HomeMy WebLinkAboutPC Reso 89-038 PA 89-058 Southern Pacific Pipelines request to construct Pump station and power and control center building RESOLUTION NO. 89 - 038
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
APPROVING PA 89-058 SOUTHERN PACIFIC PIPELINES CONDITIONAL USE PERMIT REQUEST
TO CONSTRUCT A GASOLINE PUMP STATION AND POWER AND CONTROL CENTER BUILDING AT
6433 DOUGHERTY ROAD
WHEREAS, Southern Pacific Pipelines filed an application for a
Conditional Use Permit (PA 89-058) to allow the construction of a gasoline pump
station and power and control center in the M-1 District located at 6433
Dougherty Road; and
WHEREAS, Section 8-51.3(b) (Conditional Uses: M-1 District) of the City
Zoning Ordinance identifies outdoor storage yards for equipment and supplies
(if conducted within an area enclosed by a solid wall or fence) as a use which
is permitted subject to the approval of a Conditional Use Permit; and
WHEREAS, this application has been reviewed in accordance with the
provisions of the California Environmental Quality Act and a Negative
Declaration has been adopted (Planning Commission Resolution No. 89-037) for
this project as it will not have a significant effect on the environment; and
WHEREAS, notice of the public hearing was published in the Herald, posted
in public buildings, and mailed to property owners within 300 feet of the
project in accordance with California State Law; and
WHEREAS, a Staff analysis was submitted recommending conditional approval
of the application; and
WHEREAS, the Planning Commission held a public hearing on July 5, 1989 to
consider all reports, recommendations and testimony.
NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does
hereby find that:
a. The use is required by the public need in that it provides for the
improved transport of gasoline throughout the Bay Area.
b. The use will be properly related to other land uses, transportation and
service facilities in the vicinity in that daytime activities will be
commensurate with the present use of properties in the neighborhood.
c. The use, under all circumstances and conditions of this particular case,
will not adversely affect the health or safety of persons residing or
working in the vicinity or be materially detrimental to the public
welfare or injurious to property or improvements in the neighborhood, as
all applicable regulations will be met.
d. The use will not be contrary to the specific intent clauses or
performance standards established for the district in which it is to be
located in that the use meets all applicable performance standards
established for the M-1 District.
BE IT FURTHER RESOLVED THAT THE Planning Commission does hereby
conditionally approve PA 89-058 as shown by the materials labeled Background
Attachments 1 through 5 in the Planning Commission Staff Report dated July 5,
1989 on file with the Dublin Planning Department and subject to the following
conditions.
Unless stated otherwise, all Conditions of Approval shall be complied with
subject to Planning Department review and approval.
1. This approval is for the construction of a gasoline pump station and
power and control center building, stored outside on the Southern Pacific
right-of-way located at 6433 Dougherty Road. The equipment to be stored
on the site includes:
a. One 1250 horsepower and one 1500 horsepower electric motor drive
pumps.
-1-
b. One 20'xll'x12' tall power and control center building.
c. An 8'x8'x8' tall transformer.
2. This Conditional Use Permit shall be valid until July 14, 1991. If
building permits have not been issued by July 14, 1990, this approval
shall expire. The approval period for the Conditional Use Permit may be
extended up to one (1) additional year (Applicant must submit a written
request for the extension prior to the expiration date of the permit) by
the Planning Director upon his determination that the Conditions of
Approval remain adequate to ensure that items a) through d) listed above
as findings will continue to be met.
3. The use shall comply with all applicable Planning, Building and Fire
Department Codes/Regulations/Ordinances.
4. All equipment on this site shall be protected from physical damage and
tampering to the satisfaction of Dougherty Regional Fire Authority staff.
5. No combustibles shall be stored on the site at anytime.
6. No other equipment (other than that listed in Condition #1 above) shall
be stored on the site at anytime.
7. The facility shall be enclosed on all sides by a 6 foot tall vinyl clad
chain link fence using redwood clad throughout, as a complete screening
device.
8. Noise generated by this use shall be controlled so as not to create a
nuisance to the surrounding community. Compliance with noise standards
established in the Dublin General Plan is required.
9. No signing for this use may be placed on the site, fence or building
without first receiving Planning Department approval.
10. This Conditional Use Permit shall be void if any of the terms or
conditions of the permit are violated. Any violation of the terms or
conditions of the permit shall be subject to citation.
11. All conditions of approval listed in Planning Commission Resolution No.
89-039 (approving the Site Development Review for PA 89-058) shall be
fully complied with in conjunction with the approval of this Conditional
Use Permit.
12. This permit shall be revocable for cause in accordance with Section 8-
90.3 of the Dublin Zoning Ordinance.
PASSED, APPROVED AND ADOPTED this 5th day of July, 1989.
AYES: Commissioners Barnes, Burnham, Okun and Zika
NOES: None
ABSENT: Commissioner Mack
Planning Comm s n C erson
Planning Director
-2-