Loading...
HomeMy WebLinkAboutItem 8.1 PA 90-009 U Haul CUP/SDR/VARTO: FROM: PREPARED BY: SUBJECT: GENERAL INFORMATION: PROJECT: APPLICANT: PROPERTY OWNER: LOCATION: ASSESSOR PARCEL: PARCEL SIZE: GENERAL PLAN DESIGNATION: EXISTING ZONING AND LAND USE: SURROUNDING LAND USE AND ZONING: CITY OF DUBLIN PLANNING COMMISSION AGENDA STATEMENT/STAFF REPORT Meeting Date: June 15, 1992 Planning Commission Planning Staff Carol R. Cirelli, Associate Planner PA 92-009 U-Haul Conditional Use Permit/Site Development Review/Variance Conditional Use Permit/Site Development Review/ Variance request to 1) construct 4 new self - storage buildings, 2) install additional on -site parking spaces, 3) allow an existing 35 foot tall freestanding sign with changeable copy, and 4) voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Variance is to allow reduced parking spaces and side yard setbacks. Kirk T. Powell 558 North 20th Street San Jose, CA 95112 U-Haul of the East Bay Steve Langford 44511 Grimmer Road Fremont, CA 94538 6265 Scarlett Court 941-550-37, 38 5.94 acres Business Park/Industrial: Outdoor Storage M-1, Light Industrial District; self -storage, vehicle/equipment rental, outdoor storage North: South: Vacant; M-1, Light Industrial District Scarlett Court/I-580 Freeway; City/Caltrans Public Right -of -Way ITEM NO. %./ COPIES TO: Applicant Owner Address File PAGE / OF 57 ZONING HISTORY: C-2814: S-614: V-7945: C-3606: S-755: East: Chabot Channel/Scotsman (Manufacturing); Alameda Flood Control District Zone 7/M- 1, Light Industrial District West: El Monte Recreation Vehicle Rental/Sales; M-1, Light Industrial District On August 14, 1974, the Zoning Administrator of Alameda County approved a Conditional Use Permit request (R.T. Nahas Co.) for a public storage facility with an outdoor storage lot for boats and other recreation vehicles. The Conditional Use Permit was subject to public hearing review at 3 year intervals following the initial approval, for the purposes of re-evaluating the conditions of approval. On October 25, 1977, the Alameda County Planning Director approved a Site Development Review request (Plumas-Eureka Development Co.) to construct a 109,400 square foot public storage facility with 14 self -storage buildings and 2 general warehouse buildings. This project was never constructed. On June 20, 1979, the Zoning Administrator of Alameda County approved a Variance request (Frank T. Oley/ U-Haul Co.) to reduce the west side yard setback from the required 10 feet to 5 feet and the rear yard setback from the required 20 feet to 3 feet. This permit expired June 20, 1982. On June 20, 1979, the Zoning Administrator of Alameda County approved a Conditional Use Permit request (Frank T. Oley/U-Haul Co.) to allow the outdoor storage of truck and trailer rentals, with accessory uses and indoor household storage. As a condition of approval, the rear yard was not allowed to be less than 13 feet. This permit expired June 20, 1982. On February 6, 1980, the Alameda County Planning Director approved a Site Development Review request (U-Haul) to construct five self -storage buildings. On May 27, 1981, the Alameda County Planning Director approved a modification to the previous Site Development Review request (S-755, U-Haul) to construct a 2,220 square foot building for sales/service and security uses and a 2,000 square foot building for service and hitch bays. -2- PAGE PA 82-016: PA 84-021: On November 4, 1982, the Dublin Zoning Administrator approved a Variance request (Frank T. Oley/U-Haul Co.) to allow a 4 foot side yard setback from the western property line instead of the 5 foot side yard setback formally approved under Variance V-7945. Due to the inadvertent placement of the foundation, 1+ foot into the approved 5 foot setback, the newly constructed building was set back 4 feet from the western property line. On October 5, 1984, the Dublin Planning Director approved a Site Development Review request (Tom Oley/U-Haul) to construct a 25,200 square foot manufacturing plant building. This approval expired October 5, 1986. The building was never constructed. PA 86-087.1/2: On October 20, 1986, the Dublin Planning Commission approved a Site Development Review and Conditional Use Permit request to construct a 25,200 square foot vehicle maintenance and light industrial facility and an 800± square foot vehicle wash canopy facility, and to allow the outdoor storage of rental vehicles and equipment and recreation vehicles on the project site. The Conditional Use Permit expired October 16, 1988 and the Site Development Review expired October 16, 1987. The buildings were never constructed. APPLICABLE REGULATIONS: Section 8-51.2 Permitted Uses: M-1 Districts states that a storage use, when conducted within an enclosed building, is a permitted use in an M-1 District. Section 8-51.3A.1 Conditional Uses: M-1 Districts states that contractor's or other outdoor storage yard for equipment and supplies, if conducted within an area enclosed by a solid wall or fence, is a conditional use in the M-1, Light Industrial District, subject to Planning Commission Conditional Use Permit approval. Section 8-51.3A.3 Conditional Uses: M-1 Districts states that storage of liquefied petroleum gas is a conditional use in the M-1, Light Industrial District, subject to Planning Commission Conditional Use Permit approval. Section 8-51.3A.10 Conditional Uses: M-1 Districts states that other uses which are found by the Planning Commission as may meet the intent of the district and the requirements of Section 8-51.8 Performance Standards: M-1 Districts are conditional uses n an M-1 District, subject to Planning Commission Conditional Use Permit approval. -3- PAGE - OF Section 8-51.4b) Accessory Uses: M-1 Districts states that the retail sale of products produced by a permitted use on the premise may be qualified as Accessory to a permitted use on the same lot in an M-1 District. Section 8-87.34 Freestanding Signs of the Zoning Ordinance establishes provisions for regulating freestanding signs. Section 8-87.60E) Signs Requiring Conditional Use Permits of the Zoning Ordinance states that changeable copy signs on which the copy is manually or electrically changed, when used to promote items of general interest to the community, such as time, temperature, and/or date. Section 8-93.0 Variance establishes the procedure for granting Variances and establishes findings which must be made affirmatively: a) That there are special circumstances including size, shape, topography, location or surroundings, applicable to the property which deprive the property of privileges enjoyed by other properties in the vicinity under the identical zoning classifications; and b) That the granting of the application will not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity and zone; and c) That the granting of the application will not be detrimental to persons or property in the neighborhood or to the public welfare. Section 8-94.0 states that conditional uses must be analyzed to determine: 1) whether or not the use is required by the public need; 2) whether or not the use will be properly related to other land uses, transportation and service facilities in the vicinity; 3) whether or not the use will materially affect the health or safety of persons residing or working in the vicinity; and 4) whether or not the use will be contrary to the specific intent clauses or performance standards established for the district in which it is located. Section 8-95.0 Site Development Review of the Zoning Ordinance states that Site Development Review is a discretionary review process intended to promote orderly, attractive and harmonious site and structural development compatible with individual site environmental constraints and compatible with surrounding properties and neighborhoods; to resolve major project related issues including, but not limited to, building location, architectural and landscape design and theme, vehicular and pedestrian access and on -site circulation, parking and traffic impacts; to ensure compliance with development standards and general requirements established for Zoning and Planned Development Districts, including, but not limited to, setbacks, heights, parking, fences, accessory structures and signage; to stabilize property values; and to promote the general welfare. ENVIRONMENTAL REVIEW: A Mitigated Negative Declaration has been prepared pursuant to the California Environmental Quality Act (CEQA), State CEQA Guidelines and the City of Dublin Environmental Guidelines. -4- PAGE 0 The project, as mitigated, will not have a significant effect on the environment. NOTIFICATION: Public Notice of the June 15, 1992 hearing was published in the local newspaper, mailed to adjacent property owners, and posted in public buildings. ANALYSIS: The Applicant is requesting Variance, Conditional Use Permit and Site Development Review approval to 1) construct 4 new self -storage buildings, 2) install additional on -site parking spaces, 3) allow an existing 35 foot tall freestanding sign with changeable copy, and 4) voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Variance is to allow reduced parking