Loading...
HomeMy WebLinkAboutItem 6.1 Sunflower Hill at Grace Point STAFF REPORT Planning Commission Page 1 of 10 Agenda Item 6.1 DATE: December 9, 2025 TO: Planning Commission SUBJECT: Sunflower Hill at Grace Pointe (PLPA-004232-2025) Prepared by: Gaspare Annibale, Senior Planner EXECUTIVE SUMMARY: The Applicant, Sunflower Hill in partnership with Satellite Affordable Housing Associates (SAHA), requests approval of a Site Development Review Permit to construct a three -story multi-family apartment building with 59 affordable units for people with intelle ctual and developmental disabilities and one manager’s unit. The development includes a community room, makers space, fitness room, and amenitized central courtyard. The Planning Commission will also consider a determination that the proposed project is co vered by the SCS Dublin Environmental Impact Report (EIR) and no further environmental review is required. STAFF RECOMMENDATION: Disclose ex-parte contacts, conduct the public hearing, deliberate and adopt a Resolution approving a Site Development Review Permit for the Sunflower Hill at Grace Pointe project. DESCRIPTION: Background The Sunflower Hill at Grace Pointe (Grace Pointe) project site is part of the larger Dublin Centre project (formerly known as SCS Dublin). The Dublin Centre (or The DC) project is located on 54 acres between Tassajara Road and Brannigan Street, north of Dublin Boulevard. The DC project by Landsea Homes is a mixed-use development which includes 500 residential units, 105 accessory dwelling units, approximately 38,000 square feet of retail commercial uses, a public park, a community center and a 1.89-acre Public/Semi-Public site for affordable housing, which is the subject of this Staff Report. As shown in Figure 1 below, the project site is located at the northwest corner of Dublin Boulevard and Brannigan Street in Planning Area 2 (PA-2) on a portion of Assessor Parcel Number 985-0051-006-00. The site is generally flat, and the proposed Project will not impact any slopes or other topographic features. The General Plan and Eastern Dublin Specific Plan land use designation is Public/Semi-Public and is zoned Planned Development subject to Ordinance No. 14-22. 9 Page 2 of 10 Figure 1. Project Location In 2022, the City Council approved the SCS Dublin project which included certification of the Final Environmental Impact Report (Resolution No. 135-22), General Plan and Eastern Dublin Specific Plan Amendments (Resolution No. 136-22), and Ordinances approving Planned Development Zoning with Stage 1 and Stage 2 Development Plans and a Development Agreement (Ordinance No. 14-22 and No.15-22). On February 5, 2025, the City Council approved an Affordable Housing Agreement (Resolution No. 10 -25). In accordance with the Development Agreement and Affordable Housing Agreement, Landsea, the developer of the Dublin Centre project, will complete the rough grading of the affordable housing site and associated improvements (i.e. curb, gutter, sidewalk, landscape, irrigation, and access roadways on all sides of the site). Landsea will then dedicate the project site to the City or its designee, which is Sunflower Hill. The City issued the sitework permit for the associated on-site improvements on PA-2 in September 2025. On March 18, 2025, the City Council held a study session to provide Sunflower Hill with the opportunity to share their initial design with City Council. As part of the study session, the City Council provided feedback to soften the white color of the building, include a pet relief area and evaluate the parking demands. Analysis The proposed Grace Pointe project consists of the construction of a three-story multi-family apartment building with 59 affordable units for people with intellectual and developmental disabilities (I/DD) and one manager’s unit. The development includes 36 parking spaces, a community room, makers space, fitness room, and amenitized central courtyard. 10 Page 3 of 10 Site Development Review Permit Pursuant to Dublin Municipal Code (DMC) Section 8.104.040(C)(4), all new principal structures require Planning Commission approval of a Site Development Review (SDR) Permit. In addition, all new multi-family residential development projects are required to comply with the Citywide Multi-Family Objective Design Standards (MFODS). The purpose of the MFODS is to ensure that new multi-family development in Dublin provides high quality architecture, appropriately connects to its surroundings, includes well designed amenities and open spaces, promotes sustainability, and contributes to walkable and safe environments. The MFODS are intended to guide property owners, applicants/developers and design professionals and provide clear design direction that enhances an area’s unique character and ensures a high- quality living environment that will be desirable and hold its value over time, while encouraging creative design that enriches the community of Dublin. Projects requesting any deviation from the MFODS must be reviewed under the discretionary SDR process. In order to ap prove an SDR application, the City must make all of the findings contained in DMC Section 8.104.090, particularly DMC Section 8.104.090.B, as outlined below. 8.104.090.B. The proposal is consistent with the provisions of this Title, Zoning. For new multifamily residential development only, the proposal is either consistent with all of the Citywide Multifamily Objective Design Standards adopted pursuant to Section 8.36.020(B); alternatively, if the proposal deviates from one or more objective design standards, then the proposal is consistent with the purpose and intent of the applicable standard. Staff reviewed the proposed project for compliance with the MFODS and found that project is either consistent with the objective design standards or meets the intent of the standards. An overview of the objective design standards that are met through intent is provided in Attachment 3. For the objective design standards not included in the Attachment, the project either fully complies, or the objective design standard is not applicable to this project. The project is includes a concession under the State Density Bonus Law for objective design standard 3.1(E) for a minor exception to minimum building offset. An explanation of the State Density Bonus Law and the request is further described below. State Density Bonus Law The California Density Bonus Law, first enacted in 1979, was designed to encourage the construction of affordable housing by allowing developers to exceed local zoning limits on density in exchange for including a certain number of affordable units. The law has been significantly updated over time and these amendments have consistently aimed to strengthen the incentives available to developers, making it easier to build affordable and senior housing projects. Cities and Counties are required to grant a density bonus and other incentives or con cessions to any housing project with at least five housing units that provides a minimum number of permanently affordable housing units. The city or county is required to provide one or more (and up to five) incentives or concessions to each project which qualifies for a density bonus. 11 Page 4 of 10 An incentive or concession is intended to help make the development of eligible housing projects economically feasible. The proposed project seeks two concessions to reduce site development standards/design requirements. These two small concessions would result in identifiable and actual cost reductions to support the development of affordable housing: 1. Reduced Parking. The project is subject to the parking requirements of DMC Chapter 8.76 Off-Street Parking and Loading Regulations and is required to provide 120 parking spaces (2 spaces per unit). The project proposes a reduction to 36 parking spaces and requests a concession under State Density Bonus Law for a modified parking standard. In order to meet the parking requirements and provide 120 parking spaces, the project would require structured parking or parking lifts, which is not financially feasible for a project of this size. The applicant, who operates other I/DD communities, provides that less than 10 percent of households will include people who will drive and that many residents are gone all day at day programs. Caregivers are the anticipated primary users of the parking lot with many being on shifts coming and going at different times of the day. Furthermore, the project is located along a rapid bus route (Tri-Valley Wheels bus Route 30R) with connections to the Dublin/Pleasanton BART station. 2. Multi-Family Objective Design Standard 3.1(E) Building Form and Massing. As discussed above, the project is subject to the City-wide MFODS and under Chapter 3.1 Building Form and Massing, elevations not facing a primary street shall have an average of a five-foot offset. The project does not meet this requirement for the left courtyard and west elevations and provides an average offset of 3’-8” and 2’-10” respectively. The project requests a concession under the State Density Bonus law for an exception to this design standard. The articulation of the building is driven by the unit plan design, and the unit plans have been designed to be appropriately sized for this resident population. Increasing projections to meet the five -foot offset requirement would add costs to the building by adding space without doing so in a manner that was optimized for the livability of the unit necessary for the residents. Although these two elevations do not meet the exact standard, variation in color and roof forms further highlight changes in depth. In addition, offsets are provided more frequently than required on other elevations providing a balance in the overall design. This resident population requires more amenities than would typically be provided for an affordable housing project, the larger movements at the amenity spaces are balanced with quieter facades at less prominent elevations. Architecture The project’s architectural style utilizes a contemporary design approach that seamlessly integrates with the aesthetic of the larger Dublin Centre project. The exterior employs complementary colors and simple details with clean lines in keeping with the architecture used on the adjacent townhouses in Dublin Centre. The massing of the building is broken up using reveals, paint color changes and articulation, allowing the scale to visually appear pedestrian - 12 Page 5 of 10 oriented. Architecturally, the building features articulation on all sides and appropriate variation in the wall plane and roof forms, while a palette of durable body and accent materials of stucco and fiber cement lap siding has been chosen with the overall community in mind (refer to Figures 2 and 3 below). Figure 2. Perspective View: Corner of Dublin Boulevard and Brannigan Street Figure 3. Perspective View: Aerial Site Design, Access and Circulation The project site would be accessed to the north from a new private road provided as part of the Dublin Centre project. The main driveway would be located off this street providing direct access to the parking lot and main building entry (refer to Figures 4 and 5). The project’s location and site design provides multiple pedestrian connections from Brannigan Street to the project. Since this project is designed around a resident population with I/DD, protected internal circulation that is secure is of upmost importance. The U-shaped building design and secure perimeter fencing provides a safety barrier where internal pedestrian pathways and 13 Page 6 of 10 connections are emphasized within the central courtyard . Figure 4. Site Access Figure 5. Proposed Site Plan Landscape and Amenities The project would provide approximately 26,212 square feet of new landscape area, including a new parking lot, site perimeter, building façade/central courtyard, and bio -retention landscaping. Plants have been proposed using texture, color and size variation so that they will provide a rich visual tapestry for passersby as well as to create an appropriate canvas for the building to sit within. Plant massing and overall arrangements are proposed to perform logistical solutions (i.e., screening), but also to create larger overall movements for visual relief. The Planned Development conceptual landscape design requires the following landscape design standards for the project: 14 Page 7 of 10  Treat the site' s storm water in a set of basins throughout the site that are linked to the site' s water infrastructure, or for areas where regional treatment was previously approved, treat the site' s stormwater in a regional stormwater treatment basin.  Create a visual buffer and soften the edge between the public realm and the site.  Utilize plants that provide a year-round vegetated landscape with seasonality, color, and interest for an attractive visual environment. The project’s conceptual landscape plan would provide two stormwater treatment basins along Brannigan Street that would be linked to the site’s water infrastructure. This coupled with site perimeter landscaping along Dublin Boulevard and Brannigan Street would provide a visual buffer that would soften the edge between the public realm and the project. The plant palette would reference that of the adjacent Dublin Centre project to the north and west providing year-round vegetated landscape with seasonality, color and texture for a visually appealing environment. Internal to the project site, the proposed project would feature a spacious courtyard with decorative landscaping, several informal shaded seating areas, a lawn area for lounging and games, multi-purpose sport court, shaded patio with BBQ’s adjacent to the main community room, and a community garden. The metal picket fence along Brannigan Street secures the courtyard while also providing visual connectivity to the streetscape. Outside of the central courtyard, the project includes an art garden/makers room breakout area, pedestrian pathways providing connectivity to the surrounding area, and a pet relief area with waste s tation (refer to Figure 6). Figure 6. Proposed Landscape and Amenities Public Art The City’s public art requirement does not apply to 100% low-income housing projects. Consistency with General Plan, Specific Plans and Zoning Ordinance The proposed project is consistent with the General Plan and Eastern Dublin Specific Plan (EDSP) land use designation of Public/Semi-Public. Development of housing on a site 15 Page 8 of 10 designated on the General Plan Land Use Map as Public/Semi-Public Facilities shall be considered consistent with the General Plan when it is developed by a non -profit entity and serves to meet affordable housing needs or the housing needs of an underserved economic segment of the community. Determination as to whether housing should be permitted on a specific Public/Semi-Public Facilities site and the acceptable density and design is through the Planned Development. The proposed project would be developed by Sunflower Hill in partnership with Satellite Affordable Housing Associates, which are both non-profit organizations that provide affordable housing for low-income individuals and families. This project would create 59 new homes for people with intellectual and developmental disabilities that support independence and interdependence. The project is subject to Planned Development Ordinance No. 14-22 which established a maximum density of 50 units per acre. Housing Element The Grace Pointe project site is designated in the 2023 -2031 Housing Element as an opportunity site that can accommodate up to 100 lower-income affordable housing units. The “No Net Loss” law requires local governments to take certain steps when a project is approved with fewer units than were identified for the site in the local government’s Housing Element. In approving the project, the local government must determine whether the remaining sites in the Housing Element are adequate to meet the regional hou sing need. If the remaining sites are inadequate, the local government has 180 days to “make available” additional sites to accommodate the need. (See Gov. Code, § 65863, subds. (b)(2) and (c)(2).) Approval of the Site Development Review Permit for 59 affordable housing units would require the City find whether the shortfall of 41 lower-income units can be accommodated on the remaining sites identified in the Housing Element. In conjunction with its adoption of the 2023 - 2031 Housing Element, the City Council approved a rezoning, in coordination with the Alameda County Surplus Property Authority, the property owner, of Site D-2 in the Dublin Transit Center from Campus Office to Campus Office/High-Density Residential. This action created lower-income residential development capacity of 222 residential units on Site D-2. Half (or 111) of those units were identified in the Housing Element. As was contemplated at the time of the adoption of the Housing Element, the remainder of the development capacity on Site D-2 (111 units) could be used to make the “No Net Loss” law finding that the remaining sites are adequate. The draft Resolution approving the project includes the required finding and that the 41-unit deficit can be accommodated on Site D-2, leaving 70 units of surplus “lower-income” capacity on Site D-2. Airport Influence Area (AIA)/Overlay Zoning District The site is located within the Airport Influence Area (AIA)/Overlay Zoning District. This area is designated as an area in which current or future airport-related noise, overflight, safety and/or airspace protection factors may significantly affect land uses or necessitate restrictions on those uses. The AIA is a designation by the Alameda County Airport Land Use Commission (ALUC). The proposed project is consistent with uses established by the General Plan, EDSP and Planned Development Ordinance No. 14-22; therefore, review by the Alameda County ALUC is not required. 16 Page 9 of 10 REVIEW BY APPLICABLE DEPARTMENTS AND AGENCIES: The Building Division, Fire Prevention Bureau, Public Works Department, and Dublin San Ramon Services District reviewed the project and provided Conditions of Approval where appropriate to ensure that the project is established in compliance with all local Ordinances and Regulations. Conditions of Approval from these departments and agencies have been included in the attached Resolution (Attachment 1). ENVIRONMENTAL DETERMINATION: In compliance with the California Environmental Quality Act (CEQA), on November 15, 2022, the City Council certified the Final EIR for the SCS Dublin Project, which included up to 550 market rate residential units, up to 100 affordable units, up to 265,000 square feet of retail commercial development and related infrastructure and landscape improvements. Upon approval of the SCS Dublin Project, the City Council adopted a Mitigation Monitoring and Reporting Program and a Statement of Overriding Considerations (Resolution No. 135-22). The proposed project is within the scope of the project covered by the SCS Dublin EIR. The circumstances under which the project is to be undertaken have not substantially changed since the SCS Dublin EIR was prepared and will not substantially change with approval of the project. As supported by the project description, Site Development Review Permit plans, the EIR adequately describes the impacts of the project for the purposes of CEQA and no mitigation measures or new alternatives are required by the project other than those previously disclosed and analyzed in the SCS Dublin EIR. Approval of the project will not create any site‐ specific operations giving rise to environmental effects different from those examined by the EIR or require the preparation of an Initial Study. The proposed project is subject to the SCS Dublin EIR Mitigation Monitoring and Reporting Program. Consequently, pursuant to CEQA Guidelines Section 15162, the project impacts are covered by the SCS Dublin EIR and no further environmental review is required for this project. NOTICING REQUIREMENTS/PUBLIC OUTREACH: Two City-led Community Meetings were held on November 12 and 13, 2025, to provide Dublin residents with information about the proposed Sunflower Hill at Grace Pointe project. Six community members attended the meeting on November 12, and four community members attended the meeting on November 13. Staff provided a presentation that included an overview of the City’s development review process and the proposed project. Questions were asked about construction timing, the use of union labor and the resident selection process. One statement was provided in support of the project. 17 Page 10 of 10 In accordance with State law, a public notice was mailed to all property owners and occupants within 300 feet of the proposed project to advertise the project and upcoming public hearing. A public notice was also published in the East Bay Times and posted at several locations throughout the City. A Planning Application sign was posted on the project site and the project was also included on the City’s Development Projects webpage. A copy of this Staff Report has been provided to the applicant. ATTACHMENTS: 1) Attachment 1 – Resolution Approving a Site Development Review Permit for the Sunflower Hill at Grace Pointe Project 2) Attachment 2 – Exhibit A to the Resolution – Sunflower Hill at Grace Pointe Project Plans 3) Attachment 3 – Multi-Family Objective Design Standards Compliance Overview 18 Attachment 1 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 1 of 32 RESOLUTION NO. 25 – XX A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING THE SITE DEVELOPMENT REVIEW PERMIT FOR THE SUNFLOWER HILL AT GRACE POINTE PROJECT (Portion of APN 985-0051-006-00) WHEREAS, the Applicant, Sunflower Hill in partnership with Satellite Affordable Housing Associates, submitted a Site Development Review Permit for the construction of a three-story multi- family apartment building with 59 affordable units for people with intellectual and developmental disabilities (I/DD) and one manager’s unit. The proposed improvements are collectively known as the “Sunflower Hill at Grace Pointe Project” or the “Project”; and WHEREAS, the Project site is 1.89 acres in size and is part of the larger Dublin Centre project (formerly known as SCS Dublin) and is located at the northwest corner of Dublin Boulevard and Brannigan Street in Planning Area 2 (PA-2) on a portion of Assessor Parcel Number (APN) 985-0051- 006-00; and WHEREAS, on November 15, 2022, the City Council approved the SCS Dublin project and included certification of a Final Environmental Impact Report, General Plan and Eastern Dublin Specific Plan Amendments, a Planned Development Rezone with Stage 1 and Stage 2 Development Plans and a Development Agreement. On February 5, 2025, the City Council approved an Affordable Housing Agreement for the Dublin Centre project; and WHEREAS, the existing General Plan and Eastern Dublin Specific Plan land use designation for the Project site is Public/Semi-Public and the Sunflower Hill at Grace Pointe Project is consistent with the General Plan as the project would be developed by a non-profit entity and serve to meet affordable housing needs or housing needs of an underserved economic segment of the community; and WHEREAS, the Project site is located within Planned Development Ordinance No. 14-22, which allows for up to 500 market rate residential units, up to 100 affordable units, and up to 265,000 square feet of commercial development; and WHEREAS, the Project site is designated in the 2023-2031 Housing Element as an opportunity site that can accommodate up to 100 lower-income affordable housing units and is subject to the “No Net Loss” provision as there would be a shortfall of 41 lower-income units; and WHEREAS, Transit Center Site D-2 (APN 986-0034-014-00), identified in the 2023-2031 Housing Element, serves as an alternative opportunity site to accommodate the 41 lower-income units; and WHEREAS, the California Environmental Quality Act (CEQA), together with the CEQA Guidelines and City of Dublin CEQA Guidelines and Procedures require that certain projects be reviewed for environmental impacts and that environmental documents be prepared; and WHEREAS, on November 15, 2022, the City Council certified the Final Environmental Impact Report (EIR) for the SCS Dublin Project, which included up to 550 market rate residential units, up to 19 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 2 of 32 100 affordable units, up to 265,000 square feet of retail commercial development and related infrastructure and landscape improvements. Upon approval of the SCS Dublin Project, the City Council adopted a Mitigation Monitoring and Reporting Program and a Statement of Overriding Considerations (Resolution No. 135-22); and WHEREAS, the proposed Project is covered by the SCS Dublin Project EIR. The circumstances under which the Project is to be undertaken have not substantially changed since the SCS Dublin Project EIR was prepared and will not substantially change with the approval of the Project. Approval of the project will not create any site‐specific operations giving rise to environmental effects different from those examined by the EIR or requiring the preparation of an Initial Study. Consequently, pursuant to CEQA Guidelines Section 15162, the Project impacts are covered by the SCS Dublin Project EIR and no further environmental review is required for this p roject; and WHEREAS, on March 18, 2025, the City Council held a study session on the proposed project, received presentations by Staff and the Applicant, and provided feedback on the Project; and WHEREAS, a Staff Report, dated December 9, 2025, and incorporated herein by reference, described and analyzed the Project, including the Site Development Review Permit; and WHEREAS, the Planning Commission held a properly noticed public hearing on the Project, on December 9, 2025, at which time all interested parties had the opportunity to be heard; and WHEREAS, the Planning Commission considered all above -referenced reports, recommendations, and testimony to evaluate the Project. NOW, THEREFORE, BE IT RESOLVED that the foregoing recitals are true and correct and made part of this Resolution. BE IT FURTHER RESOLVED that the Planning Commission finds the shortfall of 41 lower- income units is in accordance with Government Code Section 65863 (No Net Loss): A. The reduction is consistent with the adopted General Plan, including the Housing Element. Consistent with Goal A and Policy 5 of the Housing Element, the City has forecasted for existing and projected housing needs and developed a buffer, by identifying alternative sites within the City, above household projections to meet existing and project needs. The Project would not reduce the amount of low-income units because an alternative site has been identified. Transit Center Site D- 2 (APN 986-0034-014-00) is identified as an alternative site for the 41 low-income units and is in close proximity to the Dublin/ Pleasanton BART station and within walking or cycling distance to places of employment, commerce, recreation, and services. The project would be in conformance with the following Housing Element Goal and Policy: Goal A: Expand housing choice and multi-modal transportation opportunities for existing and future Dublin. Policy A.5: Promote affordable housing opportunities adjacent to public transportation and within walking or cycling distance to places of employment, commerce, recreation, and services. B. The remaining sites identified in the Housing Element are adequate to meet the requirements of Section 65583.2 and to accommodate the jurisdiction’s share of the regional housing need 20 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 3 of 32 pursuant to Section 65584. The finding shall include a quantification of the remaining unmet need for the jurisdiction’s share of the regional housing need at each income level and the remaining capacity of sites identified in the housing element to accommodate that need by income level. While the 2023-2031 Housing Element allocated 100 low-income units on the Project site, the City has identified an alternative site to relocate these units to accommodate the total Regional Housing Needs Allocation (RHNA). The City is in coordination with the Alameda County Surplu s Property Authority, support development on surplus property at the Dublin Transit Center. This site, Transit Center Site D-2, has a surplus of units that can serve as an opportunity site to accommodate these 41 units. The site has a General Plan land use designation of Campus Office/ High Density Residential and Planned Development Zoning that allows for Multi-Family Residential Use with an average density of 66 units per acre. As identified in the Housing Element Site Table D-9: City of Dublin 6th Cycle Housing Element Candidate Sites, Transit Center Site D- 2 (APN 986-0034-014- 00) has a capacity of 222 units, of which 111 units are currently allocated to lower income households and 111 units to above moderate households. As shown in the table below, this alternative site can accommodate the 41 units and is adequate to meet the requirements of Section 65583. 