 Resiliency and Disaster Preparedness Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 47 258 Shannon Community Center Play Yard Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0004 Project Location Description This project provides for the design and construction of the replacement of the poured-in-place safety surfacing at the preschool playground at the Shannon Community Center Preschool. The surfacing will create a modern, safe, and stimulating environment that aligns with the evolving needs of our community's preschool-aged children. Capital Cost FY2027 Budget $0 Total Budget (all years) $200K Project Total $200K Funding Sources FY2027 Budget $0 Total Budget (all years) $200K Project Total $200K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $0 $0 $0 $130,000 $0 $0 $0 $130,000 9200 - Contract Services $0 $0 $0 $55,000 $0 $0 $0 $55,000 9100 - Salaries & Benefits $0 $0 $0 $15,000 $0 $0 $0 $15,000 Total $0 $0 $0 $200,000 $0 $0 $0 $200,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $0 $0 $0 $200,000 $0 $0 $0 $200,000 Total $0 $0 $0 $200,000 $0 $0 $0 $200,000 Shannon Community Center Play Yard 2026-2031 Five-Year Capital Improvement Program | Dublin Page 48 259 Project Timeline ●07/1/2026 This project is anticipated to begin in 2029. Shannon Community Center Play Yard 2026-2031 Five-Year Capital Improvement Program | Dublin Page 49 260 Situational Awareness Camera Program Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0523 Project Location Description This project will provide 40 situational awareness cameras at 10 locations to cover known gaps within the City. These cameras will be strategically located along major corridors and arteries to maximize observation of Dublin’s many entrance and exit points. These cameras will be valuable technological resources that assist in criminal investigations and the apprehension of law violators within the city. Details Type of Project:Other Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $585K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $585K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $533,000 $0 $0 $0 $0 $0 $0 $533,000 9200 - Contract Services $44,928 $0 $0 $0 $0 $0 $0 $44,928 9100 - Salaries & Benefits $7,072 $0 $0 $0 $0 $0 $0 $7,072 Total $585,000 $0 $0 $0 $0 $0 $0 $585,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $585,000 $0 $0 $0 $0 $0 $0 $585,000 Total $585,000 $0 $0 $0 $0 $0 $0 $585,000 Situational Awareness Camera Program 2026-2031 Five-Year Capital Improvement Program | Dublin Page 50 261 Project Timeline ●07/1/2025 The project was in various stages of design and implementation. ●07/1/2026 The project is anticipated to be completed in summer 2026. Situational Awareness Camera Program 2026-2031 Five-Year Capital Improvement Program | Dublin Page 51 262 The Wave Pool Replastering Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0006 Project Location Description This project provides for the design and construction to replace the pool plaster and resurface portions of the pool decks at The Wave Indoor Pool, Outdoor Sport Pool, and Aquatic Play Structure. Capital Cost FY2027 Budget $500K Total Budget (all years) $2M Project Total $2M Funding Sources FY2027 Budget $500K Total Budget (all years) $2M Project Total $2M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $0 $0 $0 $1,310,000 $0 $0 $0 $1,310,000 9200 - Contract Services $0 $430,000 $0 $120,000 $0 $0 $0 $550,000 9100 - Salaries & Benefits $0 $70,000 $0 $70,000 $0 $0 $0 $140,000 Total $0 $500,000 $0 $1,500,000 $0 $0 $0 $2,000,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $0 $500,000 $0 $1,500,000 $0 $0 $0 $2,000,000 1001 - General Fund $0 $0 $0 $0 $0 $0 $0 $0 Total $0 $500,000 $0 $1,500,000 $0 $0 $0 $2,000,000 The Wave Pool Replastering 2026-2031 Five-Year Capital Improvement Program | Dublin Page 52 263 Project Timeline ●07/1/2026 This project is anticipated to begin in 2027. The Wave Pool Replastering 2026-2031 Five-Year Capital Improvement Program | Dublin Page 53 264 Waste Enclosures Upgrades Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department General Improvements Type Capital Improvement Project Type General Improvements Project Number GI0425 Project Location Description This project provides for the design and construction to replace or upgrade waste enclosures at various City facilities. The first location to be upgraded will be at the Civic Center, serving City Hall and the Dublin Arts Center. Other locations for future upgrades include the Senior Center, Shannon Community Center, Library, Dublin Sports Grounds, Emerald Glen Park, and Fire Stations 16, 17, and 18. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $3.13M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $3.13M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $213,000 $0 $0 $0 $0 $0 $1,840,000 $2,053,000 9200 - Contract Services $89,000 $0 $0 $0 $0 $0 $760,000 $849,000 9100 - Salaries & Benefits $23,000 $0 $0 $0 $0 $0 $200,000 $223,000 Total $325,000 $0 $0 $0 $0 $0 $2,800,000 $3,125,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $131,124 $0 $0 $0 $0 $0 $2,800,000 $2,931,124 2921 - State Grants - General $193,876 $0 $0 $0 $0 $0 $0 $193,876 Total $325,000 $0 $0 $0 $0 $0 $2,800,000 $3,125,000 Waste Enclosures Upgrades 2026-2031 Five-Year Capital Improvement Program | Dublin Page 54 265 Project Timeline ●07/1/2025 The project design was complete. ●07/1/2026 The project permitting for the Civic Center is underway and is anticipated to be complete late 2026. Waste Enclosures Upgrades 2026-2031 Five-Year Capital Improvement Program | Dublin Page 55 266 Parks FY27 - FY31 Parks Projects (including Historical Budgeted, Future Budgeted) Alamo Creek Park and Assessment District - Fence Replacement $850,000 1.75% Downtown Dublin Town Square Park $4,611,565 9.47% Dublin Sports Grounds Rehabilitation $3,650,000 7.50% Emerald Glen Ball Field Renovation $400,000 0.82% Fallon Sports Park - Artificial Turf Field Replacement $2,250,000 4.62% Fallon Sports Park Baseball Field G Upgrades $400,000 0.82% Forest Park $3,538,947 7.27% Iron Horse Nature Park and Open Space $12,169,900 25.00% Kolb Park Renovation $3,475,000 7.14% Parks Playground Replacement $1,109,560 2.28% Restrooms Replacement $1,975,000 4.06% Sports Courts Resurfacing $2,100,000 4.31% Sunday School Barn Flooring $385,000 0.79% Wallis Ranch Community Park $11,760,000 24.16% $32M$32M$32M $1M$1M$1M $3M$3M $3M $2M$2M$2M $2M$2M$2M $3M$3M $3M $5M$5M $5M Historical Budgeted 2027 2028 2029 2030 2031 Future Budgeted 0 $10M $20M $30M $40M Summary of Requests Project No. / Category Historical Budgeted FY2027 FY2028 FY2029 FY2030 FY2031 Future Budgeted Total PK0122 Alamo Creek Park and Assessment District - Fence Replacement $850,000 $0 $0 $0 $0 $0 $0 $850,000 PK0221 Downtown Dublin Town Square Park $111,565 $0 $0 $0 $0 $0 $4,500,000 $4,611,565 PK0002 Dublin Sports Grounds Rehabilitation $0 $0 $0 $150,000 $600,000 $2,900,000 $0 $3,650,000 PKNEW01 Emerald Glen Ball Field Renovation $0 $400,000 $0 $0 $0 $0 $0 $400,000 Parks 2026-2031 Five-Year Capital Improvement Program | Dublin Page 56 267 Project No. / Category Historical Budgeted FY2027 FY2028 FY2029 FY2030 FY2031 Future Budgeted Total PK0003 Fallon Sports Park - Artificial Turf Field Replacement $0 $0 $0 $2,250,000 $0 $0 $0 $2,250,000 PK0225 Fallon Sports Park Baseball Field G Upgrades $400,000 $0 $0 $0 $0 $0 $0 $400,000 PK0322 Forest Park $3,538,947 $0 $0 $0 $0 $0 $0 $3,538,947 PK0422 Iron Horse Nature Park and Open Space $9,391,246 $0 $2,778,654 $0 $0 $0 $0 $12,169,900 PK0224 Kolb Park Renovation $2,425,000 $0 $0 $0 $1,050,000 $0 $0 $3,475,000 PK0124 Parks Playground Replacement $1,109,560 $0 $0 $0 $0 $0 $0 $1,109,560 PK0321 Restrooms Replacement $1,475,000 $500,000 $0 $0 $0 $0 $0 $1,975,000 PK0126 Sports Courts Resurfacing $600,000 $0 $500,000 $0 $600,000 $0 $400,000 $2,100,000 PK0125 Sunday School Barn Flooring $385,000 $0 $0 $0 $0 $0 $0 $385,000 PK0421 Wallis Ranch Community Park $11,760,000 $0 $0 $0 $0 $0 $0 $11,760,000 Total Summary of Requests $32,046,318 $900,000 $3,278,654 $2,400,000 $2,250,000 $2,900,000 $4,900,000 $48,674,972 Parks 2026-2031 Five-Year Capital Improvement Program | Dublin Page 57 268 Alamo Creek Park and Assessment District - Fence Replacement Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0122 Project Location Description This project provides for the design and construction of replacement fencing at Alamo Creek Park and for replacement and repair of fencing along Alamo Creek within the Dougherty Road Landscape and Lighting District No. 1986-1. Most of the existing tubular steel fencing has reached the end of its service life and needs to be replaced or repaired. In addition to the park fencing, the existing decorative concrete masonry walls within the park, which include integrated tubular steel fence elements, will be evaluated, repaired, and repainted as needed.  The project also includes evaluation and select replacement or repair of the tubular steel fencing that is maintained by the Landscape and Lighting District No. 1986-1. The subject fencing is located along Fall Creek Road, Wildwood Road, and Willow Creek Drive.  The project funding for this portion is provided from funding reserves that were collected from Landscape and Lighting District No. 1986-1.  Details Type of Project:Replacement Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $850K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9300 - Land/Right-of-way $747,500 $0 $0 $0 $0 $0 $0 $747,500 9200 - Contract Services $53,751 $0 $0 $0 $0 $0 $0 $53,751 9100 - Salaries & Benefits $41,600 $0 $0 $0 $0 $0 $0 $41,600 9400 - Improvements $7,149 $0 $0 $0 $0 $0 $0 $7,149 Total $850,000 $0 $0 $0 $0 $0 $0 $850,000 Alamo Creek Park and Assessment District - Fence Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 58 269 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $850K Project Timeline ●07/1/2025 Project design began. ●07/1/2026 The project required right-of-way modifications to complete the design, which is now complete, and construction is anticipated to begin in 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $450,000 $0 $0 $0 $0 $0 $0 $450,000 2703 - Landscape District Dougherty 1986-1 $400,000 $0 $0 $0 $0 $0 $0 $400,000 Total $850,000 $0 $0 $0 $0 $0 $0 $850,000 Alamo Creek Park and Assessment District - Fence Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 59 270 Downtown Dublin Town Square Park Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0221 Project Location Description This project provides for the planning, design, and construction of a new Town Square, in accordance with the main principles of the Downtown Dublin Preferred Vision, which was approved by the City Council on November 5, 2019. The Town Square is a one-acre park and plaza that will serve as Downtown Dublin's gathering place, which may include a market promenade, outdoor dining, and event space, and will be located one block north of Dublin Boulevard in the Dublin Place shopping center along the proposed extension of Golden Gate Drive.  Possible future funding sources are development impact fees, community facilities district financing, or other assessment district funding. Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $4 .61M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9300 - Land/Right-of-way $0 $0 $0 $0 $0 $0 $2,400,000 $2,400,000 9400 - Improvements $0 $0 $0 $0 $0 $0 $1,440,000 $1,440,000 9200 - Contract Services $75,000 $0 $0 $0 $0 $0 $550,000 $625,000 9100 - Salaries & Benefits $36,565 $0 $0 $0 $0 $0 $110,000 $146,565 Total $111,565 $0 $0 $0 $0 $0 $4,500,000 $4,611,565 Downtown Dublin Town Square Park 2026-2031 Five-Year Capital Improvement Program | Dublin Page 60 271 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $4 .61M Project Timeline ●07/1/2026 Project planning is occurring in conjunction with the review of the developer's application. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4100 - Public Facility Fees $0 $0 $0 $0 $0 $0 $4,500,000 $4,500,000 1001 - General Fund $111,565 $0 $0 $0 $0 $0 $0 $111,565 Total $111,565 $0 $0 $0 $0 $0 $4,500,000 $4,611,565 Downtown Dublin Town Square Park 2026-2031 Five-Year Capital Improvement Program | Dublin Page 61 272 Dublin Sports Grounds Rehabilitation Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0002 Project Location Description This project provides for the design and construction to renovate the easterly ball fields at the Dublin Sports Grounds. The improvements may include dugout covers/shelter, fence repairs, backstop replacement, replacement of the score booths and storage at the fields. Additionally, the dugouts and bullpen openings will be reconfigured. The project will also include the replacement of the westerly restroom and the addition of concrete walkways. Details Type of Project:Refurbishment Capital Cost FY2027 Budget $0 Total Budget (all years) $3.65M Project Total $3.65M Funding Sources FY2027 Budget $0 Total Budget (all years) $3.65M Project Total $3.65M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $0 $0 $0 $575,040 $1,900,000 $0 $2,475,040 9200 - Contract Services $0 $0 $0 $125,040 $0 $790,000 $0 $915,040 9100 - Salaries & Benefits $0 $0 $0 $24,960 $24,960 $210,000 $0 $259,920 Total $0 $0 $0 $150,000 $600,000 $2,900,000 $0 $3,650,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $0 $0 $0 $150,000 $600,000 $2,900,000 $0 $3,650,000 Total $0 $0 $0 $150,000 $600,000 $2,900,000 $0 $3,650,000 Dublin Sports Grounds Rehabilitation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 62 273 Project Timeline ●07/1/2026 This project is anticipated to begin in 2028. Dublin Sports Grounds Rehabilitation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 63 274 Emerald Glen Ball Field Renovation Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PKNEW01 Project Location Description This project provides for the design and construction of enhancements to Ball Fields A and C at Emerald Glen Park, in coordination with improvements by the Dublin Unified School District (DUSD). DUSD will improve Fields A, B, and C to support the relocation of Dublin Little League from Fallon Sports Park to Emerald Glen Park to allow Emerald High School to use Fallon Sports Park as its primary fields for its baseball and softball programs. In conjunction with DUSD’s work, the City will install concrete walkways, shade structures, and replace the Field A scoreboard.  Details Type of Project:Replacement Capital Cost FY2027 Budget $400K Total Budget (all years) $400K Project Total $400K Funding Sources FY2027 Budget $400K Total Budget (all years) $400K Project Total $400K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $300,000 $0 $0 $0 $0 $0 $300,000 9200 - Contract Services $0 $75,000 $0 $0 $0 $0 $0 $75,000 9100 - Salaries & Benefits $0 $20,000 $0 $0 $0 $0 $0 $20,000 9500 - Miscellaneous $0 $5,000 $0 $0 $0 $0 $0 $5,000 Total $0 $400,000 $0 $0 $0 $0 $0 $400,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $0 $400,000 $0 $0 $0 $0 $0 $400,000 Total $0 $400,000 $0 $0 $0 $0 $0 $400,000 Emerald Glen Ball Field Renovation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 64 275 Project Timeline ●07/1/2026 The project improvements will begin construction in 2026 through an Intergovernmental Reciprocal Services agreement with DUSD. Emerald Glen Ball Field Renovation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 65 276 Fallon Spor ts Park - Ar tificial Turf Field Replacement Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0003 Project Location Fallon Sports Park Description This project provides for the design and construction to replace the four artificial turf sports fields at Fallon Sports Park. The lifespan of artificial turf sports fields can vary depending on factors such as the quality of the turf, the level of usage, maintenance practices, and environmental conditions. Depending upon continued use and maintenance, the artificial turf is anticipated to need replacement in 2028. Details Type of Project:Replacement Capital Cost FY2027 Budget $0 Total Budget (all years) $2.25M Project Total $2.25M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $0 $0 $1,550,000 $0 $0 $0 $1,550,000 9200 - Contract Services $0 $0 $0 $600,000 $0 $0 $0 $600,000 9100 - Salaries & Benefits $0 $0 $0 $100,000 $0 $0 $0 $100,000 Total $0 $0 $0 $2,250,000 $0 $0 $0 $2,250,000 Fallon Sports Park - Artificial Turf Field Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 66 277 Funding Sources FY2027 Budget $0 Total Budget (all years) $2.25M Project Total $2.25M Project Timeline ●07/1/2026 This project is anticipated to begin in 2028. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $0 $0 $0 $2,250,000 $0 $0 $0 $2,250,000 Total $0 $0 $0 $2,250,000 $0 $0 $0 $2,250,000 Fallon Sports Park - Artificial Turf Field Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 67 278 Fallon Spor ts Park Baseball Field G Upgrades Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0225 Project Location Description This project provides for the planning, design, and construction of various improvements at Fallon Sport Park Field G, including installation of a lighted 60-foot flagpole at the southwest corner of the baseball diamond, field fence screening/padding, a Wi-Fi system (to facilitate streaming games), bleachers/seating for 150–250 people, a new scoreboard at a new location, and storage.  Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $400K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $400K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $282,500 $0 $0 $0 $0 $0 $0 $282,500 9200 - Contract Services $100,000 $0 $0 $0 $0 $0 $0 $100,000 9100 - Salaries & Benefits $15,000 $0 $0 $0 $0 $0 $0 $15,000 9500 - Miscellaneous $2,500 $0 $0 $0 $0 $0 $0 $2,500 Total $400,000 $0 $0 $0 $0 $0 $0 $400,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $400,000 $0 $0 $0 $0 $0 $0 $400,000 Total $400,000 $0 $0 $0 $0 $0 $0 $400,000 Fallon Sports Park Baseball Field G Upgrades 2026-2031 Five-Year Capital Improvement Program | Dublin Page 68 279 Project Timeline ●02/4/2025 The City Council directed Staff to begin work on the project. ●07/1/2025 The project completed the installation of the flagpole, Wi-Fi, and fence screening and began the planning phase for the bleachers. ●07/1/2026 Work is currently being done in preparation for the bleacher and storage installation. The new scoreboard is anticipated to be complete in 2027. Fallon Sports Park Baseball Field G Upgrades 2026-2031 Five-Year Capital Improvement Program | Dublin Page 69 280 Forest Park Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0322 Project Location Description This project provides for the planning, design, and construction of a 2.0-acre neighborhood square in the Jordan Ranch Development. The neighborhood square will be designed in accordance with the Neighborhood Square Standards within the Parks and Recreation Master Plan. Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $3.54M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $2,619,749 $0 $0 $0 $0 $0 $0 $2,619,749 9200 - Contract Services $518,940 $0 $0 $0 $0 $0 $0 $518,940 9500 - Miscellaneous $282,680 $0 $0 $0 $0 $0 $0 $282,680 9100 - Salaries & Benefits $117,578 $0 $0 $0 $0 $0 $0 $117,578 Total $3,538,947 $0 $0 $0 $0 $0 $0 $3,538,947 Forest Park 2026-2031 Five-Year Capital Improvement Program | Dublin Page 70 281 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $3.54M Project Timeline ●07/1/2024 The project planning, conceptual plan, and design were completed. ●07/1/2025 The project was in construction. ●07/1/2026 The project was substantially complete, and the park was dedicated on December 13, 2025. The project continues with conversion to recycled water irrigation and is anticipated to be fully completed by the end of 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4100 - Public Facility Fees $2,898,947 $0 $0 $0 $0 $0 $0 $2,898,947 1001 - General Fund $350,000 $0 $0 $0 $0 $0 $0 $350,000 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $250,000 $0 $0 $0 $0 $0 $0 $250,000 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $40,000 $0 $0 $0 $0 $0 $0 $40,000 Total $3,538,947 $0 $0 $0 $0 $0 $0 $3,538,947 Forest Park 2026-2031 Five-Year Capital Improvement Program | Dublin Page 71 282 Iron Horse Nature Park and Open Space Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0422 Project Location Description This project provides for the planning, design, and construction of 12.13 acres of a nature park and open space adjacent to the Iron Horse Regional Trail, from the Dublin/San Ramon city limit to the confluence of Alamo and South San Ramon Creeks, that may be developed in partnership with Alameda County Flood Control and Water Conservation District (Zone Water Agency). The park size could increase to over 20 acres of usable parkland when combined with adjacent Zone 7 Water Agency property. The park will be designed in accordance with the Iron Horse Nature Park and Open Space Master Plan, which was approved by the City Council in October 2013. The City has already acquired 12.13 acres and the balance of the parkland would be accessible through an easement and operational agreement with Zone 7 Water Agency. The City will continue to pursue the acquisition of the Alameda County portion of the Iron Horse Regional Trail corridor to add to the City's portion of the parkland. The Phase I improvements include a trail connection to Stagecoach Park, the installation of a shade structure over a picnic area, as well as replacement benches and picnic tables. In addition to the Public Facilities Fee, possible funding sources are additional statewide grants or federal grants for projects that provide non-motorized infrastructure and enhancements that promote new or alternate access to parks, waterways, outdoor recreational pursuits, and forested or other natural environments to encourage health-related active transportation and opportunities for residents and trail users to reconnect with nature, such as Active Transportation Program grants or Proposition 68. Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $2.78M Project Total (to date) $12.2M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $5,930,768 $0 $2,778,654 $0 $0 $0 $0 $8,709,422 9200 - Contract Services $2,577,731 $0 $0 $0 $0 $0 $0 $2,577,731 9500 - Miscellaneous $620,500 $0 $0 $0 $0 $0 $0 $620,500 9100 - Salaries & Benefits $262,247 $0 $0 $0 $0 $0 $0 $262,247 Total $9,391,246 $0 $2,778,654 $0 $0 $0 $0 $12,169,900 Iron Horse Nature Park and Open Space 2026-2031 Five-Year Capital Improvement Program | Dublin Page 72 283 Funding Sources FY2027 Budget $0 Total Budget (all years) $2.78M Project Total (to date) $12.2M Project Timeline ●07/1/2025 The project Phase 7 planning and design were complete and construction began. ●07/1/2026 The Phase 7 segment of the trail and open space was dedicated on January 2026. The design and installation of the permit-required mitigation measures are anticipated to be complete in 2027. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4100 - Public Facility Fees $7,010,446 $0 $0 $0 $0 $0 $0 $7,010,446 9998 - Unidentified $0 $0 $2,778,654 $0 $0 $0 $0 $2,778,654 2403 - State Park Grant $2,294,000 $0 $0 $0 $0 $0 $0 $2,294,000 1001 - General Fund $86,800 $0 $0 $0 $0 $0 $0 $86,800 Total $9,391,246 $0 $2,778,654 $0 $0 $0 $0 $12,169,900 Iron Horse Nature Park and Open Space 2026-2031 Five-Year Capital Improvement Program | Dublin Page 73 284 Kolb Park Renovation Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0224 Project Location Description This project provides for the planning, design, and construction to renovate the 4.86-acre Kolb Park. The planning phase of the project will evaluate and prioritize the improvements, focusing on the replacement of aging infrastructure and amenities. The improvements will be consistent with the Parks and Recreation Master Plan and may include the replacement of the play equipment, site furnishings, picnic areas, drinking fountains, tot lot fencing, parcourse equipment stations, signage, refresh the shade structure, relevel the existing pavers and decomposed granite pathways, and refresh the landscaping. Staff will look for opportunities to incorporate Green Stormwater Infrastructure within the park as a part of the renovation. Details Type of Project:Refurbishment Capital Cost FY2027 Budget $0 Total Budget (all years) $1.05M Project Total (to date) $3.48M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $1,825,000 $0 $0 $0 $950,000 $0 $0 $2,775,000 9200 - Contract Services $500,080 $0 $0 $0 $50,000 $0 $0 $550,080 9100 - Salaries & Benefits $49,920 $0 $0 $0 $50,000 $0 $0 $99,920 9500 - Miscellaneous $50,000 $0 $0 $0 $0 $0 $0 $50,000 Total $2,425,000 $0 $0 $0 $1,050,000 $0 $0 $3,475,000 Kolb Park Renovation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 74 285 Funding Sources FY2027 Budget $0 Total Budget (all years) $1.05M Project Total (to date) $3.48M Project Timeline ●07/1/2025 The project planning phase evaluated and prioritized the improvements, focusing on the replacement of aging infrastructure and amenities. ●07/1/2026 The park has been identified as the site for offsite mitigation requirements generated by the Village Parkway Reconstruction Project. The project design will begin after the permitting process is complete, which is anticipated to be complete in 2028. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $2,425,000 $0 $0 $0 $0 $0 $0 $2,425,000 9998 - Unidentified $0 $0 $0 $0 $1,050,000 $0 $0 $1,050,000 Total $2,425,000 $0 $0 $0 $1,050,000 $0 $0 $3,475,000 Kolb Park Renovation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 75 286 Parks Playground Replacement Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0124 Project Location Ted Fairfield Park Description This project provides for the planning, design, and construction of replacement playground equipment at various parks. Annual safety inspections and maintenance records are used to identify equipment in need of replacement, along with consideration of each asset’s age and remaining useful life. The first phase will include Emerald Glen Park near Splash Pad (Ages 5-12) and Ted Fairfield Park (Ages 2-5 and 5-12). Details Type of Project:Replacement Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.11M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.11M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $850,000 $0 $0 $0 $0 $0 $0 $850,000 9200 - Contract Services $120,000 $0 $0 $0 $0 $0 $0 $120,000 9100 - Salaries & Benefits $118,560 $0 $0 $0 $0 $0 $0 $118,560 9500 - Miscellaneous $21,000 $0 $0 $0 $0 $0 $0 $21,000 Total $1,109,560 $0 $0 $0 $0 $0 $0 $1,109,560 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $1,109,560 $0 $0 $0 $0 $0 $0 $1,109,560 Total $1,109,560 $0 $0 $0 $0 $0 $0 $1,109,560 Parks Playground Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 76 287 Project Timeline ●07/1/2026 This project is anticipated to begin design in 2027. Parks Playground Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 77 288 Restrooms Replacement Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0321 Project Location Alamo Creek Park Description This project provides for the planning, design, and construction to replace the existing restrooms at Kolb Park, Alamo Creek Park, and Mape Memorial Park. To bring the restrooms up to current accessibility standards and codes, the existing restroom buildings will be demolished and replaced with pre-engineered restroom buildings. Details Type of Project:Replacement Capital Cost FY2027 Budget $500K Total Budget (all years) $500K Project Total (to date) $1.98M Funding Sources FY2027 Budget $500K Total Budget (all years) $500K Project Total (to date) $1.98M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $1,207,000 $450,000 $0 $0 $0 $0 $0 $1,657,000 9200 - Contract Services $209,000 $25,000 $0 $0 $0 $0 $0 $234,000 9100 - Salaries & Benefits $50,000 $25,000 $0 $0 $0 $0 $0 $75,000 9500 - Miscellaneous $9,000 $0 $0 $0 $0 $0 $0 $9,000 Total $1,475,000 $500,000 $0 $0 $0 $0 $0 $1,975,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $1,475,000 $500,000 $0 $0 $0 $0 $0 $1,975,000 Total $1,475,000 $500,000 $0 $0 $0 $0 $0 $1,975,000 Restrooms Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 78 289 Project Timeline ●07/1/2025 The project was in design. ●07/1/2026 The project continues design and permitting and anticipated to be in construction beginning 2027. Restrooms Replacement 2026-2031 Five-Year Capital Improvement Program | Dublin Page 79 290 Spor ts Courts Resurfacing Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0126 Project Location Description This project provides for the design and construction to resurface the tennis and basketball courts at Fallon Sports Complex and Emerald Glen Park. Courts generally have a seven-to-ten-year useful life prior to needing to be resurfaced. The sports courts at Emerald Glen Park would be the first sites to be resurfaced, followed by those at Fallon Sports Park. Details Type of Project:Refurbishment Capital Cost FY2027 Budget $0 Total Budget (all years) $1.1M Project Total (to date) $2.1M Funding Sources FY2027 Budget $0 Total Budget (all years) $1.1M Project Total (to date) $2.1M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $400,000 $0 $330,000 $0 $400,000 $0 $255,000 $1,385,000 9200 - Contract Services $160,000 $0 $135,000 $0 $160,000 $0 $115,000 $570,000 9100 - Salaries & Benefits $40,000 $0 $35,000 $0 $40,000 $0 $30,000 $145,000 Total $600,000 $0 $500,000 $0 $600,000 $0 $400,000 $2,100,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 6205 - Internal Service Fund - Facilities Replacement $600,000 $0 $500,000 $0 $600,000 $0 $400,000 $2,100,000 Total $600,000 $0 $500,000 $0 $600,000 $0 $400,000 $2,100,000 Sports Courts Resurfacing 2026-2031 Five-Year Capital Improvement Program | Dublin Page 80 291 Project Timeline ●07/1/2026 This project is anticipated to begin design in 2027. Sports Courts Resurfacing 2026-2031 Five-Year Capital Improvement Program | Dublin Page 81 292 Sunday School Barn Flooring Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0125 Project Location Description This project provides for the design and construction to renovate the existing wood floor inside the Sunday School Barn at Heritage Park. The original wood floors are not adequate for the types and frequency of use that the building is experiencing. The project is intended to preserve the look and historic fabric of the original wood that is believed to be from the late 1800s while ensuring the structural integrity and finish of the floor are adequate for the current and planned uses of the barn. Details Type of Project:Refurbishment Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $385K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $385K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $200,000 $0 $0 $0 $0 $0 $0 $200,000 9200 - Contract Services $125,080 $0 $0 $0 $0 $0 $0 $125,080 9100 - Salaries & Benefits $49,920 $0 $0 $0 $0 $0 $0 $49,920 9500 - Miscellaneous $10,000 $0 $0 $0 $0 $0 $0 $10,000 Total $385,000 $0 $0 $0 $0 $0 $0 $385,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $385,000 $0 $0 $0 $0 $0 $0 $385,000 Total $385,000 $0 $0 $0 $0 $0 $0 $385,000 Sunday School Barn Flooring 2026-2031 Five-Year Capital Improvement Program | Dublin Page 82 293 Project Timeline ●07/1/2026 This project is anticipated to begin design in 2026. Sunday School Barn Flooring 2026-2031 Five-Year Capital Improvement Program | Dublin Page 83 294 Wallis Ranch Community Park Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Parks CIP Projects Type Capital Improvement Project Type Parks Project Number PK0421 Project Location Description This project provides for the planning, design, and construction of a community park in the Wallis Ranch Development and will be designed to the Community Park Standards contained in the Parks and Recreation Master Plan. The Park consists of three separate parcels totaling 8.85 acres with amenities to include play areas, picnic facilities, turf area, lighted tennis, pickle ball, and basketball facilities, natural areas, restrooms, pathways, lighting, dog park, and irrigation and landscaping. Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $11.8M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $11.8M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $9,224,172 $0 $0 $0 $0 $0 $0 $9,224,172 9200 - Contract Services $1,356,421 $0 $0 $0 $0 $0 $0 $1,356,421 9500 - Miscellaneous $987,205 $0 $0 $0 $0 $0 $0 $987,205 9100 - Salaries & Benefits $192,202 $0 $0 $0 $0 $0 $0 $192,202 Total $11,760,000 $0 $0 $0 $0 $0 $0 $11,760,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4100 - Public Facility Fees $11,760,000 $0 $0 $0 $0 $0 $0 $11,760,000 1001 - General Fund $0 $0 $0 $0 $0 $0 $0 $0 Total $11,760,000 $0 $0 $0 $0 $0 $0 $11,760,000 Wallis Ranch Community Park 2026-2031 Five-Year Capital Improvement Program | Dublin Page 84 295 Project Timeline ●07/1/2025 The project was in construction. ●07/1/2026 The project is substantially complete and the park was dedicated in August 2025. Final project work continues with the conversion of the upper park's irrigation to recycled water and is anticipated to be completed by the end of 2026. Wallis Ranch Community Park 2026-2031 Five-Year Capital Improvement Program | Dublin Page 85 296 Public Art FY27 - FY31 Public Art Projects (including Historical Budgeted, Future Budgeted) Downtown Dublin $1,500,000 88.24% Outdoor Murals $200,000 11.76% $1,450K$1,450K $1,450K $250K$250K $250K 000 000 000 000 000 Historical Budgeted 2027 2028 2029 2030 2031 Future Budgeted 0 $500K $1,000K $1,500K $2,000K Summary of Requests Project No. / Category Historical Budgeted FY2027 FY2028 FY2029 FY2030 FY2031 Future Budgeted Total PA0123 Downtown Dublin $1,250,000 $250,000 $0 $0 $0 $0 $0 $1,500,000 PA0125 Outdoor Murals $200,000 $0 $0 $0 $0 $0 $0 $200,000 Total Summary of Requests $1,450,000 $250,000 $0 $0 $0 $0 $0 $1,700,000 Public Art 2026-2031 Five-Year Capital Improvement Program | Dublin Page 86 297 Downtown Dublin Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Art CIP Type Capital Improvement Project Type Public Art Project Number PA0123 Project Location Description This project provides for public art commissions in Downtown Dublin, which includes a comprehensive review of existing Downtown Dublin planning documents and the Public Art Master Plan, as well as the development of a guide for public art in the Downtown. Details Type of Project:New Construction Capital Cost FY2027 Budget $250K Total Budget (all years) $250K Project Total (to date) $1.5M Funding Sources FY2027 Budget $250K Total Budget (all years) $250K Project Total (to date) $1.5M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $900,000 $250,000 $0 $0 $0 $0 $0 $1,150,000 9500 - Miscellaneous $250,000 $0 $0 $0 $0 $0 $0 $250,000 9200 - Contract Services - Engineering/Architecture $75,040 $0 $0 $0 $0 $0 $0 $75,040 9100 - Salaries & Benefits - Planning $24,960 $0 $0 $0 $0 $0 $0 $24,960 Total $1,250,000 $250,000 $0 $0 $0 $0 $0 $1,500,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2801 - Public Art Fund $1,250,000 $250,000 $0 $0 $0 $0 $0 $1,500,000 Total $1,250,000 $250,000 $0 $0 $0 $0 $0 $1,500,000 Downtown Dublin 2026-2031 Five-Year Capital Improvement Program | Dublin Page 87 298 Project Timeline ●07/1/2025 The project planning phase began in 2025. ●07/1/2026 The project planning phase continues concurrently with the Downtown development. Downtown Dublin 2026-2031 Five-Year Capital Improvement Program | Dublin Page 88 299 Outdoor Murals Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Art CIP Type Capital Improvement Project Type Public Art Project Number PA0125 Project Location Description This project will include painting of Public Art Murals at sites, which includes generator enclosures at the Civic Center Library, Don Biddle Community Park, and the Dublin Arts Center, as well as utility enclosures, and others. The exact locations will be identified and reviewed by the Heritage and Cultural Arts Commission, and will require approval by the City Council. Details Type of Project:New Construction Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $200K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $200K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Repairs/Improvements $150,000 $0 $0 $0 $0 $0 $0 $150,000 9500 - Miscellaneous $35,000 $0 $0 $0 $0 $0 $0 $35,000 9100 - Salaries & Benefits - Planning $15,000 $0 $0 $0 $0 $0 $0 $15,000 Total $200,000 $0 $0 $0 $0 $0 $0 $200,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2801 - Public Art Fund $200,000 $0 $0 $0 $0 $0 $0 $200,000 Total $200,000 $0 $0 $0 $0 $0 $0 $200,000 Outdoor Murals 2026-2031 Five-Year Capital Improvement Program | Dublin Page 89 300 Project Timeline ●07/1/2025 This project was in the planning stages with a future mural on the generator enclosure adjacent to the Civic Center Library. Artist and artwork selection was complete. ●07/1/2026 The project painting of the mural adjacent to the Civic Center Library is anticipated to be complete in 2026. Outdoor Murals 2026-2031 Five-Year Capital Improvement Program | Dublin Page 90 301 Streets FY27 - FY31 Streets Projects (including Historical Budgeted, Future Budgeted) Amador Plaza Road Bicycle and Pedestrian Improvements $1,413,649 0.45% Annual Street Resurfacing $47,133,862 14.88% Citywide Bicycle and Pedestrian Improvements $13,486,045 4.26% Citywide Signal Communications Upgrade $6,939,427 2.19% Downtown Dublin Street Grid Network $21,428,020 6.76% Dublin Boulevard Extension - Fallon Road to North Canyons Parkway $126,414,018 39.90% Dublin Ranch Streetlight Improvements $276,741 0.09% Gleason Drive Bridge Repair $750,000 0.24% Golden Gate Drive Intersection Improvements - Dublin Blvd and St. Patrick Way $4,451,640 1.41% Green Stormwater Infrastructure $4,209,063 1.33% Iron Horse Trail Bridge at Dublin Boulevard $14,054,439 4.44% Local Street Resurfacing at I580 Interchanges $6,000,000 1.89% San Ramon Road Trail Lighting $173,461 0.05% Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School $16,500,000 5.21% Tassajara Road Realignment and Widening - Fallon Road to North City Limit $12,777,416 4.03% Traffic Signal and Roadway Safety Improvements $170,000 0.05% Traffic Signal Re-Lamping $647,080 0.20% $146M$146M$146M $11M$11M$11M $35M$35M $35M $6M$6M$6M $8M$8M $8M $5M$5M $5M $105M$105M $105M Historical Budgeted 2027 2028 2029 2030 2031 Future Budgeted 0 $50M $100M $150M $200M Streets 2026-2031 Five-Year Capital Improvement Program | Dublin Page 91 302 Village Parkway Reconstruction $40,000,000 12.63% Summary of Requests Project No. / Category Historical Budgeted FY2027 FY2028 FY2029 FY2030 FY2031 