Loading...
HomeMy WebLinkAboutItem 5.3 Annual Street Resurfacing - 2024 Slurry Seal Project, CIP No. ST0117 – Acceptance of Work STAFF REPORT CITY COUNCIL Page 1 of 3 Agenda Item 5.3 DATE: October 21, 2025 TO: Honorable Mayor and City Councilmembers FROM: Colleen Tribby, City Manager SUBJECT: Annual Street Resurfacing - 2024 Slurry Seal Project, CIP No. ST0117 – Acceptance of Work Prepared by: Robert Magno, Assistant Civil Engineer EXECUTIVE SUMMARY: The City Council will consider accepting the Annual Street Resurfacing – 2024 Slurry Seal Project. The project resurfaced multiple street segments with a slurry seal treatment that will prolong the life of the existing pavement surface. STAFF RECOMMENDATION: Adopt the Resolution Accepting the Annual Street Resurfacing - 2024 Slurry Seal Project, CIP No. ST0117. FINANCIAL IMPACT: The cost of the Annual Street Resurfacing (2024 Slurry Seal) Project were as follows: Annual Street Resurfacing Project: Funding Sources General Fund $1,250,000 State Gas Tax Fund $700,000 Measure BB Sales Tax Local Streets Fund $200,000 Road Maintenance & Rehab Account (RMRA) $2,350,000 CalRecycle Grant $103,324 Total Funding $4,603,324 94 Page 2 of 3 Expenditures 2024 Slurry Seal Project: $1,075,294 Construction Contract - $809,029 Change Orders - $142,765 Contract Services, Design, Salary, and Testing - $123,500 2024 Overlay Project (completed previously) 2024 Cape Seal Project (completed previously) $2,184,575 $1,019,000 Total Expenditures $4,278,869 Estimated Project Balance $324,455 Upon the City Council’s acceptance of the project, the remaining budget will be retained within the Annual Street Resurfacing Project for use on other 2025 resurfacing projects. DESCRIPTION: On April 16, 2024, the City Council awarded a construction contract in the amount of $809,029 to American Asphalt Repair & Resurfacing Co., Inc. for the Annual Street Resurfacing -2024 Slurry Seal Project, CIP No. ST0117. On October 15, 2024, the City Council approved Resolution No. 117-24 that authorized an increase of the contingency amount to $185,000 from the initial contingency amount of $100,000. The increased contingency amount was for change order work to complete crack sealing and localized pavement repairs on Hacienda Drive, between Dublin Boulevard and the I-580 freeway ramps. In addition to the change order work on Hacienda Drive, the 2024 Slurry Seal rehabilitated approximately 51 street segments in the Positano and Dublin Ranch neighborhoods, covering over 1.5 million square feet of roadway with a slurry seal preventative maintenance technique used to prolong the life of asphalt concrete surfacing. As streets begin to show wear and stress cracks, it is important to seal the cracks to keep water from getting under the roadway pavement. Slurry consists of a sand/oil mixture which seals cracks and provides a new, uniform wearing surface. Figure 1 below shows the project slurry seal streets in Positano and Dublin Ranch. 95 Page 3 of 3 Figure 1. Location Map Staff has inspected the work and determined that the project is complete and recommends that the City Council accept the project and begin the warranty period. STRATEGIC PLAN INITIATIVE: None. NOTICING REQUIREMENTS/PUBLIC OUTREACH: The City Council Agenda was posted. A copy of this Staff Report was provided to American Asphalt Repair & Resurfacing Co., Inc. and to the Independent Watchdog Committee of the Alameda County Transportation Commission. ATTACHMENTS: 1) Resolution Accepting the Annual Street Resurfacing -2024 Slurry Seal Project, CIP No. ST0117 2) CIP No. ST0117 96 Attachment 1 Reso. No. XX-25, Item X.X, Adopted 10/21/2025 Page 1 of 2 RESOLUTION NO. XX - 25 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF DUBLIN ACCEPTING THE ANNUAL STREET RESURFACING - 2024 SLURRY SEAL PROJECT, CIP NO. ST0117 WHEREAS, on April 16, 2024, the City entered into a Construction Contract with American Asphalt Repair & Resurfacing Co., Inc. for the Annual Street Resurfacing –2024 Slurry Seal Project, CIP No. ST0117; and WHEREAS, on October 15, 2024, the City approved Resolution No. 117-24 that increased the project contingency amount to $185,000 and authorized the City Manager to approve contract change orders up to said $185,000 contingency amount; and WHEREAS, the project resurfaced multiple street segments with a slurry seal treatment that will prolong the life of the existing pavement surface; and WHEREAS, said improvements have been completed in accordance with plans and specifications, and any approved modifications thereof, to the satisfaction of the City Engineer of the City of Dublin; and WHEREAS, as a condition of the contract, American Asphalt Repair & Resurfacing Co., Inc. is required to warranty the improvements for a period of one year following the completion of the work and maintain a maintenance bond in the amount of 10% of the final contrac t value. NOW, THEREFORE, BE IT RESOLVED that the City Council of the City of Dublin does hereby accept the Annual Street Resurfacing –2024 Slurry Seal Project, CIP No. ST0117, and authorize Staff to file a Notice of Completion with Alameda County. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to release the retention, if after 35 days of filing the Notice of Completion there are no subcontractor claims. BE IT FURTHER RESOLVED that the City Council of the City of Dublin does hereby authorize the City Manager, or designee, to release the maintenance bond at the end of the one - year warranty period. {Signatures on the following page} 97 Reso. No. XX-25, Item X.X Adopted 10/21/2025 Page 2 of 2 PASSED, APPROVED AND ADOPTED this 21st day of October 2025, by the following vote: AYES: NOES: ABSENT: ABSTAIN: ______________________________ Mayor ATTEST: _________________________________ City Clerk 98 Annual Street Resurfacing Overview Project Number ST0117 Description This project provides for the design and construction of a variety of pavement resurfacing treatments, from slurry seal to major rehabilitation and reconstruction of streets and resurfacing of bridge decks. The project also includes installation of new or upgrades of existing ADA curb ramps on roads that are reconstructed or receive an asphalt concrete overlay. Streets are selected for improvements based on the City’s Pavement Management System to optimize the pavement condition in relation to the available budget. The City owns and maintains approximately 148 centerline miles of streets.  The Metropolitan Transportation Commission groups Pavement Condition Index (PCI) ratings into the following categories: 80-100 Very Good-Excellent, 70-79 Good, 60-69 Fair, 50-59 At Risk, 25-49 Poor, and 0-24 Failed. The City of Dublin is rated very good with a three-year moving average PCI of 79. Capital Cost Historical $15.5M FY2025 Budget $4.6M Total Budget (all years) $22.6M Project Total (to date) $38.1M Detailed Breakdown Category Historical FY2025 FY2026 FY2027 FY2028 FY2029 Future Total 9400 - Improvements $12,737,648 $3,653,324 $3,550,000 $3,550,000 $3,550,000 $3,550,000 $0 $30,590,972 9200 - Contract Services $2,509,344 $775,000 $775,000 $775,000 $775,000 $775,000 $0 $6,384,344 9100 - Salaries & Benefits $227,235 $167,500 $167,500 $167,500 $167,500 $167,500 $0 $1,064,735 9500 - Miscellaneous $56,311 $7,500 $7,500 $7,500 $7,500 $7,500 $0 $93,811 Total $15,530,538 $4,603,324 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $0 $38,133,862 Annual Street Resurfacing 2024-2029 Five-Year Capital Improvement Program Update | Dublin Attachment 2 99 Funding Sources Historical $15.5M FY2025 Budget $4.6M Total Budget (all years) $22.6M Project Total (to date) $38.1M Operational Costs FY2025 Budget $0 Total Budget (all years) $0 Project Total $0 Project Timeline ●04/1/2025 The City was awarded grant funding from the Department of Resources Recycling and Recovery (CalRecycle) Rubberized Pavement Grant Program in the amount of $103,324 and will be used for a rubberized cape seal treatment that will be constructed in 2026. ●07/1/2025 Construction of the 2024 Overlay, and 2024 Cape Seal projects are complete. Construction began in May 2025 for the 2025 Slurry Seal project. Design is currently underway for the 2026 Street Resurfacing Detailed Breakdown Category Historical FY2025 FY2026 FY2027 FY2028 FY2029 Future Total 2220 - Road Maint. & Rehab Account (RMRA) $4,263,599 $2,350,000 $2,000,000 $2,000,000 $2,000,000 $2,000,000 $0 $14,613,599 1001 - General Fund $467,999 $1,250,000 $2,086,900 $1,750,000 $1,850,000 $1,850,000 $0 $9,254,899 2201 - State Gas Tax $5,289,941 $700,000 $413,100 $750,000 $650,000 $650,000 $0 $8,453,041 2214 - Measure BB Sales Tax - Local Streets Fund (Alameda CTC) $2,831,020 $200,000 $0 $0 $0 $0 $0 $3,031,020 2204 - Measure B Sales Tax - Local Streets Fund (Alameda CTC) $1,784,999 $0 $0 $0 $0 $0 $0 $1,784,999 2215 - Measure BB Sales Tax - Bike & Ped. Fund (Alameda CTC) $304,500 $0 $0 $0 $0 $0 $0 $304,500 2205 - Measure B Sales Tax - Bike & Ped. Fund (Alameda CTC) $300,000 $0 $0 $0 $0 $0 $0 $300,000 2304 - Local Recycling Programs $160,000 $0 $0 $0 $0 $0 $0 $160,000 9997 - Other $0 $103,324 $0 $0 $0 $0 $0 $103,324 2216 - Measure B Grants $82,500 $0 $0 $0 $0 $0 $0 $82,500 4309 - Mitigation Contributions $45,980 $0 $0 $0 $0 $0 $0 $45,980 Total $15,530,538 $4,603,324 $4,500,000 $4,500,000 $4,500,000 $4,500,000 $0 $38,133,862 Annual Street Resurfacing 2024-2029 Five-Year Capital Improvement Program Update | Dublin 100 project and the preliminary engineering began for the 2027 Street Resurfacing project. Improvements are typically constructed each year between spring and fall. Annual Street Resurfacing 2024-2029 Five-Year Capital Improvement Program Update | Dublin 101