spaces and side yard setbacks. Site Development Review The Applicant is requesting Site Development Review approval to construct a 25,200 square foot storage addition to an existing self - storage and vehicle rental/services facility; install 8 additional customer and employee parking spaces; and voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Applicant requested Public Works approval for a lot merger to join the existing two parcels at the project site into one parcel for constructing the 4 new storage buildings and reducing the recreation vehicle outdoor storage area from 57 parking spaces to 34 spaces. The existing storage area at the U-Haul facility is 49,250 square feet, comprising 471 units. One existing storage building and a portion of another storage building, totalling 3,455 square feet of storage space, will be demolished to accommodate 4 new single story storage buildings and a new 955 square foot office space (see Exhibit A). The amount of additional storage area is 25,200 square feet, or 210 storage units, and the total proposed storage area for the entire U-Haul facility is 70,995 square feet, comprising 681 storage units. The building material for the proposed storage buildings is metal insulated wall panels with a metal insulated roof and metal roll -up storage doors. A condition of approval is included in Draft Resolution Exhibit F that requires the Applicant to incorporate architectural or sculptural treatment in order to avoid the blank, long wall and steel box effect. The building materials and the color of the proposed storage buildings are compatible with the existing buildings at the site. The scale, color, texture and height of the proposed storage buildings are compatible with the existing surrounding light industrial uses, and are in conformance with the Zoning Ordinance and General Plan. The proposed storage buildings will be constructed in line with the existing storage buildings and at the same width as the existing structures to facilitate on -site pedestrian and vehicular circulation. Draft Resolution Exhibit F includes conditions of approval requiring -5- PAGE = . the Applicant to relocate Buildings H and I northerly 5 feet, and relocate the 2 recreation vehicle parking spaces adjacent to Buildings G and J elsewhere on the site to facilitate pedestrian circulation. As a mitigation measure in the Negative Declaration for the project, the Applicant will be required to construct the proposed storage buildings at or above the flood plain level (329 feet) in compliance with the Building Department requirements. The Applicant is proposing to install 8 additional employee and customer parking spaces for a total of 16 parking spaces. The required number of employee and customer parking spaces for the U-Haul rental, storage (office and management headquarters), and service facility (exclusive of the parking requirement for storage units) is 15 parking spaces. The Applicant is proposing adequate landscaping for the project site. However, as a Public Works Department condition of approval, the Applicant is required to construct a 4 foot wide sidewalk in place of the proposed landscape strip along the eastern portion of the project site and also required to landscape the northwestern and northeastern portions of the project site as generally shown on the Staff Study, Exhibit A. The northeast portion of the project site is an existing cul-de- sac roadway that will be vacated, or abandoned by the City, as depicted on the Staff Study. The Planning Commission will determine whether the cul-de-sac roadway abandonment is in conformance with the General Plan as a separate Planning Commission meeting item. The intent to abandon the existing cul-de-sac roadway will be heard by the City Council at a future City Council meeting and abandonment of the cul-de-sac roadway will be heard at a subsequent City Council meeting as a public hearing item. The Public Works Department completed a traffic study for the project indicating the project will generate an additional 63 vehicle trips per day on Dougherty Road and Dublin Boulevard and that a traffic impact fee is warranted for the project to mitigate this impact. The Applicant is voluntarily contributing traffic improvement funds in the amount of $6,480 to construct Dougherty Road and Dublin Boulevard improvements to mitigate this impact. This fund shall be paid prior to issuance of building permits. The Applicant is also required to dedicate a total of 35.76 feet of right-of-way for public street purposes along the existing cul-de-sac roadway west of Chabot Channel. This dedication is for the future connection to Dublin Boulevard Extension. U-Haul of the East Bay (Property Owner) has already dedicated 32.76 feet of the existing cul-de-sac roadway to the City as an easement and right-of-way for access. The Applicant is required to dedicate 3 additional feet for sidewalk improvements. Conditional Use Permit The Applicant is also requesting Conditional Use Permit approval to allow the outdoor storage of recreation vehicles, petroleum gas -6- PA E tanks and rental vehicles and equipment and an existing 35 foot tall freestanding sign with changeable copy. A Conditional Use Permit is required for the outdoor storage of recreation vehicles because this use may be found by the Planning Commission as meeting the intent of the M-1 District and the requirements of the M-1 District Performance Standards. The outdoor storage of truck and equipment rentals is a conditional use in the M-1 District. The U-Haul facility business hours are from 7:30 a.m. to 6:00 p.m., Monday through Saturday, and 9:00 a.m. to 5:00 p.m. on Sunday. The accessory retail, equipment/vehicle rental and petroleum tank uses are compatible with the self -storage use in that the hours of operation are the same and there are no on -site operational conflicts. The retail use involves the sales of equipment/vehicle accessory items (i.e., boxes and moving supplies, trailer hitches and related towing accessories) and propane gas cylinders (and filling of cylinders). A condition has been added to Draft Resolution Exhibit E stating that the retail use shall be accessory to the primary self -storage and vehicle/equipment rental use. There is no record of any complaints or zoning violations associated with the U-Haul facility since the last Conditional Use Permit was granted. There are no records of a prior Conditional Use Permit approval for the existing freestanding and changeable copy sign. This approval is required because the sign exceeds a height of 20 feet and a portion of the sign includes changeable copy. The existing double faced freestanding sign is in compliance with the lot size, sign height, setback and sign area requirements for freestanding signs, including the maximum aggregate allowable sign area provisions of the Zoning Ordinance. As a condition of approval (Exhibit E), the Applicant is required to display on the changeable copy portion of the sign, only items of general interest to the public, such as time, temperature, and/or date, U-Haul services offered, and hours/days of operation. Variance The Variance request is to allow 16 customer and employee parking spaces instead of the required 86 parking spaces; and a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line (as a result of the roadway dedication and improvements condition of approval for the project) instead of the required 10 foot side yard setbacks. Staff is recommending approval of the Applicant's Variance request. Affirmative findings of fact must be made by the Planning Commission prior to granting a Variance. These findings are specified in the attached Draft Resolution Exhibit D. The Applicant's Variance findings are addressed in the written statement (see Attachment 2). Affirmative findings recommended by Staff are made as follows: -7-- PAGE OF 1. That there are special circumstances including size, shape, topography, location or surroundings, applicable to the property which deprive the property of privileges enjoyed by other properties in the vicinity under the identical zoning classifications. In regards to allowing 16 customer and employee parking spaces rather than the required 86 parking spaces, the physical placement of the storage buildings on -site, the function of these buildings and the nature of a self -storage development results in minimal on -site parking needs for customers, or patrons. Self -storage facilities function as follows: patrons typically park in front of a storage unit for easy access and loading and unloading of vehicles on a short term basis (average 15 to 30 minutes), which results in a high turnover rate for on -site parking spaces and less of a demand for designated parking spaces. In regards to reduced side yard setbacks, as a Site Development Review condition of approval, the Applicant is required to dedicate the existing cul-de-sac roadway west of Chabot Channel for a public street right-of-way (including sidewalk), thereby reducing the width of the lot to less than what is typical for lots in the vicinity. As a result of this condition, the existing eastern buildings on the project site (Buildings B and C) and the proposed building (Building J) will have a zero foot side yard setback from the new eastern property line, instead of the required 10 foot side yard setback. Once the property is dedicated, Buildings B and C would become legal nonconforming buildings. The existing and proposed western buildings would also be affected by the reduced lot width. In order to maintain the existing on -site pedestrian and vehicular circulation and consistency with the existing storage buildings in terms of building size and location, a Variance is required for the project to allow a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line. 2. That the granting of the application will not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity and zone. Granting the Variance would not constitute a special privilege inconsistent with the limitations upon other properties in the area in that: a. there are other self -storage sites in Dublin that have minimal on -site parking spaces for patrons (i.e., 14 parking spaces, Public Storage; 14 parking spaces, Dublin Mini -Storage). b. A Variance was granted on November 4, 1982 (PA 82-016) allowing an existing building (Building F) to have a 4 foot side yard setback from the western property line instead of the previously approved 5 foot side yard setback (V-7945). c. The adjacent western property received Variance approval (V- 5782) to allow reduced side yard and rear yard setbacks. The site has an existing light industrial/warehouse structure located 6 inches from -8- PAGE OF S the side yard or eastern property line, and zero feet from the rear yard or northern property line, instead of the required 20 feet. 3. That the granting of the application will not be detrimental to persons or property in the neighborhood or to the public welfare. The Applicant will be required to comply with all applicable building codes and Dublin Police Department nonresidential security requirements, and required to provide proper on -site circulation for the safe movement of vehicles and pedestrians and adequate on -site parking. The project has been reviewed by other City departments and government agencies and their comments have been incorporated into the Staff Study (Exhibit A) and the Draft Resolutions (Exhibits B, C, D, E, and F) as conditions of approval. The City Attorney also reviewed the Staff Report and accompanying resolutions and had no comments. A Mitigated Negative Declaration has been prepared for the project in compliance with the California Environmental Quality Act (CEQA), State CEQA Guidelines and the City of Dublin Environmental Guidelines. The 21 day public review period began May 22, 1992. No comments on the Mitigated Negative Declaration have been received to date. The project, as mitigated, will not have a significant effect on the environment. The project is in compliance with the General Plan and Zoning Ordinance. Staff recommends Variance approval to allow reduced parking spaces and side yard setbacks; Conditional Use Permit approval to allow the outdoor storage of recreation vehicles, petroleum gas tanks and rental vehicles and equipment and an existing 35 foot tall freestanding sign with changeable copy; and Site Development Review approval to construct 4 new self -storage buildings, install additional on -site parking spaces, and voluntarily contribute traffic improvement funds in the amount of $6,480.00, subject to the conditions specified in the Draft Resolutions (Exhibits B, C, D, E, and F). RECOMMENDATIONS: FORMAT: 1) Open public hearing and hear Staff presentation. 2) Take testimony from Applicant and the public. 3) Question Staff, Applicant and the public. 4) Close public hearing and deliberate. 5) Adopt Draft Resolutions approving PA 92-009 U-Haul Mitigated Negative Declaration (Exhibit B), Mitigation Monitoring Program (Exhibit C), Variance (Exhibit D), Conditional Use Permit (Exhibit E), and Site Development Review (Exhibit F), or give Staff and Applicant direction and continue the matter. ACTION: Staff recommends that the Planning Commission adopt Draft Resolution (Exhibit B) approving the Mitigated Negative Declaration, Draft Resolution (Exhibit C) approving the -9- PAGE i_G 5/ Mitigation Monitoring Program, Draft Resolution (Exhibit D) approving the Variance, Draft Resolution (Exhibit E) approving the Conditional Use Permit and Draft Resolution (Exhibit F) approving the Site Development Review for PA 92-009 U-Haul. ATTACHMENTS: Exhibit A: Exhibit B: Exhibit C: Exhibit D: Exhibit E: Exhibit F: Site Plan, Landscape Plan, Building Elevations, Floor Plans, Sign Plan, Staff Study Draft Planning Commission Resolution approving the Mitigated Negative Declaration Draft Planning Commission Resolution approving the Mitigation Monitoring Program Draft Planning Commission Resolution approving the Variance Draft Planning Commission Resolution approving the Conditional Use Permit Draft Planning Commission Resolution approving the Site Development Review. Background Attachments: Attachment 1: Location/Zoning Map Attachment 2: Applicant's Written Project Statement -10- IT. OF „n-w OM! vrmEnloe MOO utfloe „le A LIM eLA ,nvirn fold 31IS l 1 N� 1 a 4. a. e •• `a 117•11 ON AM / 1 1 r , Y Y •A.._ 1 0 hA T V1 I m S\..... \- BUILDING COVERAGES SITE INFORMATION R . R 111 0 iXfflB1TA PAGE L Of 52• I e.6 If 1 ..1/-nt IMN•m0',mod larev 4.121711T711 IIt/ !tt La OS a Lad 1eAY irnrwru NV -Id Dr 'VOSaNYI pA r Q 0 -- l J 0 z a� • 1 r1 1 PAGE ..OF 5/ 1.11-Mt 11111 VIIO MINI Sawa = OO 11111 lff YNI v 10 117.00 110Y1 �1 invwn JI_Jk) • ♦ b, MMI u V w ONIC 18 3OIJdO ri I ll 0 -4 - Fd _ in 4>: v. _ 1 it J [XHI8ITAL,, DAOC /�i nr �/ •um •nt.a AVI.moo. . muinn+n u 8 u DNIO1If1 OIA1:13S '8 HOlIH 1 1 t RECEIVED g I & c < 0 (j J per■ �y PACE 15' nr 3 / If '„lra.. TN laoi A.M. iAn Ulf fall lly samarn la.a-a 1 1 SNV1d . iOld 0 4_ EXIIIBITA € PAGF /5 nr. / ,.1,-,,, I,111 Sr, 11111 VOA LICIAMO wwwn • t 1 1 Ei . L. L.. ----%Eyers SJNIO1If18 30b. JNIISIX3 aril PAp i I 19�1 �'• � I RECEIVED V Z 'vim zC VZ`, V r fa- C.2 Z cf. on G PACE_.!. O I( w.4•1 •1101..1w w•wv.w AMNIA 1r 11M otri ...«N N1.1....,01U.. THM041 'L AIX erne Yf1RJ. e111 LVI LOT. Me ID WM-2 SNV1d ►01.1 1 i� t s r-I r-1 L_i ijtt I I I y11 I i r L_..1 LrJ 1 t I }'n7h- — B. 11 _ _ r I • L I ✓'' Lia ' 1 i1-----7 I j 1 I —1. 11 L—J 4 I—_! 1 ���e 1$$ ,•e •,,ti I 1 J EXHIBIT A PAGE OF S/ ..aa, / i vt n, —t— F-- 9 a 9 9 JF 21y. somcnine 3E OlS 03SOdOad i 9 9 9 1 RECEIVED 4-1 EXHIBIT• J PAGE OF AEI 1.1111111A 1111i1 IMY 1Y IM 111,-111 (1111 •Itm 14119 111 W'n =a11w unLRAM IN., irmtn "'"" T9ND1f 1 tri S�I`dl3a / SO, Al1ne a3SOdOUd in J U W O cc a — - A f EXHIBITA 4,hio PAGE OF _ 21'- 0" 0 0 to Fa N WHITE BACK ROUND (TYP) BLACK LETTERS (TYP) RED STRIPE (TYP) WHITE BACKGROUND (TYP) FINISH GRADE HAUL BLACK LETTERS (TYP) NLY AT U-HAUL RENT A PICKUP $19.95 CALL 829-9610 5'"L- 6"X 10' DOUBLE FACED SIGN ILLUMINATED WITH EIGHT INTERIOR FLUORESCENT TUBES (TYP) 12'- 0" 4'X4' DOUBLE FACED LETTERS ILLUMINANTED WITH TWO INTERIOR FLUORESCENT TUBES EACH (TYP) 12" HIGH LETTERS (TYP) 10" COLUMN (TYP) PAINTED BRONZE TO MATCH (E) BUILDINGS RECEIVED mpy 2 0 1992. (:Z. C>5 Sc C -(- DUBLIN PLANNING SIGN DETAIL FOR U-HAUL OF THE EAST BAY 6265 SCARLETT CT. DUBLIN,CA. bitty: v-7.r 19tUllifirZ4 n.10 Jl Il PAGE 2 OF SM / / / /4 / / # /// / Ilhe .0.1.404.00r4NY NALL V.4•14 .6 li•W spI1001 01.0.11J.I /,P•01 ---4fr / 7 11111/11ZIL:""Cri Ift.1111 L------ roArmall Vet 1.1•C■ CINV.1 r•• • • fl. .••• . , A . • ..4.1011 • l•V r•.;' 14.3....11 "del Alwo...0.11 woe --) _ • MN 01111.1 L. meal - •••• snow MO 7.1.1LIMIR r1103. • ...m _ I t:La • • Weal InIPMWO 144 - 001111141111C0~1 _ 1de sideNak bog Moe UN UN 10 M MILICM10 I AP.M. 1-cas4o-cm1 I IL Cr WV 11.1,t Seta• F1.1.DON D� E I.43,001.• GTO, WOE 1110110.0111."•••11 irearmat wawa 135;7(0 • .PM 64 i -04,0-014 LEGEAJP - Ge.eeva area., 1-0 Le- - -iv be. abon don e.of 4v C,,1%,d_ wide. sidewatk(go eco-e 61.4rea:) / O. NNW OWN • cafe .4111C.A.M1 11•041.6 laociscafed RESOLUTION NO. 92 - A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN A RESOLUTION MAKING FINDINGS PURSUANT TO CALIFORNIA ENVIRONMENTAL QUALITY ACT (CEQA) AND APPROVING MITIGATED NEGATIVE DECLARATION FOR PA 92-009 U-HAUL CONDITIONAL USE PERMIT/SITE DEVELOPMENT REVIEW/VARIANCE Recitals 1. Kirk T. Powell ("Applicant"), on behalf of U-Haul of the East Bay, has made application to the City of Dublin for Conditional Use Permit/Site Development Review/Variance approval to 1) construct a 25,200 square foot storage addition to an existing self -storage facility; 2) install 8 additional customer and employee parking spaces; 3) decrease the number of recreational and vehicle outdoor storage area from 57 to 34 spaces; 4) allow an existing 35 foot tall freestanding sign with changeable copy; and 5) voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Variance is to allow 16 customer and employee parking spaces instead of the required 86 parking spaces; and to allow a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line (as a result of the roadway dedication and improvements conditions of approval for the project) instead of the required 10 foot side yard setback located at 6265 Scarlett Court (the "Project"). 