Future Budgeted Total ST0815 Amador Plaza Road Bicycle and Pedestrian Improvements $1,413,649 $0 $0 $0 $0 $0 $0 $1,413,649 ST0117 Annual Street Resurfacing $24,633,862 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $0 $47,133,862 ST0517 Citywide Bicycle and Pedestrian Improvements $9,736,045 $750,000 $750,000 $750,000 $750,000 $750,000 $0 $13,486,045 ST0713 Citywide Signal Communications Upgrade $6,939,427 $0 $0 $0 $0 $0 $0 $6,939,427 ST0221 Downtown Dublin Street Grid Network $228,020 $0 $0 $0 $0 $0 $21,200,000 $21,428,020 ST0216 Dublin Boulevard Extension - Fallon Road to North Canyons Parkway $42,191,712 $0 $0 $0 $0 $0 $84,222,306 $126,414,018 ST0417 Dublin Ranch Streetlight Improvements $150,741 $42,000 $42,000 $42,000 $0 $0 $0 $276,741 STNEW01 Gleason Drive Bridge Repair $0 $750,000 $0 $0 $0 $0 $0 $750,000 ST0423 Golden Gate Drive Intersection Improvements - Dublin Blvd and St. Patrick Way $951,640 $0 $0 $1,000,000 $2,500,000 $0 $0 $4,451,640 ST0121 Green Stormwater Infrastructure $4,209,063 $0 $0 $0 $0 $0 $0 $4,209,063 ST0118 Iron Horse Trail Bridge at Dublin Boulevard $14,054,439 $0 $0 $0 $0 $0 $0 $14,054,439 STNEW02 Local Street Resurfacing at I580 Interchanges $0 $500,000 $5,500,000 $0 $0 $0 $0 $6,000,000 ST0514 San Ramon Road Trail Lighting $173,461 $0 $0 $0 $0 $0 $0 $173,461 ST0119 Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School $15,000,000 $1,500,000 $0 $0 $0 $0 $0 $16,500,000 ST0116 Tassajara Road Realignment and Widening - Fallon Road to North City Limit $12,777,416 $0 $0 $0 $0 $0 $0 $12,777,416 ST0123 Traffic Signal and Roadway Safety Improvements $170,000 $0 $0 $0 $0 $0 $0 $170,000 ST0223 Traffic Signal Re-Lamping $647,080 $0 $0 $0 $0 $0 $0 $647,080 ST0323 Village Parkway Reconstruction $12,750,000 $3,300,000 $23,950,000 $0 $0 $0 $0 $40,000,000 Total Summary of Requests $146,026,555 $11,342,000 $34,742,000 $6,292,000 $7,750,000 $5,250,000 $105,422,306 $316,824,861 Streets 2026-2031 Five-Year Capital Improvement Program | Dublin Page 92 303 Amador Plaza Road Bicycle and Pedestrian Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0815 Project Location Description This two-phase project provides for the design and construction of pedestrian, bicycle, and vehicular improvements along Amador Plaza Road between Dublin Boulevard and Amador Valley Boulevard. The first phase included the installation of two mid-block crosswalks with pedestrian warning lights and construction of a raised concrete median at the southern Safeway/Dublin Place driveway. The second phase will include construction of an exclusive southbound right turn lane on Amador Plaza Road at Dublin Boulevard.  Details Type of Project:Improvements Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.41M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $1,035,862 $0 $0 $0 $0 $0 $0 $1,035,862 9200 - Contract Services $228,371 $0 $0 $0 $0 $0 $0 $228,371 9300 - Land/Right-of-way $126,000 $0 $0 $0 $0 $0 $0 $126,000 9100 - Salaries & Benefits $19,416 $0 $0 $0 $0 $0 $0 $19,416 9500 - Miscellaneous $4,000 $0 $0 $0 $0 $0 $0 $4,000 Total $1,413,649 $0 $0 $0 $0 $0 $0 $1,413,649 Amador Plaza Road Bicycle and Pedestrian Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 93 304 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $1.41M Project Timeline ●12/30/2016 The City Council accepted the Phase l improvement in December 2016. ●06/15/2018 Phase 2 project design began. ●07/1/2026 Phase 2 project design is currently on hold, pending acquisition of the right-of-way for these improvements. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4304 - Western Dublin Transportation Impact Fee $1,413,649 $0 $0 $0 $0 $0 $0 $1,413,649 Total $1,413,649 $0 $0 $0 $0 $0 $0 $1,413,649 Amador Plaza Road Bicycle and Pedestrian Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 94 305 Annual Street Resurfacing Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0117 Project Location Description This project provides for the design and construction of a variety of pavement resurfacing treatments, from slurry seal to major rehabilitation and reconstruction of streets and resurfacing of bridge decks. The project also includes installation of new or upgrades of existing Americans with Disabilities Act (ADA) curb ramps on roads that are reconstructed or receive an asphalt concrete overlay. Streets are selected for improvements based on the City’s Pavement Management System to optimize the pavement condition in relation to the available budget. The City owns and maintains approximately 148 centerline miles of streets.  Note: the Metropolitan Transportation Commission groups Pavement Condition Index (PCI) ratings into the following categories: 80-100 Very Good-Excellent, 70-79 Good, 60-69 Fair, 50-59 At Risk, 25-49 Poor, and 0-24 Failed. The City of Dublin is rated very good with a three-year moving average PCI of 79. Details Type of Project:Resurface Current Road Capital Cost FY2027 Budget $4.5M Total Budget (all years) $22.5M Project Total (to date) $47.1M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $19,940,972 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $0 $37,690,972 9200 - Contract Services $4,059,344 $775,000 $775,000 $775,000 $775,000 $775,000 $0 $7,934,344 9100 - Salaries & Benefits $562,235 $167,500 $167,500 $167,500 $167,500 $167,500 $0 $1,399,735 9500 - Miscellaneous $71,311 $7,500 $7,500 $7,500 $7,500 $7,500 $0 $108,811 Total $24,633,862 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $0 $47,133,862 Annual Street Resurfacing 2026-2031 Five-Year Capital Improvement Program | Dublin Page 95 306 Funding Sources FY2027 Budget $4.5M Total Budget (all years) $22.5M Project Total (to date) $47.1M Project Timeline ●07/1/2025 The 2024 annual projects were completed, construction for the 2025 annual project was underway, and design began for the 2026 annual projects. ●07/1/2026 The 2025 annual project is complete, the 2026 annual projects are underway, and design is underway for the 2027 projects. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2220 - Road Maint. & Rehab Account (RMRA)$8,613,599 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $18,613,599 1001 - General Fund $3,804,899 $1,750,000 $1,850,000 $1,850,000 $1,850,000 $1,850,000 $0 $12,954,899 2201 - State Gas Tax $6,403,041 $750,000 $650,000 $650,000 $650,000 $650,000 $0 $9,753,041 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $3,031,020 $0 $0 $0 $0 $0 $0 $3,031,020 2204 - Measure B Sales Tax - Local Streets Fund (Alameda CTC) $1,784,999 $0 $0 $0 $0 $0 $0 $1,784,999 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $304,500 $0 $0 $0 $0 $0 $0 $304,500 2205 - Measure B Sales Tax - Bike & Ped. Fund (Alameda CTC) $300,000 $0 $0 $0 $0 $0 $0 $300,000 2304 - Local Recycling Programs $160,000 $0 $0 $0 $0 $0 $0 $160,000 9997 - Other $103,324 $0 $0 $0 $0 $0 $0 $103,324 2216 - Measure B Grants $82,500 $0 $0 $0 $0 $0 $0 $82,500 4309 - Mitigation Contributions $45,980 $0 $0 $0 $0 $0 $0 $45,980 Total $24,633,862 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $0 $47,133,862 Annual Street Resurfacing 2026-2031 Five-Year Capital Improvement Program | Dublin Page 96 307 Citywide Bicycle and Pedestrian Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0517 Project Location Description This project provides for the planning, design, and construction of improvements to various pedestrian and bicycle facilities throughout the city, which includes pedestrian/bicycle bridges and annual sidewalk repairs. This project also includes design and construction of improvements recommended in the updated Bicycle and Pedestrian Plan, as well as the Safe Routes to School improvements. Furthermore, the project also includes an update to the Americans with Disabilities Act (ADA) Transition Plan and implementation of Public Right-of-way Accessibility Guidelines (PROWAG). The plan update will include a review of City buildings, parks, and rights-of-way. The City received $1,053,000 in Measure BB funds and $803,000 in VRF funds through the Alameda County Transportation Commission’s Comprehensive Investment Plan discretionary program for improvements at the San Ramon Road and Amador Valley Boulevard intersection. Lastly, the project includes traffic signal modifications and improvements for pedestrian and bicycle safety by removing slip lanes, installing directional curb ramps, improving ADA access, and adding protected intersection features to reduce conflicts between vehicles, pedestrians, and bicyclists. Details Type of Project:Improvements Capital Cost FY2027 Budget $750K Total Budget (all years) $3.75M Project Total (to date) $13.5M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $7,415,743 $525,000 $525,000 $525,000 $525,000 $525,000 $0 $10,040,743 9200 - Contract Services $2,069,668 $200,000 $200,000 $200,000 $200,000 $200,000 $0 $3,069,668 9100 - Salaries & Benefits $198,100 $20,000 $20,000 $20,000 $20,000 $20,000 $0 $298,100 9500 - Miscellaneous $52,534 $5,000 $5,000 $5,000 $5,000 $5,000 $0 $77,534 Total $9,736,045 $750,000 $750,000 $750,000 $750,000 $750,000 $0 $13,486,045 Citywide Bicycle and Pedestrian Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 97 308 Funding Sources FY2027 Budget $750K Total Budget (all years) $3.75M Project Total (to date) $13.5M Project Timeline ●01/10/2023 The City Council adopted the updated Bicycle and Pedestrian Plan. ●07/1/2024 In July 2024, the City was awarded $400,000 in funding from Alameda County Health Services Department through the Enhancing Vision 2026 (EV2026) Fund to be used for the Regional Street Mid- block Crossing Project. ●09/25/2024 In September 2024 the City was awarded $286,445 in Transportation Development Act (TDA) to be used for pedestrian and trail improvements along Amador Valley Boulevard and at the Iron Horse Regional Trail crossing. ●07/1/2025 The project improvements for the Safe Routes to School improvements at the intersections of Central Parkway at Aspen Street and Hibernia Drive, Grafton Street at Antone Way, and Amador Valley Boulevard at Burton Street were completed. The Downtown Dublin pedestrian crossing improvements on Regional Street began construction in summer 2025. The ADA Transition Plan update was completed. ●07/1/2026 The Downtown Dublin pedestrian crossing improvements on Regional Street are anticipated to be complete in 2026. The design for the intersection improvements at San Ramon Road and Amador Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $2,351,600 $500,000 $250,000 $250,000 $250,000 $250,000 $0 $3,851,600 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $1,550,100 $250,000 $300,000 $250,000 $250,000 $250,000 $0 $2,850,100 2220 - Road Maint. & Rehab Account (RMRA)$605,000 $0 $200,000 $250,000 $250,000 $250,000 $0 $1,555,000 2217 - Measure BB Grants $1,188,000 $0 $0 $0 $0 $0 $0 $1,188,000 1001 - General Fund $963,000 $0 $0 $0 $0 $0 $0 $963,000 2924 - VRF (ACTC) Grants $803,000 $0 $0 $0 $0 $0 $0 $803,000 2212 - Vehicle Registration Fee (Alameda CTC)$726,000 $0 $0 $0 $0 $0 $0 $726,000 2204 - Measure B Sales Tax - Local Streets Fund (Alameda CTC) $510,000 $0 $0 $0 $0 $0 $0 $510,000 2203 - Transportation Development Act $496,445 $0 $0 $0 $0 $0 $0 $496,445 2923 - Alameda County Grant $400,000 $0 $0 $0 $0 $0 $0 $400,000 2205 - Measure B Sales Tax - Bike & Ped. Fund (Alameda CTC) $142,900 $0 $0 $0 $0 $0 $0 $142,900 Total $9,736,045 $750,000 $750,000 $750,000 $750,000 $750,000 $0 $13,486,045 Citywide Bicycle and Pedestrian Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 98 309 Valley Boulevard is anticipated to be complete in 2026 with construction to begin in 2027. Citywide Bicycle and Pedestrian Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 99 310 Citywide Signal Communications Upgrade Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0713 Project Location Description This project provides for the continued upgrades of the traffic signal communications system and includes the replacement of signal controllers, conflict monitors, and battery backup units, as well as managing ongoing signal operations of coordinated corridors. In Fiscal Years 2019-20 and 2020-21, the project further expanded the traffic communications network, connecting traffic signals on Dublin Boulevard, San Ramon Road, Fallon Road, and Tassajara Road. The project will provide for the installation of new conduits, removal of the existing copper communication cables, and installation of new fiber optic cables on Dublin Boulevard. The project will also expand the adaptive traffic signal system along key corridors and will connect existing and new public safety infrastructure, such as situational awareness cameras and automated license plate recognition cameras, to the high-speed fiber optic communications system. The City received $1,854,000 in VRF funds through the Alameda County Transportation Commission’s Comprehensive Investment Plan program to install fiber optic cable along Dublin Boulevard from San Ramon Road to Tassajara Road. The project will replace old copper communication lines with faster and more reliable fiber optic cable, improve traffic signal coordination, upgrade detection systems, add battery backup units, and improve safety, reliability, and transit operations along the corridor. Details Type of Project:Improvements Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $6.94M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $5,291,725 $0 $0 $0 $0 $0 $0 $5,291,725 9200 - Contract Services $1,445,200 $0 $0 $0 $0 $0 $0 $1,445,200 9100 - Salaries & Benefits $187,482 $0 $0 $0 $0 $0 $0 $187,482 9500 - Miscellaneous $9,900 $0 $0 $0 $0 $0 $0 $9,900 9600 - Equipment $5,120 $0 $0 $0 $0 $0 $0 $5,120 Total $6,939,427 $0 $0 $0 $0 $0 $0 $6,939,427 Citywide Signal Communications Upgrade 2026-2031 Five-Year Capital Improvement Program | Dublin Page 100 311 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $6.94M Project Timeline ●06/30/2020 The Travel Demand Model was updated to provide traffic flow projections on arterial and collector roadways, and future land use and transportation network changes were analyzed. ●04/30/2021 The City Council adopted a Resolution establishing CEQA transportation thresholds of significance for Vehicle Miles Traveled. ●06/30/2021 The City's traffic communications network was expanded, and traffic signals on Dublin Boulevard, San Ramon Road, Fallon Road, Tassajara Road were connected. ●07/1/2025 The installation of a conduit pathway between Civic Center and San Ramon Road to accommodate the future fiber optic upgrade to city infrastructure was completed. The installation of fiber optic cables on Dublin Boulevard between San Ramon Road and Tassajara Road was in design. ●07/1/2026 The project is anticipated to complete design in 2026 and begin construction in 2027. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2924 - VRF (ACTC) Grants $1,854,000 $0 $0 $0 $0 $0 $0 $1,854,000 1101 - General Fund Designated Reserve $1,420,149 $0 $0 $0 $0 $0 $0 $1,420,149 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $1,150,000 $0 $0 $0 $0 $0 $0 $1,150,000 2212 - Vehicle Registration Fee (Alameda CTC)$787,396 $0 $0 $0 $0 $0 $0 $787,396 2220 - Road Maint. & Rehab Account (RMRA)$694,320 $0 $0 $0 $0 $0 $0 $694,320 2204 - Measure B Sales Tax - Local Streets Fund (Alameda CTC) $248,640 $0 $0 $0 $0 $0 $0 $248,640 4300 - Eastern Dublin Transportation Impact Fee $200,000 $0 $0 $0 $0 $0 $0 $200,000 4304 - Western Dublin Transportation Impact Fee $199,000 $0 $0 $0 $0 $0 $0 $199,000 6305 - Internal Service Fund - Equipment Replacement $122,300 $0 $0 $0 $0 $0 $0 $122,300 2201 - State Gas Tax $104,000 $0 $0 $0 $0 $0 $0 $104,000 1001 - General Fund $79,851 $0 $0 $0 $0 $0 $0 $79,851 2207 - Transportation for Clean Air $79,771 $0 $0 $0 $0 $0 $0 $79,771 Total $6,939,427 $0 $0 $0 $0 $0 $0 $6,939,427 Citywide Signal Communications Upgrade 2026-2031 Five-Year Capital Improvement Program | Dublin Page 101 312 Downtown Dublin Street Grid Network Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0221 Project Location Description This project provides for the planning, design, and construction of a new Street Grid Network, in accordance with the main principles of the Downtown Dublin Preferred Vision. The Street Grid Network will introduce new streets that will break down the large block format into smaller, walkable-sized blocks between 350 to 450 feet per side. The proposed extension of Golden Gate Drive north from Dublin Boulevard up to Amador Valley Boulevard will become a new main street with the classic Downtown street grid network within street rights-of-way varying between 60 and 90 feet wide. Street infrastructure may include storm drainage, sewer, water, recycled water, communications, gas, and electric utilities, as well as landscaping and irrigation. Street rights-of-way are anticipated to be dedicated by developers. Potential other future funding sources are development impact fees, community facilities district financing, or other assessment district funding. Details Type of Project:New Road Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $21.4M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $0 $0 $0 $0 $0 $20,000,000 $20,000,000 9200 - Contract Services $150,000 $0 $0 $0 $0 $0 $1,000,000 $1,150,000 9100 - Salaries & Benefits $78,020 $0 $0 $0 $0 $0 $200,000 $278,020 Total $228,020 $0 $0 $0 $0 $0 $21,200,000 $21,428,020 Downtown Dublin Street Grid Network 2026-2031 Five-Year Capital Improvement Program | Dublin Page 102 313 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $21.4M Project Timeline ●11/5/2019 The City Council approved the Downtown Dublin Preferred Vision. ●01/1/2020 The project planning phase began in 2020 with the update of the existing City Travel Demand Forecasting Model to provide traffic flow projections on the new roadways, analyze future land use development proposals, and evaluate transportation network changes in the Downtown. ●07/1/2026 The project will be planned in conjunction with the review of the developer's application. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9998 - Unidentified $0 $0 $0 $0 $0 $0 $21,200,000 $21,200,000 1001 - General Fund $228,020 $0 $0 $0 $0 $0 $0 $228,020 Total $228,020 $0 $0 $0 $0 $0 $21,200,000 $21,428,020 Downtown Dublin Street Grid Network 2026-2031 Five-Year Capital Improvement Program | Dublin Page 103 314 Dublin Boulevard Extension - Fallon Road to North Canyons Parkway Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0216 Project Location Description This project provides for the environmental review, preliminary engineering, design and construction of the 1.5-mile extension of Dublin Boulevard from Fallon Road to North Canyons Parkway in the City of Livermore. The extension is planned to have four to six travel lanes, bike lanes, a Class 1 bike/multi-use path, sidewalk, curb and gutter, traffic signals, street lighting, landscaped medians, bus stops, and utilities. The preliminary engineering and Environmental Impact Report (EIR) cost allocation between the City of Dublin and City of Livermore is governed by a Memorandum of Understanding (MOU). Alameda CTC has assumed the role of implementing agency for the final design phase of the project working in cooperation with the cities of Dublin and Livermore. The preliminary engineering level cost estimate for this project is currently at $153.6 million, which includes all project mitigation costs and indirect impacts mitigation and is anticipated to be divided among the City of Dublin and the City of Livermore based on street length in each jurisdiction. It is expected that the City of Dublin share will be approximately $126.1 million, and the City of Livermore share will be $27.5 million. The unincorporated Alameda County's costs will be shared between the City of Dublin and City of Livermore with the final cost allocation to each jurisdiction to be defined by a Cooperative Agreement. The $11.2 million identified as Tri-Valley Transportation Council Grant is an approximate amount, which will be adjusted when the funding agreement is approved. Details Type of Project:New Road Dublin Boulevard Extension - Fallon Road to North Canyons Parkway 2026-2031 Five-Year Capital Improvement Program | Dublin Page 104 315 Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $126M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $126M Project Timeline ●04/19/2016 The City of Dublin and the City of Livermore approved and entered an MOU for preliminary engineering and environmental impact report phases. ●08/20/2019 The City Council approved the certification of the EIR and amended the General Plan and Eastern Dublin Specific Plan. ●09/3/2019 Right-of-way was established, and the Ordinance was effective 30 days thereafter. ●05/19/2020 The City of Dublin, the City of Livermore, and Alameda County Transportation Commission approved and entered into a Cooperative Agreement for the design phase. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $0 $0 $0 $0 $0 $74,472,415 $74,472,415 9200 - Contract Services $17,301,105 $0 $0 $0 $0 $0 $9,549,891 $26,850,996 9300 - Land/Right-of-way $24,524,879 $0 $0 $0 $0 $0 $0 $24,524,879 9100 - Salaries & Benefits $361,262 $0 $0 $0 $0 $0 $200,000 $561,262 9500 - Miscellaneous $4,466 $0 $0 $0 $0 $0 $0 $4,466 Total $42,191,712 $0 $0 $0 $0 $0 $84,222,306 $126,414,018 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9998 - Unidentified $0 $0 $0 $0 $0 $0 $84,222,306 $84,222,306 1101 - General Fund Designated Reserve $20,250,000 $0 $0 $0 $0 $0 $0 $20,250,000 2922 - Tri-Valley Transportation Council Grants $11,200,000 $0 $0 $0 $0 $0 $0 $11,200,000 1001 - General Fund $7,290,382 $0 $0 $0 $0 $0 $0 $7,290,382 4302 - Eastern Dublin Transportation Impact Fee $1,737,585 $0 $0 $0 $0 $0 $0 $1,737,585 4301 - Eastern Dublin Transportation Impact Fee $1,033,916 $0 $0 $0 $0 $0 $0 $1,033,916 2217 - Measure BB Grants $439,824 $0 $0 $0 $0 $0 $0 $439,824 2220 - Road Maint. & Rehab Account (RMRA)$240,005 $0 $0 $0 $0 $0 $0 $240,005 Total $42,191,712 $0 $0 $0 $0 $0 $84,222,306 $126,414,018 Dublin Boulevard Extension - Fallon Road to North Canyons Parkway 2026-2031 Five-Year Capital Improvement Program | Dublin Page 105 316 ●02/1/2021 The project completed the NEPA. ●02/7/2023 The City Council approved and entered into an agreement with RES Environmental Operating Company, LLC for environmental mitigation services. ●07/1/2025 The project design began. ●07/1/2026 The City of Dublin and the City of Livermore agreed on a phased approach to the road construction, focusing initial efforts on improvements within their respective jurisdictions, and with the segment within unincorporated Alameda County to be addressed in a future phase when funding has been identified and secured. The project is anticipated to complete design and permitting in 2027 and begin construction once right-of-way is acquired. Dublin Boulevard Extension - Fallon Road to North Canyons Parkway 2026-2031 Five-Year Capital Improvement Program | Dublin Page 106 317 Dublin Ranch Streetlight Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0417 Project Location Description This project provides for the design and repainting of decorative streetlight poles. Repainting of the streetlight poles protects the integrity of the poles and improves aesthetics in the surrounding neighborhood.  This project is funded by revenue collected through the Streetlight District assessments. Details Type of Project:Improvements Capital Cost FY2027 Budget $42K Total Budget (all years) $126K Project Total (to date) $277K Funding Sources FY2027 Budget $42K Total Budget (all years) $126K Project Total (to date) $277K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9200 - Contract Services $112,026 $34,820 $34,820 $34,820 $0 $0 $0 $216,486 9100 - Salaries & Benefits $33,815 $6,760 $6,760 $6,760 $0 $0 $0 $54,095 9500 - Miscellaneous $4,900 $420 $420 $420 $0 $0 $0 $6,160 Total $150,741 $42,000 $42,000 $42,000 $0 $0 $0 $276,741 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2705 - Street Light District East Dublin 1999-1 $150,741 $42,000 $42,000 $42,000 $0 $0 $0 $276,741 Total $150,741 $42,000 $42,000 $42,000 $0 $0 $0 $276,741 Dublin Ranch Streetlight Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 107 318 Project Timeline ●07/1/2025 The conversation of 1,626 existing streetlights into energy efficient LED in the Dublin Ranch Street Light Assessment District (1999-1) was completed with the Citywide Energy Improvements Project, CIP No. GI0121. ●07/1/2026 The painting of streetlight poles is anticipated to begin in 2028. Dublin Ranch Streetlight Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 108 319 Gleason Drive Bridge Repair Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number STNEW01 Project Location Description This project provides for the design and repair of roadway and sidewalk areas adjacent to the Gleason Drive Bridge at Tassajara Creek affected by ongoing settlement of underlying soil and backfill. The project will also address groundwater related damage by repairing the concrete bridge abutment walls and storm drain outfall. Details Type of Project:Renovation Capital Cost FY2027 Budget $750K Total Budget (all years) $750K Project Total $750K Funding Sources FY2027 Budget $750K Total Budget (all years) $750K Project Total $750K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $550,000 $0 $0 $0 $0 $0 $550,000 9200 - Contract Services $0 $150,000 $0 $0 $0 $0 $0 $150,000 9100 - Salaries & Benefits $0 $45,000 $0 $0 $0 $0 $0 $45,000 9500 - Miscellaneous $0 $5,000 $0 $0 $0 $0 $0 $5,000 Total $0 $750,000 $0 $0 $0 $0 $0 $750,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2201 - State Gas Tax $0 $500,000 $0 $0 $0 $0 $0 $500,000 1001 - General Fund $0 $250,000 $0 $0 $0 $0 $0 $250,000 Total $0 $750,000 $0 $0 $0 $0 $0 $750,000 Gleason Drive Bridge Repair 2026-2031 Five-Year Capital Improvement Program | Dublin Page 109 320 Project Timeline ●07/1/2026 This project is anticipated to begin in 2026. Gleason Drive Bridge Repair 2026-2031 Five-Year Capital Improvement Program | Dublin Page 110 321 Golden Gate Drive Intersection Improvements - Dublin Blvd and St. Patrick Way Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0423 Project Location Description This project provides for the design and construction of improvements at the intersections of Dublin Boulevard at Golden Gate Drive and St. Patrick Way at Golden Gate Drive. This is a Western Dublin Transportation Impact Fee Program project designed to relieve congestion, reduce greenhouse gases, and is an Active Transportation Solution. The project is identified in the Downtown Dublin Specific Plan and the Bicycle and Pedestrian Plan. The improvements may include a new traffic signal at the intersection of St. Patrick Way and Golden Gate Drive, traffic signal modifications at the intersection of Dublin Boulevard at Golden Gate Drive, conversion of signal interconnection from copper to fiber optic, signage, striping and markings, necessary green stormwater infrastructure, and modifications or adjustments to utility, pavement, curb, gutter, ADA curb ramps, and sidewalk. The project will also consider improvements at the BART driveway south of the Enea property.  