2 and 6558 and is consistent with the City’s projected needs for low-income households for the 2023-2031 Planning period. Alternative Site: Dublin Transit Center Site D-2 Site APN General Plan Acres Net Potential Units Low- Income Units Moderate- Income Units Above Moderate- Income Units 986-0034- 014-00 Campus Office/High Density Residential 12.3 222 152 (111+41) 0 70 (111-41) BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin does hereby make the following findings and determinations regarding the Site Development Review Permit: A. The proposal is consistent with the purposes of Chapter 8.104 (Site Development Review) of the Zoning Ordinance, with the General Plan, and any applicable Specific Plans a nd design guidelines in that: 1) the Project provides an orderly, attractive and harmonious development compatible with surrounding properties and neighborhoods ; 2) the Project gives thoughtful consideration to building location, architectural and landscape design and theme, vehicular and pedestrian access, and on-site circulation and parking; 3) the Project utilizes a contemporary design approach that seamlessly integrates with the aesthetic of the larger Dublin Centre project; 4) the project will provide affordable housing opportunities in an area where the City of Dublin has made efforts to incentivize higher-density housing; 5) the Project will conform with the development regulations as stated in the Planned Development Stage 2 Development Plan; and 6) the Project is consistent with the General Plan and Eastern Dublin Specific Plan land use designation of Public/Semi-Public. B. The proposal is consistent with the provisions of Title 8, Zoning Ordinance and for new multifamily residential development only, the proposal is either consistent with all of the Citywide Multifamily Objective Design Standards adopted pursuant to Section 8.36.020(B); alternatively, if the proposal deviates from one or more objective design standards, then the proposal is consistent with the purpose and intent of the applicable standard in that: 1) the Project 21 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 4 of 32 contributes to the orderly, attractive, and harmonious site and architectural development that i s compatible with the architectural style and intensity of development – either in place or approved for future development, and context of surrounding and adjacent properties ; 2) the Project provides a pedestrian scale that connects with surrounding uses; 3) the overall design of the Project is consistent with the design requirements of the Planned Development Stage 2 Development Plan and the proposed layout, landscaping and parking are well -suited for the proposed Project; and 4) the project is either consistent with the Multi-Family Objective Design Standards or meets the intent of the standards. C. The design of the Project is appropriate to the City, the vicinity, surrounding properties, and the lot(s) in which the Project is proposed in that: 1) the architecture and landscape design for the Project provides an appropriate pedestrian scale and the landscaping and parking areas are well-suited to the Project; 2) the overall design of the Project is consistent with the design requirements of the Planned Development Stage 2 Development Plan; and 3) the Project is compatible with the design of the larger Dublin Centre project in that it utilizes similar design concepts, themes, and palettes. D. The subject site is suitable for the type and intensity of the approved development in that: 1) the Project will provide for needed affordable housing for people with intellectual and developmental disabilities that support independence and interdependence; and 2) the Project provides for its own infrastructure and required services and is designed to include sufficient vehicular and pedestrian access, with the necessary parking to support the residential population and operations for this Project. E. Impacts to existing slopes and topographic features are addressed in that: 1) the Project site is generally flat, and the proposed Project will not impact any slopes or other topographic features. F. Architectural considerations including the character, scale and quality of the design, site layout, the architectural relationship with the site and other buildings, screening of unsightly uses, lighting, building materials and colors and similar elements result in a Project that is harmonious with its surroundings and compatible with other developments in the vicinity in that: 1) the Project’s architectural style utilizes a contemporary design approach that seamlessly integrates with the aesthetic of the larger Dublin Centre project ; 2) the exterior employs complementary colors and simple details with clean lines in keeping with the architecture used on the adjacent townhouses in the Dublin Centre project; 3) the massing of the building is broken up using reveals, paint color changes and articulation, allowing the scale to visually appear pedestrian - oriented; and 4) architecturally, the building features articulation on all sides and appropriate variation in the wall plane and roof forms, while a palette of durable body and accent materials of stucco and fiber cement lap siding has been chosen with the overall community in mind. G. Landscape considerations, including the location, type, size, color, texture and coverage of plant materials, and similar elements have been incorporated into the Project to ensure visual relief, adequate screening and an attractive environment for the public in that: 1) the Preliminary Landscape Plan for the Project site emphasizes the creation of a comfortable pedestrian environment that will include a variety of outdoor amenities for this resident population; 2) the proposed plant pallet would reference that of the adjacent Dublin Centre project to the north and west using texture, color and size variation so as to provide a rich visual tapestry for passersby as well as to create an appropriate canvas for the building to sit within; and 3) sufficient landscaping would be provided throughout the parking lot, along the street frontages and perimeter of the Project site and within the central courtyard. 22 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 5 of 32 H. The site has been adequately designed to ensure the proper circulation for bicyclist, pedestrians, and automobiles in that: 1) all infrastructure including driveways, passenger loading, pathways, sidewalks, and lighting have been reviewed for conformance with City policies and regulations; 2) access to the site would be provided to the north from a new private road provided as part of the Dublin Centre project, and the main driveway would be located off this street providing direct access to the parking lot and main building entry; and 3) multiple pedestrian connections are provided off Brannigan street to ensure proper circulation for pedestrians into the project. BE IT FURTHER RESOLVED that the Planning Commission of the City of Dublin hereby approves the Site Development Review Permit the Sunflower Hill at Grace Pointe Project, subject to the conditions included below, and in accordance with the Proj ect Plans, incorporated herein by reference and attached as Exhibit A to this Resolution. CONDITIONS OF APPROVAL Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval: [PL] Planning, [B] Building, [PW] Public Works; [ADM] Administration/City Attorney; [F] Dublin Fire Prevention; [DSRSD] Dublin San Ramon Services District. CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: PLANNING – GENERAL 1. Approval. This Site Development Review (SDR) Permit approval is for the Sunflower Hill at Grace Pointe Project (PLPA-004232-2025), which proposes a 100% affordable housing project for individuals with intellectual and developmental disabilities. This approval shall be as generally depicted and indicated on the Project Plans prepared by DAHLIN and kpff, dated November 4, 2025, attached as Exhibit A and other plans, text, and diagrams relating to this project and as specified as the following Conditions of Approval for this project. PL On-going 2. Effective Date. This SDR Permit approval becomes effective 10 days following action by the Planning Commission, unless otherwise appealed to the City Council. PL On-going 3. Permit Expiration. Construction shall commence within one (1) year of the effective date of this SDR Permit or the Permit shall lapse and become null and void. Commencement of construction means the actual construction or demonstrating substantial progress toward commencing such construction. If there is a dispute as to whether the Permit has expired, the City may hold a noticed public hearing to determine the matter. Such a determination may be processed concurrently with revocation proceedings in appropriate circumstances. If PL One Year After Effective Date 23 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 6 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: a Permit expires, a new application must be made and processed according to the requirements of the Zoning Ordinance. 4. Time Extension. The Director of Community Development may, upon the Applicant/Developer’s written request for an extension of approval prior to expiration, and upon the determination that any Conditions of Approval remain adequate to assure that applicable findings of approval will continue to be met, grant a time extension of approval for a period not to exceed 12 months. The Director of Community Development may grant a maximum of two extensions of approval, and additional extensions may be granted by the original decision maker. PL Prior to Expiration Date 5. Compliance. The Applicant/Developer shall operate this use in compliance with the Conditions of Approval of this SDR Permit, the approved plans, and the regulations established in the Dublin Municipal Code. Any violation of the terms or conditions specified may be subject to enforcement action. PL, PW On-going 6. Revocation of Permit. This SDR Permit approval shall be revocable for cause in accordance with Dublin Municipal Code (DMC) Section 8.96.020.I. PL On-going 7. Requirements and Standard Conditions. The Applicant/Developer shall comply with applicable City of Dublin Fire Prevention Bureau, Dublin Public Works Department, Dublin Building Department, Dublin Police Services, Alameda County Flood Control District Zone 7, Livermore Amador Valley Transit Authority, Alameda County Public and Environmental Health, Dublin San Ramon Services District and the California Department of Health Services requirements and standard conditions. Prior to issuance of building permits or the installation of any improvements related to this project, the Applicant/Developer shall supply written statements from each such agency or department to the Planning Department, indicating that all applicable conditions required have been or will be met. Various Building Permit Issuance 8. Required Permits. The Applicant/Developer shall obtain all permits required by other agencies including but not limited to Alameda County Flood Control and Water Conservation District (Zone 7), California Department of Fish and Wildlife, Army Corps of Engineers, Regional PW Building Permit Issuance and Grading Permit Issuance 24 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 7 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: Water Quality Control Board and Caltrans and provide copies of the permits to the Public Works Department. 9. Fees. The Applicant/Developer shall pay all applicable fees in effect at the time of building permit issuance, including, but not limited to, Planning fees, Building fees, Traffic Impact fees, TVTC fees, Dublin San Ramon Services District fees, Public Facilities fees, Transportation Impact Fees, Dublin Unified School District School Impact fees, Fire Facilities Impact fees, Noise Mitigation fees, Alameda County Flood and Water Conservation District (Zone 7) Drainage and Water Connection fees, or any other fee that may be adopted and applicable. Various Building Permit Issuance 10. Indemnification. The Applicant/Developer shall defend, indemnify, and hold harmless the City of Dublin and its agents, officers, and employees from any claim, action, or proceeding against the City of Dublin or its agents, officers, or employees to attack, set aside, void, or annul an approval of the City of Dublin or its advisory agency, appeal board, Planning Commission, City Council, Community Development Director, Zoning Administrator, or any other department, committee, or agency of the City ; provided, however, that the Applicant's duty to so defend, indemnify, and hold harmless shall be subject to the City's promptly notifying the Applicant of any said claim, action, or proceeding and the City's full cooperation in the defense of such actions or proceedings. ADM On-going 11. Clarification of Conditions of Approval. In the event that there needs to be clarification to the Conditions of Approval, the Community Development Director has the authority to clarify the intent of these Conditions of Approval to the Applicant without going to a public hearing. The Community Development Director also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant to fulfill needed improvements or mitigations resulting from impacts to this project. PL, PW On-going 12. Temporary Use Permit. The Applicant/Developer shall obtain a Temporary Use Permit prior to the establishment of any construction trailer, storage shed, container units, or construction fencing/signage on the Project site. PL Establishment of the Temporary Use 13. Controlling Activities. Applicant, Developer shall control all activities on the project site so as not to create a PL Through construction 25 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 8 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: nuisance to existing/surrounding businesses and/or residences. 14. Clean-up. The Applicant/Developer shall be responsible for clean-up and disposal of project related trash to maintain a safe, clean and litter-free site. PL On-going 15. Modifications. Modifications or changes to this SDR Permit approval may be considered by the Communit y Development Director if the modifications or changes proposed comply with DMC Section 8.104.090. PL On-going 16. Equipment Screening. All electrical equipment, fire risers, and/or mechanical equipment shall be screened from public view by landscaping and/or architectural features and that electrical transformers are either underground or architecturally screened. Any roof-mounted equipment shall be completely screened from adjacent street view by materials architecturally compatible with the building and to the satisfaction of the Community Development Director. The Building Permit plans shall show the location of all equipment and screening for review and approval by the Community Development Director. PL Building Permit Issuance PLANNING DIVISION – PROJECT SPECIFIC CONDITIONS 17. Affordable Housing Regulatory Agreement and Density Bonus Housing Agreement Applicant/Developer shall execute an Affordable Housing Regulatory Agreement and Density Bonus Housing Agreement (as a single housing agreement) imposing rental controls on the 59 affordable units (very low- and low-income) in accordance with DMC Chapter 8 .68 and 8.52.150.A. PL Building Permit Issuance 18. Parking Requirement. The minimum number of required parking spaces shall be 36 as allowed and provided per the requested concession under the State Density Bonus Law. PL Building Permit Issuance 19. Mitigation Monitoring Program. The Applicant/ Developer shall comply with the SCS Dublin Final Environmental Impact Report (EIR) certified by City Council Resolution No. 135-22, including all mitigation measures, action programs, and implementation measures contained therein. The following list of mitigation measures required to be satisfied prior to the issuance of construction permits is provided for reference: PL, PW Building Permit Issuance, Sitework Permit Issuance and On- going 26 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 9 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: MM AES-4.1 Exterior Lighting Control Plan MM AQ-2.1: BAAQMD Basic Construction Mitigation Measures MM AQ-2.2: Off-Road Diesel-Powered Construction Equipment MM AQ-2.3: Architectural Coating MM AQ-2.4: Prohibition of Wood-Burning Fireplaces MM GEO-1.1: Implement Preliminary Geotechnical Exploration Recommendations MM N-1.1: Construction Noise Reduction MM N-1.2: Noise Attenuation The EIR is on file with the Community Development Department. 20. Master Sign Program. A Master Sign Program/Site Development Review Permit shall be reviewed and approved at the Staff -level for all project-related signage including, but not limited to, wall signs, monument signs, address signage, directional signage, parking signage, and other signage deemed necessary by the City. PL Installation of any project-related signage LANDSCAPE 21. Final Landscape and Irrigation Plans. A Final Landscape and Irrigation Plan prepared and stamped by a California licensed landscape architect or registered engineer shall be submitted for review and approval by the Community Development Director and shall comply with DMC Section 8.72.030. PL Landscape plan approval and installation 22. Project Landscape. A sufficient landscape screening buffer shall be provided for the project that screens the project onto neighboring properties, public/private streets, etc. Sufficient landscape screening includes but not limited to trees, shrubbery, ground cover. PL Landscape plan approval and installation 23. Water Efficient Landscaping Regulations. The Applicant/Developer shall meet all requirements of the City of Dublin’s Water-Efficient Landscape Regulations, DMC Section 8.88. PL Landscape plan approval and installation 24. Plant Size and Spacing. Plant sizes and WUCOLS designations to be included in building permit plant schedules including plant spacing and heights. Plants to be located according to spread at mature growth to reduce need for shearing and reduce green waste to landfill. PL Landscape plan approval and installation 27 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 10 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: 25. Landscaping at Street/Drive Aisle Intersections. Landscaping shall not obstruct the sight distance of motorists, pedestrians or bicyclists. Except for trees, landscaping (and/or landscape structures such as walls) at drive aisle intersections shall not be taller than 30 inches above the curb. Landscaping shall be kept at a minimum height and fullness giving patrol officers and the general public surveillance capabilities of the area. PL On-going 26. Plant Clearances. All trees planted shall meet the following clearances: a. Six feet from the face of building walls or roof eaves. b. Seven feet from fire hydrants, storm drains, sanitary sewers and/or gas lines. c. Five feet from top of wing of driveways, mailboxes, water, telephone and/or electrical mains d. Fifteen feet from stop signs, street or curb sign returns. e. Fifteen feet from either side of street lights. PL Landscape plan approval and installation BUILDING & SAFETY DIVISION 27. Building Codes and Ordinances. All project construction shall conform to all building codes and ordinances in effect at the time of building permit. B Through Completion 28. Construction Drawings. Construction plans shall be fully dimensioned (including building elevations) accurately drawn (depicting all existing and proposed conditions on site), and prepared and signed by a California licensed Architect or Engineer. All structural calculations shall be prepared and signed by a California licensed Architect or Engineer. The site plan, landscape plans and details shall be consistent with each other. B Issuance of Building Permits 29. Building Permits. To apply for building permits, Applicant/Developer shall submit electronic drawings and specifications for plan check. Each set of plans shall have attached an annotated copy of these Conditions of Approval. The notations shall clearly indicate how all Conditions of Approval will or have been complied with. Construction plans will not be accepted without the annotated resolutions attached to each set of plans. Applicant/Developer will be responsible for obtaining the approvals of all participating non-City agencies prior to the issuance of building permits. B Issuance of Building Permits 30. As-Built Drawings. All revisions made to the building plans during the project shall be incorporated into an “As Built” electronic file and submitted prior to the issuance of the final occupancy. As-built drawings may be provided B Occupancy 28 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 11 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: as the last set of revisions to the approved plans, integrated into the full plan set. 31. Addressing a) Provide a site plan with the City of Dublin’s address grid overlaid on the plans (1 to 30 scale). Highlight all exterior door openings on plans (front, rear, garage, etc.). The site plan shall include a single large format page showing the entire project and individual sheets for each neighborhood. See address application for additional information. Application and Plans shall be submitted electronically. b) Provide plan for display of addresses. The Chief Building Official shall approve plan prior to issuance of the first building permit. c) Address signage shall be provided as per the Dublin Residential Security Code. d) Exterior address numbers shall be illuminated and be posted in such a way that they may be seen from the street. B Release of addresses Building Permit Issuance Occupancy of any Unit Building Permit Issuance and Through Completion 32. Engineer Observation. The Engineer of record shall be retained to provide observation services for all components of the lateral and vertical design of the building, including nailing, hold-downs, straps, shear, roof diaphragm and structural frame of building. A written report or calculation package shall be submitted to the City Inspector prior to scheduling the final frame inspection. B Scheduling the Final Frame Inspection 33. Foundation. Geotechnical Engineer for the soils report shall review and approve the foundation design . A letter shall be submitted to the Building Division on the approval. B Building Permit Issuance 34. Temporary Fencing. Temporary Construction fencing shall be installed along the perimeter of all work under construction. B Through Completion 35. Cool Roofs – CA Energy Code. Flat roof areas shall have their roofing material coated with light colored gravel or painted with light colored or reflective material designed for cool roofs. B Through Completion 36. Parking. The required number of parking stalls, the design and location of the accessible parking stalls shall be as required by the CA Building Code. B Through Completion 29 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 12 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: The design and number of clean air / EV ready stalls shall be as required by the CA Green Building Standards Code. 37. Copies of Approved Plans. Within 30 days of issuance, Applicant shall provide City with one reduced (1/2 size) copy of the City of Dublin stamped approved plan. B 30 Days After Permit and Each Revision Issuance FIRE PREVENTION BUREAU 38. Fire department access requirements are to be met. All fire apparatus access road shall be with an approved all-weathered surface and capable of supporting imposed load of 75,000 lbs. F Approval of Improvement Plans 39. Fire Hydrants. All existing and proposed fire hydrants shall comply with the requirements in CFC Section 507.5, Appendix B, and Appendix C. F Approval of Improvement Plans 40. No vertical combustible construction shall begin prior to approved fire access roads being installed and hydrants in service. The approved all weather-surface shall be considered as first lift of asphalt and the access shall be approved by the Department of Public Works prior to commencement of combustible storage or any construction on the site. F Vertical Combustible Construction 41. The building will be required to comply with all Building and Fire Code requirements in effect at time of permit application. F Building Permit Issuance 42. No fire service lines shall pass beneath buildings. F Approval of Improvement Plans 43. New Fire Sprinkler System & Monitoring Requirements. In accordance with The Dublin Fire Code, fire sprinklers shall be installed in the building. The system shall be in accordance with the NFPA 13, the CA Fire Code and CA Building Code. Plans and specifications showing detailed mechanical design, cut sheets, listing sheets and hydraulic calculations shall be submitted to the Fire Department for approval and permit prior to installation. This may be a deferred submittal. a) Sprinkler Plans. (Deferred Submittal Item). Submit detailed mechanical drawings of all sprinkler installations, including cut sheets, listing sheets and calculations to the Fire Department for approval and permit prior to installation. b) All sprinkler system components shall remain in compliance with the applicable N.F.P.A. 13 F Building Permit Issuance 30 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 13 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: Standard, the CA Fire Code and the CA Building Code. c) Underground Plans. (Deferred Submittal Item). Submit detailed shop drawings for the fire water supply system, including cut sheets, listing sheets and calculations to the Fire Department for approval and permit prior to installation. All underground and fire water supply system components shall be in compliance with the applicable N.F.P.A. 13, 24, 20, 22 Standards, the CA Fire Code and the CA Building Code. The system shall be hydrostatically tested and inspected prior to being covered. Prior to the system being connected to any fire protection system, a system flush shall be witnessed by the Fire Department. d) Central Station Monitoring. Automatic fire extinguishing systems installed within buildings shall have all control valves and flow devices electrically supervised and maintained by an approved central alarm station. Zoning and annunciation of central station alarm signals shall be submitted to the Fire Department for approval. e) Fire Protection Equipment shall be identified with approved signs constructed of durable materials, permanently installed and readily visible. 