2. The Project includes the payment of the proposed Project's proportionate share of the cost of improving Dublin Boulevard and Dougherty Road, and a condition of approval to construct the new storage buildings at or above the flood plain level (329 feet). 3. Pursuant to Public Resources Code Section 21081.6, the City Planning Commission adopted Resolution No. 92- , A RESOLUTION ADOPTING A MITIGATION MONITORING PROGRAM FOR THE NEGATIVE DECLARATION FOR PA 92-009 U-HAUL CONDITIONAL USE PERMIT/SITE DEVELOPMENT REVIEW/VARIANCE approved on June 15, 1992 to provide for the implementation of a mitigation monitoring program covering the project. 4. Pursuant to Public Resources Code Section 21080.1 and Section 15063 of the State CEQA Guidelines (Title 14, California Administrative Code), an initial study dated May 15, 1992, (the "Initial Study") was prepared to determine whether there are effects on the environment peculiar to the proposed Project. 5. The Initial Study, based in part on a March 13, 1992 memorandum and traffic study generated by Mehran Sepehri, Senior Civil Engineer of the Dublin Public Works Department (the "Traffic Report"), and project comments from the City of Dublin Building Official, identified the following effects on the environment as being peculiar to the proposed Project: S Reduction of the level of service on Dublin Boulevard and Dougherty Road. Potential for exposure of people and/or property to flooding. 6. The Initial Study indicated that the significant environmental effects listed in paragraph 5 could be mitigated by widening Dougherty Road, extending Dublin Boulevard to Tassajara Road, and improving the Dublin Boulevard and Dougherty Road intersection, and by constructing the new storage buildings at or above the flood plain level (329 feet) in compliance with the Dublin Building Department requirements. 7. The proposed Project has been modified to include provisions for payment by the Applicant of its proportionate share of the costs of mitigating the effects described in paragraph 5 above (the "traffic mitigation measure") in the manner described in the Traffic Report, and requiring the Applicant to construct the new storage buildings at or above the flood plain level (329 feet) in compliance with the Building Department requirements. 8. Based on the information contained in the Traffic Report, Dublin Building Department project comments, the Initial Study and the June 15, 1992 Staff Report (the "Staff Report") all of which are incorporated herein by this reference, a Mitigated Negative Declaration, incorporating the traffic and hydrology mitigation measures, was prepared for the proposed Project. Notice of the Mitigated Negative Declaration was duly given prior to the Planning Commission hearing on June 15, 1992. 9. The Planning Commission held a Public Hearing on the proposed Project on June 15, 1992, at which time the Planning Commission took testimony from interested persons regarding the proposed Project. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby resolve that: A. The foregoing Recitals are true and correct and are made a part hereof. B. The Planning Commission finds, on the basis of the record before it and the foregoing Recitals, (1) that feasible mitigation measures, including without limitation the traffic and hydrology mitigation measures, have been incorporated into the Project to mitigate the significant environmental effects identified in paragraph 5 above; (2) that such mitigation measures will eliminate or reduce to a level of insignificance the significant environmental effects identified in paragraph 5; and (3) that uniformly applied development policies or standards will not mitigate the significant environmental effects identified in paragraph 5 above. -2- c. The Planning Commission has reviewed and considered the Mitigated Negative Declaration, together with all comments received during the public comment period and all testimony at the public hearing. The Planning Commission hereby finds that there is no substantial evidence that the Project, as modified to incorporate the traffic mitigation measures, will have a significant effect on the environment and approves the Mitigated Negative Declaration. PASSED, APPROVED AND ADOPTED this 15th day of June, 1992. AYES: NOES: ABSENT: ATTEST: Planning Director Planning Commission Chairperson -3- PAGE RESOLUTION NO. 92 - A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN ADOPTING A MITIGATION MONITORING PROGRAM FOR THE NEGATIVE DECLARATION FOR PA 92-009 U-HAUL CONDITIONAL USE PERMIT/SITE DEVELOPMENT REVIEW/VARIANCE WHEREAS, Public Resources Code 21081.6 requires the City to adopt a reporting or monitoring program for changes in a project or conditions imposed to mitigate or avoid significant environmental effects in order to ensure compliance during project implementation; and WHEREAS, on June 15, 1992, the Planning Commission held a Public Hearing and adopted Resolution No. 92- , making findings approving the Mitigated Negative Declaration for PA 92-009 U-Haul Conditional Use Permit/Site Development Review/Variance; and WHEREAS, proper notice of said public hearing was given in all respects as required by law. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does adopt the "U-Haul Negative Declaration Mitigation Monitoring Program" attached hereto as Attachment C-1 as the monitoring program required by Public Resources Code 21081.6. PASSED, APPROVED AND ADOPTED this 15th day of June, 1992. AYES: NOES: ABSENT: ATTEST: Planning Director Planning Commission Chairperson DWIBIT PAGE OF..57 U-HAUL PA 92-009 CUP/SDR/VAR 6265 Scarlett Court Negative Declaration Mitigation Monitoring Program The Applicant shall be responsible for any and all costs incurred in monitoring mitigation measures. For detailed information on impacts and mitigation measures refer to the Initial Study and Mitigated Negative Declaration for PA 92-009 U-Haul Conditional Use Permit/Site Development Review/Variance RESOURCE Hydrology IMPACT Due to project location, people and/or property may be exposed to flooding. Transportation/ The project Circulation may result in the generation of substantial vehicular involvement on local traffic systems. MONITORING ACTION Prior to issuance of building permits, the Applicant shall depict on the construction/ building plans for the project, building pad elevations at or above the flood plain level (329 feet), in compliance with the Building Department requirements. Prior to issuance of building permits, the Applicant shall pay a traffic impact fund of $6,480.00 to mitigate potential traffic impacts on Dougherty Road and Dublin Boulevard. VERIFICATION Building Department issuance of building permits. Public Works Department prior to issuance of building permits. EXHIB1Tc-� PAGE .24 or .S� RESOLUTION NO.92- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING PA 92-009 U-HAUL VARIANCE REQUEST TO ALLOW 16 CUSTOMER AND EMPLOYEE PARKING SPACES INSTEAD OF THE REQUIRED 86 PARKING SPACES AND A 5 FOOT SIDE YARD SETBACK FROM THE WESTERN PROPERTY LINE AND A ZERO FOOT SIDE YARD SETBACK FROM THE EASTERN PROPERTY LINE (AS A RESULT OF THE ROADWAY DEDICATION AND IMPROVEMENTS CONDITION OF APPROVAL FOR THE PROJECT) INSTEAD OF THE REQUIRED 10 FOOT SIDE YARD SETBACK LOCATED AT 6265 SCARLETT COURT WHEREAS, Kirk T. Powell, on behalf of U-Haul of the East Bay has filed an application for a Variance, Conditional Use Permit and Site Development Review to 1) construct a 25,200 square foot storage addition to an existing self -storage and vehicle rental/services facility, 2) install 8 additional parking spaces, 3) decrease the outdoor recreation vehicle/boat outdoor storage area from 57 spaces to 34 spaces, 4) allow an existing 35 foot tall double-faced freestanding sign with changeable copy, and 5) voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Variance request is to allow 16 employee and customer parking spaces instead of the required 86 parking spaces and a 5 foot setback from the western property line and a zero foot setback from the eastern property line; and WHEREAS, the Planning Commission did hold a public hearing on said application on June 15, 1992; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, the application has been reviewed in accordance with the provisions of the California Environmental Quality Act (CEQA) and a Mitigated Negative Declaration has been adopted (Planning Commission Resolution No. ). The project, as mitigated, will not have a significant effect on the environment; and WHEREAS, the Staff Report was submitted recommending that the application be conditionally approved; and WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby find that: A. There are special circumstances including size, shape, topography, location or surroundings applicable to the property which would deprive the property of privileges enjoyed by other properties in the vicinity under the identical zoning classification in that: EXINBij' D PAGE OF �,, 1) The physical placement of the storage buildings on -site, the function of these buildings and the nature of a self -storage development results in minimal on -site parking needs for patrons. Self -storage facilities function as follows: patrons typically park in front of a storage unit for easy access and loading and unloading of vehicles on a short term basis (average 15 to 30 minutes), which results in a high turnover rate for on -site parking spaces and less of a demand for designated parking spaces. 