Potential other future funding sources will be needed.  Details Type of Project:Improvements Capital Cost FY2027 Budget $0 Total Budget (all years) $3.5M Project Total (to date) $4 .45M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $609,000 $0 $0 $100,000 $2,500,000 $0 $0 $3,209,000 9200 - Contract Services $300,000 $0 $0 $750,000 $0 $0 $0 $1,050,000 9100 - Salaries & Benefits $42,640 $0 $0 $150,000 $0 $0 $0 $192,640 Total $951,640 $0 $0 $1,000,000 $2,500,000 $0 $0 $4,451,640 Golden Gate Drive Intersection Improvements - Dublin Blvd and St. Patrick Way 2026-2031 Five-Year Capital Improvement Program | Dublin Page 111 322 Funding Sources FY2027 Budget $0 Total Budget (all years) $3.5M Project Total (to date) $4 .45M Project Timeline ●07/1/2025 The project was in the preliminary design and planning phase. ●07/1/2026 This project is anticipated to begin design in 2028. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9998 - Unidentified $0 $0 $0 $0 $2,500,000 $0 $0 $2,500,000 4304 - Western Dublin Transportation Impact Fee $951,640 $0 $0 $1,000,000 $0 $0 $0 $1,951,640 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $0 $0 $0 $0 $0 $0 $0 $0 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $0 $0 $0 $0 $0 $0 $0 $0 Total $951,640 $0 $0 $1,000,000 $2,500,000 $0 $0 $4,451,640 Golden Gate Drive Intersection Improvements - Dublin Blvd and St. Patrick Way 2026-2031 Five-Year Capital Improvement Program | Dublin Page 112 323 Green Stormwater Infrastructure Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0121 Project Location Description This project provides for the planning, design, and construction of various citywide projects that will improve water quality and provide other environmental benefits in accordance with the Green Stormwater Infrastructure (GSI) Plan. The GSI Plan and associated projects along with trash load reduction requirements are mandated by the Municipal Regional Stormwater Permit (MRP). Projects include stormwater full trash capture device installation throughout the city, and construction of GSI along the Iron Horse Regional Trail corridor, south of Amador Valley Boulevard. The City and Alameda County Transportation Commission (CTC) entered into Cooperative Agreements in February 2023, and April 2024, to partner on the design, environmental permitting, and construction phases for a bio-retention and hydromodification management facility along the Iron Horse Regional Trail corridor, south of Amador Valley Boulevard, that satisfies a portion of the City's GSI requirement and Alameda CTC's project, SR84 Expressway Widening and SR84/I-680 Interchange Improvements.  Alameda CTC's share of the costs is 75% of the total, which will be reimbursed to the City after expenditure. Both agencies will enter into a subsequent agreement for the maintenance phase. The "Other County Reimbursement" funding is from Alameda CTC. Details Type of Project:Improvements Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $4 .21M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $2,958,670 $0 $0 $0 $0 $0 $0 $2,958,670 9200 - Contract Services $1,082,053 $0 $0 $0 $0 $0 $0 $1,082,053 9100 - Salaries & Benefits $156,340 $0 $0 $0 $0 $0 $0 $156,340 9500 - Miscellaneous $12,000 $0 $0 $0 $0 $0 $0 $12,000 Total $4,209,063 $0 $0 $0 $0 $0 $0 $4,209,063 Green Stormwater Infrastructure 2026-2031 Five-Year Capital Improvement Program | Dublin Page 113 324 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $4 .21M Project Timeline ●06/18/2019 The City Council approved the Green Stormwater Infrastructure Plan. ●07/1/2021 The project planning phase began. ●02/7/2023 The City of Dublin and Alameda CTC approved and entered into a cooperative agreement for the design and environmental permitting phases. ●04/16/2024 The City of Dublin and Alameda CTC approved and entered into a cooperative agreement for the construction of the improvements. ●07/1/2025 The project construction and installation of 80 stormwater full trash capture devices was completed. The project construction of GSI along the Iron Horse Regional Trail corridor was underway. ●07/1/2026 Construction of the GSI improvements along the Iron Horse Regional Trail will be completed in 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9901 - Other County Reimbursement $2,335,687 $0 $0 $0 $0 $0 $0 $2,335,687 1101 - General Fund Designated Reserve $1,823,376 $0 $0 $0 $0 $0 $0 $1,823,376 2203 - Transportation Development Act $50,000 $0 $0 $0 $0 $0 $0 $50,000 Total $4,209,063 $0 $0 $0 $0 $0 $0 $4,209,063 Green Stormwater Infrastructure 2026-2031 Five-Year Capital Improvement Program | Dublin Page 114 325 Iron Horse Trail Bridge at Dublin Boulevard Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0118 Project Location Description This project provides for the planning, design, and construction of the Iron Horse Trail bridge for bicycles and pedestrians over Dublin Boulevard. The project will construct a 230-foot clear span truss arch bridge consistent with the Iron Horse Trail Feasibility Study and preliminary bridge design. The bridge will provide safer and easier trail access, including access to and from the Dublin-Pleasanton BART station. The Alameda CTC approved an allocation of $1,294,000 of Measure BB discretionary funds in Fiscal Year 2017-18 for the bridge design and environmental clearance. In June 2019, Alameda CTC approved additional funding in the amount of $4,751,000 of Measure BB and $856,419 of Transportation for Clean Air funds for the construction phase of the project. The project will also receive funding of $1,000,000 for construction from a Developer contribution from the Boulevard Project. In fall of 2020, BART approved $1,500,000 of Measure RR Safe Routes to BART Grant for the construction phase of the project along with $600,000 of Tri-Valley Transportation Council Grants. Details Type of Project:Other Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $14 .1M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $11,416,979 $0 $0 $0 $0 $0 $0 $11,416,979 9200 - Contract Services $2,469,540 $0 $0 $0 $0 $0 $0 $2,469,540 9100 - Salaries & Benefits $155,460 $0 $0 $0 $0 $0 $0 $155,460 9500 - Miscellaneous $12,460 $0 $0 $0 $0 $0 $0 $12,460 Total $14,054,439 $0 $0 $0 $0 $0 $0 $14,054,439 Iron Horse Trail Bridge at Dublin Boulevard 2026-2031 Five-Year Capital Improvement Program | Dublin Page 115 326 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $14 .1M Project Timeline ●11/7/2017 The City Council approved the Iron Horse Trail Feasibility Study and preliminary bridge design. ●11/23/2024 The bridge and trail section over Dublin Boulevard was opened and dedicated. ●07/1/2026 The project construction along the southwest limits adjacent Scarlett Drive extension is anticipated to be completed in 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2217 - Measure BB Grants $6,045,000 $0 $0 $0 $0 $0 $0 $6,045,000 2218 - Measure RR $1,500,000 $0 $0 $0 $0 $0 $0 $1,500,000 4401 - Dublin Crossing Development Fee $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 2220 - Road Maint. & Rehab Account (RMRA)$970,000 $0 $0 $0 $0 $0 $0 $970,000 2207 - Transportation for Clean Air $856,419 $0 $0 $0 $0 $0 $0 $856,419 2201 - State Gas Tax $845,040 $0 $0 $0 $0 $0 $0 $845,040 2922 - Tri-Valley Transportation Council Grants $600,000 $0 $0 $0 $0 $0 $0 $600,000 2204 - Measure B Sales Tax - Local Streets Fund (Alameda CTC) $587,980 $0 $0 $0 $0 $0 $0 $587,980 4301 - Eastern Dublin Transportation Impact Fee $500,000 $0 $0 $0 $0 $0 $0 $500,000 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $400,000 $0 $0 $0 $0 $0 $0 $400,000 2205 - Measure B Sales Tax - Bike & Ped. Fund (Alameda CTC) $400,000 $0 $0 $0 $0 $0 $0 $400,000 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $300,000 $0 $0 $0 $0 $0 $0 $300,000 1101 - General Fund Designated Reserve $50,000 $0 $0 $0 $0 $0 $0 $50,000 1001 - General Fund $0 $0 $0 $0 $0 $0 $0 $0 Total $14,054,439 $0 $0 $0 $0 $0 $0 $14,054,439 Iron Horse Trail Bridge at Dublin Boulevard 2026-2031 Five-Year Capital Improvement Program | Dublin Page 116 327 Local Street Resurfacing at I580 Interchanges Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number STNEW02 Project Location Description This project provides for the design and construction of local city street segments within the Caltrans I-580 corridor. These segments are located within Caltrans right-of-way but are maintained by the City per a maintenance agreement. Th project includes installation or reconfiguration of bike and vehicle lanes, as well as upgrades to pedestrian curb ramps. The project will also evaluate existing roadway structural sections to determine whether a more robust pavement design should be implemented to accommodate current traffic patterns and support long-term roadway performance. Details Type of Project:Renovation Capital Cost FY2027 Budget $500K Total Budget (all years) $6M Project Total $6M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $0 $0 $4,800,000 $0 $0 $0 $0 $4,800,000 9200 - Contract Services $0 $400,000 $600,000 $0 $0 $0 $0 $1,000,000 9100 - Salaries & Benefits $0 $100,000 $50,000 $0 $0 $0 $0 $150,000 9500 - Miscellaneous $0 $0 $50,000 $0 $0 $0 $0 $50,000 Total $0 $500,000 $5,500,000 $0 $0 $0 $0 $6,000,000 Local Street Resurfacing at I580 Interchanges 2026-2031 Five-Year Capital Improvement Program | Dublin Page 117 328 Funding Sources FY2027 Budget $500K Total Budget (all years) $6M Project Total $6M Project Timeline ●07/1/2026 This project is anticipated to begin in 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9998 - Unidentified $0 $0 $5,000,000 $0 $0 $0 $0 $5,000,000 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $0 $500,000 $500,000 $0 $0 $0 $0 $1,000,000 Total $0 $500,000 $5,500,000 $0 $0 $0 $0 $6,000,000 Local Street Resurfacing at I580 Interchanges 2026-2031 Five-Year Capital Improvement Program | Dublin Page 118 329 San Ramon Road Trail Lighting Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0514 Project Location Description This project provides for the design and construction of improvements to the trail light fixtures between Silvergate Drive and Alcosta Boulevard. In prior years, the project included installation of tree root barriers and repair of portions of the asphalt concrete trail, which were completed with other CIP Projects (ST0514 - Storm Drain Bypass San Ramon Road, ST0117 - Annual Street Resurfacing, and ST0517 - Citywide Bicycle and Pedestrian Improvements). Details Type of Project:Renovation Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $173K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $173K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $119,891 $0 $0 $0 $0 $0 $0 $119,891 9200 - Contract Services $31,142 $0 $0 $0 $0 $0 $0 $31,142 9100 - Salaries & Benefits $21,378 $0 $0 $0 $0 $0 $0 $21,378 9500 - Miscellaneous $1,050 $0 $0 $0 $0 $0 $0 $1,050 Total $173,461 $0 $0 $0 $0 $0 $0 $173,461 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1001 - General Fund $173,461 $0 $0 $0 $0 $0 $0 $173,461 Total $173,461 $0 $0 $0 $0 $0 $0 $173,461 San Ramon Road Trail Lighting 2026-2031 Five-Year Capital Improvement Program | Dublin Page 119 330 Project Timeline ●06/30/2022 The trail lighting improvement portion of the project was completed in 2022. ●07/1/2025 A portion of the pole painting was completed in conjunction with the Dublin Ranch Street Light Improvements, CIP No. ST0477. ●07/1/2026 The painting of remaining streetlight poles is anticipated to begin in 2028. San Ramon Road Trail Lighting 2026-2031 