HomeMy WebLinkAboutPC Reso 92-044 PA 92-038 Crosswinds Church est. community Facility within M-1 RESOLUTION NO. 92 - 044
A RESOLUTION OF THE PLANNING COMMISSION
OF THE CITY OF DUBLIN
APPROVING PA 92-038 CROSSWINDS CHURCH CONDITIONAL USE PERMIT
APPLICATION FOR THE ESTABLISHMENT OF A COMMUNITY FACILITY (CHURCH) USE
WITHIN AN M-1, LIGHT INDUSTRIAL DISTRICT AT 6444 SIERRA COURT
WHEREAS, Jack Wallace, on behalf of Crosswinds Church, has filed
an application requesting Conditional Use Permit approval for the
establishment of a community facility (church) within an existing
±40,000 square foot tenant space, in an M-1, Light Industrial
District, located at 6444 Sierra Court; and
WHEREAS, the Planning Commission did hold a public hearing on
said application on August 17, 1992; and
WHEREAS, proper notice of said public hearing was given in all
respects as required by law; and
WHEREAS, the application has been reviewed in accordance with the
provisions of the California Environmental Quality Act (CEQA) and a
Negative Declaration has been adopted (Planning Commission Resolution
No. 92-043). The project will not have a significant effect on the
environment; and
WHEREAS, the Staff Report was submitted recommending that the
application be conditionally approved; and
WHEREAS, the Planning Commission did hear and consider all said
reports, recommendations and testimony hereinabove set forth.
NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning
Commission does hereby find:
A. The proposed church use will serve the public need by providing
increased opportunity for spiritual worship, counseling and
community activities.
B. The proposed church use will be properly related to other land
uses, transportation and service facilities in the immediate
vicinity, as the proposed use will be compatible to said land
uses, transportation and service facilities in the immediate
vicinity.
C. The proposed church use will not materially adversely affect the
health or safety of persons residing or working in the vicinity,
or be materially detrimental to the public welfare or injurious
to property or improvements in the neighborhood, as all
applicable regulations will be met.
D. The proposed church use will not be contrary to the specific
intent clauses or performance standards established for the
district in which it is to be located, as the proposed use is
compatible with the adjacent light industrial district uses.
E. The project is consistent with the policies contained in the
City's General Plan.
n ^
BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does
hereby conditionally approve Conditional Use Permit application PA 92-
038 as shown in Exhibit A, stamped approved and on file with the
Dublin Planning Department, and subject to the following conditions:
CONDITIONS OF APPROVAL:
Unless stated otherwise, all Conditions of Approval shall be complied
with prior to the issuance of building permits or establishment of
use, and shall be subject to Planning Department review and approval.
The following codes represent those departments/agencies responsible
for monitoring compliance of the conditions of approval. [PL]
Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM]
Administration/City Attorney, [FIN] Finance, [F] Dougherty Regional
Fire Authority, [DSR] Dublin San Ramon Services District, [CO] Alameda
County Department of Environmental Health.
1. This approval is for the establishment of a church facility at
6444 Sierra Court as shown on the site plan and floor plan
prepared by Ambiance Associates, dated received August 10, 1992
(Exhibit A) stamped approved. Activities shall be limited to the
following: Services on Sunday; Sunday School; Child-Care during
Services only; Weekday evening activities; and Administrative
Offices. [PL]
2. Prior to the establishment of use the Applicant shall submit to
the Planning Department 1) a letter from the parent church
acknowledging the Crosswinds Church affiliation and 2) a copy of
the parent church articles of religious corporation, or
equivalent, subject to review and approval of the Planning
Director. [PL]
3. All weekday evening meetings shall begin after 6:00 p.m. [PL, PO]
4. The Principal Congregational Meeting Room shall be limited to
7,350 square feet. Should fixed seating be installed within the
Principal Congregational Meeting Room, the maximum seating
capacity shall not exceed 700 seats. [B, PL]
5. Prior to the issuance of a Building Permit, the Applicant shall
submit an attested copy of a "Joint Use Parking Agreement" for
weekend and weekday evening use of 175 on-site parking spaces for
the life of the Church use. The Applicant shall maintain a
minimum of 175 on-site parking spaces at all times throughout the
duration of this use. [PL, B, PO]
6. The Applicant shall comply with the City of Dublin Non-
Residential Security Requirements (attached). [PO]
7. The Applicant shall be responsible for ensuring that project
related noise is maintained in a manner which minimizes the
impacts on surrounding businesses. [PL, B]
8. All signs for this business shall be subject to the provisions of
the Sign Ordinance. [PL]
- 2 -
ess
9. The Applicant shall comply with all applicable requirements of
the Dublin San Ramon Services District, Dougherty Regional Fire
Authority, and Dublin Building Department. [DSR, F, B]
10. The Applicant shall be responsible for clean up and disposal of
project related trash to maintain a clean and litter-free site.
[PL]
11. No loudspeakers or amplified music shall be permitted outside the
enclosed building. [PL]
12. The Applicant shall submit a parking lot striping plan subject to
review and approval of the Planning Director. All parking spaces
shall be double-striped (4 inch wide stripes set 2 feet apart -
see Attachment). Handicapped, employee and compact parking
spaces shall be appropriately identified on the pavement and
designated on the parking plan. [PL]
13. This permit shall be valid for five (5) years, expiring on
August 27, 1997. The approval for the Conditional Use Permit may
be extended an additional two (2) years by the Zoning
Administrator, in compliance with Section 8-94.2 of the Zoning
Ordinance, upon the determination that the conditions are being
complied with and remain adequate to ensure that the stated
findings will continue to be met. The Applicant must submit a
written request for the extension prior to the expiration date of
the permit. [PL]
14. On an annual basis, this use shall be subject to Zoning
Investigator review and determination as to compliance with the
Conditions of Approval. [PL]
15. This approval shall become null and void, in the event the
approved use fails to be established or ceases to operate for a
continuous one year period. [PL]
16. This permit shall be revocable for cause in accordance with
Section 8-90.3 of the Dublin Zoning Ordinance. Any violation of
the terms or conditions of this permit shall be subject to
citation. [PL]
PASSED, APPROVED AND ADOPTED this 17th day of August, 1992.