2 As a Site Development Review condition of approval, the Applicant is required to dedicate the existing cul-de-sac roadway west of Chabot Channel for a public street right-of- way (including sidewalk), thereby reducing the width of the lot to less than what is typical for lots in the vicinity. As a result of this condition, the existing eastern buildings on the project site (Buildings B and C) and the proposed building (Building J) will have a zero foot side yard setback from the new eastern property line, instead of the required 10 foot side yard setback. Once the property is dedicated, Buildings B and C would become legal nonconforming buildings. The existing and proposed western buildings would also be affected by the reduced lot width. In order to maintain the existing on -site pedestrian and vehicular circulation and consistency with the existing storage buildings in terms of size and location, a Variance is required for the project to allow a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line. B. The granting of the Variance application would not constitute a grant of special privileges inconsistent with the limitations upon other properties in the vicinity, in that: 1) there are other self -storage sites in Dublin that have minimal on -site parking spaces for patrons (i.e. 14 parking spaces, Public Storage and 14 parking spaces, Dublin Mini - Storage), 2 3 a Variance was granted on November 4, 1982 (PA 82-016) allowing an existing building (Building F) to have a 4 foot side yard setback from the western property line instead of the previously approved 5 foot side yard setback (V-7945), the adjacent western property received Variance approval (V- 5782) to allow reduced side yard and rear yard setbacks. The site has an existing light industrial/warehouse structure located 6 inches from the side yard or eastern property line, and zero feet from the rear yard or northern property line, instead of the required 20 feet. C. The granting of this Variance will not be detrimental to persons or property in the neighborhood or to the public welfare, in that the Applicant will be required to comply with all applicable - 2 PAGE building codes and Dublin Police Department nonresidential security requirements, and required to provide proper on -site circulation for the safe movement of vehicles and pedestrians and adequate on -site parking. BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby approve PA 92-009 U-Haul Variance to allow 16 customer and employee parking spaces, a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line (as a result of the roadway dedication condition of approval for the project), as generally depicted by materials labeled Exhibit A, stamped approved and on file with the Dublin Planning Department and subject to the approval of the related Conditional Use Permit and Site Development Review and to the following conditions: CONDITIONS OF APPROVAL Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. (PL] Planning, [B] Building, [PO] Police, (PW Public Works, (ADM] Administration/City Attorney, (FIN] Finance, [F] Dougherty Regional Fire Authority, (DSR] Dublin San Ramon Services District, fCO] Alameda County Department of Environmental Health. 1. This approval is for PA 92-009 U-Haul is to allow: 1) 16 employee and customer parking spaces instead of the required 86 parking spaces, 2) a 5 foot side yard setback from the western property line instead of the required 10 feet, and 3) a zero foot side yard setback from the eastern property line instead of the required 10 feet (as a result of the related Site Development Review condition of approval requiring roadway dedication and improvements). This approval shall generally conform to the plans labeled Exhibit A stamped approved, as modified by the following conditions of approval and associated Conditional Use Permit and Site Development Review, consisting of a site plan, landscape plan, building elevations, floor plans (9 sheets) and sign plan (1 sheet), prepared by Kirk T. Powell dated received February 21, 1992, and May 20, 1992, respectively, and a Staff Study (1 sheet) dated June 5, 1992. [PL, B] 2. All curbing around the existing and proposed fire hydrants shall be painted red and the Applicant shall provide either a "No Parking - Fire Lane" sign near the fire hydrants and curbs, or pavement markings in the area where no parking is permitted. [PL, F] 3. The 5 foot side yard area shall be maintained and kept free of debris at all times. [PL] 4. The Property Owner shall dedicate 35.76 feet of right-of-way for public street west of the Chabot Channel, for the future connection to Dublin Boulevard, as generally depicted on the 3 Staff Study, Exhibit A, subject to the review and approval of the Public Works Director. [PW] 5. Building permits for the proposed improvements shall be secured and construction commenced within one year after the effective date of this approval or said approval shall be void. This one year period may be extended an additional six (6) months after the expiration date of this approval (Applicant must submit a written request for the extension prior to the expiration date) by the Planning Director upon the determination that the Conditions of Approval remain adequate to assure that the above stated Findings of Approval will continue to be met. [B, PL] 6. This permit shall be revocable for cause in accordance with Section 8-90.3 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this permit shall be subject to citation. [PL] PASSED, APPROVED AND ADOPTED this 15th day of June, 1992. AYES: NOES: ABSENT: ATTEST: Planning Director Planning Commission Chairperson 4 PACE )i RESOLUTION NO. 92- A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING PA 92-009 U-HAUL CONDITIONAL USE PERMIT TO ALLOW AN EXISTING 35 FOOT TALL FREESTANDING SIGN WITH CHANGEABLE COPY AND THE OUTDOOR STORAGE OF RECREATION VEHICLES, PETROLEUM GAS TANKS AND RENTAL VEHICLES AND EQUIPMENT LOCATED AT 6265 SCARLETT COURT WHEREAS, Kirk T. Powell, on behalf of U-Haul of the East Bay, requests approval of a Conditional Use Permit/Site Development Review/Variance to construct a 25,200 square foot storage addition to an existing self -storage facility; to install 8 additional customer and employee parking spaces; to decrease the number of recreational vehicle outdoor storage area from 57 parking spaces to 34 spaces; to allow an existing 35 foot tall freestanding sign with changeable copy; and to voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Variance is to allow 16 customer and employee parking spaces instead of the required 86 parking spaces; and to allow a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line (as a result of the roadway dedication and improvements conditions of approval for the project) instead of the required 10 foot side yard setback; and WHEREAS, the Planning Commission held a public hearing on said application on June 15, 1992; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, the application has been reviewed in accordance with the provisions of the California Environmental Quality Act (CEQA) and a Mitigated Negative Declaration has been adopted (Planning Commission Resolution No. ). This project, as mitigated, will not have a significant effect on the environment; and WHEREAS, the Staff Report was submitted recommending that the application be conditionally approved; and WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby find that: A. The proposed project will serve a public need by providing additional self -storage units, with recreation vehicle storage and equipment rental and retail services to the general public in Dublin. B. The proposed use will be properly related to other land uses and transportation and service facilities in the vicinity, as the proposed use will be compatible when compared to the type and nature of operations typically found in the neighborhood. PAGE C. The use, under all circumstances and conditions of this particular case, will not materially adversely affect the health or safety of persons residing or working in the vicinity, or be materially detrimental to the public welfare or injurious to property or improvements in the neighborhood, as all applicable regulations will be met. D. The use will not be contrary to the specific intent clauses or performance standards established for the District in which it is to be located. E. The approval of this Conditional Use Permit will be consistent with the Dublin General Plan. BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby conditionally approve PA 92-009 U-Haul Conditional Use Permit as shown on Exhibit A, stamped approved and on file with the Dublin Planning Department, subject to the approval of the related Site Development Review/Variance and to the following conditions: CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL] Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM] Administration/City Attorney, [FIN] Finance, [F] Dougherty Regional Fire Authority, [DSR] Dublin San Ramon Services District, [CO] Alameda County Department of Environmental Health. 