44. Fire Alarm System Required. A Fire Alarm System in conformance the Dublin Fire Code is required shall be installed throughout the building so as to provide full property protection, including combustible concealed spaces, as required by NFPA 72. The system shall be installed in accordance with NFPA 72, CA Fire, Building, Electrical, and Mechanical Codes. a) Fire Alarm Plans. (Deferred Submittal Item). Submit detailed drawings of the fire alarm system, including floor plan showing all rooms, device locations, ceiling height and construction, cut sheets, listing sheets and battery and voltage drop calculations to the Fire Department for review and permit prior to the installation. Where employee work areas have audible alarm coverage, circuits shall be initially designed with a minimum 20% spare capacity for adding appliances to accommodate hearing impaired employees. b) Central Station Monitored Account. Automatic fire alarm systems shall be monitored by an approved central alarm station. Zoning and F Occupancy 31 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 14 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: annunciation of central station alarm signals shall be approved by the Fire Department. c) Qualified Personnel. The system shall be installed, inspected, tested, and maintained in accordance with the provisions of NFPA 72. Only qualified and experienced persons shall perform this work. Examples of qualified individuals are those who have been factory trained and certified or are NICET Fire Alarm Certified. d) Inspection & Testing Documentation. Performance testing of all initiating & notification devices in the presence of the Fire Inspector shall occur prior to final of the system. Upon this inspection, proof that the specific account is UL Certificated must be provided to the Fire Inspector. 45. The building shall comply with the emergency escape and rescue requirements per CFC section 1031. A ground ladder shall be able to position at a 75 degree to all emergency escape and rescue window sills. It shall be an unobstructed and all weather access with leveled surface. F Building Permit Issuance 46. Fire Extinguishers. Extinguishers shall be visible and unobstructed. Signage shall be provided to indicate fire extinguisher locations. The number and location of extinguishers shall be shown on the plans. Additional fire extinguishers maybe required by the fire inspector. Fire extinguisher shall meet a minimum classification of 2A 10BC. Extinguishers weighing 40 pounds or less shall be mounted no higher than 5 feet above the floor measured to the top of the extinguisher. Extinguishers shall be inspected monthly and serviced by a licensed concern annually. F Occupancy 47. FD Building Key Box. Building Access. A Fire Department Key Box shall be installed at the main entrance to the Building. Note these locations on the plans. The key box should be installed approximat ely 5 1/2 feet above grade. The box shall be sized to hold the master key to the facility as well as keys for rooms not accessible by the master key. Specialty keys, such as the fire alarm control box key and elevator control keys shall also be installed in the box. The key box door and necessary keys are to be provided to the fire inspector upon the final inspection. The inspector will then lock the keys into the box. F Occupancy 32 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 15 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: 48. Means of Egress. Exit signs shall be visible and illuminated with emergency lighting when building is occupied. F Occupancy 49. Maximum Occupant Load. Posting of room capacity is required for any occupant load of 50 or more persons. Submittal of a seating plan on 8.5” x 11” paper is required prior to final occupancy. F Occupancy 50. Interior Finish. Wall and ceiling interior finish material shall meet the requirements of Chapter 8 of the California Fire Code. Interior finishes will be field verified upon final inspection. If the product is not field marked and the marking visible for inspection, maintain the products cut- sheets and packaging that show proof of the products flammability and flame-spread ratings. Decorative materials shall be fire retardant. F Occupancy 51. General Inspection. Upon inspection of the work for which this submittal was provided, a general inspection of the business and site will be conducted. F Occupancy 52. Addressing. Addressing shall be illuminated or in an illuminated area. The address characters shall be contrasting to their background. If address is placed on glass, the numbers shall be on the exterior of the glass and a contrasting background placed behind the numbers. Building Address. The building shall be provided with all addresses or the assigned address range so as to be clearly visible from either direction of travel on the street the address references. The address characters shall not be less than 5 inches in height by 1-inch stroke. Larger sizes may be necessary depending on the setbacks and visibility. F Occupancy of any building 53. Fire Access During Construction. a) Fire Access. Access roads, turnaround, pullouts, and fire operation areas are fire lanes and shall be maintained clear and free of obstructions, including the parking of vehicles. b) Entrances. Entrances to job sites shall not be blocked, including after hours, other than by approved gates/barriers that provide for emergency access. c) Site Utilities. Site utilities that would require the access road to be dug up or made impassible shall be installed prior to construction commencing. F Ongoing during construction 33 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 16 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: d) Entrance flare, angle of departure, width, turning radii, grades, turnaround, vertical clearances, road surface, bridges/crossings, gates/key-switch, within a 150-foot distance to Fire Lane shall be maintained. e) Personnel Access. Route width, slope, surface and obstructions must be considered for the approved route to furthermost portion of the exterior wall. f) All-weather access. Fire access is required to be all-weather access. Show on the plans the location of the all-weather access and a description of the construction. Access roads must be designed to support the imposed loads of fire apparatus. 54. Fire Safety During Construction a) Clearance to combustibles from temporary heating devices shall be maintained. Devices shall be fixed in place and protected from damage, dislodgement or overturning in accordance with the manufacturer’s instructions. b) Smoking shall be prohibited except in approved areas. Signs shall be posted “NO SMOKING” in a conspicuous location in each structure or location in which smoking is prohibited. c) Combustible debris, rubbish and waste material shall be removed from buildings at the end of each shift of work. d) Flammable and combustible liquid storage areas shall be maintained clear of combustible vegetation and waste materials. F Ongoing during construction PUBLIC WORKS – GENERAL 55. Conditions of Approval. Applicant/Developer shall comply with the City of Dublin Public Works Standard Conditions of Approval contained below (“Standard Condition”) unless specifically modified by Project Specific Conditions of Approval below. PW On-going 56. Compliance. Applicant/Developer shall comply with the Subdivision Map Act, the City of Dublin Subdivision and Zoning Ordinances, City of Dublin Title 7 Public Works Ordinance, which includes the Grading Ordinance, the City of Dublin Public Works Standards and Policies, the most current requirements of the State Code Title 24 and the Americans with Disabilities Act with regard to accessibility, and all building and fire codes and ordinances in effect at the time of building permit. All PW On-going 34 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 17 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: public improvements constructed by Applicant/Developer and to be dedicated to the City are h ereby identified as “public works” under Labor Code section 1771. Accordingly, Applicant/Developer, in constructing such improvements, shall comply with the Prevailing Wage Law (Labor Code. Sects. 1720 and following). 57. Clarifications and Changes to the Conditions. In the event that there needs to be clarification to these Conditions of Approval, the City Engineer has the authority to clarify the intent of these Conditions of Approval to the Applicant/Developer without going to a public hearing. The City Engineer also has the authority to make minor modifications to these conditions without going to a public hearing in order for the Applicant/Developer to fulfill needed improvements or mitigations resulting from impacts of this project. PW On-going 58. Zone 7 Impervious Surface Fees. The Applicant/Developer shall complete a “Zone 7 Impervious Surface Fee Application” and submit an accompanying exhibit for review by the Public Works Department. Fees generated by this application will be due at issuance of Building Permit. PW Grading Permit or Building Permit Issuance PUBLIC WORKS – AGREEMENTS 59. Stormwater Management Maintenance Agreement. Developer or Property Owner shall enter into an Agreement with the City of Dublin that guarantees the property owner’s perpetual maintenance obligation for all stormwater management measures installed as part of the project, including those on-site and within the public Rights of Way. In addition to stormwater management measures, drainage v-ditches, mitigation areas, and existing wetlands shall be included for reference, as applicable. Said Agreement is required pursuant to Provision C.3 of the Municipal Regional Stormwater NPDES Permit, Order No. R2-2022-0018. Said permit requires the City to provide verification and assurance that all treatment devices will be properly operated and maintained. The Agreement shall be recorded against the property and shall run with the land. PW Grading Permit or Building Permit Issuance PUBLIC WORKS – PERMITS AND BONDS 60. Encroachment Permit. Applicant/Developer shall obtain an Encroachment Permit from the Public Works Department for all construction activity within the public right-of-way. At the discretion of the City Engineer an PW Permit Issuance 35 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 18 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: encroachment permit for work specifically included in an Improvement Agreement may not be required. 61. Grading Permit. Applicant/Developer shall obtain a Grading Permit from the Public Works Department for all grading. PW Permit Issuance 62. Security. Applicant/Developer shall provide faithful performance security to guarantee the improvements, as well as payment security, as determined by the City Engineer (Note: The performance security shall remain in effect until one year after final inspection). PW Permit Issuance 63. Permits from Other Agencies. Applicant/Developer shall obtain all permits and/or approvals required by other agencies including, but not limited to:  Army Corps of Engineers  US Fish and Wildlife  Regional Water Quality Control Board  Federal Emergency Management Agency  California Department of Fish and Wildlife  California Dept. of Transportation (Caltrans)  Bay Area Rapid Transit (BART)  Livermore-Amador Valley Transit Authority (LAVTA)  Tri-Valley-San Joaquin Valley Regional Rail Authority  Dublin San Ramon Services District (DSRSD)  Alameda County Flood Control and Water Conservation District Zone 7 (Zone 7) PW Permit Issuance PUBLIC WORKS - SUBMITTALS 64. Improvement Plan Submittal Requirements. All submittals of plans shall comply with the requirements of the “City of Dublin Public Works Department Improvement Plan Submittal Requirements”, the “City of Dublin Improvement Plan Review Check List,” and current Public Works and industry standards. A complete submittal of improvement plans shall include all civil improvements, joint trench, street lighting and on-site safety lighting, landscape plans, and all associated documents as required. Applicant/Developer shall not piecemeal the submittal by submitting various components separately. PW Grading Permit Issuance 65. Improvement Plan Requirements from Other Agencies. Applicant/Developer will be responsible for PW Grading Permit Issuance 36 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 19 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: submittals and reviews to obtain the approvals of all participating non-City agencies, including but not limited to: the Alameda County Fire Department and the Dublin San Ramon Services District. 66. Composite Exhibit. Construction plan set shall include a Composite Exhibit showing all site improvements, utilities, landscaping improvements and trees, etc. to be constructed to ensure that there are no conflicts among the proposed and existing improvements. PW Grading Permit Issuance 67. Geotechnical Report. Applicant/Developer shall submit a Design Level Geotechnical Report, which includes street pavement sections, grading and additional information and/or clarifications as determined by the City Engineer. PW Grading Permit Issuance 68. Ownership and Maintenance of Improvements. Applicant/Developer shall submit an Ownership and Maintenance Exhibit for review and approval by Planning Division and Public Works Department. Terms of maintenance are subject to review and approval by the City Engineer. PL, PW Approval of Parcel Map or Grading Permit Issuance 69. Building Pads, Slopes and Walls. Applicant/Developer shall provide the Public Works Department with a letter from a registered civil engineer or surveyor stating that the building pads have been graded to within 0.1 feet of the grades shown on the approved Grading Plans, and that the top & toe of banks and retaining walls are at the locations shown on the approved Grading Plans. PW Acceptance of Improvements 70. Approved Plan Files. Applicant/Developer shall provide the Public Works Department a PDF format f ile of approved site plans, including grading, improvement, landscaping & irrigation, joint trench and lighting. PW Grading Permit Issuance 71. Master Files. Applicant/Developer shall provide the Public Works Department a digital vectorized file of the “master” files for the project, in a format acceptable to the City Engineer. Digital raster copies are not acceptable. The digital vectorized files shall be in AutoCAD 14 or higher drawing format. All objects and entities in layers shall be colored by layer and named in English. All submitted drawings shall use the Global Coordinate System of USA, California, NAD 83 California State Plane, Zone III, and U.S. foot. PW Acceptance of Improvements 72. Environmental & Sustainability Files. Applicant/Developer shall provide to the Public Works PW/ESD Acceptance of Improvements 37 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 20 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: Department GIS shape files, provided in a format acceptable to the City, all MRP Provision C.3 stormwater features, trash capture devices, mitigation measures, wetlands, v-ditches and public waste containers. 73. SB 1383 Compliance Reporting. To comply with SB 1383, applicant shall keep and maintain a copy of all records pertaining to the procurement of SB 1383 compliant compost and mulch. Applicant shall provide to the Public Works Department records indicating the total compost and mulch procured or used, the quantity of compost (tons or cubic yards) and mulch (tons) procured from each facility or entity, facility or vendor information (name of facility, address, contact information), a general description of how the compost and/or mulch was used, and where compost and mulch was used, and invoices demonstrating procurement. PW/ESD Acceptance of Improvements / building occupancy PUBLIC WORKS - GRADING 74. Grading Plan. The Grading Plan shall be in conformance with the recommendation of the Geotechnical Report, the approved Tentative Map and Site Development Review, and the City design standards & ordinances. In case of conflict between the soil engineer’s recommendatio n and the City ordinances, the City Engineer shall determine which shall apply. PW Grading Permit Issuance 75. Geotechnical Engineer Review and Approval. The Project Geotechnical Engineer shall be retained to review all final grading plans and specifications. The Project Geotechnical Engineer shall approve all grading plans prior to City approval. PW Grading Permit Issuance/ Sitework Permit 76. Grading Off-Haul. The disposal site and haul truck route for any off-haul dirt materials shall be subject to the review and approval by the City Engineer prior to the issuance of a Grading Permit. If the Applicant/Developer does not own the parcel on which the proposed disposal site is located, the Applicant/Developer shall provide the City with a Letter of Consent signed by the current owner, approving the placement of off-haul material on their parcel. A Grading Plan may be required for the placement of the off-haul material. A Transportation Permit or Encroachment Permit may be required for the haul route, as determined by the City Engineer, which shall include a pre- and post-hauling PW Grading Permit Issuance/ Sitework Permit 38 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 21 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: survey of the pavement condition. Applicant/Developer shall be responsible for repairing damaged pavement due to hauling operations, as determined by the City Engineer. 77. Erosion Control Plan. A detailed Erosion and Sediment Control Plan shall be included with the Grading Plan submittal. The plan shall include detailed design, location, and maintenance criteria of all erosion and sedimentation control measures. The plan shall also address site housekeeping best management practices. PW Grading Permit Issuance 78. Demolition Plan. The Applicant/Developer’s Civil Engineer shall prepare a demolition plan for the project, which shall be submitted concurrent with the improvement plan package. The demolition plan shall address the following:  Pavement demolition, including streetlights and landscaped median islands.  Landscaping and irrigation  Fencing to be removed and fencing to remain  Any items to be saved in place and or protected, such as trees, water meters, sewer cleanouts, drainage inlets or backflow prevention devices. PW Grading Permit Issuance PUBLIC WORKS – STORM DRAINAGE & OTHER UTILITIES 79. On-site Storm Drain System. Storm drainage for the 10- year storm event shall be collected on-site and conveyed through storm drains to the public storm drain system. Show the size and location of existing and proposed storm drains and catch basins on the site plan. Show the size and location of public storm drain lines and the points of connection for the on-site storm drain system. PW Grading Permit Issuance 80. Overland Release. Grading and drainage shall be designed so that surplus drainage (above and beyond that of the 10-year storm event) not collected in site catch basins, is directed overland so as not to cause flooding of existing or proposed buildings. PW Grading Permit Issuance 81. Storm Drain Easements. Private storm drain easements and maintenance roads shall be provided for all private storm drains or ditches that are located on private property. The Applicant/Developer shall be responsible for the acquisition of all storm drain easements from offsite property owners which are required for the connection and maintenance of all offsite storm drainage improvements. PW Grading Permit Issuance 82. Storm Drain Inlet (SDI) Markers. All storm drain inlets must be marked with storm drain medallions that read: “No PW Acceptance of Improvements 39 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 22 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: dumping, drains to creek” and use the following color scheme:  Public SDIs: blue medallions.  Public SDIs with installed trash capture devices: yellow medallions.  Private streets SDIs: black medallions with the name of the development.  Public Green Stormwater Infrastructure facilities: green medallions with asset identification number and the wording “stormwater treatment measure.” Details and notes for each medallion shall be shown on the improvement plans. Standard blue medallions may be purchased from the Public Work Department. 83. Fire Hydrants. Fire hydrant locations shall be approved by the Alameda County Fire Department. A raised reflector blue traffic marker shall be installed in the street opposite each hydrant, and shown on the signing & striping plan. PW Acceptance of Improvements 84. Dry Utilities. Applicant/Developer shall construct gas, electric, telephone, cable TV, and communication improvements within the fronting streets and as necessary to serve the project and the future adjacent parcels as approved by the City Engineer and the various Public Utility agencies. PW Certificate of Occupancy or Acceptance of Improvements 85. Dry Utility Locations. All new and existing electric, telephone, cable TV, and communications utilities, shall be placed underground in accordance with the City policies and ordinances. All utilities shall be located and provided within public utility easements or public services easements and sized to meet utility company standards. PW Certificate of Occupancy or Acceptance of Improvements 86. Utility Vaults and Boxes. All utility vaults, boxes, and structures, unless specifically approved otherwise by the City Engineer, shall be underground and placed in landscaped areas and screened from public view. Landscape drawings shall be submitted to the City showing the location of all utility vaults, boxes, and structures and adjacent landscape features and plantings. The Joint Trench Plans shall be submitted along with the grading and/or improvement plans. PW Certificate of Occupancy or Acceptance of Improvements PUBLIC WORKS- STREET IMPROVEMENTS 87. Public Improvements. The public improvements shall be constructed generally as shown on the Site Development Review. However, the approval of the Tentative Map and Site Development Review is not an approval of the specific PW Grading Permit or Encroachment Permit Issuance 40 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 23 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: design of the drainage, traffic circulation, parking, stormwater treatment, sidewalks and street improvements. 88. Public Improvement Conformance. All public improvements shall conform to the City of Dublin Standard Plans, current practices, and design requirements and as approved by the City Engineer. PW Grading Permit or Encroachment Permit Issuance 89. Curb, Gutter & Sidewalk. Applicant/Developer shall remove and replace damaged, hazardous, or nonstandard curb, gutter and sidewalk along the project frontage. Contact the Public Works Department to mark the existing curb, gutter and sidewalk that will need to be removed and replaced. PW Grading Permit or Encroachment Permit Issuance 90. Curb Ramps. City standard curb ramps are required at all intersections. All curb ramps shall include truncated domes, and meet the most current City and ADA design standards. Show curb ramp locations on the plans. Please note that all curb returns on public streets shall have directional or dual ADA ramps – one for each crosswalk and oriented to align parallel with the crosswalk. PW Grading Permit or Encroachment Permit Issuance 91. Visibility Triangle. All improvements within the sight visibility triangle at all intersections, including but not limited to walls and landscaping, shall be a maximum height of 30” from the roadway surface elevation at the nearest lane. PW Grading Permit or Encroachment Permit Issuance PUBLIC WORKS - CONSTRUCTION 92. Erosion Control Implementation. The Erosion and Sediment Control Plan shall be implemented between October 1st and April 30th unless otherwise allowed in writing by the City Engineer. The Applicant/Developer will be responsible for maintaining erosion and sediment control measures for one year following the City’s acceptance of the improvements. PW Start of Construction and On-going 93. Archaeological Finds. If archaeological materials are encountered during construction, construction within 100 ft of these materials shall be halted until a professional Archaeologist certified by the Society of California Archaeology (SCA) or the Society of Professional Archaeology (SOPA) has had an opportunity to evaluate the significance of the find and suggest appropriate mitigation measures. PW Start of Construction and On-going 94. Construction Activities. Construction activities, including the idling, maintenance, and warming up of equipment, shall be limited to Monday through Friday, and non-City holidays, between the hours of 7:30 a.m. and 6:00 p.m. PW Start of Construction and On-going 41 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 24 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: except as otherwise approved by the City Engineer. Extended hours or Saturday work will be considered by the City Engineer on a case-by-case basis. Note that the construction hours of operation within the public right-of- way are more restrictive. 95. Temporary Fencing. Temporary construction fencing shall be installed along the construction work perimeter to separate the construction area from the public. All construction activities shall be confined within the fenced area. Construction materials and/or equipment shall not be operated/stored outside of the fenced area or within the public right-of-way unless approved in advance by the City Engineer. PW Start of Construction and On-going 96. Construction Noise Management Plan. Applicant/Developer shall prepare a construction noise management plan that identifies measures to minimize construction noise on surrounding developed properties. The plan shall include hours of construction operation, use of mufflers on construction equipment, speed limit for construction traffic, haul routes and identify a noise monitor. Specific noise management measures shall be provided prior to project construction. PW Start of Construction Implementation, and On-going as needed 97. Traffic Control Plan. Closing of any existing pedestrian pathway and/or sidewalk during construction shall be implemented through a City-approved Traffic Control Plan and shall be done with the goal of minimizing the impact on pedestrian circulation. PW Start of Construction and On-going as needed 98. Construction Traffic Interface Plan. Applicant/Developer shall prepare a plan for construction traffic interface with public traffic on any existing public street. Construction traffic and parking may be subject to specific requirements by the City Engineer. PW Start of Construction; Implementation, and On-going as needed 99. Pest Control. Applicant/Developer shall be responsible for controlling any rodent, mosquito, or other pest problem due to construction activities. PW On-going 100. Dust Control Measures. Applicant/Developer shall be responsible for watering or other dust-palliative measures to control dust as conditions warrant or as directed by the City Engineer. PW Start of Construction; Implementation On-going as needed 101. Dust Control/Street Sweeping. The Applicant/Developer shall provide adequate dust control measures at all times during the grading and hauling operations. All trucks PW During Grading and Site Work 42 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 25 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: hauling export and import materials shall be provided with tarp cover at all times. Spillage of haul materials and mud- tracking on the haul routes shall be prevented at all times. The Applicant/Developer shall be responsible for sweeping of streets within, surrounding and adjacent to the project, as well as along the haul route, if it is determined that the tracking or accumulation of material on the streets is due to its construction activities. 