AYES: Commissioners Barnes, Burnham, and North
NOES: None
ABSENT: Commissioners Rafanelli and Zika
''lann' Commiss' n Chairperson
ATTEST:
_lanning Directo
- 3 -
ABBIANCE
., �,., �,� 4 :a ,• ASSOCIATES
II.;T41 L r
Interior Design•Architecture
OeC,W 1'•J CA& Or,1SA.KMI•. TVr 4. • e'•y p•-o ,e'-a' Ni•)
1
tsr
-9 _-/_ I I I I ICI LI cl`IG • CI CI aI CIc I`lCI�ILI�ICICI�I CI CIOIO IOI- /� - :e 7.1::rr ru::.:u Cl
M CA
'r :H.i n�.o u o ;.a ni- I - III... a Ir.a ...
.o vwTf I b siS v. T T. :o—ri.c I .= ..a...,.,. ...a...,..
f I1II11I1I1J I __ I ", Ii I I
1 eau.
7 :-'7i -' KN lcW.
1
a CROSSIVINDS CHURCH )
�9 BMA SIERRA COURT
R 3 I DUBLIN, CA
6:4 ]
72
t 1
r!,,t. F..V.‘4? 1.'t :14. ,....% i
1 !• K::„ '-‘ r . „ r, = ,
N ♦\
(11 - 'T
H L •a1�. .] l_KW WTtT
j�i� °ie _� U �'�'J, LL'-j �7Yr-l! j "' �'.e.r•ro ro inL>I .�
JI
-a MO.C 1•a 1 4T C�••o' bv.0•1'..' - 1 f6A CITT 9 R.I I ironl 111111111 U`I` fl'I'I`I`I` `I`I`I"I"l"If LIf141`L`I`I`1�I`I`I`I`l`I`I°I`IGI`I`I
M �1
llI I l l I I I I l4 ° `` I l l I l I lui I ._.
♦—I I _ '
It Sr.y 1'o? _ 6•,rH.1 S 6-✓ K.STO.K..,•j'N' n n,••., [YOffvl.Di C...M.N...uu.o,tr.u6..Wsau Silt nw
o ;u gz�3s WIN1,
I,1 SI'I'I. PLAN C ...~•••
• E D.sc
G . _...a REIVED ..
AUG t U 1992 0 _ '
D6yyq s Ic�`
•
AMBIANCE
•
o e o �o 0 0 0 0 0 ASSOCIATES
Interior Design•Architecture
CI
CI
0G9 i� - _.- I _ r. MSs1 14 X 12 %1
L�Or[ ii -- • e••r•rrr Ironr.r•I.•.
J- GAIN xowF- k u G7 n n aezz . r,r.Y.•[.r r.
suits:sr
.. v F i a.a..lxx z :u li v i) Y.I.I u.a u Y u rou...,. .r.n
.az VA aoz zoY [
1i � "
. )
[ [11r.r a I;r, 10Yu
r �H .xrt�,. IX I o
20 Iy l
11
Eel CItOSSIt11NDSCIIURC 1
[nl i�oe.
——--
I - - )Y Is 6444 SIERRA COURT
”,
a
4 I .I��--.—F
J I. J �f•- YIILH[Il Mlwo 0
I'--� 7 �w I O DUDLIN, CA
I 17 rL_' •_-- r a rt_t��� t i== I. 1.Yro 1.'Y)0 -
; '
r0 r)• Yl Y 10 Y')
I f o
I P u I Q-Q y 2�
Z1 I -- • '- --_.— p Gel`o Gil CA •
�z �/ 1 /4r�/U
1( Z �I _ref. •u /3 p wee:o w).)o En)L p RECEIVED
/if/
YJJ Y f 1p O pvA
..<
1
0 0
iii1 p GIfl AUG 1 1992
rg
>o:>o:>. )3 b I �p tI,.lig
D�gLIN PLANNING;
III /tt I.
uw 35 3 14 MA S 0!4/ "Pint L./-
r-l1 Hs u-1Y 200
)1 N 11
LD I:]
sla HSIWI[
IXl`g E I I.
�"�'� L11YP]LYOILIILeOlrY610.80.11 \\ �` in
; r PI [nl Wer 0 •• 6/>HI..,PG L.TY� .
l..•.. 1� r o X 11
•• YUf•I
___IY1--E
•
r,uy Y•w�,',. n•.H 1366t IWO6Y2
I•
Dann•Inaa•x•+-•++ k t'±7
.111.11 LOW[MINCE DISCOHxY'ICH[ fAAOI 2 4 3 G1140(5 I♦e
.....+.......Ana , .u...r H
' � x •oYle## 'YiO° Lx
y• I I
1 == I
LI __ . Ve 1-0
t nzsr ri.00iz �:� _ I
�,_ ' l� i —O r 2
7t- , ' .j i t
`4 L \
1 I; ,
I I .)
„ftoi
.i : !1; -. 3 i ,
1: : 1, _
!, 1
I i I I
` I .
I I
1
Ft_, L, !1 ice.,
---"+?__I Flt-He___,
2..._.-411-1 L.
___
____
• ,_ 11 ,, Q0
.,,v 3 1
ATTACHMENT