1. PA 92-009 U-Haul Conditional Use Permit approval is to allow an existing 35 foot tall freestanding sign with changeable copy and the outdoor storage of recreation vehicles, petroleum gas tanks and rental vehicles and equipment. This approval shall generally conform to the plans labeled Exhibit A, stamped approved and on file with the Planning Department, as modified by the following conditions of approval and associated Site Development Review and Variance, consisting of Site Plan, Landscape Plan, Building Elevations, Floor Plans (9 sheets) and Sign Plan (1 sheet) prepared by Kirk T. Powell, dated received February 21, 1992 and May 20, 1992, respectively, and a Staff Study (1 sheet) dated June 5, 1992. [PL] 2. The Conditional Use Permit approval for PA 92-009 U-Haul supersedes all previous Conditional Use Permit approvals for the project site. [PL] 3. The freestanding sign shall generally conform to the following dimensions: [PL] a. Maximum Sign Area: 278 square feet, double faced (Total) - 2 - PAGE OF ff.. "U-HAUL" - 168 square feet, double faced Changeable Copy - 110 square feet, double faced b. Maximum Sign Height: 35 feet c. Minimum Setback from the Southern Property Line: 85 feet 4. The changeable copy portion of the freestanding sign shall display only items of general interest to the public, such as time, temperature, and/or date, U-Haul services offered, and hours/days of operation. [PL] 5. The freestanding sign shall be located within a landscaped area or planter. [PL] 6. Any modifications to the freestanding sign shall be subject to the review and approval of the Planning Director. [PL] 7. All signs shall be subject to the requirements of the Sign Ordinance. [PL] 8. The Applicant shall comply with all applicable Planning, Building, Dougherty Regional Fire Authority, Police Department and Alameda County Department of Environmental Health codes, regulations and ordinances. [PL, B, F, PO, CO] 9. The facility shall provide and maintain at all times 16 employee and customer parking spaces. [PL] 10. Operation of the petroleum gas tanks shall be in compliance with the Dougherty Regional Fire Authority and Alameda County Department of Environmental Health codes and regulations. [F, CO] 11. The outdoor parking of recreation vehicles, equipment rentals and other vehicles shall occur in the designated parking spaces on - site (34 spaces in the northern end of the project site for recreation vehicles and the truck/trailer/equipment display and storage area as designated on the Site Plan, Exhibit A). [PL] 12. The exterior storage and/or display of equipment, other than the rental trucks and recreation vehicles, shall be generally limited to bulky and/or gasoline powered items or equipment within the five following generalized categories: (1) garden equipment, (2) contractors' equipment, (3) recreational equipment, (4) moving equipment, and (5) small miscellaneous equipment. The five generalized categories listed above may be modified by submitting a written notice to the Planning Director for review and approval. [PL] 13. The retail use shall be accessory to the primary self -storage and vehicle/equipment rental use. [PL] 14. The Applicant/Property Owner shall be responsible for clean-up and disposal of project related trash to maintain a clean, litter -free site. [PL] - 3 PAGE _LL 15. No loudspeakers or amplified music shall be permitted outside the enclosed buildings. All activities associated with the use, except for the outdoor storage of recreation vehicles, equipment or other vehicles, and the petroleum gas tanks shall be conducted entirely within the enclosed buildings. [PL] 16. All existing and proposed landscape areas shall be enhanced and properly maintained. [PL] 17. On an annual basis, this Conditional Use Permit approval shall be subject to Zoning Investigator review and determination as to the compliance with the Conditions of Approval. [PL] 18. This approval shall become null and void in the event the approved use ceases to operate for a continuous one-year period. [PL] 19. This permit shall be revocable for cause in accordance with Section 8-90.3 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this permit shall be subject to citation. [PL] PASSED, APPROVED AND ADOPTED this 15th day of June, 1992. AYES: NOES: ABSENT: ATTEST: Planning Director Planning Commission Chairperson - 4 PACE RESOLUTION NO. A RESOLUTION OF THE PLANNING COMMISSION OF THE CITY OF DUBLIN APPROVING PA 92-009 U-HAUL SITE DEVELOPMENT REVIEW APPLICATION TO CONSTRUCT A 25,200 SQUARE FOOT STORAGE ADDITION, TO INSTALL 8 ADDITIONAL CUSTOMER AND EMPLOYEE PARKING SPACES AND VOLUNTARILY CONTRIBUTE TRAFFIC IMPROVEMENT FUNDS IN THE AMOUNT OF $6,480.00 LOCATED AT 6265 SCARLETT COURT WHEREAS, Kirk T. Powell, on behalf of U-Haul of the East Bay, requests Conditional Use Permit/Site Development Review/Variance approval to construct a 25,200 square foot storage addition to an existing self -storage and vehicle rental/services facility; to install 8 additional customer and employee parking spaces; to decrease the number of recreational vehicle outdoor storage area from 57 parking spaces to 34 spaces; to allow an existing 35 foot tall freestanding sign with changeable copy; and to voluntarily contribute traffic improvement funds in the amount of $6,480.00. The Variance is to allow 16 customer and employee parking spaces instead of the required 86 parking spaces; and to allow a 5 foot side yard setback from the western property line and a zero foot side yard setback from the eastern property line (as a result of the roadway dedication and improvements conditions of approval for the project) instead of the required 10 foot side yard setback; and WHEREAS, the Planning Commission did hold a public hearing on said application on June 15, 1992; and WHEREAS, proper notice of said public hearing was given in all respects as required by law; and WHEREAS, the application has been reviewed in accordance with the provisions of the California Environmental Quality Act (CEQA) and a Mitigated Negative Declaration has been adopted (Planning Commission Resolution No. ). This project, as mitigated, will not have significant effects on the environment; and WHEREAS, the Staff Report was submitted recommending that the application be conditionally approved; and WHEREAS, the Planning Commission did hear and consider all said reports, recommendations and testimony hereinabove set forth. NOW, THEREFORE, BE IT RESOLVED THAT THE Dublin Planning Commission does hereby find that: A. The approval of this application is consistent with the intent/purpose of Section 8-95.0 SITE DEVELOPMENT REVIEW. B. The approval of this application, as conditioned, complies with the General Plan and with District Regulations and the general requirements established in the Zoning Ordinance. C. The approval of this application, as conditioned, is in the best interests of the public health, safety and general welfare. PAGE,5 OF D. The propost._ site development, including site layout, vehicular access, circulation and parking, setbacks, height, walls, public safety and similar elements have been designed to provide a desirable environment for the development. E. Architectural consideration, including the character, scale and quality of the design, the architectural relationship with the site and other buildings, building materials and colors, screening of exterior appurtenances, exterior lighting and similar elements have been incorporated into the project in order to insure compatibility of this development with the development's design concept or theme and the character of adjacent buildings and uses. F. Landscape considerations, including the locations, type, size, color, texture and coverage of plant materials, provisions and similar elements have been considered to insure visual relief and an attractive environment for the public. G. The approval of this Site Development Review will be consistent with the policies set forth within the Dublin General Plan. BE IT FURTHER RESOLVED THAT THE Dublin Planning Commission does hereby conditionally approve PA 92-009 U-Haul Site Development Review as generally depicted on the plans labeled Exhibit A, stamped approved and on file with the Dublin Planning Department and subject to the approval of the related Conditional Use Permit/Variance and to the following conditions: CONDITIONS OF APPROVAL: Unless stated otherwise, all Conditions of Approval shall be complied with prior to the issuance of building permits or establishment of use, and shall be subject to Planning Department review and approval. The following codes represent those departments/agencies responsible for monitoring compliance of the conditions of approval. [PL] Planning, [B] Building, [PO] Police, [PW] Public Works, [ADM] Administration/City Attorney, [FIN] Finance, [F] Dougherty Regional Fire Authority, [DSR] Dublin San Ramon