102. Construction Traffic and Parking. All construction-related parking shall be off-street in an area provided by the Applicant/Developer. Construction traffic and parking shall be provided in a manner approved by the City Engineer. PW Start of Construction and On-going PUBLIC WORKS – EROSION CONTROL & STORMWATER QUALITY 103. Stormwater Treatment. Consistent with Provision C.3 of the Municipal Regional Stormwater NPDES Permit (MRP) Order No. R2-2022-0018, the Applicant/Developer shall submit documentation including construction drawings demonstrating all stormwater treatment measures and hydromodification requirements as applicable are met. PW/ESD Grading Permit Issuance 104. Stormwater Source Control. All applicable structural and operational stormwater source controls shall be implemented. PW/ESD Grading/Sitework Permit Issuance 105. Maintenance Access. Applicant shall design and construct maintenance access to all stormwater management measures and mitigation swales, as appropriate. Maintenance access for equipment and personnel to overflow risers, cleanouts and other structures is required. The final number, location, width, and surfacing of maintenance access points from public or private streets is subject to the approval of the City Engineer and GHAD Engineer, as applicable. PW/ESD Grading Permit Issuance 106. NOI and SWPPP. Prior to any clearing or grading, Applicant/Developer shall provide the City evidence that a Notice of Intent (NOI) has been sent to the California State Water Resources Control Board per the requirements of the NPDES. A copy of the Storm Water Pollution Prevention Plan (SWPPP) shall be provided to the Public Works Department and be kept at the construction site. PW Start of Any Construction Activities 107. SWPPP. The Storm Water Pollution Prevention Plan (SWPPP) shall identify the Best Management Practices (BMPs) appropriate to the project construction activities. The SWPPP shall include the erosion and sediment control measures in accordance with the regulations outlined in the PW SWPPP to be Prepared Prior to Grading Permit Issuance; Implementation 43 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 26 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: most current version of the Association of Bay Area Governments (ABAG) Erosion and Sediment Control Handbook or State Construction Best Management Practices Handbook. The Applicant/Developer is responsible for ensuring that all contractors implement all storm water pollution prevention measures in the SWPPP. Prior to Start of Construction and On-going as needed 108. Stormwater Management Plan. The Stormwater Management Plan has been approved in concept only. A final Stormwater Management Plan shall be submitted for review and approval by the City Engineer. Approval is subject to the Applicant/Developer providing the necessary plans, details, and calculations that demonstrate the plan complies with the standards issued by the San Francisco Bay Regional Water Quality Control Board and Alameda Countywide Clean Water Program. Landscape Based Stormwater Management Measures shall be irrigated and be on a separate irrigation controller from traditional landscape, and meet WELO requirements. PW/ESD Building Permit Issuance and Grading Permit Issuance 109. Stormwater Control Plan. A narrative Stormwater Control Plan with sufficient detail to ensure the stormwater design, site plan, and landscaping plan are congruent shall be submitted for review and approval by the City Engineer. The Stormwater Control Plan shall consist of a report an exhibit. Required details of the plan are available at https://dublin.ca.gov/1656 110. SB 1383 Compliance. To comply with SB 1383 procurement requirements, all mulch and compost used in stormwater management measures and general landscape areas shall meet SB 1383 procurement requirements. Specifically, compost must be produced at a permitted composting facility; digestate, biosolids, manure and mulch do not qualify as compost. Eligible mulch must be derived from organic materials and be produced at a permitted transfer station, landfill, or composting facility. Examples of allowed compost include arbor mulch and composted mulch. Examples of allowed mulch include mulch made from recycled pallets and dimensional lumber, aged tree trimmings, wood fines, and screened compost overs. Mulch must meet or exceed the physical contamination, maximum metal concentration, and pathogen density standards for land application specified in 14 CCR 17852(a)(24.5)(A)1 through 3. PW/ESD Building Permit Issuance and Grading Permit Issuance. 111. Trash Capture. The project must include appropriate full trash capture devices for both private and public improvements. Specific details on the trash capture PW Building Permit Issuance and 44 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 27 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: devices selected are required on the construction plan set demonstrating how MRP Provision C.10 (trash capture) requirements are met. A list of approved full trash capture devices may be found at the California Stormwater Quality Association website at the following link: https://www.casqa.org/resources/trash/certified-full- capture-system-trash-treatment-control-devices. Please note that lead time for trash capture device delivery can be substantial. The applicant/contractor shall plan accordingly. Applicant must confirm with the manufacturer of the selected trash capture device(s) during the final design/construction document phase that the device(s) selected are compatible with the intended use. Grading Permit Issuance 112. Phased Construction and Stormwater Management Measures. Required stormwater treatment, hydromodification management, and trash capture devices shall be installed concurrent with construction of the first phase of improvements. Temporary facilities are not permitted. PW/ESD Building Permit Issuance and Grading Permit Issuance PUBLIC WORKS – ONSITE IMPROVEMENTS 113. Drive Aisle Width. The parking lot aisles shall be a minimum of 24 feet wide to allow for adequate onsite vehicle circulation for cars, trucks, and emergency vehicles. PW Grading Permit Issuance 114. Vehicle Parking. All on-site vehicle parking spaces shall conform to the following: a. All parking spaces shall be double striped using 4” white lines set 2 feet apart in accordance with City Standards and DMC 8.76.070.A.17. b. 12”-wide concrete step-out curbs shall be constructed at each parking space where one or both sides abut a landscaped area or planter. c. Where wheel stops are shown, individual 6’ long wheel stops shall be provided within each parking space in accordance with City Standards. d. A minimum 2’ radius shall be provided at curb returns and curb intersections where applicable. e. Parking stalls next to walls, fences and obstructions to vehicle door opening shall be an additional 4’ in width per DMC 8.76.070.A.16. f. Landscaped strips adjacent to parking stalls shall be unobstructed in order to allow for a minimum 2 - foot vehicular overhang at front of vehicles. PW Grading Permit Issuance 45 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 28 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: 115. Onsite Signing and Striping Plan. A Traffic Signing and Striping Plan showing all proposed signing and striping within on-site parking lots and drive aisles, shall be submitted for review and approval by the City Engineer. PW Grading Permit or Encroachment Permit Issuance 116. Photometrics. The Applicant/Developer shall provide a complete photometrics plan for both onsite and frontage roadways. Include the complete data on photometrics, including the High, Average and Minimum values for illuminance and uniformity ratio. PW Grading Permit or Encroachment Permit Issuance 117. Project signs. All proposed project monument signs shall be placed on private property. Signs should be located outside of any easement areas unless specifically approved by the City Engineer. Any signage allowed to be located in an easement is subject to removal and replacement at the expense of the Developer/property owner if required by the easement holder. PW Grading Permit Issuance 118. Solid Waste Requirements. The Project must comply with all requirements in Dublin Municipal Code Chapter 7.98 and City of Dublin Waste Handling Standards for Commercial Properties and Multi-Family Properties, including the following requirements:  Install pet waste disposal stations within parks and along pedestrian trails.  Install color-coded three stream (gray for garbage, blue for recycling, green for compost) public litter containers with clear signage describing each waste stream at eating and picnic areas. Install color-coded two stream (gray for garbage, blue for recycling,) public litter containers with clear signage describing each waste stream along public and private sidewalks. Containers shall include covers or side openings, or be located under cover to prevent rainwater from entering. The collection containers shall/will be maintained by the property. PW/ESD Building Permit or Site Work Permit Issuance 119. Cigarette butt collection. Install and appropriately site cigarette butt collection containers for employee and public and/or resident use. PW/ESD Building Permit or Site Work Permit Issuance 120. Garbage truck access. The applicant shall provide plans and details on anticipated garbage truck access and routes, in addition to example set-out diagrams for waste carts/bins placement on garbage day demonstrating adequate space available for carts/bins. Carts and bins shall not block street or driveway access. On street parking must be considered PW/ESD Building Permit or Site Work Permit Issuance 46 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 29 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: (e.g., if on street parking is allowed, demonstrate that there is adequate space for parked cars and three-stream carts). PUBLIC WORKS - SPECIAL CONDITIONS 121. ReScape California Landscape Design. All publicly owned landscape (e.g. parks, right of way, etc.) shall be designed and rated to meet ReScape standards. The applicant is encouraged to design all other landscape areas according to ReScape Landscape standards. PW/ESD Building Permit Issuance and Grading Permit Issuance 122. Street Restoration. A pavement treatment, such as slurry seal or grind and overlay, may be required within the public streets fronting the site as determined by the Public Works Department. The type and limits of the pavement treatment shall be determined by the City Engineer based upon the number and proximity of trench cuts, extent of frontage and median improvements, extent of pavement striping and restriping, excessive wear and tear/damage due to construction traffic, etc. PW Certificate of Occupancy or Acceptance of Improvements 123. Waste Enclosure. The waste enclosure/trash room shall meet all of the requirements set forth within the Dublin Municipal Code Section 7.98 and City of Dublin Waste Handling Standards for Commercial Properties and Multi- Family Properties, including but not limited to providing sewer and water hook-ups. The improvement plans and/or building permit plans shall show additional information demonstrating these requirements are met. A standard plan for the waste enclosure can be downloaded at https://dublin.ca.gov/341/Standard-Plans in the “Stormwater Measures” section. A pedestrian accessible path of travel shall be provided for employees from the building to the waste enclosure in conformance with current accessibility requirements. PW/ESD Building Permit Issuance and Grading Permit Issuance 124. Biofiltration. Stormwater discharge into stormwater treatment facilities must be accomplished such that inadvertent bypass of the treatment soil does not occur (e.g., bubble-ups must be placed adjacent to the facility, outside of the treatment soil area) PW/ESD Building Permit Issuance and Grading Permit Issuance 125. Stormwater Details. Stormwater details must adhere to the guidelines in the Alameda Countywide Clean Water Program C.3 Stormwater Technical Guidance Manual and City of Dublin standard details PW/ESD Building Permit Issuance and Grading Permit Issuance DUBLIN SAN RAMON SERVICES DISTRICT 126. Regulations that apply to development projects. The regulations that apply to development projects are DSRSD Building Permit Issuance 47 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 30 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: codified in: the Dublin San Ramon Services District Code; the DSRSD “Standard Procedures, Specifications and Drawings for Design and Installation of Water and Wastewater Facilities” as amended from time to time; all applicable DSRSD Master Plans and all DSRSD policies. Prior to issuance of any building permit, complete improvement plans shall be submitted to DSRSD that conform to the pertinent documents. 127. Fees. Planning and review fees, inspection fees, and fees associated with a wastewater discharge permit shall be paid to DSRSD in accordance with the rates and schedules and at time of payment as established in the DSRSD Code. Planning and review fees are due after the 1st submittal of plans. Construction Permit and Inspection Fees are due prior to the issuance of a Construction Permit. Capacity Reserve Fees are due before the water meter can be set or the connection to the sewer system. DSRSD Permit Submittal and Construction Permit Issuance 128. District Review and Acceptance. Prior to issuance of any building permit by the City; or any Building Permit or Construction Permit by the Dublin San Ramon Services District, all improvement plans for DSRSD facilities shall be signed by the District Engineer. Each drawing of improvement plans for DSRSD facilities shall contain a signature block for the District Engineer indicating approval of the sanitary sewer and/or water facilitie s shown. Prior to approval by the District Engineer, the applicant shall pay all required DSRSD fees, and provide an engineer’s estimate of construction costs for the sewer and water systems, a faithful performance bond, and a comprehensive general liability insurance policy in the amounts and forms that are acceptable to DSRSD. The applicant shall allow at least 15 working days for final improvement drawing review by DSRSD before signature by the District Engineer. DSRSD Building Permit Issuance or Construction Permit Issuance 129. Easements. All easement dedications for DSRSD facilities shall be by separate instrument irrevocably offered to DSRSD or by offer of dedication on the Final Map. Prior to approval by the City for Recordation, the Final Map shall be submitted to and approved by DSRSD for easement locations, widths, and restrictions. DSRSD Building Permit Issuance or Construction Permit Issuance 130. Submission of Proposed Easements. Prior to approval by the City of a grading permit or a site development permit, the locations and widths of all proposed easement dedications for DSRSD Grading Permit Issuance 48 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 31 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: water and sewer lines shall be submitted to and approved by DSRSD. 131. Locate facilities in public streets. Water and sewer mains shall be located in public streets rather than in off- street locations to the fullest extent possible. If unavoidable, then sewer or water easements must be established over the alignment of each sewer or water main in an off -street or private street location to provide access for future maintenance and/or replacement. DSRSD Approval of Improvement Plans 132. Looped or Interconnect Pipelines. Domestic and fire protection waterline systems for Tracts or Commercial Developments shall be designed to be looped or interconnected to avoid dead end sections in accordance with requirements of the DSRSD Standard Specifications and sound engineering practice. DSRSD Approval of Improvement Plans 133. Water and/or Sewer Capacity Demands. This project will be analyzed by DSRSD to determine if it represents additional water and/or sewer capacity demands on the District. Applicant will be required to pay all incremental capacity reserve fees for water and sewer services as required by the project demands. All capacity reserve fees must be paid prior to installation of a water meter for water. If a water meter is not required, the capacity reserve fee shall be paid prior to issuance of a building permit. The District may not approve the building permit until capacity reserve fees are paid. DSRSD Building Permit Issuance or Construction Permit Issuance 134. Obtain Permit to Construct. No sewer line or waterline construction shall be permitted unless the proper utility construction permit has been issued by DSRSD. A construction permit will only be issued after all of the items in Condition No. 128 have been satisfied. DSRSD Building Permit Issuance or Construction Permit Issuance 135. Backflow Prevention Devices/Double Detector Check Valves. Above ground backflow prevention devices/double detector check valves shall be installed on fire protection systems connected to the DSRSD water main. The applicant shall collaborate with the Fire Department and with DSRSD to size and configure its fire system. DSRSD Approval of Improvement Plans 136. Proposed Irrigation. Any proposed irrigation for this project shall be designed for and connected to potable water. Unless explicitly stated otherwise by DSRSD, DSRSD Construction Permit Issuance 49 Reso. No. 25-XX, Item 6.1, Adopted XX/XX/2025 Page 32 of 32 CONDITION TEXT RESPONSIBL E AGENCY WHEN REQUIRED PRIOR TO: recycled water irrigation is unavailable for use for this project per DERWA recycled water moratorium Resolution No. 19-3 dated 3/24/2019. 137. No installation under pavers, decorative pavement or concrete. Pipelines and related appurtenances shall not be constructed underneath pavers or decorative pavement or concrete. DSRSD Construction Permit Issuance 138. Trash Enclosures. If trash enclosures are required to drain to the sanitary sewer system, grease interceptors shall be connected downstream of the drain and installed near the trash enclosure area. The trash enclosure shall be roofed and graded to minimize rain water or stormwater from entering the drain within the trash enclosure. DSRSD Building Permit Issuance or Construction Permit Issuance PASSED, APPROVED AND ADOPTED BY this 9th day of December, 2025 by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Planning Commission Chair ATTEST: _________________________________ Community Development Director 50 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.1 TITLE SHEET SUNFLOWER HILL AT GRACE POINTE DUBLIN, CA SITE DEVELOPMENT REVIEW SUBMITTAL NORTH Du b l i n B l v d . PROJECT LOCATION Brannigan St. SHEET INDEX: A1.1 TITLE SHEET A1.2 PROJECT DATA SUMMARY A1.3 CONTEXT IMAGERY A1.4 ARCHITECTURAL SITE PLAN A1.5 FIRE ACCESS DIAGRAM A1.6 ACCESS DIAGRAM A1.7 TRASH DIAGRAM A1.8 PERSPECTIVE VIEW: AERIAL A1.9 PERSPECTIVE VIEW: ENTRY A1.10 PERSPECTIVE VIEW: CORNER OF DUBLIN BLVD. AND BRANNIGAN ST. A1.11 CODE ANALYSIS:ALLOWABLE AREA AND HEIGHT CALCULATIONS A1.12 CODE ANALYSIS: ALLOWABLE OPENINGS A2.1 GROUND FLOOR PLAN A2.2 SECOND FLOOR PLAN A2.3 THIRD FLOOR PLAN A2.4 UNIT PLANS A2.5 UNIT PLANS A2.6 ROOF PLAN A3.1 BUILDING ELEVATIONS A3.2 COURTYARD ELEVATIONS A3.3 BUILDING ELEVATIONS A3.4 BUILDING SECTION A3.5 COLORS & MATERIALS A3.6 DESIGN DIAGRAM: PRIMARY (FINNIAN WAY ) STREET ELEVATION A3.7 DESIGN DIAGRAM: SIDE (BRANNIGAN) STREET ELEVATION A3.8 DESIGN DIAGRAM: LEFT & RIGHT COURTYARD ELEVATIONS A3.9 DESIGN DIAGRAM: DUBLIN BLVD. ELEVATION A3.10 DESIGN DIAGRAM: WEST ELEVATION A3.11 EXAMPLE BIKE RACK & TYPICAL DETAIL A3.12 CONCEPTUAL WINDOW TRIM DETAILS L.01 CONCEPTUAL LANDSCAPE PLAN L.02 SUPPLEMENTAL LANDSCAPE EXHIBITS L.03 SUPPLEMENTAL LANDSCAPE EXHIBITS L.04 CONCEPTUAL LIGHTING PLAN C0.1 COVER SHEET C0.2 GENERAL NOTES C0.3 FIRE ACCESS PLAN C1.0 EROSION CONTROL PLAN C1.1 EROSION CONTROL NOTES AND DETAILS C2.0 SITE LAYOUT & STRIPPING PLAN C2.1 GRADING & DRAINAGE PLAN C2.2 TYPICAL SECTIONS C3.0 UTILITY PLAN C4.0 STORMWATER CONTROL PLAN C4.1 CLEAN BAY BLUE PRINT C5.0 GARBAGE TRUCK TURING PLAN C5.1 DELIVERY TRUCK TURNING PLAN C6.0 STRIPING DETAIL C6.1 UTILITY DETAILS E0.02 LUMINAIRE SCHEDULE E1.00 SITE LIGHTING E1.01 SITE PHOTOMETRICS PROJECT DESCRIPTION: Sunflower Hill at Grace Pointe is a fully-electric community offering 59 units of affordable housing and one manager’s unit, specifically designed to support individuals with intellectual and developmental disabilities. This development aligns with the master plan, featuring architectural and site designs that seamlessly integrate into the larger community. Residents will enjoy a variety of indoor and outdoor amenities catering to different levels of interactivity. Indoor amenities include a maker space and gallery, a multi-purpose community room, a fitness area, laundry facilities, secured bike storage, lounge areas, and mail services. The project also includes dedicated office and breakroom space for management staff, service providers, and caregivers. Outdoor amenities feature a sports court, gardening beds, outdoor seating, a lawn area for lounging and games, and shaded seating areas. Vehicular access is provided on the north side of the site, as outlined in the master development plan. There are 36 proposed parking stalls, along with additional pick-up and drop-off space near the entry, out of the main vehicular circulation route. This parking is expected to be primarily used by guests and caregivers, as most residents do not own or operate personal vehicles. The three-story U-shaped building is located south of the parking area and encloses a secured outdoor courtyard. While the primary frontage faces inward within the master plan community, key indoor amenities are situated in a single-story wing along Brannigan Street, offering additional volume and glazing in these areas. The secured courtyard along Brannigan Street provides visual connectivity to the streetscape. The project comprises 60 units in total: 30 one-bedroom units, 29 two-bedroom units, and 1 three-bedroom unit. These residential units are positioned along the west and south portions of the U-shaped building. The southern edge, bordering neighboring townhomes, will be thoughtfully landscaped to maximize privacy for both Sunflower Hill residents and adjacent neighbors. Architecturally, the three-story building will feature articulation on all sides, embodying a contemporary aesthetic that harmonizes with the prevalent architecture in the master plan community. The design will incorporate appropriate variation in the wall plane and roof forms, while a palette of durable body and accent materials will be chosen with the overall community in mind. PROJECT CONTACTS: DEVELOPER/APPLICANT: Satellite Affordable Housing Associates 1835 Alcatraz Avenue Berkeley, CA 94703 (510) 647-0700 Contact: Jonathan Astmann jastmann@sahahomes.org Sunflower Hill 3278 Constitution Drive, Bldg. 16 Livermore, CA 94551 Phone: (925) 800-1042 Susan Houghton susanh.sunflower@gmail.com ARCHITECT: DAHLIN Architecture | Planning | Interiors 5865 Owens Drive Pleasanton, CA 94588 Phone: (925) 251-7200 Contact: Lauri Moffet-Fehlberg lfehlberg@dahlingroup.com CIVIL: KPFF Consulting Engineers 1101 Creekside Ridge Drive, Suite 150 Roseville, CA 95678 Phone: (213) 266-5287 Contact: Ryan Carter ryan.carter@kpff.com LANDSCAPE: Form/Work LA 2585 University Avenue San Diego, CA 92104 Phone: (619) 269-4423 Contacts: Michael Vail mike@formwork-la.com ELECTRICAL: Emerald City Engineers 21705 Highway 99 Lynnwood, WA 98036 Phone: (425) 741-1200 Contact: Adam French afrench@emeraldcityeng.com VICINITY MAP: Attachment 2 51 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.2 PROJECT DATA SUMMARY PROJECT DATA SUMMARY PROJECT NAME: LOCATION: PROJECT NUMBER: CLIENT: APN: PARCEL 1 GP DESIGNATION: ZONING: ACREAGE:Acres 1.89 TOTAL:1.89 PROPOSED CONSTRUCTION TYPE: PROPOSED OCCUPANCY: MAXIMUM BUILDING HEIGHT PROPOSED BUILDING HEIGHT MAXIMUM NUMBER OF STORIES PROPOSED NUMBER OF STORIES MAXIMUM DENSITY PROPOSED DENSITY Dublin Blvd. Brannigan St. Private Drives/Alleys MINIMUM REQUIRED SETBACKS 20'-0" 10'-0"4'-0" PROPOSED SETBACKS RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: GROUND LEVEL: RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: SECOND LEVEL: RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: THIRD LEVEL: RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: UNIT MIX 1-BD: 2-BD: 3-BD: TOTAL: TOTAL NUMBER OF BEDS: STANDARD PARKING STALLS: VEHICULAR PARKING PROVIDED (SPACES) 91 60 15,850 0 286 3,374 34 15,023 803 807 3,417 29 20,841 +/- 39'-9" DATE: 09/22/25 GROSS BUILDING AREAS PER FLOOR (SF) 67,504 50 DU/AC Sunflower Hill at Grace Pointe Dublin, CA 681-007 SAHA and Sunflower Hill 82,561 GENERAL 975 20,485 Type VA R-2 4,057 1,791 26,178 10,848 3,557 Refer to Sheet A1.4 for proposed setbacks PD Ord. 14-22 Square Feet 82,561 985-0051-006 Public/Semi-Public 5 3 31.9 DU/AC ZONING REGULATIONS 65' 30 1 45,524 5,292 2,283 GROSS BUILDING AREA TOTALS (SF) 14,651 4,489 1,190 791 CIRCULATION:UTILITY: TOTAL: GROUND LEVEL: RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: SECOND LEVEL: RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: THIRD LEVEL: RESIDENTIAL UNITS: COMMON / AMENITY: OFFICES / SERVICES: CIRCULATION: UTILITY: TOTAL: UNIT MIX 1-BD: 2-BD: 3-BD: TOTAL: TOTAL NUMBER OF BEDS: STANDARD PARKING STALLS: ACCESSIBLE PARKING STALLS 1: TOTAL2: PARKING RATIO : LONG TERM3: SHORT TERM: TOTAL: Ratio # of units Total COMMON:200 60 12,000 TOTAL: COMMON: TOTAL: VEHICULAR PARKING PROVIDED (SPACES) 91 60 15,850 0 286 3,374 34 2 15,923 36 OPEN SPACE PROVIDED (SF) 15,923 1One van accessible parking space provided. 215% of the total parking to be provided with Level 2 EVSE chargers per CGBSC Tier 2 Requirements. 12,000 OPEN SPACE REQUIRED (SF) per PD Ordinace 14-22 BIKE PARKING PROVIDED 36 32 4 3 In addition to the bikes that can be accomodated by the racks shown in the room, open floor area is available for the tricycles and scooters. 