Five-Year Capital Improvement Program | Dublin Page 120 331 Tassajara Road Improvements - Nor th Dublin Ranch Drive to Quarry Lane School Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0119 Project Location Description This project provides for design and construction to complete the street improvements on Tassajara Road, from North Dublin Ranch Drive to Quarry Lane School. The scope of this project was previously included as part of CIP No. ST0116 - Tassajara Road Realignment & Widening (ST0116), which includes the design and construction of Tassajara Road from North Dublin Ranch Drive to Dublin's northern limit. In 2019, the scope of ST0116 was revised to only include the segment of Tassajara Road north of Fallon Road. The project will improve Tassajara Road to a four-lane arterial standard, with bike lanes, sidewalks, landscaped median, stormwater treatment areas, and other associated street improvements. Portions of the existing roadway have been improved by adjacent development projects, and this project will complete the street improvements implementing the General Plan and the Complete Streets Policy. This roadway segment is a project within the Eastern Dublin Transportation Impact Fee program. Preliminary engineering and environmental documentation were completed as part of ST0116. Details Type of Project:Improvements Capital Cost FY2027 Budget $1.5M Total Budget (all years) $1.5M Project Total (to date) $16.5M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $11,840,000 $1,500,000 $0 $0 $0 $0 $0 $13,340,000 9200 - Contract Services $2,169,660 $0 $0 $0 $0 $0 $0 $2,169,660 9300 - Land/Right-of-way $436,300 $0 $0 $0 $0 $0 $0 $436,300 9500 - Miscellaneous $418,000 $0 $0 $0 $0 $0 $0 $418,000 9100 - Salaries & Benefits $136,040 $0 $0 $0 $0 $0 $0 $136,040 Total $15,000,000 $1,500,000 $0 $0 $0 $0 $0 $16,500,000 Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School 2026-2031 Five-Year Capital Improvement Program | Dublin Page 121 332 Funding Sources FY2027 Budget $1.5M Total Budget (all years) $1.5M Project Total (to date) $16.5M Project Timeline ●07/1/2025 The project right-of-way acquisition was completed in 2025. ●07/1/2026 The project design is complete with construction anticipated to begin in 2026. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4306 - Tri-Valley Transportation Development Fee $5,500,000 $0 $0 $0 $0 $0 $0 $5,500,000 4301 - Eastern Dublin Transportation Impact Fee $3,848,020 $0 $0 $0 $0 $0 $0 $3,848,020 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $500,000 $1,500,000 $0 $0 $0 $0 $0 $2,000,000 4305 - Traffic Impact Fee - Dougherty Valley $1,500,000 $0 $0 $0 $0 $0 $0 $1,500,000 2922 - Tri-Valley Transportation Council Grants $1,450,000 $0 $0 $0 $0 $0 $0 $1,450,000 2201 - State Gas Tax $1,201,980 $0 $0 $0 $0 $0 $0 $1,201,980 2217 - Measure BB Grants $872,000 $0 $0 $0 $0 $0 $0 $872,000 2207 - Transportation for Clean Air $128,000 $0 $0 $0 $0 $0 $0 $128,000 Total $15,000,000 $1,500,000 $0 $0 $0 $0 $0 $16,500,000 Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School 2026-2031 Five-Year Capital Improvement Program | Dublin Page 122 333 Tassajara Road Realignment and Widening - Fallon Road to North City Limit Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0116 Project Location Description The project provides for the planning and preliminary engineering to define a new roadway alignment, design cross-section, right-of-way, and environmental clearance for Tassajara Road between North Dublin Ranch Drive and the City and Contra Costa County limits. The project also provides for the design and construction of a realigned Tassajara Road from Fallon Road to the northern city limit, which will be coordinated with Contra Costa County. Planning and preliminary engineering costs will be split in accordance with the Memorandum of Understanding. Costs for the design and construction will be agreed upon and split proportionally with the work within each jurisdiction. The City and Contra Costa County executed a Joint Exercise Powers Agreement (JEPA) in September 2020 for Contra Costa County to lead the project design, which started in January 2021. The design and construction of the southerly Tassajara Road segment is included in another Capital Improvement Program project, Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School (ST0119). This project will also widen Tassajara Road to a four-lane arterial standard with bike lanes, sidewalks, landscaped median, stormwater treatment areas, and other associated street improvements. Segments of the existing roadway have been improved by adjacent development projects. This project will complete the street improvements and realign the remaining segments of the existing roadway to improve safety and achieve better circulation while adhering to the Complete Streets Policy. The roadway segment is a project within both the Tri-Valley Transportation Council Strategic Expenditure Plan (Project B-8) and the Eastern Dublin Transportation Impact Fee Program. Details Type of Project:Improvements Tassajara Road Realignment and Widening - Fallon Road to North City Limit 2026-2031 Five-Year Capital Improvement Program | Dublin Page 123 334 Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $12.8M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $12.8M Project Timeline ●01/1/2015 The City of Dublin and Contra Costa County approved and entered an MOU for planning and preliminary engineering. ●09/23/2020 The City of Dublin and Contra Costa County executed a JEPA for the County to take the lead in the design phase. ●01/1/2021 The preliminary design began. ●01/1/2025 The project was in design. ●07/1/2026 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $8,072,476 $0 $0 $0 $0 $0 $0 $8,072,476 9300 - Land/Right-of-way $1,980,000 $0 $0 $0 $0 $0 $0 $1,980,000 9200 - Contract Services $1,924,149 $0 $0 $0 $0 $0 $0 $1,924,149 9500 - Miscellaneous $495,313 $0 $0 $0 $0 $0 $0 $495,313 9100 - Salaries & Benefits $305,478 $0 $0 $0 $0 $0 $0 $305,478 Total $12,777,416 $0 $0 $0 $0 $0 $0 $12,777,416 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 4301 - Eastern Dublin Transportation Impact Fee $6,008,739 $0 $0 $0 $0 $0 $0 $6,008,739 4305 - Traffic Impact Fee - Dougherty Valley $3,964,338 $0 $0 $0 $0 $0 $0 $3,964,338 2922 - Tri-Valley Transportation Council Grants $1,000,000 $0 $0 $0 $0 $0 $0 $1,000,000 2220 - Road Maint. & Rehab Account (RMRA)$692,059 $0 $0 $0 $0 $0 $0 $692,059 4306 - Tri-Valley Transportation Development Fee $503,017 $0 $0 $0 $0 $0 $0 $503,017 4303 - Traffic Impact Fee - Category 3 $409,263 $0 $0 $0 $0 $0 $0 $409,263 2201 - State Gas Tax $200,000 $0 $0 $0 $0 $0 $0 $200,000 Total $12,777,416 $0 $0 $0 $0 $0 $0 $12,777,416 Tassajara Road Realignment and Widening - Fallon Road to North City Limit 2026-2031 Five-Year Capital Improvement Program | Dublin Page 124 335 The project design and permitting are anticipated to be completed with construction anticipated to begin in 2028. Tassajara Road Realignment and Widening - Fallon Road to North City Limit 2026-2031 Five-Year Capital Improvement Program | Dublin Page 125 336 Traffic Signal and Roadway Safety Improvements Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0123 Project Location Description This project will provide for feasibility, design, construction, and modification of traffic signals and roadway safety improvements at locations prioritized and recommended by Local Roadway Safety Plan (LRSP). Improvements include upgrading the signal equipment such as traffic signal poles/mast arms, vehicle and pedestrian signal heads, signal controllers, cabinet upgrades, streetlighting/safety lighting, signal phasing and timing changes, signing and striping, and other alternatives identified in the LRSP toolbox and under systemic and site recommendations. The project will also provide for evaluating the design and installation of protected intersection elements. Details Type of Project:Improvements Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $170K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9200 - Contract Services $149,200 $0 $0 $0 $0 $0 $0 $149,200 9100 - Salaries & Benefits $20,800 $0 $0 $0 $0 $0 $0 $20,800 Total $170,000 $0 $0 $0 $0 $0 $0 $170,000 Traffic Signal and Roadway Safety Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 126 337 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $170K Project Timeline ●01/31/2023 The City Council approved the LRSP. ●07/1/2025 The project installed yellow retroreflective borders at 14 intersections that were identified in the LRSP. ●07/1/2026 Future LRSP project implementations will be incorporated into upcoming improvement projects. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $85,000 $0 $0 $0 $0 $0 $0 $85,000 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $85,000 $0 $0 $0 $0 $0 $0 $85,000 1001 - General Fund $0 $0 $0 $0 $0 $0 $0 $0 Total $170,000 $0 $0 $0 $0 $0 $0 $170,000 Traffic Signal and Roadway Safety Improvements 2026-2031 Five-Year Capital Improvement Program | Dublin Page 127 338 Traffic Signal Re-Lamping Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0223 Project Location Description This project provides for the replacement of the traffic signal and pedestrian signal LED lamps at approximately 78 signalized intersections. The City currently has 98 traffic signals, many of which were installed in 2008, and the LED lamps are reaching the end of their useful life, which is typically eight-to-ten years. The City has replaced 20 signalized intersection lamps through on-going maintenance efforts. New LED lamps will ensure proper visibility of vehicle and pedestrian signal heads, which is critical for maintaining safe traffic flow. Details Type of Project:Replacement Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $647K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $564,600 $0 $0 $0 $0 $0 $0 $564,600 9200 - Contract Services $70,000 $0 $0 $0 $0 $0 $0 $70,000 9100 - Salaries & Benefits $12,480 $0 $0 $0 $0 $0 $0 $12,480 Total $647,080 $0 $0 $0 $0 $0 $0 $647,080 Traffic Signal Re-Lamping 2026-2031 Five-Year Capital Improvement Program | Dublin Page 128 339 Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total (to date) $647K Project Timeline ●07/1/2025 Project construction began. ●07/1/2026 The re-lamping of green lights was completed. The project continues to re-lamp the traffic signals and is expected to be completed in 2027. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 2212 - Vehicle Registration Fee (Alameda CTC)$260,000 $0 $0 $0 $0 $0 $0 $260,000 2201 - State Gas Tax $237,080 $0 $0 $0 $0 $0 $0 $237,080 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $100,000 $0 $0 $0 $0 $0 $0 $100,000 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $50,000 $0 $0 $0 $0 $0 $0 $50,000 Total $647,080 $0 $0 $0 $0 $0 $0 $647,080 Traffic Signal Re-Lamping 2026-2031 Five-Year Capital Improvement Program | Dublin Page 129 340 Village Parkway Reconstruction Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Streets CIP Projects Type Capital Improvement Project Type Streets Project Number ST0323 Project Location Description This project provides for the planning, design, and construction of the replacement of the existing streetscape elements on Village Parkway between Amador Valley Boulevard and the northern city limit (approximately 6,000 linear feet). The project will transform the segment of Village Parkway between Amador Valley Boulevard and Kimball Avenue into a pedestrian and bicycle friendly roadway incorporating complete streets elements such as median islands, bulbouts, decorative or high visibility crosswalks, and street lighting. The work includes the reconstruction of the median island, reconstruction of the roadway base immediately adjacent to the median island, reconstruction necessary for sidewalks improvements, Americans with Disabilities Act (ADA) upgrades to curb ramps, curb, gutter, necessary utility work, landscaping, stormwater improvements, and new roadway pavement.  The project also includes the replacement of the city entrance monument sign at Village Parkway median at Kimball Avenue, as well as intersection improvements at Village Parkway and Amador Valley Boulevard, removal of slip lanes, curb ramp upgrades, crosswalk realignment, and traffic signal modification.  