Services District, [CO] Alameda County Department of Environmental Health, [LDD] Livermore Dublin Disposal Service 1. This Site Development Review approval for PA 92-009 is to construct a 25,200 square foot storage addition to an existing self -storage and vehicle rental/services facility; to install 8 additional customer and employee parking spaces; and to voluntarily contribute traffic improvement funds in the amount of $6,480.00. This approval shall generally conform to the plans labeled Exhibit A, stamped approved and on file with the Planning Department, as modified by the following conditions of approval and associated Conditional Use Permit and Variance, consisting of Site Plan, Landscape Plan, Building Elevations, Floor Plans (9 sheets) and Sign Plan (1 sheet) prepared by Kirk T. Powell, dated - 2 - :'AGE ' ? OF received Februail 21, 1992 and May 20, 1992, respectively, and a Staff Study (1 sheet) dated June 5, 1992. [PL, B, PW] 2. The Applicant shall comply with all applicable City of Dublin Site Development Review Standard Conditions (see Attachment). [PL] Voluntary Traffic Improvement Funds 3. The Applicant's voluntary contribution of the traffic improvement funds in the amount of $6,480.00 as identified in the Applicant's project description, shall be paid by the Applicant prior to issuance of building permits. [PL, PW, FIN] Parking/Circulation 4. All on -site pedestrian walkways shall maintain a minimum 4 foot unobstructed width. [PL] 5. The Applicant shall submit a parking lot striping plan subject to review and approval of the Planning Director. All employee and customer parking spaces shall be double -striped (4 inch wide stripes set approximately 2 feet apart, see Attachment). Handicapped, customer, employee and compact parking spaces shall be appropriately identified on the pavement and designated on the parking plan. [PL] 6. Handicapped ramps and parking stalls shall be provided and maintained as required by the State of California Title 24 provisions. [PL, B] 7. The Applicant shall relocate Buildings H and I northerly five (5) feet to facilitate pedestrian circulation as depicted on the Staff Study, Exhibit A, subject to the review and approval of the Planning Director and Building Official. [PL, B] 8. The Applicant shall relocate the two (2) recreational vehicle parking spaces adjacent to Buildings G and J, elsewhere on the site to facilitate pedestrian circulation as depicted on the Staff Study, Exhibit A, subject to the review and approval of the Planning Director and Building Official. [PL, B] 9. All landscape fingers and islands adjacent to parking stalls shall maintain a minimum 1 foot wide raised curb or equivalent to facilitate pedestrian access. [PL] 10. All landscape planters and end islands within the parking area shall maintain a three (3) foot curb radius to facilitate vehicular maneuvering. [PL] Architectural 11. All storage building elevations shall incorporate architectural or sculptural treatment in order to avoid the blank, long wall and steel box effect, subject to the review and approval of the Planning Director. This may be accomplished by providing changes in the wall plane, spatial volumes, building height, and - 3 - FACE !O,.,� incorporating vc._ied use of arcades, materi- s and roof elements. [PL] 12. The Applicant shall submit exterior colors and materials for the proposed storage buildings subject to the final review and approval of the Planning Director. [PL] 13. All ducts, meters, air conditioning equipment and other mechanical equipment that is on -site or roof mounted shall be effectively screened from view with materials architecturally compatible with the main structure subject to the review and approval of the Planning Director. [PL] 14. The outdoor storage of recreational vehicles, rental vehicles and equipment shall be screened with a vinyl clad chain link fence and gate with redwood slats or other fencing material acceptable to the Planning Department. [PL] Landscape and Irrigation Plans 15. A final detailed Landscape and Irrigation Plan (at 1 inch = 20 feet or larger), along with a cost estimate of the work and materials proposed, shall be submitted for review and approval by the Planning Director. Landscape and Irrigation Plans shall be signed by a licensed landscape architect. Final landscape plans shall indicate the common and botanical names, container size, growth rate and number of each plant. All landscaping, as shown on the Landscape and Irrigation Plan, shall include drought tolerant vegetation. [PL] 16. The final landscape plan shall be generally consistent with the preliminary landscape plans prepared by Kirk T. Powell dated received by the Planning Department February 21, 1992, and Staff Study dated June 5, 1992 (Exhibit A). [PL] 17. The Applicant shall provide landscaping at the northwest corner of the project site and the northeast corner of the project site once the existing cul-de-sac portion of the existing roadway west of Chabot Channel is abandoned by the City, as generally shown on the Staff Study, Exhibit A, subject to the review and approval of the Planning Director. [PL] 18. As required by the Public Works Department, the Applicant shall provide a four (4) foot wide sidewalk along the westerly curb line of the existing roadway instead of landscaping as generally shown on the Staff Study, Exhibit A, subject to the review and approval of the Public Works Director. [PW] 19. Landscaping shall not obstruct the sight distance of motorists, pedestrians or bicyclists. Except for trees, landscaping at drive aisle intersections shall not be taller than thirty (30) inches above the curb. [PL, PW] 20. The Applicant shall complete and submit to the Dublin Planning Department the Standard Plant Material, Irrigation and Maintenance Agreement (see Attachment). [PL] - 4 PAGE Lighting 21. Exterior lighting shall be provided and shall be of a design and placement so as not to cause glare onto adjoining properties or Scarlett Court. Lighting used after daylight hours shall be adequate to provide for security needs (1.5 foot candles). Wall lighting around the entire perimeter of the buildings shall be supplied to provide "wash" security lighting. The Applicant shall provide photometrics and cut sheets subject to the review and approval of the Planning Director. [PL, B, PO] Building 22. The new storage buildings shall be constructed at or above the flood plain level (329 feet), in compliance with the Building Department requirements. [B] 23. One hour fire resistant walls are required on the ends of Buildings C, D, E, F, G, H, I, and J, in compliance with the Building Department requirements. [B, F] Fire Protection 24. The Applicant shall comply with all applicable requirements of the Dougherty Regional Fire Authority (DRFA), including painting appropriate curbs red and posting "No Parking" signs. [F, PL] 25. All proposed storage buildings must be equipped with a automatic fire suppression system installed per the National Fire Protection Association 13 standards. [F, B] 26. All valves, controls, including the automatic fire suppression system, shall be supervised by an approved central station, in compliance with DRFA requirements. [F] 27. Additional requirements for interior hose outlets inside of the proposed buildings may be required according to DRFA requirements. [F] 28. A Knox override switch shall be installed at the automatic entrance gate and a Knox Lock at the rear gate in accordance with DRFA requirements. [F] 29. Minimum aisle widths, as shown on the Site Plan labeled Exhibit A, shall be maintained free and clear at all times for the adequate movement of emergency vehicles. [F, PL] 30. Prior to issuance of a building permit, a Fire Impact Fee in the amount of $600.00 per 2,000 square feet of building area shall be collected separately for each new building, in accordance with DRFA requirements. [F, B] 31. Prior to issuance of a building permit, the Applicant shall supply written confirmation that the requirements of DRFA have been, or will be met. [F, B, PL] - 5 PAGE Water and Sewer Services 32. Prior to issuance of building permits, the Applicant shall provide written documentation that the requirements of the Dublin San Ramon Services District have been, or will be, met. [DSR, B, PL] Police Security 33. As required by the Dublin Police Department, all security hardware for the new structures must comply with the City of Dublin Non -Residential Security Requirements (City Ordinance No. 21-89; see Attachment). Security hardware must be provided for doors, windows, roof, vents, skylights and roof ladders. [B, PO] 34. The rear access gate shall be locked at all times with a locking system approved by the Dougherty Regional Fire Authority (see Condition #28). [PO, F] 35. The Applicant shall work with the Dublin Police Department prior to submittal of building plans and on an ongoing basis to establish an effective theft prevention and security program. [PO] 36. Written documentation that all Police Department requirements have been complied with shall be submitted to the Planning Director prior to issuance of building permits. [PL, B] Debris/Dust/Construction