0.53 15,023 803 807 3,417 29 20,841 GROSS BUILDING AREAS PER FLOOR (SF) 67,504 975 20,485 4,057 1,791 26,178 10,8483,557 30 1 14,651 4,489 1,190 791 52 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.3 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE ROWTOWNS - BUILDING 1 STYLE ‘A’ - ELEVATIONS BUILDING 1 - 5-PLEX - FRONT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 1 - 5-PLEX - LEFT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 1 - 5-PLEX - RIGHT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 1 - 5-PLEX - REAR ELEVATION ‘A’ SCALE: 1/8”=1’ 9’ - 1 ” A4.5 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE ROWTOWNS - BUILDING 2 STYLE ‘B’ - ELEVATIONS BUILDING 2 - 6-PLEX - FRONT ELEVATION ‘B’ SCALE: 1/8”=1’ BUILDING 2 - 6-PLEX - LEFT ELEVATION ‘B’ SCALE: 1/8”=1’ BUILDING 2 - 6-PLEX - RIGHT ELEVATION ‘B’ SCALE: 1/8”=1’ BUILDING 2 - 6-PLEX - REAR ELEVATION ‘B’ SCALE: 1/8”=1’ 9’ - 1 ” A4.11 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE ROWTOWNS - BUILDING 1 STYLE ‘B’ - ELEVATIONS BUILDING 1 - 5-PLEX - FRONT ELEVATION ‘B’ SCALE: 1/8”=1’ BUILDING 1 - 5-PLEX - LEFT ELEVATION ‘B’ SCALE: 1/8”=1’ BUILDING 1 - 5-PLEX - REAR ELEVATION ‘B’ SCALE: 1/8”=1’ BUILDING 1 - 5-PLEX - RIGHT ELEVATION ‘B’ SCALE: 1/8”=1’ 9’ - 1 ” A4.6 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE ROWTOWNS - BUILDING 3 STYLE ‘A’ - ELEVATIONS BUILDING 3 - 8-PLEX - FRONT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 3 - 8-PLEX - LEFT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 3 - 8-PLEX - REAR ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 3 - 8-PLEX - RIGHT ELEVATION ‘A’ SCALE: 1/8”=1’ 9’ - 1 ” A4.15 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE ROWTOWNS - BUILDING 2 STYLE ‘A’ - ELEVATIONS BUILDING 2 - 6-PLEX - FRONT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 2 - 6-PLEX - LEFT ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 2 - 6-PLEX - REAR ELEVATION ‘A’ SCALE: 1/8”=1’ BUILDING 2 - 6-PLEX - RIGHT ELEVATION ‘A’ SCALE: 1/8”=1’ 9’ - 1 ” A4.10 CONTEXT IMAGERY 5-PLEX A 6-PLEX A 8-PLEX A 5-PLEX B 6-PLEX B 2.4 FOR TREE LEGEND GRADES AND A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C A/C 5A 5A 5B 5B 6B 5A 5A 6A 5B 6B 5A 6A 6B 6B 6B 6A 8A 5B 13 4 2 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE A5.1 FINNIAN WAY - STREETSCAPE VIEW KEY PLAN 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 1213.010 02-05-2024 JOB NO. DATE A6.1 STAND ALONE RETAIL - AXON VIEW 1 2 3 4 ADJACENT TOWNHOUSE ARCHITECTURE: EXTRACTED FROM APPROVED ENTITLEMENT SET FOR MASTER PLAN DEVELOPMENT SITE PLAN GRAPHIC FROM APPROVED MASTER PLAN: REFER TO APPROVED MASTER PLAN FOR DETAILS ON SITE MODIFICATIONS IMAGE FROM APPROVED MASTER PLAN DEVELOPMENT IMAGE FROM APPROVED MASTER PLAN DEVELOPMENT PROJECT SITE 53 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.4 ONE-BEDROOM UNITS TWO-BEDROOM UNITS THREE-BEDROOM UNITS LOCATION OF FUTURE GARDEN SHED PROPERTY LINE ARCHITECTURAL SITE PLAN LEGEND: 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 20 40 80 0 4 8 16 BUILDING UNIT MIX 1BD/1BA 30 2BD/2BA 29 3BD/2BA 1 TOTAL 60 UNITS BRANNIGAN STREET DU B L I N B O U L E V A R D 54 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.5 FIRE ACCESS DIAGRAM BRANNIGAN STREET DU B L I N B O U L E V A R D FIRE TRUCK ACCESS FIRE AERIAL APPARATUS ACCESS 30’ OFFSET FROM FACE OF CURB 200’ HOSE PULL CLEAR LADDER AREA. SURFACE TO BE UNOBSTRUCTED AND LEVELED ROOF HEIGHT BELOW 30’ INSIDE FACE OF WALL BELOW KEY: 26 ’ - 0 ” 25 ’ - 0 ” 24 ’ - 0 ” 25’-0” 38’-8” 26’-0” ROOF ACCESS HATCH ROAD MARKING STRIP 30’-0” 30’-0” 30 ’ - 0 ” 55 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.6 ACCESS DIAGRAM TRASH PICKUP ACCESS TRASH STAGING AREA KEY: 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 20 40 80 0 4 8 16 BRANNIGAN STREET DU B L I N B O U L E V A R D 56 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.7 TRASH DIAGRAM KEY: RESIDENT TRASH ACCESS MAINTENANCE STAFF ACCESS ONLY RESIDENTIAL: [(30 x 1BD)+(29 x 2BD)+(1 x 3BD)] x 2 = 182 OCCUPANTS 182 OCCUPANTS X 15 GAL/OCCUPANT = 2730 GAL 200 GAL = 1 CUBIC YARD WEEKLY TRASH: 40% X 2730 = 1092 GAL = 5.46 CUBIC YARDS (2) 3-YARD BINS PROVIDED AT DUMPSTER ROOM. (2) 64 GAL CARTS PROVIDED AT GROUND FLOOR RESIDENT TRASH ROOM & CHUTE PROVIDED AT UPPER FLOOR RESIDENT TRASH ROOMS. GARBAGE: RESIDENTIAL: [(30 x 1BD)+(29 x 2BD)+(1 x 3BD)] x 2 = 182 OCCUPANTS 182 OCCUPANTS X 15 GAL/OCCUPANT = 2730 GAL 200 GAL = 1 CUBIC YARD WEEKLY COMPOST: 20% X 2730 = 546 GAL = 2.73 CUBIC YARDS (1) 3-YARD BIN PROVIDED AT TRASH ROOM. (1) 64 GAL CART PROVIDED AT EACH GROUND AND UPPER FLOOR RESIDENT TRASH ROOM. ORGANICS: RESIDENTIAL: [(30 x 1BD)+(29 x 2BD)+(1 x 3BD)] x 2 = 182 OCCUPANTS 182 OCCUPANTS X 15 GAL/OCCUPANT = 2730 GAL 200 GAL = 1 CUBIC YARD WEEKLY RECYCLING: 40% X 2730 = 1092 GAL = 5.46 CUBIC YARDS (2) 3-YARD BINS PROVIDED AT TRASH ROOM. (2) 64 GAL CARTS PROVIDED AT GROUND FLOOR RESIDENT TRASH ROOM & CHUTE PROVIDED AT UPPER FLOOR RESIDENT TRASH ROOMS. RECYCLING: 0 8 16 32 0 16 32 64 0 32 64 128 0 4 8 16 WASTE GENERATION CALCULATIONS: GENERAL NOTES: 1. ALL DOORS ARE MINIMUM 3’-0” WIDE. 2. A 6”X6” CONCRETE CURB STOP IS PROVIDED AROUND THE PERIMETER OF THE DUMPSTER ROOM AS SHOWN IN ADJACENT PLANS. 3. ALL BINS ARE LOCATED MIN. 6” AWAY FROM THE CONCRETE CURB STOP AND WITH MIN. 1’-0” SPACE BETWEEN BINS.ENLARGED PLANS - GROUND FLOOR TRASH ROOMS ENLARGED PLANS - TRASH STAGING AREA 1 3 ENLARGED PLANS - UPPER FLOOR TRASH ROOM, TYP.2 57 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.8 PERSPECTIVE VIEW: AERIAL KEYPLAN: 58 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.9 PERSPECTIVE VIEW: ENTRY KEYPLAN: 59 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.10 PERSPECTIVE VIEW: CORNER OF DUBLIN BLVD. AND BRANNIGAN ST. KEYPLAN: 60 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.11 LEGEND: R-2 OCCUPANCY A-3 OCCUPANCY CODE ANALYSIS: ALLOWABLE AREA AND HEIGHT CALCULATIONS ALLOWABLE AREA CALCULATION - MULTISTORY MIXED OCCUPANCY BUILDING - Type VA Construction Residential (R2)Community Room (A3) At = 36,000 s.f. (area from Table 506.2)At = 34,500 s.f. (area from Table 506.2) NS =12,000 s.f. (area from Table 506.2)NS =11,500 s.f. (area from Table 506.2) F = 0 ft. (actual frontage or 0)F = 0 ft. (actual frontage or 0) P = 1 ft. (actual perimeter or 1)P = 1 ft. (actual perimeter or 1) W = 0 ft. (use 0, 20 to 30)W = 0 ft. (use 0, 20 to 30) # stories = 3 (R2) (use 2 to 4)# stories = 1 (A3) (use 1 to 3 for # of floors occurs on) If = 0.0000 If = 0.0000 [F/P - 0.25] W/30 [F/P - 0.25] W/30 Aa = 36,000 s.f.Aa = 34,500 s.f. {At + [NS x If]}{At + [NS x If]} Mixed Use Ratio Building 1st Floor 2nd Floor 3rd Floor Bldg Total Actual Areas (A): R2 Residential=18,000 20,370 20,015 58,385 A3 Community=8,700 0 0 8,700 Floor Total 26,700 20,370 20,015 67,085 Mixed Use R2 + A3 =Total A/Aa + A/Aa = 1st floor 0.50 0.25 = 0.75 0.75 <1 Complies 2nd floor 0.57 0.00 = 0.57 0.57 <1 Complies 3rd floor 0.56 0.00 = 0.56 0.56 <1 Complies 1st Floor 2nd Floor 3rd Floor All Floors:0.75 0.57 +0.56 =1.87 <2 Complies Total ratio Building OK 1.87 <2 Complies ALLOWABLE HEIGHT - MULTISTORY MIXED-OCCUPANCY BUILDING AT GRADE - Type VA Construction Per CBC Table 504.3 and CBC Table 504.4, the Type VA, R-2 project is allowed to be constructed up to 60' and 4 stories if both the height and area increase are utilized. Footnote j in Table 503.3 and footnote o in Table 504.4 note that "For Group R-2 buildings of Type VA construction equipped throughout with an approved automatic sprinkler system in accordance with Section 903.3.1.1, S area increase is permitted in addition to the height and story increase provided the height shall not exceed 60 feet and 4 stories." Thus the project, proposed at a maximum height of +/- 39'-9" and 3 stories is compliant with the allowable height. BOILER ROOM 439 SQ FT R. R . LAUNDRY CARE GIVER BREAK ROOM 490 LOC IDF CARE GIVER 15,30,45 TRASH CARE GIVER UP JAN. STACKW/D STACKW/D WASH DRYWASHDRYSTACKW/D STACKW/D LIGHT HOUSE 460 ROOF BELOW ROOF BELOW ROOF BELOW ROOF BELOW 64 G . O. R.T. ST.UP DN IDF CARE GIVER CARE GIVER dn SFH STOR MAINTENANCE 604 sq ft TRASH 64 G . O. R.T. ROOF BELOW ROOF BELOW ROOF BELOW ROOF BELOW ST.UP DN 3 THIRD FLOOR LEVEL 2 SECOND FLOOR LEVEL 1 GROUND FLOOR LEVEL 61 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A1.12 CODE ANALYSIS: ALLOWABLE OPENINGS Top of Subfloor 2ND FLOOR Top of Subfloor 3RD FLOOR ROOF LEGEND: WALL AREA OPENING AREA CALCULATIONS: (GREATER THAN 15’ BUT LESS THAN 20’ FROM PROPERTY LINE TO CLOSEST BUILDING FACE = 75% OPEN ALLOWED) GROUND FLOOR: 874 SQ. FT. OPENINGS / 2,957 SQ. FT. WALL AREA = 29.5% OPEN (75% ALLOWED) SECOND FLOOR: 845 SQ. FT. OPENINGS / 2,806 SQ. FT. WALL AREA = 30% OPEN (75% ALLOWED) THIRD FLOOR: 845 SQ. FT. OPENINGS / 2,806 SQ. FT. WALL AREA = 30% OPEN (75% ALLOWED) GROUND FLOOR SECOND FLOOR THIRD FLOOR 15 ’ - 1 ” 3 GROUND FLOOR PLAN 2 BUILDING ELEVATION 1 LADDER DIAGRAM EGRESS LADDER ACCESS AREA. CLEAR, FLAT AREA STARTING AT 3’ AND EXTENDING TO 10’ FROM WINDOW WALL. SMOOTH AREA. CONCRETE PAD NOT REQUIRED. CENTER ON OPERABLE BEDROOM WINDOW. 62 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A2.1 GROUND FLOOR PLAN ONE-BEDROOM UNITS TWO-BEDROOM UNITS THREE-BEDROOM UNITS LOCATION OF FUTURE GARDEN SHED KEY: GROUND FLOOR UNIT MIX 1BD/1BA 9 2BD/2BA 9 3BD/2BA 1 TOTAL 19 UNITS 63 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A2.2 2ND FLOOR PLAN ONE-BEDROOM UNITS TWO-BEDROOM UNITS THREE-BEDROOM UNITS LEGEND: SECOND FLOOR UNIT MIX 1BD/1BA 10 2BD/2BA 10 3BD/2BA 0 TOTAL 20 UNITS BOILER ROOM 439 SQ FT R. R . LAUNDRY CARE GIVER BREAK ROOM 490 LOC IDF CARE GIVER 15,30,45 TRASH CARE GIVER UP JAN. STACK W/D STACK W/D WASH DRYWASHDRYSTACK W/D STACK W/D LIGHT HOUSE 460 ROOF BELOW ROOF BELOW ROOF BELOW ROOF BELOW 64 G . O. R.T. ST.UP DN 64 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A2.3 3RD FLOOR PLAN ONE-BEDROOM UNITS TWO-BEDROOM UNITS THREE-BEDROOM UNITS LEGEND: THIRD FLOOR UNIT MIX 1BD/1BA 11 2BD/2BA 10 3BD/2BA 0 TOTAL 21 UNITS IDF CARE GIVER CARE GIVER dn SFH STOR MAINTENANCE 604 sq ft TRASH 64 G . O. R.T. ROOF BELOW ROOF BELOW ROOF BELOW ROOF BELOW ST.UP DN 65 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A2.4 UNIT PLANS LIVING BATH BEDROOM CL O S E T 12'-5"12'-10" 25 ' - 5 " 25 ' - 5 " 10 ' - 4 " 11 ' - 1 1 " 3' - 2 " 25'-3" UNIT 1A -ADAPTABLE 1BD/1BA GROSS SF: +/-601 SF NET SF: +/-549 SF CO A T ENTRY 25'-3" 3' - 3 1 / 2 " 7' - 0 1 / 2 " 1'-11"5'-7"2'-5 1/2" 2 1/2"9'-11 1/2"5'-0"10'-1" L 10'-0" 11 ' - 2 " 1 2 4 8 SCALE: 1/4" = 1'-0" JOB NO. DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 681.007 01/07/25 A1.0 10 ' - 6 " 14 ' - 1 1 " 1' - 1 0 " 3' - 3 1 / 2 " 7' - 2 1 / 2 " 2' - 7 " 12 ' - 4 " 34'-2" BEDROOM 1 BATH 1 BEDROOM 2 CLOSET 2 BATH 2 CO A T LIVING KITCHEN ENTRY UNIT 2A -ADAPTABLE 2BD/2BA GROSS SF: +/-893 SF NET SF: +/-825 SF 2 1/2"8'-9 1/2"4'-8"20'-6" 10'-1"7'-7"2'-10"11"5'-5"2'-5 1/2" 10'-1 1/2"10'-2" 27 ' - 3 " L 11 ' - 1 0 1 / 2 " 34'-2" 27 ' - 3 " 13'-5 1/2"10'-3" 2' - 3 1 / 2 " 2' - 4 1 / 2 " 5' - 7 " 15 ' - 2 " 10'-5 1/2" 25 ' - 5 " 1' - 1 0 " 14 ' - 8 1 / 2 " CLOSET 1 1 2 4 8 SCALE: 1/4" = 1'-0" JOB NO. DATEINT 681.007 01.03.2025 25 ' - 5 " 1' - 1 0 " 11 ' - 2 1 / 2 " 2' - 3 1 / 2 " 11 ' - 1 1 " 34'-2" BEDROOM 1 BATH 1 BEDROOM 2 CLOSET 2 BATH 2 LIVING KITCHEN 27 ' - 3 " L CO A T 10'-2" 11 ' - 5 1 / 2 " 10'-1 1/2" 8'-9 1/2"4'-10 1/2"20'-6" UNIT 2B -MOBILITY 2BD/2BA GROSS SF: +/-895 SF NET SF: +/-824 SF CLOSET 1 10'-1"7'-7"2'-10" 34'-2" 10'-5 1/2"13'-5 1/2"10'-3" 27 ' - 3 " 3' - 4 1 / 2 " 5' - 5 " 2' - 3 1 / 2 " 14 ' - 4 " 25 ' - 5 " 1' - 1 0 " 13 ' - 1 0 1 / 2 " 1 2 4 8 SCALE: 1/4" = 1'-0" JOB NO. DATE UNIT 2B -MOBILITY 681-007 01/07/25 LIVING BATH 25'-3" BEDROOM CL O S E T 25 ' - 5 " 25 ' - 5 " 10 ' - 4 " 11 ' - 1 1 " 3' - 2 " 2 1/2"8'-6"4'-8"11'-10 1/2" UNIT 1B -MOBILITY 1BD/1BA GROSS SF: +/-601 SF NET SF: +/-546 SF COAT2' - 4 1 / 2 " 7' - 1 1 1 / 2 " KITCHEN 12'-5"12'-10" 25'-3" 10'-0" 11 ' - 2 " 1 2 4 8 SCALE: 1/4" = 1'-0" JOB NO. DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 UNIT 1B -MOBILITY SUNFLOWER HILL AT GRACE POINT 681-007 01/03/2025 A2.0 0 8 16 32 0 16 32 64 0 32 64 128 0 4 8 16 UNIT PLANS SQUARE FOOTAGE CALCULATIONS*: UNIT GROSS SQ. FT. - MEASURED TO THE OUTSIDE FACE OF PERIMETER STUDS. UNIT NET SQ. FT. - MEASURED TO THE INSIDE FACE OF GYPSUM BOARD. *SQUARE FOOTAGES MAY VARY SLIGHTLY FOR CONSTRUCTION DOCUMENTS. 66 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A2.5 UNIT PLANS REF. 20'-11"23'-9" 44'-8" 25 ' - 5 " 1' - 1 0 " 44'-8" BEDROOM 1 BATH 1 BEDROOM 2 CLOSET 2 CO A T BEDROOM 3 CLOSET 3 BATH 2 HALL 2 LIVING 2' - 1 1 1 / 2 " 5 ' - 4 " 6' - 6 1 / 2 " 10 ' - 7 " KITCHEN L 3' - 4 1 / 2 " 5' - 5 " 2 ' - 3 1 / 2 " 14 ' - 4 " 27 ' - 3 " 10'-2" 10 ' - 1 1 / 2 " 10'-2" 10 ' - 1 1 / 2 " 10'-2" 10'-9"10'-2"13'-0"10'-9" 13'-8 1/2"4'-8"26'-3 1/2" 15'-10"7'-9 1/2"2'-8"3'-1 1/2"8'-1 1/2"2'-5 1/2" UNIT 3B -MOBILITY 3BD/2BA GROSS SF: +/-1,162 SF NET SF: +/-1,074 SF DINING 25 ' - 5 " 1' - 1 0 " 27 ' - 3 " 13 ' - 1 0 1 / 2 " CLOSET 1 1 2 4 8 SCALE: 1/4" = 1'-0" JOB NO. DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 UNIT 3B -MOBILITY SUNFLOWER HILL AT GRACE POINT 681.007 01/07/25 A6.0 0 8 16 32 0 16 32 64 0 32 64 128 0 4 8 16 UNIT PLANS REF. 20'-11"23'-9" 44'-8" 25 ' - 5 " 1' - 1 0 " 44'-8" BEDROOM 1 BATH 1 BEDROOM 2 CLOSET 2 CO A T BEDROOM 3 CLOSET 3 BATH 2 HALL 2 LIVING 2' - 1 1 1 / 2 " 5 ' - 4 " 6' - 6 1 / 2 " 10 ' - 7 " KITCHEN L 3' - 4 1 / 2 " 5' - 5 " 2 ' - 3 1 / 2 " 14 ' - 4 " 27 ' - 3 " 10'-2" 10 ' - 1 1 / 2 " 10'-2" 10 ' - 1 1 / 2 " 10'-2" 10'-9"10'-2"13'-0"10'-9" 13'-8 1/2"4'-8"26'-3 1/2" 15'-10"7'-9 1/2"2'-8"3'-1 1/2"8'-1 1/2"2'-5 1/2" UNIT 3B -MOBILITY 3BD/2BA GROSS SF: +/-1,162 SF NET SF: +/-1,074 SF DINING 25 ' - 5 " 1' - 1 0 " 27 ' - 3 " 13 ' - 1 0 1 / 2 " CLOSET 1 1 2 4 8 SCALE: 1/4" = 1'-0" JOB NO. DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 UNIT 3B -MOBILITY SUNFLOWER HILL AT GRACE POINT 681.007 01/07/25 A6.0 SQUARE FOOTAGE CALCULATIONS*: UNIT GROSS SQ. FT. - MEASURED TO THE OUTSIDE FACE OF PERIMETER STUDS. UNIT NET SQ. FT. - MEASURED TO THE INSIDE FACE OF GYPSUM BOARD. *SQUARE FOOTAGES MAY VARY SLIGHTLY FOR CONSTRUCTION DOCUMENTS. 67 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A2.6 NOTES: 1. ROOF PLAN IS CONCEPTUAL. ADDITIONAL PENETRATION LOCATIONS WILL BE DETERMINED AS THE PROJECT PROGRESSES TOWARD BUILDING PERMITS. 2. EXACT EQUIPMENT MODELS AND HEIGHTS WILL BE DETERMINED AS THE PROJECT PROGRESSES TOWARD BUILDING PERMITS. 3. PARAPETS WILL BE UTILIZED TO SCREEN THE EQUIPMENT. 4. SOLAR PV SYSTEM WILL BE DESIGNED BY A PV ENGINEER AND FINAL LOCATIONS AND NUMBERS OF PANELS WILL BE DETERMINED AS THE PROJECT PROGRESSES TOWARD BUILDING PERMITS; THE SYSTEM WILL BE DESIGNED TO COMPLY WITH BUILDING CODE. POTENTIAL SOLAR AREA ROOF PLAN ROOF PLAN KEYNOTE LEGEND: 1. MEMBRANE ROOF, TYP. SLOPE 1/2” / 1’-0” MINIMUM TO INTERNAL DRAIN; DIRECTION OF SLOPE AND REPRESENTED GRAPHICALLY 2. MECHANICAL UNIT, TYP. - FINAL LOCATION AND NUMBER T.B.D. 3. ROOF DRAIN, TYP. - FINAL LOCATION AND NUMBER T.B.D. 4. TRASH CHUTE 5. ROOF HATCH 6. ELEVATOR RUNOUT # 1.5:12 SLOPE 1.5:12 SLOPE 1.5:12 SLOPE 2:12 SLOPE 1. 5 : 1 2 S L O P E 1.5:12 SLOPE1. 5 : 1 2 S L O P E 1.5:12 SLOPE 1.5:12 SLOPE 1.5:12 SLOPE 1. 5 : 1 2 S L O P E 4" E A V E , T Y P . 4" R A K E , T Y P . 4" E A V E , T Y P . 4" R A K E , T Y P . 1 2 6 5 4 3 68 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.1 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 BUILDING ELEVATIONS +/ - 3 9 ' - 9 " +/ - 3 7 ' - 1 1 " BUILDING ELEVATION - BRANNIGAN STREET2 2 KEYPLAN: 1 1 1 34 2225 1311812 +/ - 3 9 ' - 9 " +/ - 3 7 ' - 1 1 " BUILDING ELEVATION - ENTRY1 111 1 342225791013 1 ELEVATION KEYNOTE LEGEND: 1. PAINTED METAL COPING 2. PAINTED STUCCO WITH CONTROL JOINTS, TYP. 3. FIBER CEMENT LAP SIDING 4. PAINTED ACCENT COLOR TRIM, MIN. 1/2” THICK 5. BLACK OR DARK BRONZE VINYL FRAME WINDOW, TYP. 6. GLAZED DOOR 7. PAINTED DOOR, COLOR TO MATCH ADJACENT WALL SURFACE 8. MECHANICAL LOUVER 9. ROLL-UP DOOR, COLOR TO MATCH ADJACENT WALL SURFACE 10. ROOF OVERHANG AT BUILDING ENTRY 11. POTENTIAL MURAL OPPORTUNITY, FINAL DESIGN TBD. 12. FENCING, SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION AND FULL EXTENT OF FENCING PROPOSED 13. PLACEHOLDER SIGNAGE FOR ADDRESS PER CBC 502.4 & LOCAL FIRE DEPARTMENT REQUIREMENTS # NOTE: WHERE INTERIOR SIDE OF PARAPET IS VISIBLE FROM A PEDESTRIAN LEVEL, IT WILL BE PAINTED TO MATCH THE BUILDING. 69 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.2 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 COURTYARD ELEVATIONS 5 KEYPLAN: 3 4 +/ - 3 9 ' - 9 " +/ - 3 7 ' - 1 1 " COURTYARD ELEVATION 3 11 5 34228106 2 +/ - 3 9 ' - 9 " +/ - 3 7 ' - 1 1 " COURTYARD ELEVATION 5 1 1110143 2 2256 COURTYARD ELEVATION 4 11 1014832225 ELEVATION KEYNOTE LEGEND: 1. PAINTED METAL COPING 2. PAINTED STUCCO WITH CONTROL JOINTS, TYP. 3. FIBER CEMENT LAP SIDING 4. PAINTED ACCENT COLOR TRIM, MIN. 1/2” THICK 5. BLACK OR DARK BRONZE VINYL FRAME WINDOW, TYP. 6. GLAZED DOOR 7. PAINTED DOOR, COLOR TO MATCH ADJACENT WALL SURFACE 8. MECHANICAL LOUVER 9. ROLL-UP DOOR, COLOR TO MATCH ADJACENT WALL SURFACE 10. ROOF OVERHANG AT BUILDING ENTRY 11. POTENTIAL MURAL OPPORTUNITY, FINAL DESIGN TBD. 12. FENCING, SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION AND FULL EXTENT OF FENCING PROPOSED 13. PLACEHOLDER SIGNAGE FOR ADDRESS PER CBC 502.4 & LOCAL FIRE DEPARTMENT REQUIREMENTS # NOTE: WHERE INTERIOR SIDE OF PARAPET IS VISIBLE FROM A PEDESTRIAN LEVEL, IT WILL BE PAINTED TO MATCH THE BUILDING. 70 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.3 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 BUILDING ELEVATIONS 7 +/ - 3 9 ' - 9 " +/ - 3 7 ' - 1 1 " BUILDING ELEVATION 7 KEYPLAN: 1 114722258437 +/ - 3 9 ' - 9 " +/ - 3 7 ' - 1 1 " BUILDING ELEVATION - DUBLIN BOULEVARD6 1 1 143222 58 6 ELEVATION KEYNOTE LEGEND: 1. PAINTED METAL COPING 2. PAINTED STUCCO WITH CONTROL JOINTS, TYP. 3. FIBER CEMENT LAP SIDING 4. PAINTED ACCENT COLOR TRIM, MIN. 1/2” THICK 5. BLACK OR DARK BRONZE VINYL FRAME WINDOW, TYP. 6. GLAZED DOOR 7. PAINTED DOOR, COLOR TO MATCH ADJACENT WALL SURFACE 8. MECHANICAL LOUVER 9. ROLL-UP DOOR, COLOR TO MATCH ADJACENT WALL SURFACE 10. ROOF OVERHANG AT BUILDING ENTRY 11. POTENTIAL MURAL OPPORTUNITY, FINAL DESIGN TBD. 12. FENCING, SEE LANDSCAPE PLANS FOR ADDITIONAL INFORMATION AND FULL EXTENT OF FENCING PROPOSED 13. PLACEHOLDER SIGNAGE FOR ADDRESS PER CBC 502.4 & LOCAL FIRE DEPARTMENT REQUIREMENTS # NOTE: WHERE INTERIOR SIDE OF PARAPET IS VISIBLE FROM A PEDESTRIAN LEVEL, IT WILL BE PAINTED TO MATCH THE BUILDING. 71 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.4 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 1 BUILDING SECTION A-A 2 BUILDING SECTION B-B THIRD FLOOR SECOND FLOOR GROUND FLOOR 1' - 2 " 9' - 1 " +/ - 3 7 ' - 1 1 " 9' - 1 " COMMUNITY ROOM FITNESS AREA 2 BD UNIT3 BD UNIT 2 BD UNITLIGHT HOUSE 2 BD UNIT CORR. CORR.+/ - 3 9 ' - 9 " THIRD FLOOR SECOND FLOOR GROUND FLOOR 1' - 2 " 9' - 1 " 9' - 1 " +/ - 3 7 ' - 1 1 " 9' - 1 " 1 BD UNIT CORR. CORR. 1' - 2 " BIKE ROOM 1 BD UNIT CORR. 1 BD UNIT BOILER ROOM CAREGIVER BREAK ROOM LAUNDRY BOILER ROOM MAINTENANCE1 BD UNIT MEET BREAK OFFICEMAILCOMMUNITY ROOM +/ - 3 9 ' - 9 " BUILDING SECTION KEYPLAN: A A B B 72 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.5 COLORS & MATERIALS 2455 3 1 6 5 TRIM COLOR WINDOW TRIM, FASCIA, CANOPIES, ETC. Urbane Bronze SW 7048 by Sherwin Williams 6 ROOF COLOR LOW SLOPE MEMBRANE ROOF SIMILAR TO COLOR SHOWN, FINAL COLOR TBD AS AVAILABLE BY MANUFACTURER NOTE PAINT COLORS ARE SHOWN FOR DESIGN INTENT. FINAL COLORS WILL BE DETERMINED THROUGH ON-SITE BRUSH OUTS DURING CONSTRUCTION. NOTE: SEE ELEVATION SHEETS FOR UNTAGGED MATERIALS. 1 BODY COLOR 1 EXTERIOR WALL MATERIAL - CEMENT PLASTER Kestrel White SW 7516 2 BODY COLOR 2 EXTERIOR WALL MATERIAL - CEMENT PLASTER Evergreen Fog SW9130 3 BODY COLOR 3 EXTERIOR WALL MATERIAL - CEMENT PLASTER Slate Tile SW 7624 by Sherwin Williams 4 ACCENT 1 FIBER CEMENT LAP SIDING Urbane Bronze SW 7048 by Sherwin Williams 4 ACCENT 2 - AT BUILDING ENTRIES ACCENT COLOR - CEMENT PLASTER Cheerful SW 6903 by Sherwin Williams 73 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.6 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 DESIGN DIAGRAM PRIMARY (FINNIAN WAY) STREET ELEVATION LINE OF BUILDING ABOVE KEY: 12'-2" PARAPET ROOF WITH CORNICE 12'-10" PARAPET ROOF WITH REVEAL 17'-4" PARAPET ROOF WITH CORNICE 23'-11" SHED ROOF 22'-2" SHED ROOF 23'-2" SHED ROOF 2'-6" 28'-6" SHED ROOF PLANE 1 ANGLED ALONG PRIMARY STREET PLANE 2 PARALLEL ALONG PRIMARY STREET STANDARDS FOR PRIMARY STREET FACING ELEVATIONINTERNAL STREET ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 50% MAX. 21.7% MAX. AVERAGE OFFSET 5'-0" MIN.15'-11" MINIMUM OFFSET 1'-0" MIN.1'-8" LINE OF BUILDING ABOVE ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' PRIMARY PLANE OF BUILDING ELEVATION (SEE ORANGE DIMENSIONS FOR LENGTHS OF ELEVATION COINCIDING WITH PLANES) BUILDING FOOTPRINT ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' BUILDING FOOTPRINT DESIGN DIAGRAM - PRIMARY STREET ELEVATION 4'-8"12'-7" 3'-3" 4'-9" LINE OF BUILDING ABOVE KEY: PLANE 1 ANGLED ALONG PRIMARY STREET PLANE 2 PARALLEL ALONG PRIMARY STREET STANDARDS FOR PRIMARY STREET FACING ELEVATIONINTERNAL STREET ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 50% MAX. 21.7% MAX. AVERAGE OFFSET 5'-0" MIN.15'-11" MINIMUM OFFSET 1'-0" MIN.1'-8" LINE OF BUILDING ABOVE ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' PRIMARY PLANE OF BUILDING ELEVATION (SEE ORANGE DIMENSIONS FOR LENGTHS OF ELEVATION COINCIDING WITH PLANES) BUILDING FOOTPRINT ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' BUILDING FOOTPRINT DESIGN DIAGRAM - PRIMARY STREET ELEVATION 4'-8"12'-7" 3'-3" 4'-9" DEFINITIONS FROM ADOPTED MULTI-FAMILY OBJECTIVE DESIGN STANDARDS GLOSSARY: PRIMARY STREET: A PUBLIC OR PRIVATE STREET THAT PROVIDES ACCESS TO THE MAJOR ENTRY OF A PROJECT OR STRUCTURE. SIDE STREET: A MINOR OR SUBSIDIARY STREET THAT MAY INTERSECTS WITH OR ADJOIN A PRIMARY STREET. BASED ON THESE DEFINITIONS, THIS PROJECT’S PRIMARY STREET IS FINNIAN WAY AND THE SIDE STREET IS BRANNIGAN STREET. THIS IS REFLECTED IN ALL OF THE FOLLOWING DESIGN DIAGRAM SHEETS DIMENSIONS ARE SHOWN ON DESIGN DIAGRAM SHEETS TO ILLUSTRATE BUILDING AND ROOF ARTICULATION. 74 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.7 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 45'-1" BUILDING FOOTPRINT 8'-6"8'-0" SHED ROOF 1'-7" 9'-1" SHED ROOF 5'-4" PARAPET ROOF WITH REVEAL 11'-5" LOW PARAPET ROOF 14'-9" FLAT ROOF 8'-3" LOW PARAPET ROOF 15'-8" FLAT ROOF 15'-8" FLAT ROOF 18'-8" LOW PARAPET ROOF 18'-8" LOW PARAPET ROOF 15'-8" FLAT ROOF 7-9" LOW PARAPET ROOF 26'-0" SHED ROOF 27'-1" SHED ROOF 7'-7" PARAPET ROOF WITH CORNICE 32'-11" SHED ROOF 28'-6" SHED ROOF ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' PRIMARY PLANE OF BUILDING ELEVATION (SEE ORANGE DIMENSIONS FOR LENGTHS OF ELEVATION COINCIDING WITH PLANES) PLANE 4 BACK OF COURTYARD FACADE PLANE 3 PARALLEL ALONG BRANNIGAN STREET PLANE 5 ANGLED ALONG BRANNIGAN STREET KEY: STANDARDS FOR ELEVATIONS NOT FACING A PRIMARY STREETBRANNIGAN ST. ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 75% MAX. 21.7% MAX. AVERAGE OFFSET 5'-0" MIN.8'-6" MINIMUM OFFSET 1'-0" MIN.1'-10" 45'-10"42'-5" GLAZING LARGE WINDOWS INTO FITNESS ROOM 52'-9" SHED ROOF 43'-2" SHED ROOF 2'-0" PARAPET ROOF GLAZING LARGE WINDOWS INTO COMMUNITY ROOM ACCENT MATERIAL ACCENT MATERIAL DESIGN DIAGRAM - SIDE (BRANNIGAN) STREET ELEVATION DESIGN DIAGRAM SIDE (BRANNIGAN) STREET ELEVATION 75 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.8 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 BUILDING FOOTPRINT STANDARDS FOR ELEVATIONS NOT FACING A PRIMARY STREETLEFT COURTYARD ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 75% MAX. 50% MAX. AVERAGE OFFSET 5'-0" MIN.3'-8" MINIMUM OFFSET 1'-0" MIN.1'-10" STANDARDS FOR ELEVATIONS NOT FACING A PRIMARY STREETRIGHT COURTYARD ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 75% MAX. 49.6% MAX. AVERAGE OFFSET 5'-0" MIN.5'-7" MINIMUM OFFSET 1'-0" MIN.5'-7" PLANE 7 RIGHT COURTYARD FACADE, PARALLEL TO COURTYARD PLANE 8 RIGHT COURTYARD FACADE, ANGLED TO COURTYARDPLANE 6 RIGHT COURTYARD FACADE ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' PRIMARY PLANE OF BUILDING ELEVATION (SEE ORANGE DIMENSIONS FOR LENGTHS OF ELEVATION COINCIDING WITH PLANES) KEY: 46'-8" TRELLIS STRUCTURE DEEP ROOF OVERHANG GLAZING FULL-LITE PAIRS OF DOORS AND CLERESTORY WINDOWS GLAZING FULL-LITE PAIRS OF DOORS AND CLERESTORY WINDOWS 10'-3" SHED ROOF 15'-6" PARAPET ROOF WITH CORNICE 8'-4" LOW PARAPET ROOF 11'-11" SHED ROOF 14'-7" LOW PARAPET ROOF 15'-5" FLAT ROOF 22'-5" LOW PARAPET ROOF 12'-2" PARAPET ROOF WITH REVEAL 48'-7" SHED ROOF 23'-11" FLAT ROOF 14'-10" SHED ROOF 8'-9" LOW PARAPET ROOF 6'-0" FLAT ROOF DESIGN DIAGRAM - LEFT & RIGHT COURTYARD ELEVATIONS DESIGN DIAGRAM LEFT & RIGHT COURTYARD ELEVATIONS 76 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.9 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' PRIMARY PLANE OF BUILDING ELEVATION (SEE ORANGE DIMENSIONS FOR LENGTHS OF ELEVATION COINCIDING WITH PLANES) KEY: BUILDING FOOTPRINT 2'-5" PARAPET ROOF WITH CORNICE 24'-2" SHED ROOF 6'-3" LOW PARAPET ROOF 13'-6" PARAPET ROOF WITH CORNICE 11'-10" PARAPET ROOF WITH REVEAL 15'-8" PARAPET ROOF WITH CORNICE 9'-2" LOW PARAPET ROOF 19'-4" LOW PARAPET ROOF 16'-10"8'-2" LOW PARAPET ROOF 15'-7" SHED ROOF STANDARDS FOR ELEVATIONS NOT FACING A PRIMARY STREETRIGHT COURTYARD ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 75% MAX. 49.6% MAX. AVERAGE OFFSET 5'-0" MIN.6'-4" MINIMUM OFFSET 1'-0" MIN.1'-9" DESIGN DIAGRAM - DUBLIN BLVD. ELEVATION PLANE 9 PARALLEL TO DUBLIN BLVD. DESIGN DIAGRAM DUBLIN BLVD. ELEVATION 77 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.10 0 8 16 32 0 16 32 64 0 32 64 128 0 10 20 40 0 4 8 16 ELEVATION OFFSET MORE THAN 5' ELEVATION OFFSET 1' TO 5' PRIMARY PLANE OF BUILDING ELEVATION (SEE ORANGE DIMENSIONS FOR LENGTHS OF ELEVATION COINCIDING WITH PLANES) KEY: BUILDING FOOTPRINT 10'-2" SHED ROOF 15'-0" PARAPET ROOF WITH CORNICE 22'-3" LOW PARAPET ROOF 25'-0" PARAPET ROOF WITH REVEAL 22'-1" LOW PARAPET ROOF 15'-8" PARAPET ROOF WITH CORNICE 22'-3" LOW PARAPET ROOF 25'-1" PARAPET ROOF WITH REVEAL 21'-11" LOW PARAPET ROOF 15'-9" PARAPET ROOF WITH CORNICE 18'-8" LOW PARAPET ROOF 15'-8" PARAPET ROOF WITH CORNICE 9'-5" LOW PARAPET ROOF 8'-10" PARAPET ROOF WITH REVEAL 15'-1" PARAPET ROOF WITH CORNICE 12'-4" SHED ROOF 15'-7" SHED ROOF STANDARDS FOR ELEVATIONS NOT FACING A PRIMARY STREETRIGHT COURTYARD ELEVATION STANDARD REQUIRED ACTUAL PERCENTAGE OF ELEVATION IN SAME PLANE 75% MAX. 56.2% MAX. AVERAGE OFFSET 5'-0" MIN.2'-10" MINIMUM OFFSET 1'-0" MIN.1'-9" DESIGN DIAGRAM - WEST ELEVATION PLANE 10 WEST ELEVATION, FACING ADJACENT TOWNHOMES DESIGN DIAGRAM WEST ELEVATION 78 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.11 EXAMPLE LONG-TERM BIKE RACK & TYPICAL DETAIL 8" M I N . FIBER CEMENT LAP SIDING O/ WEATHER BARRIER (BLDG. PAPER) SILL PLATE, S.S.D. SET ON FOAM GASKET STARTER STRIP 3/ 4 " 6" M I N . SEE A2 SHEET SERIES PLANS FOR WALL TAG AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N CONCRETE FOUNDATION, S.S.D. FINISH GRADE SLOPE AWAY FROM BUILDING, S.C.D. STARTER STRIP 6" M I N . AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N CONCRETE FOUNDATION, S.S.D. FINISH GRADE SLOPE AWAY FROM BUILDING, S.C.D. 8" M I N . 3/ 4 " FIBER CEMENT BATTENS IN LINE W/ 2X STUDS SEE ELEVATIONS FOR SIZE & SPACING, O/ FIBER CEMENT PANEL SIDING O/ WEATHER BARRIER (BLDG. PAPER) E A2 SHEET SERIES PLANS FOR WALL TAG 8" M I N . 4" M I N . SILL PLATE, S.S.D. SET ON FOAM GASKET 3/ 4 " 6" M I N . AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N CONCRETE FOUNDATION, S.S.D. FINISH GRADE SLOPE AWAY FROM BUILDING, S.C.D. METAL FLASHING O/ S.A.F. W/4" MIN. ADHESION TO CONCRETE AND EXTENDS UP WALL VERTICAL 2X NAILER FOR METAL FLASHING FASTENING LAP WEATHER BARRIER 4" O/ METAL FLASHING BELOW 8" S.A.F. CENTERED ON JOINT 6" S.A.F. O/ METAL FLASHING 8" M I N . 4" M I N . FIBER CEMENT LAP SIDING O/ WEATHER BARRIER (BLDG. PAPER) SILL PLATE, S.S.D. SET ON FOAM GASKET STARTER STRIP 3/ 4 " 6" M I N . SEE A2 SHEET SERIES PLANS FOR WALL TAG AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N CONCRETE FOUNDATION, S.S.D. FINISH GRADE SLOPE AWAY FROM BUILDING, S.C.D. VERTICAL 2X NAILER FOR METAL FLASHING FASTENING METAL FLASHING O/ S.A.F. W/4" MIN. ADHESION TO CONCRETE AND EXTENDS UP WALL LAP WEATHER BARRIER 4" O/ METAL FLASHING BELOW 8" S.A.F. CENTERED ON JOINT 6" S.A.F. O/ METAL FLASHING AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N CONCRETE FOUNDATION, S.S.D. FINISH GRADE SLOPE AWAY FROM BUILDING, S.C.D. 6" M I N . 8" M I N . 1/2" ASPHALT IMPREGNATED FILLER 2" M I N . LAP WEATHER BARRIER 4" O/ METAL FLASHING BELOW SEE A2 SHEET SERIES PLANS FOR WALL TAG 3/ 4 " FIBER CEMENT LAP SIDING O/ WEATHER BARRIER (BLDG. PAPER) SILL PLATE, S.S.D. SET ON FOAM GASKET STARTER STRIP CONCRETE FOUNDATION, S.S.D. HARDSCAPE SLAB SLOPE AWAY FROM BUILDING, S.C.D. AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N METAL FLASHING O/ S.A.F. W/4" MIN. ADHESION TO CONCRETE AND EXTENDS UP WALL VERTICAL 2X NAILER FOR METAL FLASHING FASTENING 6" M I N . 4" M I N . 