Details Type of Project:Renovation Capital Cost FY2027 Budget $3.3M Total Budget (all years) $27.3M Project Total (to date) $40M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 9400 - Improvements $10,000,000 $2,700,000 $18,450,000 $0 $0 $0 $0 $31,150,000 9200 - Contract Services $2,505,048 $510,560 $5,000,000 $0 $0 $0 $0 $8,015,608 9100 - Salaries & Benefits $159,432 $89,440 $500,000 $0 $0 $0 $0 $748,872 9500 - Miscellaneous $85,520 $0 $0 $0 $0 $0 $0 $85,520 Total $12,750,000 $3,300,000 $23,950,000 $0 $0 $0 $0 $40,000,000 Village Parkway Reconstruction 2026-2031 Five-Year Capital Improvement Program | Dublin Page 130 341 Funding Sources FY2027 Budget $3.3M Total Budget (all years) $27.3M Project Total (to date) $40M Project Timeline ●02/20/2024 The City Council approved the Concept Plan and approved the recommendation to add replacement of the neighborhood concrete waIls to the project. ●05/22/2025 The project received grants funding in the amount of $9,150,000 from the State Transportation Improvement Program, which will be allocated in Fiscal Year 2027-28. The project also received grant funding in the amount of $7,275,000 in Measure BB funds and $285,000 in VRF funds, which will be allocated in Fiscal Year 2027-28. ●07/1/2025 The project was in design. ●07/1/2026 The project design and permitting are anticipated to be completed in 2027, with construction to begin in 2028. Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total 1101 - General Fund Designated Reserve $12,200,000 $2,800,000 $4,500,000 $0 $0 $0 $0 $19,500,000 9997 - Other $0 $0 $9,150,000 $0 $0 $0 $0 $9,150,000 9998 - Unidentified $0 $0 $8,800,000 $0 $0 $0 $0 $8,800,000 2217 - Measure BB Grants $0 $0 $1,215,000 $0 $0 $0 $0 $1,215,000 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $250,000 $200,000 $0 $0 $0 $0 $0 $450,000 2201 - State Gas Tax $300,000 $100,000 $0 $0 $0 $0 $0 $400,000 2924 - VRF (ACTC) Grants $0 $0 $285,000 $0 $0 $0 $0 $285,000 1001 - General Fund $0 $200,000 $0 $0 $0 $0 $0 $200,000 Total $12,750,000 $3,300,000 $23,950,000 $0 $0 $0 $0 $40,000,000 Village Parkway Reconstruction 2026-2031 Five-Year Capital Improvement Program | Dublin Page 131 342 Unfunded - Future Projects FY27 - FY31 Unfunded - Future Projects Projects (including Historical Budgeted, Future Budgeted) City Entrance Signs $510,000 0.56% Dublin Sports Grounds - Phase 5 Renovation $2,750,000 3.01% Eastern Dublin Transportation Impact Fee $61,750,000 67.59% Emerald Glen Recreation and Aquatic Complex - Phase 2 $17,600,000 19.26% Western Dublin Transportation Impact Fee $8,750,000 9.58% 000 000 000 000 000 000 $91M$91M$91M Historical Budgeted 2027 2028 2029 2030 2031 Future Budgeted 0 $25M $50M $75M $100M Summary of Requests Project No. / Category Historical BudgetedFY2027FY2028FY2029FY2030FY2031 Future Budgeted Total S-01 City Entrance Signs $0 $0 $0 $0 $0 $0 $510,000 $510,000 P-01 Dublin Sports Grounds - Phase 5 Renovation $0 $0 $0 $0 $0 $0 $2,750,000 $2,750,000 S-02 Eastern Dublin Transportation Impact Fee $0 $0 $0 $0 $0 $0 $61,750,000 $61,750,000 P-02 Emerald Glen Recreation and Aquatic Complex - Phase 2 $0 $0 $0 $0 $0 $0 $17,600,000 $17,600,000 S-03 Western Dublin Transportation Impact Fee $0 $0 $0 $0 $0 $0 $8,750,000 $8,750,000 Total Summary of Requests $0 $0 $0 $0 $0 $0 $91,360,000 $91,360,000 Unfunded - Future Projects 2026-2031 Five-Year Capital Improvement Program | Dublin Page 132 343 City Entrance Signs Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Works Type Other Project Type Unfunded - Future Projects Project Number S-01 Project Location Description This project provides for the design and construction to install City entrance signs at the San Ramon Road median at Alcosta Boulevard, Schaefer Ranch Road at Dublin Boulevard, Tassajara Road north of Fallon Road, Dublin Boulevard and San Ramon Road (Downtown gateway), Fallon Road at Dublin Boulevard, and Dublin Boulevard at the eastern city limit. The new signs will conform to the Streetscape Master Plan and will match the existing granite monument signs currently installed throughout the city. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total $510K Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total $510K Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Estimated Costs $0 $0 $0 $0 $0 $0 $510,000 $510,000 Total $0 $0 $0 $0 $0 $0 $510,000 $510,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Unidentified $0 $0 $0 $0 $0 $0 $510,000 $510,000 Total $0 $0 $0 $0 $0 $0 $510,000 $510,000 City Entrance Signs 2026-2031 Five-Year Capital Improvement Program | Dublin Page 133 344 Dublin Sports Grounds - Phase 5 Renovation Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Works Type Other Project Type Unfunded - Future Projects Project Number P-01 Project Location Description This project provides for the design and construction to renovate a portion of the Dublin Sports Grounds. The Phase 5 project encompasses approximately 180,000 square feet, west of Soccer Field #3, which includes installation of a sand channel drainage system, irrigation upgrades, and new turf. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total $2.75M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total $2.75M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Estimated Costs $0 $0 $0 $0 $0 $0 $2,750,000 $2,750,000 Total $0 $0 $0 $0 $0 $0 $2,750,000 $2,750,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Unidentified $0 $0 $0 $0 $0 $0 $2,750,000 $2,750,000 Total $0 $0 $0 $0 $0 $0 $2,750,000 $2,750,000 Dublin Sports Grounds - Phase 5 Renovation 2026-2031 Five-Year Capital Improvement Program | Dublin Page 134 345 Eastern Dublin Transpor tation Impact Fee Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Works Type Other Project Type Unfunded - Future Projects Project Number S-02 Project Location 100 Civic Plaza Description This project provides for the design and construction of 15 projects being partially funded by the Eastern Dublin Transportation Impact Fee (EDTIF) program. The City Council established the EDTIF program in January 1995 and adopted the most recent update in December 2021. This project does not include completed EDTIF projects, current projects that are individual CIP projects, or current projects to be constructed by developers. EDTIF projects within the five-year capital improvement program are ST0116 Tassajara Road Realignment & Widening, ST0119 Tassajara Road Improvements - North Dublin Ranch Drive to Quarry Lane School, and ST0216 Dublin Boulevard Extension. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total $61.8M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total $61.8M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Estimated Costs $0 $0 $0 $0 $0 $0 $61,750,000 $61,750,000 Total $0 $0 $0 $0 $0 $0 $61,750,000 $61,750,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Unidentified $0 $0 $0 $0 $0 $0 $61,750,000 $61,750,000 Total $0 $0 $0 $0 $0 $0 $61,750,000 $61,750,000 Eastern Dublin Transportation Impact Fee 2026-2031 Five-Year Capital Improvement Program | Dublin Page 135 346 Emerald Glen Recreation and Aquatic Complex - Phase 2 Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Works Type Other Project Type Unfunded - Future Projects Project Number P-02 Project Location Description This project provides for the design and construction of the final phase of the Emerald Glen Recreation and Aquatic Complex (The Wave). Amenities include a community room and gymnasium space. This project may be modified as the City has entered into an agreement for a joint use gymnasium at the Dublin Crossing school site. Until such time, it will remain as a future project. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total $17.6M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total $17.6M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Estimated Costs $0 $0 $0 $0 $0 $0 $17,600,000 $17,600,000 Total $0 $0 $0 $0 $0 $0 $17,600,000 $17,600,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Unidentified $0 $0 $0 $0 $0 $0 $17,600,000 $17,600,000 Total $0 $0 $0 $0 $0 $0 $17,600,000 $17,600,000 Emerald Glen Recreation and Aquatic Complex - Phase 2 2026-2031 Five-Year Capital Improvement Program | Dublin Page 136 347 Western Dublin Transportation Impact Fee Overview Request Owner Michael Boitnott, Capital Improvement Program Manager Department Public Works Type Other Project Type Unfunded - Future Projects Project Number S-03 Project Location 100 Civic Plaza Description This project provides for the design and construction of eight projects being partially funded by the Western Dublin Transportation Impact Fee (WDTIF) program. The City Council adopted an update to the WDTIF in September 2016. The WDTIF program includes a total of nine projects, however two projects are within the five-year capital improvement program, which are ST0815 - Amador Plaza Road Bicycle and Pedestrian Improvements, and ST0423 - Golden Gate Drive Intersection Improvements - Dublin Boulevard and St. Patrick Way. Capital Cost FY2027 Budget $0 Total Budget (all years) $0 Project Total $8.75M Funding Sources FY2027 Budget $0 Total Budget (all years) $0 Project Total $8.75M Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Estimated Costs $0 $0 $0 $0 $0 $0 $8,750,000 $8,750,000 Total $0 $0 $0 $0 $0 $0 $8,750,000 $8,750,000 Detailed Breakdown Category Historical Budgeted FY2027 Requested FY2028 Requested FY2029 Requested FY2030 Requested FY2031 Requested Future Budgeted Total Unidentified $0 $0 $0 $0 $0 $0 $8,750,000 $8,750,000 Total $0 $0 $0 $0 $0 $0 $8,750,000 $8,750,000 Western Dublin Transportation Impact Fee 2026-2031 Five-Year Capital Improvement Program | Dublin Page 137 348 Budget Change Reference #: From Un-Appropriated Reserves Budget Transfer Between Funds From Designated Reserves x Account Amount Account Amount ST0121.1101 $450,000 ST0121.9400.9401 $300,000 ST0121.9200.9201 $120,000 ST0121.9100.9101 $30,000 4/21/2026 Posted By:Date: City Council's Approval Required ST0121 - Green Stormwater Infrastructure Project - Salaries & Benefits **********Finance Use Only********** CITY OF DUBLIN To advance $450,000 for the Green Stormwater Infrastructure project, #ST0121, that was originally budgeted in Fiscal Year 2026-27 to the current Fiscal Year, 2025-26. This advance will allow for additional treatment facilities proposed in other areas of the City to begin sooner, address additional compliance items, and demonstrate fiscal readiness to help secure potential grant opportunities. These costs are funded by the Climate Action Plan Reserve, which has available funding to allow the advance. REASON FOR BUDGET CHANGE FISCAL YEAR 2025-26 BUDGET CHANGE FORM DECREASE BUDGET AMOUNT INCREASE BUDGET AMOUNT ST0121 - Green Stormwater Infrastructure Project - General Fund Reserve - Climate Action Plan Reserve ST0121 - Green Stormwater Infrastructure Project - Improvements ST0121 - Green Stormwater Infrastructure Project - Contract Services Attachment 2 349 Proposed Five-Year Capital Improvement Program 2026-2031 April 21,2026 350 Capital Improvement Program •A Capital Improvement Program (CIP) is a five-year planning document used by the City to identify and establish budgets for capital improvement projects. •CIP project budgets are funded from various funding sources, including General Fund, Impact Fees, Assessment Districts, and Grants. •CIP is adopted every two years. •CIP funding is annually appropriated, coinciding with the City Budget process. 351 Background and Schedule •Five-Year CIP drafted every two years to coincide with the City’s two-year budget process •March 6 –Preliminary Budget and CIP presented at the City Council Strategic Planning Workshop •March 12 –Heritage and Cultural Arts Commission reviewed related CIP projects •March 16 –Parks and Community Services Commission reviewed related CIP projects •April 21 –Draft Proposed CIP presented at City Council •May 12 –CIP to be presented to Planning Commission •June 2 –CIP to be adopted by City Council 352 2026-2031 Capital Improvement Program 353 Dublin Arts Center 354 Exterior Improvements 355 2026-2031 Capital Improvement Program – General Improvements 356 Camp Parks Sign 357 2026-2031 Capital Improvement Program – Public Art PROJECT NAME PRIOR YEARS 2026-2027 BUDGET 2027-2028 2028-2029 2029-2030 2030-2031 FUTURE YEARS TOTAL Downtown Dublin $1,250,000 $250,000 $1,500,000 Outdoor Murals $200,000 $200,000 TOTAL $1,450,000 $250,000 $0 $0 $0 $0 $0 $1,700,000 358 Wallis Ranch Community Park 359 Forest Park 360 2026-2031 Capital Improvement Program – Parks 361 Annual Street Resurfacing 362 Safe Routes to Schools 363 2026-2031 Capital Improvement Program – Streets 364 2026-2031 Capital Improvement Program – Funding Sources 365 Future Projects & Costs Beyond Five-Year CIP •Corporation Yard Equipment Wash Pad * •Electric Vehicle (EV) Charging Stations (Future Phase) •Waste Enclosure Upgrades * •Downtown Dublin Town Square Park •Dublin Sports Grounds –Phase 5 Renovation* •Emerald Glen Rec & Aquatic Complex -Phase 2* •Sports Courts Resurfacing •City Entrance Signs* •Downtown Dublin Street Grid Network •Dublin Boulevard Extension •Eastern Dublin Transportation Impact Fee Projects* •Western Dublin Transportation Impact Fee Projects* * Future Projects Beyond 5-year Timeframe. 366 Staff Recommendation •Receive the report. •Approve Budget Change Advancing Funding for the Green Stormwater Infrastructure Project, CIP No. ST0121. •Provide Direction to Staff on the Five-Year Capital Improvement Program 2026-2031. 367