1/ 4 " 8" S.A.F. CENTERED ON JOINT 6" S.A.F. O/ METAL FLASHING FIBER CEMENT BATTENS IN LINE W/ 2X STUDS SEE ELEVATIONS FOR SIZE & SPACING, O/ FIBER CEMENT PANEL SIDING O/ WEATHER BARRIER (BLDG. PAPER) E A2 SHEET SERIES PLANS FOR WALL TAG 8" M I N . SILL PLATE, S.S.D. SET ON FOAM GASKET 3/ 4 " 6" M I N . AL I G N F A C E O F SH E A T H I N G W/ S L A B E D G E , S E E SL A B P L A N CONCRETE FOUNDATION, S.S.D. FINISH GRADE SLOPE AWAY FROM BUILDING, S.C.D. 1' - 0 " 2'-6" 4" 1'-0" 2"7"2" 6" 2" 2 " 2'-1" 4" 2'-6" FRONT ELEVATION SIDE ELEVATION PLAN VIEW CONCRETE SPLASH BLOCK CONCRETE SPLASH BLOCK DOWNSPOUT KICKER AT BOTTOM OF DOWNSPOUT JOB NO. DRAWN CHECK SHEET SEAL / SIGNATURE A9.1.1 1405.001 AM / BP CA ARCHITECTURAL DETAILS - FOUNDATION FIRST PERMIT SUBMITTAL 08/06/19 SCALE: 3" = 1'-0" 6LAP SIDING @ GRADE SCALE: 3" = 1'-0" 8LAP SIDING W/ CURB @ GRADE 17DING @ GRADE LESS THAN 8" SCALE: 3" = 1'-0" 7LAP SIDING @ GRADE LESS THAN 8" 18DING W/ CURB @ GRADE SCALE: 3" = 1'-0" 11LAP SIDING @ HARDSCAPE16DING @ GRADE SCALE: 1 1/2" = 1'-0" 1CONC. SPLASH BLOCK REVISIONS LICENSED ARCHITECT F C IFO ST EO AL RNIAT A0REN.1 30 21 L AURI A.MOF F ET-FEHLBE R G 12 No. 19799The Shark™ Up rack is designed for high density bike parking. The Shark Up is economical, functional, and compact. It features front wheel stops for stable parking, a 3/4" solid rod for “U” locks, 16" clearance between bikes, tamper-resistant construction, and ease of installation. This bicycle rack is our most compact lockable bike rack, ideal for indoor or outdoor locations where space may be a concern. by Graber Manufacturing, Inc. Shark Up™ 800.448.7931 www.madrax.com 34 3/4" ▲ ▲▲7"▲ 1 EXAMPLE LONG-TERM BIKE RACKS MADRAX SHARK UP 79 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES 5865 Owens DrivePleasanton, CA 94588925-251-7200 681.007 11.04.2025 JOB NO. DATE A3.12 CONCEPTUAL WINDOW TRIM DETAILS 2 A3.12 1 A3.12 3 A3.12 CEMENT PLASTER WINDOW FIBER CEMENT TRIM CEMENT PLASTER FIBER CEMENT CORNER TRIM WINDOW CEMENT PLASTER WINDOW FIBER CEMENT TRIM WINDOW FIBER CEMENT TRIM, MINIMUM 1/2" THICK STUCCO STOOL & APRON WINDOW FIBER CEMENT TRIM, MINIMUM 1/2" THICK STUCCO WINDOW FIBER CEMENT TRIM, MINIMUM 1/2" THICK STUCCO 11 / 3 / 2 0 2 5 6 : 1 5 : 5 7 P M SCALE:3" = 1'-0" 11CONCEPTUAL WINDOW SILL - RECESSED BAY SCALE: 3" = 1'-0" 12CONCEPTUAL WINDOW JAMB - RECESSED BAY SCALE: 3" = 1'-0" 13CONCEPTUAL WINDOW HEAD - RECESSED BAY SCALE: 3" = 1'-0" 2WINDOW JAMB AT STUCCO WITH TRIM SCALE: 3" = 1'-0" 1WINDOW SILL AT STUCCO WITH TRIM SCALE: 3" = 1'-0" 3WINDOW HEAD AT STUCCO WITH TRIM NOTE: ALL WINDOW TRIM AND SILL TO BE MINIMUM 1/2” THICK 80 SD SD SD SD SD SD SD SD SD SD SD SD SD SD SS SS SS SS SS SS SS SS SS SS SS SS SS SS SD SD FW FW FW FW FW FW FW FW ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD WM SD SD SD SD SD SD SD SD FWFWFW FW FW FW FW FW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW DW SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SDSDSDSDSDSDSDSD SD SD SD SD SD SD SD SD SD SD SD SD SD SD SD > > > > > > > > > > JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT JT EV PARKING ONLY EV PARKING ONLY SD SD 33'-1" CONCEPTUAL LANDSCAPE PLAN MULTI-PURPOSE SPORT COURT. SOLID SPORT COURT WALL/ART WALL WITH LARGE-SCALE STEP-STONE ACCESS. LANDSCAPE BERMS WITH 'TWIG' BENCHES AND SHADE TREES. GAME COURT/MULTI-USE AREA. RESIDENT GARDEN AREA WITH INDIVIDUAL PLOTS & GARDEN SHED. SMALLER/CONTEMPLATIVE SEATING AREA. BERMED LAWN AREA. 6-FT. DECORATIVE METAL PERIMETER FENCING. TRANSFORMER. ART GARDEN/MAKERS' ROOM BREAKOUT AREA. DROP-OFF AREA. CENTRAL ACCENT WALKWAY WITH ENHANCED FINISH MATERIAL. COMMUNITY ROOM BREAKOUT AREA WITH BBQ COUNTER AND FLEXIBLE/MOVABLE FURNISHINGS. NEW PEDESTRIAN PAVING. OVERHEAD SHADE STRUCTURES. ENHANCED VEHICULAR PAVING AT ENTRY TO MATCH OTHER ENHANCED PAVED AREAS. SHORT-TERM BICYCLE PARKING. PROJECT ENTRY SIGNAGE. PET RELIEF AREA WITH WASTE STATION. 6-FT. DECORATIVE SOLID WOOD FENCING FOR SCREENING. SMOKERS' PATIO W/ SEATING AND CIGARETTE/ASH RECEPTACLE. WAITING AREA. LANDSCAPE ELEMENTS KEY SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 11-03-2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 L A N D S C A P E A R C H I T E C T U R E form/work 2813 B STREET SAN DIEGO, CA 92102 T: 619.269.4423 NORTH DU B L I N B L V D . L.01 FUTURE TOWNHOMES PAVING & LANDSCAPING IN RIGHT-OF-WAY SHOWN FOR REFERENCE ONLY. TO BE INSTALLED BY MASTER DEVELOPER. PAVING & LANDSCAPING IN RIGHT-OF-WAY SHOWN FOR REFERENCE ONLY. TO BE INSTALLED BY MASTER DEVELOPER. PROPERTY LINE PROPERTY LINE PR O P E R T Y L I N E PR O P E R T Y L I N E STORMWATER TREATMENT BASINS, SEE CIVIL. PLANTING @ CAR OVERHANGS SHALL BE LOW & NOT CREATE A BARRIER, TYP. DECORATIVE SCREEN W/ VINES ALL PLANTING IN CLEARANCE ZONES SHALL BE LOW & COMPLIANT W/ UTILITY CO. STANDARDS. NET SITE AREA:75,657 SF LANDSCAPING AREA: 26,212 SF PERCENTAGE LANDSCAPING AREA: 34% LOCATION FOR FUTURE GARDEN SHED A.SB 1383 COMPLIANCE: ALL MULCH AND COMPOST USED IN STORMWATER MANAGEMENT MEASURES AND GENERAL LANDSCAPE AREAS SHALL MEET SB 1383 REGULATORY REQUIREMENTS. COMPOST MUST BE PRODUCED AT A PERMITTED COMPOSTING FACILITY; DIGESTATE, BIOSOLIDS, MANURE AND MULCH DO NOT QUALIFY AS COMPOST. ELIGIBLE MULCH MUST BE DERIVED FROM ORGANIC MATERIALS AND BE PRODUCED AT A PERMITTED TRANSFER STATION, LANDFILL, OR COMPOSTING FACILITY. EXAMPLES OF ALLOWED COMPOST INCLUDE ARBOR MULCH AND COMPOSTED MULCH. EXAMPLES OF ALLOWED MULCH INCLUDE MULCH MADE FROM RECYCLED PALLETS AND DIMENSIONAL LUMBER, AGED TREE TRIMMINGS, WOOD FINES, AND SCREENED COMPOST OVERS. MULCH MUST MEET OR EXCEED THE PHYSICAL CONTAMINATION, MAXIMUM METAL CONCENTRATION, AND PATHOGEN DENSITY STANDARDS FOR LAND APPLICATION SPECIFIED IN 14 CCR 17852(A)(24.5)(A)1 THROUGH 3. B.SOIL MANAGEMENT REPORT SHALL BE OBTAINED UNDER THE CALIFORNIA MODEL WATER EFFICIENT LANDSCAPE ORDINANCE (MWELO) TO PROMOTE WATER EFFICIENTLY. C.A SUFFICIENT LANDSCAPE SCREENING BUFFER SHALL BE PROVIDED FOR THE PROJECT THAT SCREENS THE PROJECT ONTO NEIGHBORING PROPERTIES, PUBLIC STREETS, ETC. SUFFICIENT LANDSCAPE SCREENING INCLUDES BUT IS NOT LIMITED TO TREES, SHRUBBERY, GROUND COVER. 12-IN. CURB PROVIDED AT LANDSCAPE-ADJACENT STALLS, TYP. WASTE RECEPTACLES, TYP. GENERAL LANDSCAPE NOTTES PERIMETER FENCING TERMINATION, TYP. BRANNIGAN ST. 04 03 02 01 08 07 06 05 09 10 11 12 13 14 01 02 03 03 04 05 07 10 11 12 13 15 15 15 15 15 06 17 16 16 12 18 14 14 14 14 09 18 18 17 19 19 20 20 808 8 8 20 21 14 21 21 IRRIGATION BACKFLOW TO RECEIVE SCREENING SHRUBS. STORMWATER TREATMENT BASINS, SEE CIVIL. FIRE ACCESS GATE. 22 22 08 81 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 11-03-2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 L A N D S C A P E A R C H I T E C T U R E form/work 2813 B STREET SAN DIEGO, CA 92102 T: 619.269.4423 SUPPLEMENTAL LANDSCAPE EXHIBITS CONCEPTUAL LANDSCAPE IMAGERY - SITE SYMBOL BOTANICAL NAME (COMMON NAME)MIN. SIZE WUCOLS DROUGHT-TOLERANT PLANTING: WOODY SHRUBS (SUCH AS): GROUNDCOVERS (SUCH AS): PERENNIALS/ORNAMENTAL GRASSES (SUCH AS):TREES: VERTICAL ACCENT TREES (SUCH AS): GINKGO BILOBA 'MAGYAR'24-IN BOX MOD (MAIDENHAIR TREE) SMALL SHADE TREES (SUCH AS): PARKING TREES : SMALL ACCENT TREES (SUCH AS): CANDIDATE PLANT LEGEND MAGNOLIA G. 'SAMUEL SOMMER'24-IN BOX MOD (SOUTHERN MAGNOLIA) PLATANUS ACERIFOLIA 'COLUMBIA'24-IN BOX MOD (COLUMBIA SYCAMORE TREE ) ACER BUERGERIANUM 'STREETWISE'15-GAL MOD (TRIDENT MAPLE) LAURUS NOBILIS 'HUBBARD'15-GAL LOW (BAY LAUREL) ZELKOVA SERRATA 'CITY SPRITE '15-GAL MOD (CITY SPRITE ZELKOVA) SHRUBS/GROUNDCOVERS/VINES SHRUBS/GROUNDCOVERS/VINES CONCEPTUAL LANDSCAPE IMAGERY - PLANTING TREES MOVEABLE FURNISHINGS ENHANCED PAVINGGAME COURT/MULTI-USE AREA METAL OVERHEAD SHADE STRUCTURES VEGGIE GARDEN BEDS SYMBOL BOTANICAL NAME (COMMON NAME)MIN. SIZE WUCOLS TREES: MEDIUM SHADE TREES (SUCH AS): NYSSA SYLVATICA FIRESTARTER 24-IN BOX MOD (FIRESTARTER BLACK TUPELO TREE) PISTACIA CHINENSIS 'KEITH DAVEY'24-IN BOX LOW (CHINESE PISTACHE TREE) L.02 OLEA EUROPAEA 'WILSONII'24-IN BOX LOW (FRUITLESS OLIVE) GLEDITSIA T. 'SHADEMASTER'24-IN BOX LOW (SHADEMASTER HONEYLOCUST TREE) CERCIS OCCIDENTALIS 15-GAL LOW (WESTERN REDBUD) LAGERSTROEMIA INDICA X FAURIEI 'NATCHEZ'15-GAL LOW (NATCHEZ CRAPE MYRTLE) ARBUTUS 'MARINA' 15-GAL LOW (MARINA STRAWBERRY TREE) MAGNOLIA GRANDIFLORA 'LITTLE GEM'15-GAL MOD (LITTLE GEM SOUTHERN MAGNOLIA) SYMBOL BOTANICAL NAME (COMMON NAME)MIN. SIZE WUCOLS NYSSA SYLVATICA 'TUPELO TOWER'15-GAL MOD (TUPELO TOWER BLACK GUM) PYRUS CALLERYANA 'TRINITY'15-GAL MOD (CALLERY PEAR 'TRINITY') ULMUS 'FRONTIER'24-IN BOX MOD (FRONTIER ELM) ZELKOVA SERRATA 'GREEN VASE'15-GAL MOD (GREEN VASE ZELKOVA) CELTIS SINENSIS 24-IN BOX LOW (CHINESE HACKBERRY) OSMANTHUS FRAGRANS 5 GAL MOD (SWEET OSMANTHUS) ARBUTUS UNEDO 'ELFIN KING' 5 GAL LOW (ELFIN KING STRAWBERRY TREE) OLEA EUROPAEA 'MONTRA'5 GAL LOW (LITTLE OLLIE DWARF) LIRIOPE SPP.1 GAL MOD (LILYTURFS) AGAVE DESMETTIANA 5 GAL LOW (DWARF SMOOTH AGAVE) DIANELLA SPP.1 GAL MOD (FLAX LILIES) QUERCUS ILEX 24-IN BOX LOW (HOLLY OAK) GREVILLEA x 'NOELLII'5 GAL LOW (NOELL GREVILLEA) ARCTOSTAPHYLOS 'SUNSET'5 GAL LOW (SUNSET MANZANITA) WESTRINGIA 'MORNING LIGHT'5 GAL LOW (MORNING LIGHT COAST ROSEMARY) WESTRINGIA 'BLUE GEM'5 GAL LOW (BLUE GEM COAST ROSEMARY) RHAMNUS CALIFORNICA 'EVE CASE'5 GAL LOW (COFFEEBERY) PHORMIUM SPP.1 GAL LOW (NEW ZEALAND FLAX) SANTOLINA CHAMAECYPARISSUS 1 GAL LOW (LAVENDER-COTTON) CAREX DIVULSA 1 GAL LOW (EUROPEAN GREY SEDGE) MUHLENBERGIA DUBIA 1 GAL LOW (PINE MUHLY) HELICTOTRICHON S 'SAPPHIRE'1 GAL LOW (SAPPHIRE BLUE OAT GRASS ) DIETES HYBRIDA ‘LEMON DROPS’1 GAL LOW (LEMON DROPS FORTNIGHT LILY) ARCTOSTAPHYLOS 'EMERALD CARPET'1 GAL MOD (EMERALD CARPET MANZANITA) ERIGERON KARVINSKIANUS 'PROFUSION'1 GAL LOW (PROFUSION SANTA BARBARA DAISY) ALOE 'SAFARI SUNSET'5 GAL LOW (SAFARI SUNSET ALOE) LOMANDRA SPP.1 GAL LOW (MAT RUSH) FESTUCA GLAUCA 'ELIJAH BLUE'1 GAL LOW (ELIJAH BLUE FESCUE) STORMWATER TREATMENT PLANTING: ROSMARINUS SPP.1 GAL LOW (ROSEMARY) SENECIO SERPENS 1 GAL LOW (BLUE CHALKSTICKS) JUNIPERUS CONFERTA 'BLUE PACIFIC'1 GAL LOW (BLUE PACIFIC SHORE JUNIPER) WESTRINGIA FRUTICOSA MUNDI 1 GAL LOW (LOW COAST ROSEMARY) SYMBOL BOTANICAL NAME (COMMON NAME)MIN. SIZE WUCOLS JUNCUS PATENS 'ELK BLUE'1 GAL LOW (ELK BLUE CALIFORNIA GRAY RUSH) LEYMUS CONDENSATUS ‘CANYON PRINCE’ 1 GAL LOW (CANYON PRINCE WILD RYE ) FESTUCA RUBRA 'MOLATE'1 GAL LOW (CREEPING RED FESCUE) CHONDROPETALUM TECTORUM 'EL CAMPO'1 GAL LOW (SMALL CAPE RUSH) MUHLENBERGIA RIGENS 1 GAL LOW (DEER GRASS ) ACHILLEA MILLEFOLIUM 1 GAL LOW (YARROW) MUHLENBERGIA CAPILLARIS 1 GAL LOW (HAIRY AWN MUHLY) OUTDOOR MOVABLE FURNISHINGS MOVABLE FURNISHINGS OPEN METAL FENCING MULTI-PURPOSE SPORT COURT VITIS CALIFORNICA 5 GAL LOW (CALIFORNIA WILD GRAPE) HARDENBERGIA VIOLACEA 5 GAL LOW (LILAC VINE) CLYTOSTOMA CALLISTEGIOIDES 5 GAL MOD (VIOLET TRUMPET VINE) VINES (SUCH AS): PET WASTE STATION ZAUSCHENARIA CALIFORNICA 1 GAL LOW (CATALINA CALIFORNIA FUCHSIA ) WASTE RECEPTACLES DECORATIVE METAL SCREENING AT TRANSFORMER/UTILITIESSOLID WOOD FENCING CHIONANTHUS RETUSUS 15-GAL LOW (CHINESE FRINGE TREE) SHORT-TERM BIKE RACK 82 ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WM > > > > JT JT JT JT JT JT JT JT EV PARKING ONLY EV PARKING ONLY FW FW FW ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WM FW FW FW > > > > JT JT JT JT JT JT JT JT EV PARKING ONLY EV PARKING ONLY UP UP 33'-1" SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 11-03-2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 L A N D S C A P E A R C H I T E C T U R E form/work 2813 B STREET SAN DIEGO, CA 92102 T: 619.269.4423 NORTH SUPPLEMENTAL LANDSCAPE EXHIBITS AREA B 2.6 (A.) TOTAL COMMON USABLE OUTDOOR SPACE AREA: OPEN SPACE REQUIREMENT: 200 SF/UNIT (60 UNITS) = 12,000 PROVIDED AREAS A: 4,006 + AREA B: 13,695 = 17,618 v. .: REGULATION-SIZE MULTI-PURPOSE COURT: BOTH BASKETBALL & VOLLEYBALL COURT. v. i.: COMMUNITY GARDEN: INCLUDING 10 RAISED GARDEN PLANTERS, SMALL TABLE, COMPOST BIN, AND FUTURE GARDEN SHED. ONE POTABLE WATER CONNECTION AND IRRIGATION TO GARDEN BEDS. v. b. 1.: GATHERING SPACE: INCLUDES 9 PICNIC TABLES, 5 SHADE TREES, 2 BBQ'S, 2 WASTE/RECYCLE BINS, AND SHADE COVERAGE. AREA A 2.6 (D.) AMENITIES (60 UNITS; 3 MINIMUM REQUIRED): 'TWIG' BENCH PATIO TABLE W/ SHADE UMBRELLA ENHANCED PAVING RAISED GARDEN PLOTS STABILIZED D.G. PAVING MOVABLE FURNISHINGS CONCRETE PAVING SEATING AREA W/ OVERHEAD SHADE STRUCTURE DECORATIVE METAL FENCE & GATE PATIO TABLE W/ SHADE UMBRELLA ENHANCED PAVING ENHANCED PAVING DECORATIVE BENCH SEATING SHORT-TERM BIKE RACKS SEATWALL VEHICULAR LOADING ZONE LOCATION FOR FUTURE GARDEN SHED SEATWALL ART GARDEN/MAKERS' ROOM BREAKOUT AREA W/ MOVEABLE SEATING. LANDSCAPE BERMS W/ 'TWIG' BENCHES. 2.1 (D.): MIN. 5-FT. WIDE LANDSCAPE BUFFER FOR RESIDENT PRIVACY/SECURITY. 2.2 (E.): LANDSCAPE SCREENING AT SURFACE PARKING AREAS PROVIDED AT 3-FT. SETBACK FROM BACK OF PUBLIC SIDEWALKS. 2.3 (A.): SHORT-TERM BICYCLE PARKING PROVIDED WITHIN 200 FEET OF PRIMARY BUILDING ENTRANCE. 2.2(E.): RIDE SHARE PICK-UP/DROP-OFF ZONE W/ SHADED BENCH SEATING AND WASTE/RECYCLE RECEPTACLE. 2.2 B.) i./ii.: ENHANCED VEHICULAR PAVING (12-FT. DEPTH) AT PEDESTRIAN CROSSING. RESIDENT GARDEN AREAA DUBLIN CITY-WIDE MULTI-FAMILY DESIGN STANDARDS - COMPLIANCE DIAGRAMB MAIN ENTRY & ART GARDEN/MAKERS' ROOM BREAKOUT AREAD COMMUNITY ROOM BREAKOUTC BRANNIGAN ST. DU B L I N B L V D . L.03 FUTURE TOWNHOMES BOLLARD LIGHT, TYP. BBQ COUNTER NORTH CONCEPTUAL IRRIGATION PLANE FUTURE TOWNHOMES WATER USE AREA LEGEND LOW WATER USE MODERATE WATER USE SPECIAL LANDSCAPE AREA BRANNIGAN ST. DU B L I N B L V D . WASTE RECEPTACLES, TYP. WASTE RECEPTACLES, TYP. WASTE RECEPTACLES, TYP. SPECIAL LANDSCAPE AREA (102 SF) PROPOSED IRRIGATION P.O.C. WITH NEW IRRIGATION METER AND BFP. PEDESTRIAN CIRCULATION & COORDINATION TO PUBLIC RIGHT-OF-WAY, TYP. EXISTING BIKE PATH, PER DEVELOPER MASTER PLAN SDR PACKAGE (06/18/25) PROPOSED BIKE PATH, PER DEVELOPER MASTER PLAN SDR PACKAGE (06/18/25) WASTE RECEPTACLES STORMWATER AREA (723 SF) STORMWATER AREA (460 SF) DMC 8.76.070 A12: LANDSCAPED PARKING AREA:19% NET PARKING AREA: 6,816 SF LANDSCAPED PARKING AREA: 1,320 SF PRELIMINARY WATER-USE CALCULATIONS 83 ST O P EV PARKING ONLY EV PARKING ONLY 33'-1" SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 11-03-2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 L A N D S C A P E A R C H I T E C T U R E form/work 2813 B STREET SAN DIEGO, CA 92102 T: 619.269.4423 NORTH CONCEPTUAL LIGHTING PLAN BRANNIGAN ST. DU B L I N B L V D . L.04 FUTURE TOWNHOMES : SHIELDED CONCEPTUAL LIGHTING FIXTURES NOTE: ALL BUILDING-MOUNTED AND SITE LIGHT FIXTURES SHALL BE FULLY SHIELDED AND UTILIZE COHESIVE COLORS AND FINISHES WHICH REFLECT THE PRIMARY BUILDING’S ARCHITECTURAL STYLE. 84 SS FW ST O P >>>>>>>>>>>>>>>> SD WMDW SD SDSD SD JT JT EV PARKING ONLY EV PARKING ONLY SD >FW SUNFLOWER HILL AT GRACE POINTE DUBLIN, CA ABBREVIATIONS AC ASPHALT CONCRETE AD AREA DRAIN ADA AMERICAN DISABILITIES ACT APPROX.APPROXIMATE B BOLLARD BLDG BUILDING BOS BOTTOM OF STAIRS BOT BOTTOM OF PIPE BW BACK OF WALK CB CATCH BASIN CL CENTERLINE CMP CORRUGATED METAL PIPE CMU CONCRETE MASONRY UNIT CO CLEANOUT CONC.CONCRETE COTG CLEANOUT TO GRADE Δ DELTA D/W DRIVEWAY DI DRAIN INLET DIA.,Ø DIAMETER DIP DUCTILE IRON PIPE DW DOMESTIC WATER (E) EXISTING E ELECTRICAL EG EXISTING GRADE EL OR ELEV ELEVATION EV ELECTRIC VEHICLE FDC FIRE DEPARTMENT CONNECTION FF FINISH FLOOR ELEVATION FG FINISH GRADE FH FIRE HYDRANT FL FLOWLINE FND FOUNDATION FS FINISH SURFACE FT FOOT OR FEET G GAS GB GRADE BREAK GR GRATE ELEVATION GV GATE VALVE HDPE HIGH DENSITY POLYETHYLENE HP HIGH POINT ID INSIDE DIAMETER IE INVERT ELEVATION IRR.IRRIGATION JT JOINT TRENCH LF LINEAR FEET LP LOW POINT MAX MAXIMUM MH MANHOLE MIN MINIMUM N NORTHING NTS NOT TO SCALE O.D OUTSIDE DIAMETER OF OUTFALL OVH/OH OVERHEAD (P)PROPOSED P/L PROPERTY LINE PCC PORTLAND CEMENT CONCRETE PED PEDESTRIAN PIV POST INDICATOR VALVE PM PARKING METER POC POINT OF CONNECTION PRC POINT OF REVERSE CURVATURE PRV PRESSURE REDUCING VALVE PT POINT OF TANGENT P.U.E PUBLIC UTILITY EASEMENT PVC POLYVINYL CHLORIDE PVMT PAVEMENT PVT PRIVATE R RADIUS RCP REINFORCED CONCRETE PIPE RIM RIM ELEVATION RD ROOF DRAIN R.O.W RIGHT-OF-WAY S SLOPE (FT/FT) SD STORM DRAIN SDMH STORM DRAIN MANHOLE SF SQUARE FEET SHT SHEET SS SANITARY SEWER SSMH SANITARY SEWER MANHOLE ST STREET STA STATION STD STANDARD TC TOP OF CURB TEL TELEPHONE TOP TOP OF PIPE TRANS.TRANSFORMER TOS TOP OF STAIR TW TOP OF WALL TYP TYPICAL UG UNDERGROUND UGE UNDERGROUND ELECTRIC UNO UNLESS NOTED OTHERWISE VCP VITRIFIED CLAY PIPE VIF VERIFY IN FIELD W WATER W/ WITH WM WATER METER WV WATER VALVE R CALL BEFORE YOU DIG SITE MAP NORTH 50 50 1000 SCALE 1 INCH = 50 FEET VICINITY MAP NORTH PROJECT CONTACTS CLIENT: SATELLITE AFFORDABLE HOUSING ASSOCIATES, 1835 ALCATRAZ AVE. BERKELEY, CA 94703 CONTACT: JONATHAN ASTMANN ARCHITECT: DAHLIN GROUP 5865 OWENS DRIVE PLEASANTON, CA 94588 CONTACT: ALEXA DACK VERTICAL DATUM: CITY OF DUBLIN BENCHMARK: NGS BENCHMARK T-1257 LOCATION: THE TASSAJARA ROAD OVERPASS, 24 FEET SOUTH OF THE SOUTH MOST CENTERLINE OF THE EASTBOUND INTERSTATE 580 LANES, SET VERTICALLY IN THE EAST FACE OF THE FIRST CONCRETE PIER, ABOUT 3.5 FEET HIGHER THAN THE GROUND EL. 349.739' (NGVD 29) CIVIL ENGINEER: KPFF CONSULTING ENGINEERS 1101 CREEKSIDE RIDGE DRIVE, SUITE 150 ROSEVILLE, CA 95678 TEL: 916-772-7688 CONTACT: RYAN CARTER LEGEND PROPERTY/ RIGHT-OF-WAY LINE EASEMENT LINE CENTERLINE OVERALL LIMIT OF WORK BUILDING OUTLINE BUILDING OVERHANG CURB CURB AND GUTTER SAWCUT LINE ASPHALT PAVEMENT CONCRETE PAVEMENT BIORETENTION AREA MAJOR CONTOUR MINOR CONTOUR GRADE BREAK RETAINING WALL GRADING SLOPE DAYLIGHT LINE SWALE FENCE ELECTRIC LINE JOINT TRENCH GAS LINE TELECOMMUNICATIONS LINE COMBINED SEWER STORM DRAIN LINE SANITARY SEWER LINE WATER MAIN LINE FIRE WATER LINE STORM DRAIN INLET CLEANOUT FIRE HYDRANT FIRE DEPARTMENT CONNECTION BACKFLOW PREVENTER/DDCV GATE VALVE POST INDICATOR VALVE WATER METER LIGHT POLE ELECTRIC BOX TELEPHONE BOX POWER POLE ACCESSIBLE PARKING SPOT ELEVATION PROPOSED SLOPE GB 100 100 G E JT T o o o o >>>> CS SD SS WX"W X"SD X"SS X"CS SDSD SSSS WW CSCS WX"FW FWFW CO WM E T TC XX.XX FS XX.XX 2.0% SHEET LIST TABLE Sheet Number Sheet Title C0.1 COVER SHEET C0.2 GENERAL NOTES C0.3 FIRE ACCESS PLAN C1.0 EROSION CONTROL PLAN C1.1 EROSION CONTROL NOTES AND DETAILS C2.0 SITE LAYOUT & STRIPING PLAN C2.1 GRADING & DRAINAGE PLAN C2.2 TYPICAL SECTIONS C3.0 UTILITY PLAN C4.0 STORMWATER CONTROL PLAN C4.1 CLEAN BAY BLUE PRINT C5.0 GARBAGE TRUCK TURNING PLAN C5.1 DELIVERY TRUCK TURNING PLAN C6.0 STRIPING DETAILS C6.1 UTILITY DETAILS DUBLIN BLVD PROJECT SITE TA S S A J A R A R D BR A N N I G A N S T NOR T H S I D E D R FWY 5 8 0 FWY 5 8 0 GR A F T O N S T ZENITH AVE DUBLIN CORPORATE WAY CLARI N B R I D G E C I R FINNIAN W A Y CH A N C E R Y L N CENTRA L P K W Y WHITWORTH D R DU B L I N B L V D . BRANNIGAN ST. FEMA FLOOD ZONES MAP SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com COVER SHEET C0.1 11/04/2025 85 1.GENERAL RECOMMENDATIONS OF THE SOILS REPORT BY ___________________________ DATED _________________ AND ADDENDA SHALL BE MADE A PART OF THESE PLANS. 2.EXISTING TOPOGRAPHY SHOWN HEREON WAS TAKEN FROM SURVEY AND MASTER PLAN PROJECT FILES PROVIDED BY RJA ENGINEERS. 3.THE CONTRACTOR SHALL ASSUME SOLE AND COMPLETE RESPONSIBILITY FOR THE JOB SITE CONDITIONS, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY, DURING THE COURSE OF CONSTRUCTION OF THIS PROJECT. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY, AND SHALL NOT BE LIMITED TO NORMAL WORKING HOURS. 4.PRIOR TO COMMENCING CONSTRUCTION, THE CONTRACTOR SHALL VERIFY ALL JOIN CONDITIONS FOR GRADING, DRAINAGE AND UNDERGROUND FACILITIES INCLUDING LOCATION AND ELEVATION OF EXISTING UNDERGROUND FACILITIES AT CROSSINGS WITH PROPOSED UNDERGROUND FACILITIES. IF CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLANS, THE CONTRACTOR SHALL NOTIFY THE ENGINEER AND SHALL NOT BEGIN CONSTRUCTION UNTIL THE CHANGED CONDITIONS HAVE BEEN EVALUATED. 5.ALL DRAWINGS ARE CONSIDERED TO BE A PART OF THE CONTRACT DOCUMENTS. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE REVIEW AND COORDINATION OF ALL DRAWINGS AND SPECIFICATIONS PRIOR TO THE START OF CONSTRUCTION. ANY DISCREPANCIES THAT OCCUR SHALL BE BROUGHT TO THE ATTENTION OF THE ENGINEER PRIOR TO THE START OF CONSTRUCTION SO THAT A CLARIFICATION CAN BE ISSUED. ANY WORK PERFORMED IN CONFLICT WITH THE CONTRACT DOCUMENTS OR ANY CODE REQUIREMENTS SHALL BE CORRECTED BY THE CONTRACTOR AT THEIR OWN EXPENSE AND AT NO EXPENSE TO THE OWNER, ARCHITECT, OR ENGINEER. 6.NOTES AND DETAILS ON DRAWINGS SHALL TAKE PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS. WHERE NO DETAILS ARE GIVEN, CONSTRUCTION SHALL BE AS SHOWN FOR SIMILAR WORK. 7.THE EXISTENCE, LOCATION AND CHARACTERISTICS OF UNDERGROUND UTILITY INFORMATION SHOWN ON THESE PLANS HAVE BEEN OBTAINED FROM A REVIEW OF AVAILABLE RECORD DATA. NO REPRESENTATION IS MADE AS TO THE ACCURACY OR COMPLETENESS OF SAID UTILITY INFORMATION. THE CONTRACTOR SHALL TAKE PRECAUTIONARY MEASURES TO PROTECT THE UTILITY LINES SHOWN AND ANY OTHER LINES NOT OF RECORD OR NOT SHOWN ON THESE PLANS. 8.IF AT ANY TIME DURING GRADING OPERATIONS, ANY UNFAVORABLE GEOLOGICAL CONDITIONS ARE ENCOUNTERED, GRADING IN THAT AREA WILL STOP UNTIL APPROVED CORRECTIVE MEASURES ARE OBTAINED. 9.THE PROPOSED GRADE IS THE FINAL GRADE AND NOT THE ROUGH GRADE. THE CONTRACTOR SHALL SUBTRACT THE THICKNESS OF THE PAVED SECTION AND/OR LANDSCAPE TOPSOIL SECTION TO ARRIVE AT THE ROUGH GRADE ELEVATION. 10.STRAIGHT GRADE SHALL BE MAINTAINED BETWEEN CONTOUR LINES AND SPOT ELEVATIONS UNLESS OTHERWISE SHOWN ON THE PLANS. 11.ALL DEBRIS AND FOREIGN MATERIAL SHALL BE REMOVED FROM THE SITE AND DISPOSED OF AT APPROVED DISPOSAL SITES. THE CONTRACTOR SHALL OBTAIN NECESSARY PERMITS FOR THE TRANSPORTATION OF MATERIAL TO AND FROM THE SITE. 12.THE CONTRACTOR SHALL OBTAIN AN O.S.H.A. PERMIT FROM THE CALIFORNIA DIVISION OF INDUSTRIAL SAFETY PRIOR TO THE CONSTRUCTION OF TRENCHES OR EXCAVATIONS WHICH ARE FIVE FEET OR DEEPER. 13.DIMENSIONS TO PIPELINES ARE TO CENTERLINE UNLESS OTHERWISE NOTED. 14.ALL STORM DRAIN PIPE, FITTINGS AND JOINTS SHALL BE POLYVINYL CHLORIDE SDR 35 IN ACCORDANCE WITH SECTION 207-17 OF THE STANDARD SPECIFICATIONS, UNLESS OTHERWISE NOTED. 15.ALL SANITARY SEWER PIPE, FITTINGS AND JOINTS SHALL BE POLYVINYL CHLORIDE SDR 26 IN ACCORDANCE WITH SECTION 207-17 OF THE STANDARD SPECIFICATIONS, UNLESS OTHERWISE NOTED. 16.ALL WATER LINES AND FORCE MAINS SHALL BE INSTALLED WITH 36" MINIMUM COVER FROM TOP OF PIPE TO FINISHED GRADE, UNLESS OTHERWISE NOTED. 17.ALL WATER LINES SHALL BE POLYVINYL CHLORIDE CLASS 150 AND SHALL MEET THE REQUIREMENTS OF AWWA C900 PVC PRESSURE PIPE, UNLESS OTHERWISE NOTED. 18.THRUST BLOCKS SHALL BE INSTALLED AT WATERLINE HORIZONTAL AND VERTICAL BENDS, TEES, CAPPED ENDS AND REDUCERS ACCORDING TO THE DETAILS PROVIDED ON THESE PLANS. 19.CONSTRUCTION STAKING FOR IMPROVEMENTS SHOWN ON THESE PLANS SHALL BE PERFORMED BY A LICENSED LAND SURVEYOR. 20.THE CONTRACTOR SHALL REPLACE ALL EXISTING IMPROVEMENTS DAMAGED DURING CONSTRUCTION TO MATCH EXISTING, INCLUDING PERMANENT TRENCH RESURFACING. 21.CONTRACTOR TO CONTACT UNDERGROUND SERVICE ALERT (800-422-4133) PRIOR TO EXCAVATION. 22.ALL DIMENSIONS ARE IN FEET OR DECIMALS THEREOF. 23.ALL CURB DIMENSIONS AND RADII ARE TO PAVEMENT FACE OF CURB. 24.CONTRACTOR TO BE AWARE OF ALL OVERHEAD LINES AT ALL TIMES, SO AS NOT TO DISTURB THEM. 25.WATER SHALL BE PROVIDED ONSITE AND USED TO CONTROL DUST DURING CONSTRUCTION OPERATIONS. 26.CONTRACTOR SHALL OBTAIN ANY NECESSARY PERMITS FROM THE CITY OF _______ FOR ALL WORK WITHIN THE PUBLIC RIGHT-OF-WAY. 27.STORM DRAINAGE SYSTEMS SHOWN ON THESE PLANS HAVE BEEN DESIGNED FOR THE FINAL SITE CONDITION AT COMPLETION OF THE PROJECT. THE CONTRACTOR IS RESPONSIBLE FOR MAINTAINING ADEQUATE DRAINAGE OF THE SITE, DURING INTERIM CONDITIONS OF CONSTRUCTION. 28.CONTRACTOR SHALL OBTAIN ALL REQUIRED PERMITS, INCLUDING NPDES, FROM THE APPROPRIATE JURISDICTIONAL AGENCIES FOR DISCHARGE OF GROUNDWATER THAT MAY BE NECESSARY TO ACCOMPLISH EXCAVATIONS SHOWN ON THESE PLANS. 29.DRAIN INLETS LOCATED WITHIN ACCESSIBLE PATHS OF TRAVEL SHALL HAVE ACCESSIBILITY COMPLIANT GRATES, ORIENTED TO THE DOMINANT DIRECTION OF PEDESTRIAN TRAVEL. UTILITIES 1.ADJUST ALL INCIDENTAL STRUCTURES, MANHOLES, VALVE BOXES, CATCH BASINS, FRAMES AND COVERS, ETC. TO FINISHED GRADE. 2.CONTRACTOR SHALL ADJUST ALL EXISTING AND/OR NEW FLEXIBLE UTILITIES (WATER, GAS, TV, TELEPHONE, ELEC., ETC.) TO CLEAR ANY EXISTING OR NEW GRAVITY DRAIN UTILITIES (STORM DRAIN, SANITARY SEWER, ETC.) IF CONFLICT OCCURS. 3.CONTRACTOR SHALL COORDINATE WITH PRIVATE UTILITY COMPANIES FOR THE INSTALLATION OF GAS, ELECTRICAL, POWER AND TELEPHONE SERVICE. 4.BEFORE BACKFILLING ANY SUBGRADE UTILITY IMPROVEMENTS CONTRACTOR SHALL SURVEY AND RECORD MEASUREMENTS OF EXACT LOCATION AND DEPTH AND SUBMIT TO ENGINEER AND OWNER. 5.ALL FIRE HYDRANT LATERALS SHALL BE 6" MINIMUM, U.N.O 6.FIRE DEPARTMENT CONNECTION INSTALLATION SHALL INCLUDE SIGNAGE PER N.F.P.A. 24 AND LOCAL AGENCY REQUIREMENTS. 7.ALL FIRE SERVICE PIPING SHALL BE RATED FOR THE MAXIMUM SYSTEM WORKING PRESSURE AND NOT LESS THEN 150 PSI. 8.ALL FIRE SERVICE PIPING FITTINGS SHALL BE IN ACCORDANCE WITH N.F.P.A. 24 REQUIREMENTS AND MATCH MATERIAL OF THE SYSTEM'S PIPING U.N.O. ABOVE-GRADE FITTINGS SHALL CONFORM TO N.F.P.A. 13 REQUIREMENTS. 9.AFTER INSTALLATION, COAT RODS, NUTS, BOLTS AND OTHER FIRE SERVICE RESTRAINING DEVICES WITH A BITUMINOUS OR OTHER ACCEPTABLE CORROSION -RETARDING MATERIAL. 10.SHOP DRAWINGS FOR PRECAST AND PROPRIETARY UTILITY STRUCTURES INCLUDING PROJECT SPECIFIC INVERTS AND DIMENSIONS SHALL BE REVIEWED BY THE ENGINEER FOR CONFORMANCE WITH THE DESIGN PRIOR TO CONSTRUCTION. PAVING 1.SEE ARCHITECTURAL PLANS FOR SIDEWALK COLOR, FINISHING AND SCORING PATTERNS. 2.CONCRETE SIDEWALK AND PAVING BEING DEMOLISHED SHALL BE REMOVED TO THE NEAREST SCORE LINES, EXPANSION JOINT, OR DEEP TOOL JOINT. GENERAL NOTES KPFF GENERAL NOTES C0.2 TBD TBD SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com CITY OF DUBLIN NOTES: GENERAL NOTES: 1.REVIEW OF PLANS DOES NOT RELIEVE THE OWNER/DEVELOPER OF RESPONSIBILITY FOR CORRECTION OF MISTAKES, ERRORS OR OMISSIONS. FINAL APPROVAL OF CONSTRUCTION OR INSTALLATION SUBJECT TO INSPECTION TEST AND ACCEPTANCE. 2.PRIOR TO START OF CONSTRUCTION, THE DEVELOPER AND/OR CONTRACTOR SHALL CONTACT THE CITY'S PUBLIC WORKS DEPARTMENT AT (925) 833-6630 AND REQUEST A PRECONSTRUCTION CONFERENCE. 3.THESE PLANS SHOW EXISTING FEATURES INCLUDING, BUT NOT LIMITED TO TREES, UTILITIES, AND STRUCTURES THAT MAY BE AFFECTED BY THE CONSTRUCTION PLACEMENT OF THE PROPOSED ENGINEERED IMPROVEMENTS.THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE ENGINEER IF THERE ARE ANY EXISTING FEATURES, WHETHER SHOWN OR NOT SHOWN ON THESE PLANS THAT COULD IN ANY WAY BE IN POTENTIAL CONFLICT WITH THE DESIGN OF THESE PLANS. ALL WORK WITHIN THE VICINITY OF A POTENTIAL CONFLICT SHALL CEASE UNTIL AN ADEQUATE AND APPROPRIATE SOLUTION IS DETERMINED BY THE ENGINEER AND APPROVED BY THE PUBLIC WORKS DEPARTMENT. 4.SHOULD IT APPEAR THAT THE WORK TO BE DONE, OR ANY MATTER RELATIVE THERETO, IS NOT SUFFICIENTLY DETAILED OR EXPLAINED ON THESE PLANS, THE CONTRACTOR SHALL CONTACT KPFF CONSULTING ENGINEERS FOR SUCH FURTHER EXPLANATIONS AS MAY BE NECESSARY. 5.ALL REVISIONS TO THIS PLAN MUST BE REVIEWED BY THE PUBLIC WORKS DEPARTMENT PRIOR TO CONSTRUCTION AND SHALL BE ACCURATELY SHOWN ON REVISED PLANS SIGNED BY THE CITY ENGINEER. 6.A GRADING PERMIT FROM THE PUBLIC WORKS DEPARTMENT WILL BE REQUIRED FOR ALL GRADING AND/OR WORK ONSITE. 7.ALL GRADING AND PUBLIC IMPROVEMENTS SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE PROVISIONS OF THE CURRENT CITY ORDINANCES AND STANDARD PLANS. THE GRADING AND IMPROVEMENTS ARE SUBJECT TO THE INSPECTION AND APPROVAL OF THE PUBLIC WORKS DEPARTMENT. INSPECTION SHALL BE SCHEDULED WITH THE PUBLIC WORKS DEPARTMENT AT (925) 833-6630 AT LEAST TWO WORKING DAYS PRIOR TO THE START OF CONSTRUCTION. 8.CALL BEFORE YOU DIG! NOTIFY UNDERGROUND SERVICE ALERT (USA) AT (800) 227-2600 AT LEAST TWO WORKING DAYS PRIOR TO ANY EXCAVATION. THE USA AUTHORIZATION NUMBER SHALL BE KEPT AT THE JOBSITE. 9.THE DEVELOPER/CONTRACTOR IS REQUIRED BY STATE LAW TO ACTIVELY RESEARCH WORK AREA PRIOR TO CONSTRUCTION, REFERENCE MONUMENTS AND REPLACE THOSE DAMAGED OR REMOVED DURING CONSTRUCTION. 10.ALL GRADING TO BE ACCOMPLISHED PER THE RECOMMENDATIONS IN THE SOILS REPORT “FAULT RUPTURE HAZARD EVALUATION AND DESIGN-LEVEL GEOTECHNICAL INVESTIGATION” PREPARED BY CORNERSTONE EARTH GROUP DATED APRIL 4, 2023. 11.THE SOILS ENGINEER SHALL INSPECT AND TEST THE EXCAVATION, PLACEMENT OF FILLS AND BACKFILLING AND COMPACTION OF TRENCHES. THE SOILS ENGINEER SHALL SUBMIT SOILS REPORTS AS REQUIRED AND WILL DETERMINE THE SUITABILITY OF ANY FILL MATERIAL. UPON COMPLETION OF GRADING OPERATION THE SOILS ENGINEER SHALL STATE IN A REPORT TO THE CITY OF DUBLIN THAT INSPECTIONS AND TESTS WERE MADE BY HIM/HER OR UNDER HIS/HER SUPERVISION AND THAT IN HIS/HER OPINION ALL EMBANKMENTS AND EXCAVATION WERE CONSTRUCTED IN ACCORDANCE WITH THE APPROVED GRADING PLANS AND APPROVED REVISIONS THERETO AND ALL EMBANKMENTS AND EXCAVATIONS ARE ACCEPTABLE FOR THEIR INTENDED USE. 12. IF, DURING CONSTRUCTION, ARCHAEOLOGICAL REMAINS ARE ENCOUNTERED, CONSTRUCTION IN THE VICINITY SHALL BE HALTED, AN ARCHAEOLOGIST CONSULTED, AND THE CITY PLANNING DEPARTMENT NOTIFIED. IF, IN THE OPINION OF THE ARCHAEOLOGIST, THE REMAINS ARE SIGNIFICANT, MEASURES, AS MAY BE REQUIRED BY THE PLANNING DIRECTOR, SHALL BE TAKEN TO PROTECT THEM. 13.THE CONTRACTOR SHALL DESIGN, CONSTRUCT AND MAINTAIN ALL SAFETY DEVICES, INCLUDING SHORING, AND SHALL BE RESPONSIBLE FOR CONFORMANCE TO ALL LOCAL, STATE AND FEDERAL SAFETY AND HEALTH STANDARDS, LAWS AND REGULATIONS. 14.A CALIFORNIA DIVISION OF OCCUPATIONAL SAFETY AND HEALTH (CAL OSHA) PERMIT SHALL BE OBTAINED FOR TRENCHES FIVE FEET OR GREATER IN DEPTH. A COPY OF THIS PERMIT SHALL BE SUPPLIED TO THE PUBLIC WORKS DEPARTMENT. AN ADDITIONAL COPY SHALL BE KEPT AT THE JOBSITE AT ALL TIMES. 15.ALL NEW UTILITY DISTRIBUTION SERVICES SHALL BE PLACED UNDERGROUND. 16.PRIOR TO PLACING CURB, GUTTER, SIDEWALK, ASPHALT CONCRETE, SUBBASE, OR BASE MATERIAL, ALL UNDERGROUND FACILITIES WITHIN THE RIGHT-OF-WAY SHALL BE INSTALLED, BACKFILL COMPLETED, AND THE PUBLIC WORKS DEPARTMENT NOTIFIED BY EACH OF THE UTILITY COMPANIES HAVING FACILITIES WITHIN THE WORK AREA, THAT THE UTILITY INSTALLATION HAS SATISFACTORILY PASSED ACCEPTANCE TESTS. 17.ALL MANHOLES OR INLETS OVER 5 FEET IN DEPTH SHALL BE PROVIDED WITH POLYPROPYLENE STEPS. THE STEPS SHALL BE INTEGRALLY CAST INTO THE WALLS OF THE MANHOLE OR INLET WHETHER PRECAST OR FIELD CAST. THE STEPS SHALL BE INSTALLED IN ACCORDANCE WITH CALTRANS SPECIFICATIONS AND CITY OF DUBLIN/ALAMEDA COUNTY STANDARD PLANS, AND CAL OSHA REQUIREMENTS, IF APPLICABLE. 18.WHEN WIDENING THE PAVEMENT ON AN EXISTING ROAD, THE EXISTING PAVEMENT SHALL BE SAWCUT TO A NEAT LINE AND REMOVED BACK TO AN EXISTING ADEQUATE STRUCTURAL SECTION, OR TO THE ORIGINAL ROAD SECTION (1 FOOT MINIMUM). AN EXPLORATORY TRENCH, OR POTHOLING, MAY BE REQUIRED TO DETERMINE THE LIMITS OF PAVEMENT REMOVAL. 19.ALL RETAINING WALLS THAT WILL BE CONSTRUCTED WITH THE GRADING SHOWN ON THESE GRADING PLANS WILL REQUIRE A GRADING PERMIT FROM THE PUBLIC WORKS DEPARTMENT. ANY FUTURE RETAINING WALLS OVER THREE FEET IN HEIGHT (TWO-FEET WITH SURCHARGE) WILL REQUIRE A BUILDING PERMIT AND MUST BE SHOWN ON THE PLOT PLAN. 20.ALL PUBLIC STORM DRAIN LINES SHALL BE CLASS III RCP UNLESS OTHERWISE SPECIFIED ON THE PLANS. 21.NO TREES SHALL BE REMOVED UNLESS THEY ARE SHOWN AND NOTED TO BE REMOVED ON THE IMPROVEMENT PLANS. ALL TREES CONFLICTING WITH GRADING, UTILITIES, OR OTHER IMPROVEMENTS, OR OVERHANGING THE SIDEWALK OR PAVEMENT SO AS TO FORM A NUISANCE OR HAZARD, SHALL BE TRIMMED AND PROPERLY GRADED AND SEALED. THE DRIP LINE OF TREES TO BE SAVED WILL BE FENCED, AND NO GRADING SHALL TAKE PLACE WITHIN THIS FENCED AREA. 22.EXISTING PUBLIC IMPROVEMENTS THAT ARE DAMAGED BY THE PROJECT CONSTRUCTION SHALL BE REPAIRED OR REPLACED. EXISTING DAMAGED PUBLIC IMPROVEMENTS WITHIN THE PROJECT LIMITS SHALL BE REPAIRED OR REPLACED EVEN IF THE DAMAGE OCCURRED PRIOR TO THE START OF CONSTRUCTION. 23.ALL TRAFFIC STRIPING AND MARKINGS SHALL BE THERMOPLASTIC. (ON TRAFFIC SIGNING & STRIPING PLAN) 24.ALL TRAFFIC STRIPING SHALL BE CAT-TRACKED PRIOR TO FINAL INSTALLATION. FINAL INSTALLATION OF STRIPING WILL BE ALLOWED ONLY AFTER APPROVAL OF THE STRIPING LAYOUT BY THE PUBLIC WORKS DEPARTMENT. (ON TRAFFIC SIGNING & STRIPING PLAN) 25.ORDER OF WORK FOR ROAD WIDENING AND MEDIAN ISLAND CONSTRUCTION IN WHICH TRAFFIC STRIPING WILL BE RELOCATED: A. ROUGH GRADING B. STORM DRAIN AND DRAINAGE STRUCTURES C. UTILITY INSTALLATION D. CURB, GUTTER, AND SIDEWALK E. PAVEMENT CONSTRUCTION F. REMOVE CONFLICTING STRIPING, MARKINGS, PAVEMENT MARKERS, AND SIGNS, AND INSTALL INTERIM STRIPING G. INSTALL FINAL STRIPING AND MARKINGS H. INSTALL FINAL SIGNING (AT INTERIM LOCATIONS IF NECESSARY) I. CONSTRUCT MEDIAN CURB J. COMPLETE FINAL STRIPING, MARKINGS, PAVEMENT MARKERS, AND SIGN INSTALLATION 26.THE THICKNESS OF SUBBASE, BASE, AND SURFACING SHALL BE BASED ON TRAFFIC INDEX AND SOILS TEST FOR "R" VALUE. 27.AN ENCROACHMENT PERMIT WILL BE REQUIRED FOR ANY CONSTRUCTION ACTIVITY WITHIN A PUBLIC STREET RIGHT OF WAY THAT HAS BEEN ACCEPTED BY THE CITY. 28.A TRAFFIC CONTROL PLAN, PREPARED BY A REGISTERED CIVIL ENGINEER IN ACCORDANCE WITH THE CURRENT CALIFORNIA MUTCD, SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE CITY, A MINIMUM OF 10 DAYS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY THAT IMPACTS TRAFFIC ON PUBLIC STREETS (VEHICULAR, BICYCLE, OR PEDESTRIAN). A SEPARATE CONSTRUCTION HAUL ROUTE PLAN SHALL BE SUBMITTED FOR REVIEW AND APPROVAL BY THE CITY, A MINIMUM OF 10 DAYS PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION ACTIVITY THAT REQUIRES HAULING OF ANY CONSTRUCTION MATERIALS. STORM DRAIN VIDEO INSPECTION REQUIREMENTS: 1.PRIOR TO FINAL LIFT OF ROADWAY PAVING, THE STORM DRAIN SYSTEM, INCLUDING THE MAIN LINE, LATERALS AND INTERIORS OF STORM STRUCTURES IN ALL PUBLIC AND PRIVATE RIGHT OF WAY AND STORM DRAIN EASEMENTS, SHALL BE FLUSHED AND VISUALLY INSPECTED BY MEANS OF CLOSED-CIRCUIT TELEVISION (CCTV). ANY NECESSARY CLEAN OUT OF THE SYSTEM SHALL BE COMPLETED, DEFECTS SHALL BE REPAIRED AND THE SYSTEM SHALL BE TELEVISED AGAIN TO CONFIRM SATISFACTORY REPAIR WORK PRIOR TO ACCEPTANCE. NOTE THAT SUBDRAIN LINES IN STORMWATER TREATMENT FACILITIES AND MEASURES LOCATED IN THE PUBLIC RIGHT OF WAY MUST BE TELEVISED TO DEMONSTRATE THE SUBDRAIN IS CLEAR OF SEDIMENT AND DEBRIS PRIOR TO THE CITY'S ACCEPTANCE OF THE STORMWATER TREATMENT IMPROVEMENTS. 2.VIDEO INSPECTION WILL BE DONE ONE SECTION (STRUCTURE TO STRUCTURE) AT A TIME. THE CAMERA WILL PAN THE INTERIORS OF ALL STRUCTURES AND WHEN IN THE PIPE, WILL STOP AT EACH JOINT TO ROTATE 360 DEGREES TO PAN THE ENTIRE JOINT. 3.THE CAMERA SHALL BE SPECIFICALLY DESIGNED AND CONSTRUCTED FOR SUCH INSPECTION. LIGHTING FOR THE CAMERA SHALL BE SUITABLE TO ALLOW A CLEAR COLOR PICTURE OF THE ENTIRE PERIPHERY OF THE PIPE. THE CAMERA SHALL BE OPERATIVE IN 100% HUMIDITY CONDITIONS WITHOUT CAUSING THE CAMERA TO FOG. THE CAMERA, TELEVISION MONITOR, AND OTHER COMPONENTS OF THE VIDEO SYSTEM SHALL BE CAPABLE OF PRODUCING PICTURE QUALITY TO THE SATISFACTION OF THE PUBLIC WORKS DEPARTMENT. 4.THE PUBLIC WORKS DEPARTMENT SHALL BE NOTIFIED 48 HOURS PRIOR TO TELEVISING AND MUST BE ONSITE TO CONFIRM FLOW RATE PRIOR TO TELEVISING. THE CAMERA SHALL BE MOVED THROUGH THE LINE IN A DOWNSTREAM DIRECTION AT A MODERATE RATE, STOPPING WHEN NECESSARY TO PERMIT PROPER DOCUMENTATION OF THE STORM DRAIN CONDITION. IN NO CASE WILL THE TELEVISION CAMERA BE PULLED AT A SPEED GREATER THAN 30 FEET PER MINUTE. MANUAL WINCHES, POWER WINCHES, TV CABLE, AND POWERED REWINDS OR OTHER DEVICES THAT DO NOT OBSTRUCT THE CAMERA VIEW OR INTERFERE WITH PROPER DOCUMENTATION OF THE STORM DRAIN CONDITIONS SHALL BE USED TO MOVE THE CAMERA THROUGH THE LINE. 5.THE IMPORTANCE OF ACCURATE DISTANCE MEASUREMENTS IS EMPHASIZED. MEASUREMENT FOR LOCATION OF DEFECTS SHALL BE ABOVE GROUND BY MEANS OF A METER DEVICE. MARKING ON THE CABLE, OR THE LINE, WHICH WOULD REQUIRE INTERPOLATION FOR DEPTH OF INSERTION PIT, WILL NOT BE ALLOWED. ACCURACY OF THE DISTANCE METER SHALL BE CHECKED BY USE OF A WALKING METER, ROLL-A-TAPE, OR OTHER SUITABLE DEVICE AND THE ACCURACY SHALL BE SATISFACTORY TO THE PUBLIC WORKS DEPARTMENT. 6.DOCUMENTATION OF THE TELEVISION RESULTS SHALL BE AS FOLLOWS: THE PURPOSE OF TELEVISING SHALL BE TO SUPPLY A VISUAL AND AUDIO RECORD OF PROBLEM AREAS OF THE LINES THAT MAY BE REPLAYED. RECORDING PLAYBACK SHALL BE AT THE SAME SPEED THAT IT WAS RECORDED. THE FORMAT SHALL BE DVD. THE ACCOMPANYING AUDIO SHALL PROVIDE A DESCRIPTION OF WHAT IS ENCOUNTERED SUCH AS JOINTS, PROBLEM AREAS, AND BROKEN PIPE. THE DVD SHALL HAVE DISPLAYED THE NUMBER OF FEET FROM THE STARTING STRUCTURE FOR EACH SEGMENT. 7.SECTIONS OF PIPE FROM STRUCTURE TO STRUCTURE SHALL BE AUDIBLY AND VISUALLY IDENTIFIED IN THE VIDEO USING THE SAME NOMENCLATURE AS ON THE IMPROVEMENT PLANS (E.G. “SDMH #2 TO SDMH #3” OR “STA 10+55”). EACH DVD MUST BE LABELED WITH THE FOLLOWING INFORMATION: DATE, PROJECT #, THE LOCATIONS, AND TYPES OF STRUCTURES SHOWN ON THE DVD. 8.TITLE TO THE DVD SHALL BE WITH THE CITY. THE CONTRACTOR SHALL SUBMIT A COPY OF THE DVD FOR REVIEW BY THE PUBLIC WORKS DEPARTMENT DURING THE PROJECT. THE CONTRACTOR SHALL ALSO PROVIDE A WRITTEN SUMMARY OF THE DVD WITH DIMENSIONS AND INFORMATION, SPECIFICALLY IDENTIFYING PROBLEM AREAS AND BROKEN PIPE. STORMWATER MANAGEMENT PLAN NOTES: 1.PRIOR TO DELIVERY OF BIOTREATMENT SOIL, THE CONTRACTOR SHALL PROVIDE REQUIRED DOCUMENTATION (AVAILABLE AT WWW.CI.DUBLIN.CA.US/1656/STORMWATER-DEVELOPMENT-SUBMITTAL-REQUIRE) TO THE PUBLIC WORKS INSPECTOR DEMONSTRATING THAT THE BIOTREATMENT SOIL COMPLIES WITH SPECIFICATIONS INCLUDED IN THE MOST RECENT VERSION OF THE ALAMEDA COUNTY CLEAN WATER PROGRAM'S C.3 STORMWATER TECHNICAL MANUAL. RECEIPTS OR DELIVERY TICKETS FOR THE BIOTREATMENT SOIL AND CLASS II PERM MUST BE RETAINED FOR REVIEW BY THE PUBLIC WORKS INSPECTOR. 2.THE REQUIRED MINIMUM STORMWATER BIOTREATMENT FACILITY SURFACE AREA IS THAT AREA THAT ACHIEVES THE REQUIRED PONDING DEPTH AND IS UNDERLAIN BY 18 INCHES OF BIOTREATMENT SOIL. 3.ALL SITE GRADING AND DRAINAGE CONVEYANCE MUST CAUSE RUNOFF FROM DRAINAGE MANAGEMENT AREAS (DMA) TO DRAIN TO DESIGNATED RECEIVING FACILITY ( I.E. GRADE BREAKS MUST CONFORM TO DMA DELINEATIONS, CURB CUTS MUST EFFECTIVELY DIRECT FLOWS INTO FACILITIES, ETC.). 4.CONTRACTOR MUST MAINTAIN RECORD DOCUMENTS OF CONSTRUCTION CHANGES (“AS-BUILT DRAWINGS”) FOR ANY FACILITIES AND RELATED DESIGN FEATURES AND MUST PROVIDE SAID DOCUMENTATION TO THE PUBLIC WORKS DEPARTMENT UPON COMPLETION OF CONSTRUCTION. 5.THE PROJECT CIVIL ENGINEER IS RESPONSIBLE FOR ENSURING THAT THE FACILITIES ARE CONSTRUCTED IN ACCORDANCE WITH APPROVED PLANS. PRIOR TO BUILDING PERMIT FINAL INSPECTION OR CERTIFICATE OF OCCUPANCY OR ACCEPTANCE OF IMPROVEMENTS, THE PUBLIC WORKS INSPECTOR SHALL REQUIRE THE PROJECT CIVIL ENGINEER TO SUBMIT A STATEMENT CERTIFYING THAT THE FACILITIES HAVE BEEN INSTALLED PROPERLY AND IN ACCORDANCE WITH THE APPROVED STORMWATER MANAGEMENT PLAN OR ANY REVISIONS THEREOF. 6.ANY ASYMMETRICAL STORMWATER TREATMENT AREAS SHALL BE STAKED AND SURVEYED PRIOR TO CONSTRUCTION STORMWATER TREATMENT AREAS. 7.INSTALL STORM DRAIN MEDALLIONS OR INLET MARKERS THAT READ “NO DUMPING - DRAINS TO CREEK” ON ALL PUBLIC AND PRIVATE STORM DRAIN INLETS IN ACCORDANCE WITH CITY STANDARD DETAIL CD-704. THE MEDALLIONS MAY BE PURCHASED FROM THE PUBLIC WORKS DEPARTMENT LOCATED AT 100 CIVIC PLAZA, DUBLIN, CA. 8.PRIOR TO THE CITY GRANTING FINAL BUILDING PERMIT INSPECTION OR CERTIFICATE OF OCCUPANCY OR ACCEPTANCE OF IMPROVEMENTS, THE APPLICANT SHALL PROVIDE GPS COORDINATES FOR ALL INSTALLED STORMWATER TREATMENT FACILITIES, HYDROMODIFICATION MANAGEMENT MEASURES, AND TRASH CAPTURE DEVICES. THE COORDINATES SHALL BE IN A FORMAT DETERMINED BY THE PUBLIC WORKS DEPARTMENT. 9.PRIOR TO THE CITY'S ACCEPTANCE OF IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY, SUBDRAIN LINES IN STORMWATER TREATMENT FACILITIES AND MEASURES LOCATED IN THE RIGHT-OF-WAY MUST BE TELEVISED TO DEMONSTRATE THE SUBDRAIN IS CLEAR OF SEDIMENT AND DEBRIS. 10.PRIOR TO THE CITY'S ACCEPTANCE OF IMPROVEMENTS WITHIN THE PUBLIC RIGHT OF WAY, ANY UNDERGROUND STORMWATER TREATMENT UNITS SHALL BE INSPECTED AND MAINTENANCE ACTIVITIES CONDUCTED, INCLUDING BUT NOT LIMITED TO REMOVAL AND REPLACEMENT OF MEDIA FILTRATION CARTRIDGES, AS APPLICABLE. 11/04/2025 86 29.5 7 14.5 Alameda County Pumper Overall Length 29.500ft Overall Width 8.000ft Overall Body Height 10.432ft Min Body Ground Clearance 0.862ft Track Width 8.000ft Lock-to-lock time 6.00s Max Wheel Angle 39.40° CO COFW FW FW CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WMDWDW DW DW DW DW DW COEV PARKING ONLY EV PARKING ONLY CO CO CO > > > > FW FW FW FF = 353.25' C C2.1 5.0' 25.0' TYP. 25.8' 24.0' 26.0' TYP. 25.0' PROPOSED FIRE HYDRANT Alameda County Pumper 15' CITY OF DUBLIN FIRE HYDRANT ACCESS EASEMENT PROPOSED DDCV WITH PIV AND FDC PROPOSED CONNECTION TO BLDG FIRE RISER 250.0' 250.0' 250.0' 15.0' SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET FIRE ACCESS PLAN C0.3 DU B L I N B L V D . BRANNIGAN ST. 1.FIRE ACCESS DURING CONSTRUCTION: 1.1.ACCESS ROADS, TURNAROUND, PULLOUTS, AND FIRE OPERATION AREAS ARE FIRE LANES AND SHALL BE MAINTAINED CLEAR AND FREE OF OBSTRUCTIONS, INCLUDING THE PARKING OF VEHICLES. 1.2.ENTRANCES TO JOB SITES SHALL NOT BE BLOCKED, INCLUDING AFTER HOURS, OTHER THAN BY APPROVED GATES/BARRIERS THAT PROVIDE FOR EMERGENCY ACCESS. 1.3.SITE UTILITIES THAT WOULD REQUIRE THE ACCESS ROAD TO BE DUG UP OR MADE IMPASSIBLE SHALL BE INSTALLED PRIOR TO CONSTRUCTION COMMENCING. LEGEND: NOTES: PROPERTY LINE EXISTING EASEMENT DOMESTIC WATER. SIZE PER PLAN FIRE WATER. SIZE PER PLAN 250' HYDRANT COVERAGE PROPOSED FIRE HYDRANT EASEMENT W FW 11/04/2025 87 DU B L I N B L V D . BRANNIGAN ST. CO CO CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WM COEV PARKING ONLY EV PARKING ONLY CO CO CO > > > > SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET EROSION CONTROL PLAN C1.0 EROSION CONTROL LEGEND INLET PROTECTION PER BEST MANAGEMENT PRACTICES HANDBOOK DETAIL SE-10.GRAVEL BERM BAGS TO SURROUND INLET PER BEST MANAGEMENT PRACTICES HANDBOOK DETAIL SE-6 STABILIZED CONSTRUCTION ENTRANCE 11/04/2025 88 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET EROSION CONTROL NOTES AND DETAILS C1.1 CATCH BASIN RIM SUSPENSION CORDS/RODS CATCH BASIN CATCH BASIN STORM PIPE 2"X2"X3 4" RUBBER BLOCKS1" REBAR FOR BAG REMOVAL EXPANSION RESTRAINT FILTER SACK NOTE: RECESSED CURB INLET MUST BE BLOCKED WHEN USING FILTER FABRIC INLET SACKS. SIZE OF FILTER FABRIC INLET SACK TO BE DETERMINED BY MANUFACTURER. INSERT SACK FRONT VIEW INSERT SACK SIDE VIEW FILTER SACK OVERFLOW MAINTENANCE NOTES 1. MAINTENANCE IS TO BE PERFORMED AS FOLLOWS: A. REPAIR DAMAGES CAUSED BY SOIL EROSION OR CONSTRUCTION AT THE END OF EACH WORKING DAY. B. SWALES SHALL BE INSPECTED PERIODICALLY AND MAINTAINED AS NEEDED. C. SEDIMENT TRAPS, BERMS, AND SWALES ARE TO BE INSPECTED AFTER EACH STORM AND REPAIRS MADE AS NEEDED. D. SEDIMENT SHALL BE REMOVED AND SEDIMENT BARRIER RESTORED TO ITS ORIGINAL DIMENSIONS WHEN SEDIMENT HAS ACCUMULATED TO A DEPTH OF HALF THE SEDIMENT BARRIER HEIGHT. E. SEDIMENT REMOVED FROM BARRIER SHALL BE DEPOSITED IN A SUITABLE AREA AND IN SUCH A MANNER THAT IT WILL NOT ERODE. F. INLET PROTECTION SHALL BE CLEANED OUT WHENEVER SEDIMENT DEPTH IS ONE HALF THE HEIGHT OF ONE SAND BAG. EROSION AND SEDIMENT CONTROL MEASURES 1.SANDBAGS SHALL BE STOCKPILED ON SITE, READY TO BE PLACED IN POSITION WHEN RAIN IS FORECAST, OR WHEN THE INSPECTOR SO DIRECTS. 2.CONTRACTOR SHALL PROVIDE WATER ONSITE AND USE IT FOR DUST CONTROL DURING CONSTRUCTION. 3.CONSTRUCTION ENTRANCES SHALL BE INSTALLED PRIOR TO COMMENCEMENT OF GRADING. ALL CONSTRUCTION TRAFFIC ENTERING ONTO THE PAVED ROADS MUST CROSS THE STABILIZED CONSTRUCTION ENTRANCE WAYS. 4.CONTRACTOR SHALL MAINTAIN STABILIZED ENTRANCE AT EACH VEHICLE ACCESS POINT TO EXISTING PAVED STREETS. ANY MUD OR DEBRIS TRACKED ONTO PUBLIC STREETS SHALL BE REMOVED DAILY AND AS REQUIRED BY THE INSPECTOR. 5.INLET PROTECTION SHALL BE INSTALLED AT OPEN INLETS TO PREVENT SEDIMENT FROM ENTERING THE STORM DRAIN SYSTEM. INLETS NOT USED IN CONJUNCTION WITH EROSION CONTROL ARE TO BE BLOCKED TO PREVENT ENTRY OF SEDIMENT. 6.THIS EROSION AND SEDIMENT CONTROL PLAN MAY NOT COVER ALL THE SITUATIONS THAT MAY ARISE DURING CONSTRUCTION DUE TO UNANTICIPATED FIELD CONDITIONS. VARIATIONS AND ADDITIONS MAY BE MADE TO THIS PLAN IN THE FIELD. NOTIFY THE INSPECTOR OF ANY FIELD CHANGES. GENERAL NOTES 1.NAME OF CONTRACTOR / RESPONSIBLE PARTY: NAME: PACIFIC CONSTRUCTION ADDRESS: 4125 S. B STREET, STOCKTON, CA PHONE NUMBER: (219) 477 - 2766 2.IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN CONTROL OF THE ENTIRE CONSTRUCTION OPERATION AND TO KEEP THE ENTIRE SITE IN COMPLIANCE WITH THE SOIL EROSION CONTROL PLAN AND THE PROJECT SPECIFIC STORMWATER POLLUTION PREVENTION PLAN (SWPPP). 3.A "STANDBY EMERGENCY CREW" SHALL BE ALERTED BY THE PERMITTEE OR THE CONTRACTOR TO PERFORM EMERGENCY WORK DURING RAINSTORMS. THE PARTY TO BE CONTACTED IS ((TO BE FILLED IN BY CONTRACTOR): NAME: PHONE NUMBER: 4.CIVIL ENGINEER: KPFF CONSULTING ENGINEERS 45 FREMONT STREET, 28TH FLOOR SAN FRANCISCO, CA 94105 (415) 989-1004 5.THIS PLAN IS INTENDED TO BE USED FOR INTERIM EROSION AND SEDIMENT CONTROL ONLY AND IS NOT TO BE USED FOR FINAL ELEVATIONS OR PERMANENT IMPROVEMENTS. TEMPORARY EROSION CONTROL DEVICES SHOWN ON THE GRADING PLAN WHICH INTERFERE WITH THE WORK SHALL BE RELOCATED OR MODIFIED AS AND WHEN THE INSPECTOR SO DIRECTS AS THE WORK PROGRESSES TO MEET "AS GRADED" CONDITIONS. 6.CONTRACTOR SHALL BE RESPONSIBLE FOR MONITORING EROSION AND SEDIMENT CONTROL MEASURES PRIOR, DURING, AND AFTER STORM EVENTS. 7.EXCEPT WHEN THE QSP DIRECTS OTHERWISE, ALL DEVICES SHOWN SHALL BE IN PLACE AT THE END OF EACH WORKING DAY WHEN RAIN IS FORECAST, AND SHALL BE MAINTAINED DURING THE RAINY SEASON (OCTOBER 1 TO APRIL 30). 8.REASONABLE CARE SHALL BE TAKEN WHEN HAULING ANY EARTH, SAND, GRAVEL, STONE, DEBRIS, PAPER OR ANY OTHER SUBSTANCE OVER ANY PUBLIC STREET, ALLEY OR OTHER PUBLIC PLACE. SHOULD ANY BLOW, SPILL, OR TRACK OVER AND UPON SAID PUBLIC OR ADJACENT PRIVATE PROPERTY, IMMEDIATE REMEDY SHALL OCCUR. 9.DURING THE RAINY SEASON, ALL PAVED AREAS SHALL BE KEPT CLEAR OF EARTH MATERIAL AND DEBRIS. THE SITE SHALL BE MAINTAINED SO AS TO MINIMIZE SEDIMENT LADEN RUNOFF TO ANY STORM DRAINAGE SYSTEM, INCLUDING EXISTING DRAINAGE SWALES AND WATER COURSES. ALL LOOSE SOIL AND DEBRIS SHALL BE REMOVED FROM THE STREET AREAS UPON STARTING OPERATIONS AND PERIODICALLY THEREAFTER AS DIRECTED BY THE QSP. 10.CONTRACTOR SHALL PROVIDE DUST CONTROL AS REQUIRED BY THE APPROPRIATE FEDERAL, STATE, LOCAL AGENCY, AND QSP REQUIREMENTS. 11.COORDINATE WITH SECTION "311000 SITE CLEARING" OF THE SPECIFICATIONS FOR ADDITIONAL INFORMATION REGARDING DEMOLITION AND EROSION CONTROL. 12.THE PROJECT SITE IS SUBJECT TO THE CONDITIONS IN THE CONSTRUCTION GENERAL PERMIT AND THE LOCAL AND STATE BEST MANAGEMENT PRACTICE REQUIREMENTS. 13.THE CONTRACTOR SHALL ADHERE TO THE CONTROL MEASURES OUTLINED IN ATTACHMENT C OF GENERAL PERMIT, INCLUDING THOSE RELATED TO: ·GOOD SITE MANAGEMENT ('HOUSEKEEPING') ·NON-STORMWATER RUNOFF MANAGEMENT ·EROSION AND SEDIMENT ·RUN-ON AND RUN-OFF ·INSPECTION, MAINTENANCE, AND REPAIR 14.THE CONTRACTOR SHALL ADHERE TO THE ADDITIONAL CONTROL MEASURES OUTLINED IN ATTACHMENTS D AND E OF GENERAL PERMIT, INCLUDING DEVELOPING A RAIN EVENT ACTION PLAN (REAP) AND PERFORMING WATER SAMPLING AND REPORTING FOR VISIBLE AND NON-VISIBLE POLLUTANTS. EROSION CONTROL NOTES CITY OF DUBLIN EROSION CONTROL NOTES 1.EROSION AND SEDIMENT CONTROL FACILITIES SHALL BE INSTALLED PRIOR TO OCTOBER 1 AND SHALL BE MAINTAINED DAILY UNTIL APRIL 30. THESE FACILITIES SHALL CONTROL AND CONTAIN EROSION-CAUSED SILT DEPOSITS AND PROVIDE FOR THE SAFE DISCHARGE OF SILT FREE STORM WATERS INTO EXISTING STORM DRAIN FACILITIES. EROSION AND SEDIMENT CONTROL SUPPLIES MUST BE KEPT ON-SITE DURING THE DRY SEASON AND EMPLOYED, AS NECESSARY PRIOR TO AND DURING RAIN EVENTS. DESIGN OF THESE FACILITIES MUST BE APPROVED/UPDATED EACH YEAR PRIOR TO SEPTEMBER 30 AND SHALL BE SIGNED BY THE CITY ENGINEER, OR HIS DESIGNEE. 2.SEASONALLY APPROPRIATE BEST MANAGEMENT PRACTICES FOR THE FOLLOWING SIX (6) SITE MANAGEMENT CATEGORIES MUST BE IMPLEMENTED YEAR-ROUND: (1) EROSION CONTROL, (2) RUN-ON AND RUN-OFF CONTROL, (3) SEDIMENT CONTROL, (4) GOOD SITE MANAGEMENT AND HOUSEKEEPING, (5) NON-STORMWATER MANAGEMENT, AND (6) ACTIVE TREATMENT SYSTEMS, AS NECESSARY. 3.CONTRACTOR SHALL KEEP CONSTRUCTION TRAFFIC OUT OF LOCATIONS WHERE STORMWATER TREATMENT FACILITIES AND MEASURE WILL BE INSTALLED TO MINIMIZE COMPACTION OF EXISTING SOILS. 4.PROTECT STORMWATER TREATMENT FACILITIES FROM CONSTRUCTION SITE RUNOFF. ONCE IMPORTED MATERIALS ARE INSTALLED IN STORMWATER TREATMENT FACILITIES, RUNOFF FROM UNSTABILIZED AREAS MUST BE DIVERTED AWAY FROM SUCH FACILITIES. 5.THE CONSTRUCTION BMPS SHOWN ON THE PLAN ARE MINIMUM REQUIREMENTS. THE CITY ENGINEER OR PUBLIC WORKS INSPECTOR IS AUTHORIZED TO REQUIRE ADDITIONAL BMPS TO PREVENT NON-STORMWATER DISCHARGES. 6.ALL SITE GRADING AND DRAINAGE CONVEYANCE MUST CAUSE RUNOFF FROM DRAINAGE MANAGEMENT AREAS (DMA) TO DRAIN TO DESIGNATED RECEIVING FACILITY (I.E. GRADE BREAKS MUST CONFORM TO DMA DELINEATIONS, CURB CUTS MUST EFFECTIVELY DIRECT FLOWS INTO FACILITIES, ETC.). 7.A STORM WATER POLLUTION PREVENTION PLAN (SWPPP) FOR BASIS DUBLIN COMMERCIAL DEVELOPMENT, HAS BEEN PREPARED FOR VP PRG DUBLIN LLC BY KPFF CONSULTING ENGINEERS DATED AUGUST 8, 2024. THE SWPPP CONTAINS A COPY OF THE “NOTICE OF INTENT” FILED WITH THE STATE WATER QUALITY CONTROL BOARD. THE GENERAL CONTRACTOR IS RESPONSIBLE FOR KEEPING A COPY OF THE SWPPP ONSITE AT ALL TIMES AND IMPLEMENTING ITS PROVISIONS. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING ALL SUBCONTRACTORS AND SUPPLIERS ARE AWARE OF AND IMPLEMENT THE MEASURES IN THE SWPPP. 1 DRAIN INLET PROTECTION N.T.S. SECTION A-A NOT TO SCALE TYPICAL TIRE WASH PAVE D R O A D W A Y NTS A A SECTION B-B NTS B B CRUSHED AGGREGATE GREATER THAN 75 MM (3 IN) BUT SMALLER THAN 150 MM (6 IN) CORRUGATED STEEL PANELS FILTER FABRIC ORIGINAL GRADE 300 MM (12 IN) MIN, UNLESS OTHERWISE SPECIFIED BY A SOILS ENGINEER FILTER FABRIC ORIGINAL GRADE CRUSHED AGGREGATE GREATER THAN 75 MM (3 IN) BUT SMALLER THAN 150 MM (6 IN) 300 MM (12 IN) MIN, UNLESS OTHERWISE SPECIFIED BY A SOILS ENGINEER DITCH TO CARRY RUNOFF TO A SEDIMENT TRAPPING DEVICE MATCH EXISTING GRADE WATER SUPPLY & HOSE WASH RACK NOTE: 1. MANY DESIGNS CAN BE FIELD FABRICATED, OR FABRICATED UNITS MAY BE USED. 2 STABILIZED CONSTRUCTION ENTRANCE N.T.S. 11/04/2025 89 CO CO CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WM COEV PARKING ONLY EV PARKING ONLY CO CO CO > > > > 8 7 6 1 4 TYP2 3 5 910 A C2.1 A C2.1 B C2.1 C C2.1 D C2.1 2' OVERHANG 2' O V E R H A N G 2' O V E R H A N G 2' OVERHANG PUE (EXISTING) 6.0' PSE (EXISTING) 9.0' TYP. 20.0' TYP. 25.0' 20.0' 9.0' 9.0' 9.0' 6.0' 25.8' 13.0' PASSENGER LOADING ZONE 25.0' 26.0' 20.0' TYP 9.0' TYP 24.0'S8 8 ° 4 6 ' 4 5 " E 18 8 . 6 8 ' S1°08'49"W 107.00'L =16.5 ',R=71.9'Δ =13°07'57" L=16.5',R =8 3 .0 ' Δ=11°21'5 8 " L =9 9 .6 ',R =19 3 2.1' Δ =2 °5 7 '17 "S1°08'49"W 51.71' L=54.5',R=35.4' Δ=88°01'49" N8 9 ° 2 4 ' 1 6 " W 4. 8 6 ' N8 8 ° 2 0 ' 3 7 " W 18 . 0 6 ' N8 7 ° 2 4 ' 4 7 " W 20 . 5 4 ' N8 6 ° 5 5 ' 0 4 " W 10 3 . 3 5 ' N1°13'15"E 445.16' L =12 3.1',R =17 8 2.1' Δ =3 °5 7 '3 2 " 8 4. 0 ' 4.0' 6.0' 4. 0 ' 11 12 13 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET SITE LAYOUT & STRIPING PLAN C2.0 DU B L I N B L V D . BRANNIGAN ST. SITE LAYOUT & STRIPING KEYNOTES SITE LAYOUT & STRIPING LEGEND PROPERTY LINE LIMIT OF WORK EASEMENT CONCRETE PAVEMENT ASPHALT PAVEMENT CONCRETE PAVING. SEE LANDSCAPE PLANS. ENHANCED PAVING. SEE LANDSCAPE PLANS. STABILIZED D.G. PAVING. SEE LANDSCAPE PLANS. PLACE STANDARD DUTY ASPHALT. CONSTRUCT STANDARD PARKING STALL. SEE CITY OF DUBLIN STD DETAIL CD-112, SEE CITY OF DUBLIN STD DETAIL CD-112, SHEET C6.0. CONSTRUCT ACCESSIBLE PARKING STALL. SEE DETAIL 1 SHEET C6.0. CONSTRUCT VAN ACCESSIBLE PARKING STALL. SEE DETAIL 1 SHEET C6.0. CONSTRUCT STANDARD EV STALL. ACCESSIBLE PATH OF TRAVEL STRIPING. SEE DETAIL 2 SHEET C6.0. DECORATIVE PRIVACY WALL FOR SPORT COURT. SEE LANDSCAPE PLANS. CONSTRUCT BIORETENTION AREA. CONSTRUCT STANDARD ACCESSIBLE EV STALL. CONSTRUCT CURB CUT. SEE DETAIL 6 SHEET C6.1. "NO PARKING" SIGN. CONCRETE PAD FOR TRASH PICKUP AREA. STOP SIGN AND PAVEMENT STRIPING. 1 2 3 4 5 6 7 8 9 10 11 12 13 PARKING COUNT STANDARD PARKING STALL 32 STANDARD ACCESSIBLE PARKING STALL 1 STANDARD VAN ACCESSIBLE PARKING STALL 1 STANDARD EV STALL 1 STANDARD ACCESSIBLE EV STALL 1 TOTAL 36 11/04/2025 90 Pipe Table Pipe Name SD4 SD3 SD6 SD7 SD9 SD10 SD12 SD13 SD30 SD15 SD17 SD18 SD19 SD20 SD21 SD24 SD27 SD31 Size 12.000 12.000 8.000 8.000 8.000 8.000 8.000 6.000 8.000 8.000 8.000 8.000 8.000 8.000 8.000 12.000 12.000 12.000 Length 17.499 21.633 86.149 24.478 12.422 47.997 35.391 30.026 69.393 87.738 101.319 53.480 34.806 39.346 14.620 33.606 12.047 21.941 Slope 1.00% 0.99% 1.00% 1.00% 1.12% 1.00% 1.00% 1.00% 1.00% 1.00% 1.01% 1.00% 1.12% 0.90% 1.00% 2.02% 1.03% 1.00% SD SD SD SD SD CO CO CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> SD SD SD SD WM SD SD SD SD SD SD SD SD SD SDSDSD CO SD SD SD SD SD EV PARKING ONLY EV PARKING ONLY CO CO CO SD SD SD > > > > GB GB GB GB GB GB GB GB FF = 353.25' EX TC 351.5± EX TC 351.3±EX TC 349.6± EX TC 350.8± A C2.2 1 2 B C2.2 C C2.2 D C2.2 >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> INV 346.44 INV 344.82 (18" OUT) EX TC 353.3± TRANSFORMER PAD FF = 353.00' EX TC 352.4± FS 353.23 FS 352.78 4" CURB TC 353.11 FS 353.56 FS 353.56 FS 353.29 FS 352.82 FS 352.56 FS 352.11 FS 352.12 TC 351.94 FS 351.27 8" CURB FS 353.23 FS 353.23 FS 353.23 FS 353.23 FS 353.23 FS 353.23 FS 353.23 FS 353.23 FS 353.23 SDAD-1 RIM 353.14 INV 348.00 (8" OUT) SDAD-2 RIM 353.17 INV 348.02 (6" OUT) SDCB-6 RIM 352.81 INV 346.46 (12" OUT) INV 346.46 (12" IN) SDCB-1 RIM 351.95 INV 347.50 (8" OUT) FS 353.14 DRAINAGE OVERLAND RELEASE POINT SDCB-7 RIM 350.30 INV 346.55 (12" OUT) SDAD-7 RIM 352.58 INV 345.12 (8" IN) SDCB-4 RIM 351.04 INV 345.72 (8" IN) INV 345.72 (12" OUT)3 SDAD-5 RIM 352.80 INV 347.05 (8" OUT) SDAD-6 RIM 352.93 INV 346.84 (8" OUT) SDAD-4 RIM 353.05 INV 347.27 (8" OUT) SDCO-3 RIM 352.07 INV -0.33 (8" IN) SDAD-3 RIM 352.93 INV 348.31 (8" OUT) SDCB-2 RIM 351.71 INV 348.26 (8" OUT) SDCO-2 RIM 353.33 INV 347.06 (12" OUT) FS 353.38 FS 354.00 FS 352.56 FG 351.87 5. 7 % FS 351.91 FS 352.41 FG 351.87 FG 351.87 1. 0 % 1. 0 % 1. 0 % 1. 0 % 1. 0 % 1. 0 % 1. 0 % 1.0% 1.0% 1.0% 1.5% 1. 0 % 1. 0 % 1. 0 % 2.8%1.0% 1. 0 % 4.0% 1.0% 0. 5 % 0. 8 % 13 . 2 % 25 . 8 % 1. 5 % 9.4% 10.6% 10.0% FS 352.65 FS 352.95 FG 351.87 FG 351.87 FG 351.45 TW 352.61 1. 0 % FS 353.08 FS 352.76 FS 352.15 FS 352.19 FS 353.23 FS 353.11 FS 352.15 FS 352.81 FS 352.81 FS 353.05 FS 353.10 1.5%1.5% 1. 0 % 1. 8 % 0. 5 % 1. 4 % 1.5% 2. 8 % 11.2% 6. 9 % 3. 8 % 0. 2 % 0. 0 % FS 353.23FS 353.23 1.5% 1.0%1.0%1.0%1.0% 3. 1 % 4. 1 % 8. 0 % 7. 5 % 7. 4 % 14 . 9 % 4. 5 % FS 352.53 FS 352.62 FS 352.66FS 352.63 4 12 . 1 % (FS 352.2±) (FS 352.7±) TW 353.84 FS 352.30 1.0% 1.0% 2.1% 3.4% 3 GB TC/FS 352.54 TC 352.11 FS 351.69 5" CURB FS 352.98 FS 352.59 4" CURB TC 352.92 GB GB GB GB FG 351.21 TC/FS 352.09 TC/FS 351.74 1.5% 1.5% 1.5% 1.5% 1.5% 1.5% 2.3% 1.5% 1.5% FS 353.23 FS 353.23 FS 353.09 FS 352.64 TC/FS 352.55 FS 352.63 FS 353.15 FS 352.98 2.0%1.5% FS 353.25 FS 353.15 FS 353.15 1.5% FS 352.19 FS 351.92 FS 352.105. 6 % 7. 2 % FS 353.23 FS 353.22 FS 352.77 FS 353.07 FS 353.51 FS 352.30 FS 352.33 0. 9 % (FS 352.8±)(FS 352.7 ±) 5. 5 % FS 352.02 1.5% 1.5%4.6% 1. 0 % 1.5% 1.5% 3.9% 3.9%1.5% TW 353.00 TW 352.84 TW 352.62 FS 352.34 FS 352.52 FS 352.34 FS 352.52 FS 353.23 FS 353.23 11.1% 4.6% FS 353.58 FS 353.33 FS 352.87 1 1 1 1 1 FS 353.16 FS 353.16 1.5% 0. 8 % FS 353.03 1.6%1.5% 1.0% FS 353.09 FS 353.07 FS 353.07 FS 353.13 FS 353.21 FS 353.11 FS 353.03 FS 353.17 FS 352.96 FS 352.90FS 352.90 FS 352.95FS 352.95 FS 352.96 FS 353.01 FS 352.96 FS 352.95 FS 352.81 FS 352.73 FS 352.73FS 352.99 FS 352.56 FS 351.60 FS 351.66 FS 351.69 FS 351.64 1. 5 % 1. 9 % FS 353.10 FS 352.81 FS 352.57 FS 353.03 2 353 35 3 352 352 352 352 352 35 3 35 3 352 350 351 351 35 1 351 352 35 2 352 353 35 3 SD3SD2 SD 6 SD7 SD3 0 SD9 SD15 SD1 0 SD12 SD 1 3 FS 353.00 SD17 SD 2 0 SD 1 9 SD2 1 SD18 SD24 SD31 SD27 5 19 . 0 ' DAYLIGHT INV 351.22 (8" IN) SDAD-8 RIM 350.70 INV 345.34 (8" IN) SDAD-9 RIM 350.76 INV 345.77 (8" IN) SDAD-10 RIM 353.23 INV 346.25 (8" IN) SD34 SD36 SD39 E C2.2 1 FS 352.64 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET GRADING & DRAINAGE PLAN C2.1 GRADING & DRAINAGE KEYNOTES GRADING & DRAINAGE LEGEND PROPERTY LINE LIMIT OF WORK GRADE BREAK PROPOSED CONTOUR EXISTING CONTOUR STORM DRAIN LINE. SEE UTILITY PLAN PROPOSED ELEVATION EXISTING ELEVATION PROPOSED SLOPE EXISTING SLOPE STORM DRAIN INLET - SEE DETAIL 4/C6.1 PLANTER DRAIN - SEE DETAIL 3/C6.1 SWALE ROOF DOWNSPOUT, S.A.D. CLEANOUT - SEE DETAIL 1/C6.1 FENCE FS 100.00 EG (100.0±) 100 100 2.0% (2.0±%) SD SDSD INSTALL DOWNSPOUT SPLASH BLOCK - SEE DETAIL 5/C6.1. ALL ROOF DRAINS TO BE DISCONNECTED FROM STORM DRAIN SYSTEM AND DRAIN TO LANDSCAPE OR BIORETENTION AREAS. STORMWATER BIORETENTION AREA CONNECT STORM DRAIN TO EXISTING 12" STORM DRAIN STUB PROVIDED BY MASTER PLAN PROJECT. INSTALL R.E.M. TRITON DROP INLET FILTER - FULL AREA TRASH CAPTURE DEVICE, OR CASQA-APPROVED EQUAL. ENGINEER TO OBTAIN LETTER FROM MANUFACTURER DURING FINAL DESIGN CERTIFYING THE DEVICE IS DESIGNED TO CARRY TOTAL LOAD FROM PROJECT. TEMPORARY DRAIN INLET BY MASTER PLAN PROJECT, TO BE REMOVED AT THIS PROJECT'S CONNECTION TO POC 1 2 3 4 5 >>>> DU B L I N B L V D . BRANNIGAN ST. CO GB 11/04/2025 91 ⅊8.0' SIDEWALK (E) LANDSCAPING, CURB, AND GUTTER BY OTHERS AS PART OF MASTER PLAN DEVELOPMENT VARIES OVERFLOW STRUCTURE PER PLAN ROOF DRAIN WITH DOWNSPOUT SPLASH BLOCK 2.0' 0.5' VARIES BIORETENTION AREA 4.5' LANDSCAPING 0.5' CURB ⅊ (E) SIDEWALK, CURB, AND GUTTER BY OTHERS AS PART OF MASTER PLAN DEVELOPMENT 3:1 MAX 8.0' BUS STOP WITH SHELTER, BY OTHERS AS PART OF MASTER PLAN DEVELOPMENT VARIES LANDSCAPING 7.5' SIDEWALK, BY OTHERS AS PART OF MASTER PLAN DEVELOPMENT 0.5' CURB FF=353.25 FF=353.25 4" PERFORATED PIPE OUTLET PIPE, PER PLAN 6" STORAGE DEPTH 18" MIN BIORETENTION SOIL BRANNIGAN ST. DUBLIN BLVD. 6.0' LANDSCAPING (P) ASPHALT CONCRETE (P) CONCRETE CURB ⅊ 108.8' PARKING LOT 13.0' PASSENGER LOADING ZONE 5.0' SIDEWALK, BY OTHERS AS PART OF MASTER PLAN DEVELOPMENT (P) SIDEWALK VARIES BUILDING ENTRANCE WALKWAY FF=353.25 (E) CONCRETE (E) CONCRETE 2.0' LANDSCAPING 0.5' 0.5' 2.0' LANDSCAPING ⅊ PER PLAN 8" 12" MIN FF=353.25 19.0' LANDSCAPING ⅊ 3:1 MAX 3:1 MAX 108.8' PARKING LOT 2" FREEBOARD3:1 MAX 3:1 MAX (E) SIDEWALK BY OTHERS AS PART OF MASTER PLAN DEVELOPMENT EX. TC ±352.0 6.0' PUBLIC SERVICE EASEMENT FENCE PER PLANPER PLAN PER PLAN PER PLAN PLANTING SOIL TW=352.62 FS=352.12 FG=351.45 OVERFLOW STRUCTURE PER PLAN 6" STORAGE DEPTH VARIES OUTLET PIPE, PER PLAN 4" PERFORATED PIPE @ 0.5% MIN, PERFORATIONS ORIENTED DOWN 12" MIN CLASS 2 PERMEABLE AGGREGATE PER CALTRANS 68-02F(3) 18" MIN BIORETENTION SOIL 7.1' #4 @ 12" HORIZ #4 @ 12" STIRRUP 6" 6" 12" CAST-IN-PLACE CONCRETE ⅊ SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com 02 2 4 SCALE 1 INCH = 2 FEET TYPICAL SECTIONS C2.2 SECTION A N.T.S.A SECTION B N.T.S.B SECTION C N.T.S.C SECTION D N.T.S.D SECTION E N.T.S.E 11/04/2025 92 SD SD SD SD SD SS SS SS SS CO COFW FW FW CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> SD SD SD SD WMDWDW DW DW DW DW DW SD SD SD SD SD SD SD SD SD SDSDSD CO SD SD SD SD SD JT JT JT JT JT JT JT JT EV PARKING ONLY EV PARKING ONLY CO CO CO SD SD SD > > > > FW FW FW FF = 353.25' 2" DW EX SDMH #17 RIM 353.0 HGL 349.45 INV 346.10 (18" IN) INV 346.20 (12" IN) INV 346.10 (18" OUT) EX SSMH #1 RIM 352.9 INV 342.35 (8" THRU) INV 342.25 (8" OUT) 5 INV 345.531 4 2 8 9 6 7 TRANSFORMER PAD FF = 353.23' 11 10 1 2 4 3 INV 342.55 3 5 6" FW SS1 SS3 SS214 SSCO-1 RIM 352.26 INV 344.55 (6" IN) INV 344.55 (6" OUT) SDCB-1 RIM 351.95 INV 347.50 (8" OUT) SDCB-6 RIM 352.81 INV 346.46 (12" OUT) INV 346.46 (12" IN) SDCO-3 RIM 352.07 INV -0.33 (8" IN) SDCB-2 RIM 351.71 INV 348.26 (8" OUT) SDCO-2 RIM 353.33 INV 347.06 (12" OUT) SDAD-1 RIM 353.14 INV 348.00 (8" OUT) SDAD-2 RIM 353.17 INV 348.02 (6" OUT) SDAD-4 RIM 353.05 INV 347.27 (8" OUT)SDAD-5 RIM 352.80 INV 347.05 (8" OUT) SDAD-6 RIM 352.93 INV 346.84 (8" OUT) SDCB-4 RIM 351.04 INV 345.72 (8" IN) INV 345.72 (12" OUT) SDAD-7 RIM 352.58 INV 345.12 (8" IN) SDCB-7 RIM 350.30 INV 346.55 (12" OUT) SSCO-3 RIM 353.08 INV 345.56 (6" OUT) INV 345.56 (6" IN) SSCO-2 RIM 352.99 INV 345.49 (6" OUT) INV 345.49 (6" IN) SDCB-5 RIM 352.03 INV 345.02 (12" IN) INV 345.02 (12" IN) 51 . 5 ' 7. 0 ' 12 . 6 ' 12 2. 0 ' SDCB-3 RIM 353.73 INV 351.37 (8" OUT) SDAD-8 RIM 350.70 INV 345.34 (8" IN) SDAD-9 RIM 350.76 INV 345.77 (8" IN) SDAD-10 RIM 353.23 INV 346.25 (8" IN) SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET UTILITY PLAN C3.0 UTILITY KEY NOTES 6" SANITARY SEWER POINT OF CONNECTION. SEE PLUMBING PLANS FOR CONTINUATION. INSTALL TWO-WAY SANITARY SEWER CLEANOUT PER DETAIL 2, SHEET C6.1. POINT OF CONNECTION TO EXISTING 8" SANITARY SEWER STUB PROVIDED BY MASTER PLAN PROJECT. 2" DOMESTIC WATER POINT OF CONNECTION. SEE PLUMBING PLANS FOR CONTINUATION. POINT OF CONNECTION TO EXISTING 10" WATER STUB PROVIDED BY MASTER PLAN PROJECT. INSTALL WATER METER AND BACKFLOW DEVICE FOR DOMESTIC WATER SERVICE. 8" FIRE SERVICE POINT OF CONNECTION. SEE PLUMBING PLANS FOR CONTINUATION. INSTALL FIRE HYDRANT. INSTALL DDCV WITH FDC AND PIV PER DUBLIN SAN RAMON SERVICES DISTRICT (DSRSD) STANDARD DETAIL W-23A. PUBLIC FRONTAGE IRRIGATION METER AND LATERAL PROVIDED BY MASTER PLAN PROJECT. PROPOSED 15' DSRSD FIRE HYDRANT ACCESS EASEMENT. PROPOSED 15' DSRSD DOMESTIC WATER ACCESS EASEMENT. 1 2 3 4 5 6 7 8 9 10 11 12 UTILITY LEGEND SS DWX"W X"SS SSSS DWDW CO EASEMENT SANITARY SEWER LINE, SIZE PER PLAN. DOMESTIC WATER LINE, SIZE PER PLAN. FIRE WATER LINE, SIZE PER PLAN. STORM DRAIN INLET CLEANOUT FIRE HYDRANT BACKFLOW PREVENTER/DDCV WATER VALVE WATER METER JOINT TRENCH DOWNSPOUT CROSSING TABLE DESCRIPTION ELEV CLEARANCE 1 6" FW BOTTOM OF PIPE 12" SD TOP OF PIPE 348.60' 347.60'1.00' 2 6" FW BOTTOM OF PIPE 6" SS TOP OF PIPE 348.60' 343.40'5.20' 3 8" SD BOTTOM OF PIPE 6" SS TOP OF PIPE 347.10' 344.50'2.60' 4 6" FW BOTTOM OF PIPE 8" SD TOP OF PIPE 349.10' 348.10'1.00' 5 2" DW BOTTOM OF PIPE 8" SD TOP OF PIPE 349.40' 348.40'1.00' DU B L I N B L V D . BRANNIGAN ST. WM DWX"FW FWFW X JT UTILITY NOTES 1.SEPARATION OF 5.0' MIN. SHALL BE PROVIDED BETWEEN TREES AND UTILITIES. 11/04/2025 93 SD SD SD SD SD CO CO CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> SD SD SD SD WM SD SD SD SD SD SD SD SD SD SDSDSD CO SD SD SD SD SD EV PARKING ONLY EV PARKING ONLY CO CO CO SD SD SD > > > > DMA-4 48,070 SF BR-2 724 SF POC 2 12" SD 12" S D 8" SD 8"SD 12 " S D DMA-3 4,104 SF BR-1 441 SF 8" SD 8" S D 8" SD DMA-2 18,182 SF POC 1 6" SD 12"SD 8"S D 8"S D DMA-1 10,983 SF 6" S D 8" S D SELF-TREATING AREA SELF-TREATING AREA SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com STORMWATER CONTROL PLAN LEGEND PROPERTY/ RIGHT-OF-WAY LINE DRAINAGE MAINTENANCE AREA (DMA) BOUNDARY BUILDING OUTLINE ROOF AREA (IMPERVIOUS PAVING AREA (IMPERVIOUS) BIORETENTION AREA STORM DRAIN INLET AREA DRAIN DRAINAGE DIRECTION DOWNSPOUT AREA SUMMARY TABLE DRAINAGE MAINTENANCE AREA AREA (AC)AREA (SF)IMPERVIOUS AREA (SF)% IMPERVIOUS TREATEMENT & DETENTION ID POINT OF DISCHARGE IMPREVOUS AREA TREATED (SF) DMA-1 0.25 10,983 8,581 78%BR-1 POC-1 8,581 DMA-2 0.42 18,182 14,673 80%BR-2 POC-1 14,673 DMA-3 0.09 4,104 751 18%SELF-RETAINING OLR 751 DMA-4 1.10 48,070 31,412 65%-POC-2 - NORTH 20 20 400 SCALE 1 INCH = 20 FEET STORMWATER CONTROL PLAN C4.0 NOTE: MASTER PLAN PROJECT ACCOUNTS FOR 1.13 ACRES OF THIS 1.88 ACRE SITE TO BE TREATED VIA DOWNSTREAM BASIN. THIS PROJECT IS ONLY REQUIRED TO TREAT 0.37 ACRES (16,118 SF) OF IMPERVIOUS AREA PER MASTER STORMWATER MANAGEMENT PLAN, PG. 12. DU B L I N B L V D . BRANNIGAN ST. 11/04/2025 94 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com CLEAN BAY BLUE PRINT C4.1 11/04/2025 95 CO CO CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WM COEV PARKING ONLY EV PARKING ONLY CO CO CO > > > > FF = 353.25' 9.6' 5.0' >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 1.00% 25.8' 24.0' 8.0' 4.0' 5.0' 25.0' 13.0' 1 R3 8 . 5 ' R3 8 . 5 ' R3 8 . 5 ' R3 8 . 5 ' R3 8 . 5 ' R3 8 . 5 ' R3 8 . 5 ' AVI Front-Load Gargabe Truck R3 8 . 5 ' R3 8 . 5 ' R3 8 . 5 ' 4. 0 ' 26.0' 25.0' 2 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET GARBAGE TRUCK TURNING PLAN C5.0 TRUCK TURNING KEYNOTES TRASH STAGING AREA NO PARKING SIGN 1 2 DU B L I N B L V D . BRANNIGAN ST. LEGEND GARBAGE TRUCK. TRUCK DIMENSIONS WIDTH=8.375' LENGTH=35' TURNING RADIUS=32.434' MIN TRUCK SWEPT PATH 11/04/2025 96 CO CO CO ST O P >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> WM COEV PARKING ONLY EV PARKING ONLY CO CO CO > > > > FF = 353.25' 9.6' 5.0' >>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>>> 1.00% 25.8' 24.0' 8.0' 4.0' 5.0' 25.0' 13.0' 1 4. 0 ' 26.0' 25.0' SU-30 - Single Unit Truck 2 SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com NORTH 20 20 400 SCALE 1 INCH = 20 FEET DELIVERY TRUCK TURNING PLAN C5.1 DU B L I N B L V D . BRANNIGAN ST. TRUCK TURNING KEYNOTES TRASH STAGING AREA NO PARKING SIGN 1 2 LEGEND DELIVERY TRUCK. TRUCK DIMENSIONS WIDTH=8' LENGTH=30' TURNING RADIUS=43.48' MIN TRUCK SWEPT PATH 11/04/2025 97 SCALE:NTS2ACCESSIBLE PATH OF TRAVEL STRIPING BLUE TRAFFIC PAINT APPROXIMATING FS 15090 IN FEDERAL STANDARD 595C INTERNATIONAL SYMBOL OF ACCESSIBILITY 4" WIDE WHITE TRAFFIC PAINT, TYP. SCALE:NTS3INTERNATIONAL SIGN OF ACCESSIBILITY SCALE:NTS1ACCESSIBLE PARKING STALLS 36" O.C. 5'-0" MIN. ACCESSIBLE PATH OF TRAVEL SHALL HAVE A 4" BLUE BORDER WITH WHITE STRIPE DIAGONALS @ 36" O.C. 2. 0 % M A X 5.0% MAX 4' WHEELSTOP PAINTED BLUE WHERE SHOWN ON PLAN. SEE WHEELSTOP DETAIL ACCESSIBILITY SYMBOL PER DETAIL THIS SHEET 36"x36" AT CENTERLINE OF STALL ALIGNED TO BACK OF STALL ACCESSIBLE AISLE SHALL HAVE 4" BLUE BORDER WITH 4" WHITE STRIPES @ 45° ANGLE, 36" OC 36" O.C. 18'-0" MIN 9'-0" MIN.5'-0" MIN.9'-0" MIN. 8'-0" MIN. @ VAN STALL NO PARKING WHITE LETTERS 1'-0" HIGH MIN.4" WHITE STRIPE TO MATCH PLAN 12" TYP 3' MIN ACCESSIBLE PARKING SIGN WHERE SHOWN - DO NOT PLACE IN ACCESSIBLE PATH. SEE ACCESSIBLE PARKING DETAIL 2.0% MAX IN ANY DIRECTION IN ACCESSIBLE PARKING AND AISLE SCALE:NTS FOOTING IN WALK SCALE:NTS FOOTING IN PLANTING 12" SLOPE TOP OF FTG TO DRAIN 1/8" MIN ROUNDED CORNERS (TYP) REFLECTORIZED SIGN, 70-INCHES SQUARE MINIMUN. WHITE INTERNATIONAL SYMBOL OF ACCESSIBILITY ON BLUE BACKGROUND 2"Ø STD GALVANIZED PIPE WITH CLOSED TOP. CENTER PIPE ON ACCESSIBLE PARKING STALL "MINIMUM FINE $250" SIGN IF NOT COMBINED WITH SIGN ABOVE. "VAN ACCESSIBLE" SIGN AT VAN ACCESSIBLE STALLS 3" MIN 2'-0" MIN 12" MIN SITE CONCRETE 6'-8" MIN CLR ON CONC OR PATHWAY 5'-0" MIN CLR IN PLANTING OR ON A BUILDING 3" MIN 2'-0" MIN NOTE: 1.MOUNT SIGN TO BUILDING WHERE REQUIRED OR WHERE SHOWN ON PLAN. MIN 28 DAY CONC STRENGTH f'c=2,500 psi SCALE:NTS4ACCESSIBLE PARKING SIGN 9' 18' 4" SOLID WHITE PAINT STRIPE SEE NOTE 2 NOTES: 1.WIDTHS PROVIDED ARE TO CENTERLINE OF STRIPING. 2.PAVEMENT MARKING SHALL BE IN WHITE MARKING, 12" IN HEIGHT. PER CALIFORNIA BUILDING CODE SECTION 11B-812.9 EV CHARGING ONLY SCALE:NTS5STANDARD EVCS 90 DEGREE PARKING SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com STRIPING DETAILS C6.0 11/04/2025 98 SCALE:NTS1STANDARD CLEANOUT TO GRADE NOTES: 1.CAST IRON FRAME AND COVER SHALL MEET H-20 LOAD REQUIREMENT. 2.FOR CARRIER PIPE SIZE 10"Ø AND LESS, PROVIDE RISER PIPE SIZE TO MATCH CARRIER PIPE. 3.FOR CARRIER PIPE SIZE 12"Ø AND LARGER, RISER PIPE SHALL BE 10"Ø. 4.RISER PIPE MATERIAL TO MATCH CARRIER PIPE MATERIAL. HARD SURFACE LANDSCAPE AREA RISER O.D. + 1 2" MIN. 1" MAX. 6" MIN. 4" MIN. 2" MIN. MECHANICAL PLUG WITH GASKET CAST IRON FRAME SET IN CONCRETE #4 HOOP CENTERED IN 3000 PSI CONCRETE PAD.PROVIDE 1 4" MIN. CLEARANCE FOR CONCRETE PAD AND RISER PIPE RISER PIPE 45° BEND INSTALL PLUG WITH GASKET IF END OF LINE SERVICE CONNECTION IF REQUIRED BEDDING MATERIAL CAST IRON FRAME AND COVER TO FINISHED GRADE IN PAVED AREAS AC PVM'T OR CONC. PAVING OR OTHER SURFACING CARRIER PIPE WYE BRANCH TRENCH BACKFILL NOTES: 1.CAST IRON FRAME AND COVER SHALL MEET H-20 LOAD REQUIREMENT. 2.FOR CARRIER PIPE SIZE 10"Ø AND LESS, PROVIDE RISER PIPE SIZE TO MATCH CARRIER PIPE. 3.FOR CARRIER PIPE SIZE 12"Ø AND LARGER, RISER PIPE SHALL BE 10"Ø. 4.RISER PIPE MATERIAL TO MATCH CARRIER PIPE MATERIAL. HARD SURFACE LANDSCAPE AREA RISER O.D. + 1 2" MIN. 4" MIN. MECHANICAL PLUG WITH GASKET CAST IRON FRAME SET IN CONCRETE #4 HOOP CENTERED IN 3000 PSI CONCRETE PAD. RISER PIPE BEDDING MATERIAL CAST IRON FRAME AND COVER TO FINISHED GRADE IN PAVED AREAS AC PVM'T OR CONC. PAVING OR OTHER SURFACING CARRIER PIPE WYE BRANCH 4" MIN. CARRIER PIPE WYE BRANCH TRENCH BACKFILL 45° BEND PROVIDE 1 4" MIN. CLEARANCE FOR CONCRETE PAD AND RISER PIPE PROVIDE 1 4" MIN. CLEARANCE FOR CONCRETE PAD AND RISER PIPE RISER PIPE TRENCH BACKFILL 45° BEND RISER O.D. + 1 2" MIN. 6" MIN.6" MIN.2" MIN. SCALE:NTS2TWO-WAY SANITARY SEWER CLEANOUT SCALE:NTS3PLANTER DRAIN SCALE:NTS4CAST-IN-PLACE CONCRETE CATCH BASIN A A SECTION A-A PLAN 6"12" CLEAR OPENING 6" R=3" 6" 12" 6" LEGEND: 6" GALVANIZED FRAME AND GRATE, ALHAMBRA FOUNDRY CO., OR APPROVED EQUIVALENT. SIZE PER PLAN. PORTLAND CEMENT CONCRETE. (f'c = 4000 psi) INVERT ELEVATION PER PLAN. TOP OF GRATE. SEE PLAN FOR ELEVATION. OUTLET PIPE, SIZE PER PLAN. INLET PIPE, WHERE OCCURS. SIZE PER PLAN. FLOOR OF BASIN SHALL BE GIVEN A STEEL-TROWELED FINISH AND SHALL SLOPE TO DRAIN IN ALL DIRECTIONS. FINISH SURFACE PER PLAN. FINISH GRADE PER PLAN. CATCH BASIN WALLS AND FLOOR TO BE REINFORCED WITH 4x4-6-6 WELDED WIRE MESH. 9 10 8 1 7 3 4 6 5 4 5 10 10 8 6 3 7 9 2 2 DOWNSPOUT SPLASH BLOCK N.T.S.5 2" GEOTEXTILE FABRIC RIVER COBBLE, EMBED COBBLE 6" MINIMUM 6" 12" MIN 12" MIN 24" MIN PLAN SECTION BUILDING FACE ROOF DOWNSPOUT FG PER PLAN GEOTEXTILE FABRIC 6" MIN CENTERLINE ALIGN WITH ROOF DOWNSPOUTCOBBLE SPECIFICATION PRODUCT: 3" TO 6" WASHED, ROUNDED RIVER COBBLE 6" 48" MIN DOME OR ATRIUM GRATE, SEE NOTE 2 FINISHED GRADE 6" DIA. DRAINTECH BASIN BY NDS OR APPROVED EQUAL, SEE NOTE 2 NOTES: 1.DRAIN AND GRATE BY NDS OR APPROVED EQUAL. COMPACT SUBGRADE IE (IN/OUT)= PER PLAN PIPE SIZE PER PLAN NOTES: 1.ON THE LANDSCAPED SIDE OF EACH CURB CUT, INSTALL ROUNDED RIVER COBBLE OVER GEOTEXTILE FABRIC AS ENERGY DISSIPATION. COBBLE SHALL BE 4" IN DIAMETER, EMBEDDED 6" DEEP WITH THE TOP OF COBBLE 2" BELOW THE CURB INLET. COBBLE SHALL EXTEND ACROSS THE FULL WIDTH OF CURB OPENING AND EXTEND A MINIMUM OF 2' OUT FROM THE OPENING. CURB CUT AT BIORETENTION AREA N.T.S.6 45°45° 1'1'1' FLOW LINE (FL) GRADE PER PLAN 6" CURB/CURB & GUTTER PER PLAN COBBLE LINED SWALE, SEE NOTE 1 BIORETENTION AREA, SEE DETAIL [X] 2' MIN.2' MIN. CURB/CURB & GUTTER PER PLAN SUNFLOWER HILL AT GRACE POINTE | DUBLIN, CALIFORNIA SUNFLOWER HILL & SATELLITE AFFORDABLE HOUSING ASSOCIATES JOB NO.000.000 9/22/2025DATE 5865 Owens Drive Pleasanton, CA 94588 925-251-7200 71 Stevenson Street, Suite 1800 San Francisco, CA 94105 415.989.1004 | kpff.com UTILITY DETAILS C6.1 11/04/2025 99 10 0 10 1 10 2 Attachment 3 Multi-Family Objective Design Standards Compliance Overview Objective Design Standard Project Complies with Intent of Standard 2.1 Building Placement B. For buildings not located along the primary street, unit front entries shall be oriented to face internal common open space areas such as landscaped courtyards, plazas, or paseos. The private street is the primary street as it provides access to the project site. Since the building is setback approximately 130 feet from the primary street with the parking lot, the building is not located along the primary street. Due to the security needed for this population, unit entries are provided internally in the building. Each unit that faces the courtyard provides windows to face that internal common open space. C. Each dwelling unit fronting a primary or side street shall include at least one street-facing porch, balcony, and/or patio. Porches, balconies, and/or patio spaces dedicated to individual units are not safe for this resident population. Units that face the primary and side streets have street-facing glazing so that each unit can address the street in a manner that is safe for this resident population. 2.3 Bicycle Parking B. At least one long-term bicycle storage space is required for each unit and may be located within a designated space within the unit, within individual lockable containers outside of the unit, or within a secure, long-term bicycle parking area. A secure bike room has been provided within the building with racking systems for 32 standard bicycles along with open floor area available for tricycles and scooters. According to the applicant, providing bicycle storage for approximately half of the residential population is appropriate for this community. 2.5 Private Outdoor Space A. The equivalent of 10 percent or more of the floor area of each unit shall be provided as private outdoor space. For units on upper floors, this outdoor space may be provided by decks and balconies. This requirement may be satisfied by more than one private outdoor space area. B. Private outdoor space, including balconies provided to meet private outdoor space requirements shall be provided at a minimum of 60 square feet per unit with a minimum dimension of six feet in any direction. Based on the proposed floor area of the project’s residential units, 10% is equivalent to 4,552 square feet of private outdoor space and 60 square feet per unit results in a total of 3,600 square feet. The proposed project is consistent with the purpose and intent of this standard in that the interior courtyard is private to this resident population and provides for 13,695 square feet of private outdoor space with a variety of amenities (e.g. multi-purpose sport court, community garden, shaded seating areas, BBQ’s, pedestrian pathways). In addition to the outdoor space, this community provides communal indoor amenity space for cooking classes, fitness room, art and other activities. 2.6 Common Usable Outdoor Space A. Common usable outdoor space shall be provided at minimum 30 percent of the net site area. For example, a one-acre net site would be required to provide 13,068 square feet of common usable outdoor space in one or multiple locations within a project. 30% of the net site area totals 22,697 square feet. As shown on the proposed landscape plans, the project proposes 17,618 square feet of common usable outdoor space. That space coupled with the grand paseo provided within the larger Dublin Centre project allows for the project to meet the purpose and intent of this standard. Additionally, communal indoor space of 3,288 square feet is dedicated for a community room, fitness room and gallery and maker’s space. 3.3 Roof Forms 103 Attachment 3 A. Roof lines shall not extend more than 40 feet in length without a change in form or ridge line as described below: i. Vary roof forms, such as hip, gable, shed, flat, and mansard. ii. Incorporate architectural elements, such as parapets, varying cornices, and reveals. iii. Vary roof height at least two feet from adjacent roofs, as measured from the highest point of the roof lines. At the common areas at the eastern end of the northern wing, butterfly-style roof planes extend upward from a central point to create a sculptural edge at the common spaces. These forms fly out past the building on either side to emphasize the outdoor community space to the north and the primary entry to the south. While these movements have rooflines that are longer than 40 feet, the longer roof form is used as an accent to highlight this area in particular while incorporating articulation features such as glazing, overhangs and trellis structure (refer to Attachment 2, Sheet A3.7). Along the west elevation the proposed roof line is longer than 40 feet, however, this elevation faces an interior side yard and with the build-out of the Dublin Centre project, the totality of the building from that elevation will not be fully visible. At the street level there is angulation with projections, recesses and varying parapet heights. All other rooflines are broken into segments less than 40 feet in width, that reflect the articulation of the adjoining walls, with varying roof forms and heights. 3.8 Ancillary Structures, Equipment, and Utilities A. A minimum of 200 cubic feet of accessory storage space shall be provided for each unit within the development. The storage shall be located within 500 feet of the dwelling unit or within the project’s parking garage. The compilation of storage within each unit (e.g. closets, kitchen cabinet storage), the storage room (2,400 cubic feet) and bike room (2,925 cubic feet) provides the amount of accessory storage space necessary to meet the needs of what this resident population would need. B. Accessory storage space may be located within a private garage or carport, or private outdoor space (e.g. patio, or balcony) assigne d to the unit, and shall not be located within the habitable area. If accessory storage is provided on a patio or balcony, the amount of storage space shall be in addition to the private open space requirement and shall be designed with materials used within the primary building. There is 13,695 square feet of private open space provided within the interior courtyard and storage of any equipment/furniture needed for this resident population would be located within that area. 104 December 9, 2025 Senate Bill 343 mandates supplemental materials that have been received by the Community Development Department that relate to an agenda item after the agenda packets have been distributed to the Planning Commission be available to the public. The attached documents were received in the Community Development Department’s Office after distribution of the Planning Commission meeting agenda packet. 105 106 107 108 Dec 9, 2025 City of Dublin 100 Civic Plaza Dublin, CA 94568 Re: Proposed Housing Development Project “Sunflower Hill at Grace Pointe” To: PlanningCommission@dublin.ca.gov; Cc: City.manager@dublin.ca.gov; city.clerk@dublin.ca.gov; amy.million@dublin.ca.gov; john.bakker@redwoodpubliclaw.com; colleen.tribby@dublin.ca.gov; planningpermits@dublin.ca.gov Dear Dublin Planning Commission, The California Housing Defense Fund (“CalHDF”) submits this letter to remind the City of its obligation to abide by all relevant state laws when evaluating the proposed 60-unit, 100% affordable, supportive housing development project at the northwest corner of Dublin Boulevard and Brannigan Street. These laws include the Housing Accountability Act (“HAA”), the Density Bonus Law (“DBL”), and AB 130. The HAA provides the project legal protections. It requires approval of zoning and general plan compliant housing development projects unless findings can be made regarding specific, objective, written health and safety hazards. (Gov. Code, § 65589.5, subds. (d), (j).) The HAA also bars cities from imposing conditions on the approval of such projects that would render the project infeasible (id. at subd. (d)) or reduce the project’s density (id. at subd. (j)) unless, again, such written findings are made. As a development with at least two-thirds of its area devoted to residential uses, the project falls within the HAA’s ambit, and it complies with local zoning code and the City’s general plan. Increased density, concessions, and waivers that a project is entitled to under the DBL (Gov. Code, § 65915) do not render the project noncompliant with the zoning code or general plan, for purposes of the HAA (Gov. Code, § 65589.5, subd. (j)(3)). The HAA’s protections therefore apply, and the City may not reject the project except based on health and safety standards, as outlined above. Furthermore, if the City rejects the project or impairs its feasibility, it must conduct “a thorough analysis of the economic, social, and environmental effects of the action.” (Id. at subd. (b).) 2201 Broadway, PH1, Oakland, CA 94612 www.calhdf.org 109 CalHDF also writes to emphasize that the DBL offers the proposed development certain protections. The City must respect these protections. In addition to granting the increase in residential units allowed by the DBL, the City must not deny the project the proposed waivers and concessions with respect to parking requirements and building offset requirements. If the City wishes to deny requested waivers, Government Code section 65915, subdivision (e)(1) requires findings that the waivers would have a specific, adverse impact upon health or safety, and for which there is no feasible method to satisfactorily mitigate or avoid the specific adverse impact. If the City wishes to deny requested concessions, Government Code section 65915, subdivision (d)(1) requires findings that the concessions would not result in identifiable and actual cost reductions, that the concessions would have a specific, adverse impact on public health or safety, or that the concessions are contrary to state or federal law. The City, if it makes any such findings, bears the burden of proof. (Gov. Code, § 65915, subd. (d)(4).) Of note, the DBL specifically allows for a reduction in required accessory parking in addition to the allowable waivers and concessions. (Id. at subd. (p).) Additionally, the California Court of Appeal has ruled that when an applicant has requested one or more waivers and/or concessions pursuant to the DBL, the City “may not apply any development standard that would physically preclude construction of that project as designed, even if the building includes ‘amenities’ beyond the bare minimum of building components.” (Bankers Hill 150 v. City of San Diego (2022) 74 Cal.App.5th 755, 775.) Additionally, the project is exempt from state environmental review pursuant to section 15162 of the CEQA Guidelines, as the project is to be consistent with the final program EIR (FEIR) for the SCS Dublin Project, which includes this development. Furthermore, the project is eligible for a statutory exemption from CEQA pursuant to AB 130 (Pub. Res. Code, § 21080.66), which was signed into law on June 30, 2025 and effective immediately (Assembly Bill No. 130, 2025-2026 Regular Session, Sec. 74, available here). Caselaw from the California Court of Appeal affirms that local governments err, and may be sued, when they improperly refuse to grant a project a CEQA exemption or streamlined CEQA review to which it is entitled. (Hilltop Group, Inc. v. County of San Diego (2024) 99 Cal.App.5th 890, 911.) As you are well aware, California remains in the throes of a statewide crisis-level housing shortage. New supportive housing such as this is a public benefit: this will provide affordable and supportive housing for disabled people; it will mitigate the state’s homelessness crisis; it will bring new customers to local businesses; and it will reduce displacement of existing residents by reducing competition for existing housing. It will also help cut down on transportation-related greenhouse gas emissions by providing housing in denser, more urban areas, as opposed to farther-flung regions in the state (and out of state). While no one project will solve the statewide housing crisis, the proposed development is a step in the right direction. CalHDF urges the City to approve it, consistent with its obligations under state law. 2 of 3 110 CalHDF is a 501(c)(3) non-profit corporation whose mission includes advocating for increased access to housing for Californians at all income levels, including low-income households. You may learn more about CalHDF at www.calhdf.org. Sincerely, Dylan Casey CalHDF Executive Director James M. Lloyd CalHDF Director of Planning and Investigations 3 of 3 111