Activity 37. Measures shall be taken to contain all trash, construction debris, and materials on -site until disposal off -site can be arranged. The Applicant shall keep adjoining public streets free and clean of project dirt, mud, and materials during the construction period. The Applicant shall be responsible for corrective measures at no expense to the City of Dublin. [B, PW] 38. Areas undergoing grading, and all other construction activities, shall be watered, or other dust palliative measures used, to prevent dust, as conditions warrant. [PW, B] 39. The provision of temporary construction fencing shall be made subject to the review and approval of the Public Works Director and the Building Official. [PW, B, PL] Disposal Service 40. All trash receptacles located on -site shall be located within approved trash enclosures [PL, LDD] 41. The Applicant shall submit a design detail and location of the trash enclosure area subject to the Planning Director's review and approval. The design of the trash enclosure(s) shall reflect dimensional criteria deemed acceptable by the Livermore Dublin Disposal Service, and shall incorporate use of a 10' x 10' concrete apron in front to facilitate the District's mechanical - 6 - PI\G pick-up service. If wooden doors are utilized, the doors shall be trimmed with a heavy metal lip. Raised concrete curbing shall be provided inside the trash enclosure area to serve as wheel stops for metal trash bins to protect the interior walls of the enclosure. Colors and materials of the trash enclosure(s) shall be architecturally compatible with the main structure subject to Planning Director review and approval. [PL, LDD, B] Roadway Dedication/Right-of-Way Abandonment 42. The Property Owner shall dedicate 35.76 feet of right-of-way for public street west of the Chabot Channel for the future connection to Dublin Boulevard Extension, as generally depicted in the Staff Study, Exhibit A, subject to the review and approval of the Public Works Director. [PW] On -Site Improvements 43. All damaged on -site existing pavement sections, if any, shall be repaired or replaced as directed by the Public Works Director. [PW] 44. The rear entrance gate shall be recessed to allow a one vehicle que off the existing roadway. [PW, PL] Public Improvements 45. All improvements within the public right-of-way, including curb, gutter, sidewalks, driveways, paving and utilities, must be constructed in accordance with approved standards and/or plans and may be constructed only after an encroachment permit has been issued. [PW] 46. The Applicant shall construct a four (4) foot wide sidewalk along the westerly curb line of the existing roadway and reimburse the City for the cost of extending curb, gutter and sidewalk to the project site's northern property line, as generally depicted in the Staff Study, Exhibit A. [PW] 47. The Developer shall be responsible for correcting deficiencies, if any, in the existing frontage improvements to the satisfaction of the Public Works Director. [PW] 48. Any relocation of improvements or public facilities shall be accomplished at no expense to the City. [PW] 49. The Applicant shall comply with all applicable conditions of the "Typical Public Works Conditions of Approval for Commercial/ Industrial Site Development Review (see Attachment). [PW] Lot Merger 50. The Applicant shall submit to the Planning Director a copy of the recorded easement for the lot merger . [PL] - 7 - SAGE _ Miscellaneous 51. Building permits for the proposed improvements shall be secured and construction commenced within one year after the effective date of this approval or said approval shall be void. This one year period may be extended an additional six (6) months after the expiration date of this approval (Applicant must submit a written request for the extension prior to the expiration date) by the Planning Director upon the determination that the Conditions of Approval remain adequate to assure that the above stated Findings of Approval will continue to be met. [B, PL] 52. Prior to issuance of building permits, the Applicant shall submit for review and approval a final site plan (1" = 20') in conformance with the Conditions of Approval. Said plans shall be fully dimensioned (including building elevations), accurately drawn (depicting all existing and proposed conditions at site), and prepared and signed by a licensed civil engineer, architect or landscape architect. The site plan, landscape plan and details shall be consistent with each other. [PL] 53. The permit shall be revocable for cause in accordance with Section 8-90.3 of the Dublin Zoning Ordinance. Any violation of the terms or conditions of this approval shall be subject to citation. [PL] 54. To apply for building permits, the Applicant shall submit six (6) sets of construction plans to the Building Department for plan check. Each set of plans shall have attached an annotated copy of these conditions of approval. The notations shall clearly indicate how all conditions of approval will be complied with. Construction plans will not be accepted without the annotated conditions attached to each set of plans. The Applicant will be responsible for obtaining the approvals of all participating non - City agencies prior to the issuance of building permits. [B, PL] PASSED, APPROVED AND ADOPTED this 15th day of June, 1992. AYES: NOES: ABSENT: ATTEST: Planning Director Planning Commission Chairperson 8 PAGE C17 ----------------------------- SEE --- ----G'_�., ABOVE \\ \ >,//❑OE=11I 7,JOr \ FP, AA4R A.G1..Io, co - sty ' CAW rugs ullfTANT R CSCRVATION AI l 11 1(! CAST BAT IKG Yall PA" %/ / I 1 Iof JUSTICE CAM. .AIRS MIl1TiM At SCRWTION GAY. .j.. \M.S.NAT, ACRONAUTKS ` I SPACE AOM. COUNTY a ALAu(OA REDUCE SCALE: 1"• 2000' pro Jecf Site U-I-1auk P/-I.9 --ooq cuP/sD2/U,vr G a to s ca.- le it Colt • 1 I IL S.T J988 I[IADD TRACT 5511, 5777,5388,5780 S RM.5133, 5348 I10 IL,S.T.Iost19e6IC14ANOE E3T SID OF CITY LIMIT. 19 IL.S.T IxCLI9e6 1 ADD. TRACT 4415, 5410, 5511 5 IL.S.T 181-4. 9e6I ADD. TRACT 5402, 5131 ,,; 1 .-: 1 ...� 7 IL.3.T.jIBxJ9e6I ADO TRACT 5072,6073,5074 .: � _ • .:I 6 IL.S.SI3..M9851 ADO. TRACT 4930,5180 & P.M. 4060 15 IL.S.T.it=1904I ADO. PAL4006 , TRACT4749, TAT 4950 4 I LST.I1 c448941 ADD.R.M2922,TRACT 4943, 4991 , 4859 8 5003 C3 IL.3 T.Ii4Y.I9641 ADO. TRACT 4929 2 II S 11A....N,.. 1 .r... .--- - _ ----------------------------------- Loc-I-170,0 I'r) A- OF DUBLIN AS"E MAP: SCALE fEn JUL MiTARED ■Y / = 4 U-HAUL OF THE EAST BAY 6265 SCARLETT COURT DUBLIN, CALIFORNIA U-Haul of the East Bay has been located on this site and serving the City of Dublin for over ten years. This parcel was originally located in the county and the first construction at the site took place under their authority and direction. Later this site was annexed by the City of Dublin and came under there control. The construction and improvements done to the site were not all done at one time, but were done in phases over several years as the need and demand for there services grew along with the City of Dublin. The most recent expansion on this site was done under the City of Dublin's authority in 1986 through the Conditional Use Permit /Site Development process. In October of 1986 the Planning Commission approved a proposed 25,200 square foot vehicle maintenance / light industrial facility with exterior storage and display of rental equipment and an 800 square foot vehicle wash canopy facility. This approval has recently expired and we are at this time again seeking a renewal of our Conditional Use Permit and Site Development review for a proposed expansion of our facilities due to the continued and growing need of the residents of the City of Dublin. At present U-haul of the East Bay has two adjacent parcels, One 6265 Scarlett Court (A.P.N. 941-0550-037) that presently has six building located on it (One office building, One hitch and service building and four storage building) and is the parcel that has the Conditional Use Permit on it and under went the expansion in 1986. The second parcel is non-situs (A.P.N. 941-0550-038) and located immediately to the rear or north of 6265 Scarlett Court and is accessed by the existing easement and roadway on both of the parcels eastern property line. This second site is used for long term RV storage (Motor homes, boats etc.) and does not have any structures of any kind presently located on it. We are at this time proposing to join the two parcels into one parcel (through the lot merger process) and construct four new storage building totaling 25,200 square feet and removing one existing storage building totaling 2,500 square feet. This process will also reduce the area left over for RV storage reducing our RV capacity to approximately 34 units (A 60% reduction). The overall effect of this being that U-haul of the East Bay would merge two lots into one, expand interior storage capacity from 49,250 square feet to 70,995 though the addition of four new storage building, and reduce the RV capacity to approximately 34 vehicles while continuing to provide the same services that they have been providing at this site for the past ten years. RECEIVEri FEB 21 1992 t PAGE 1 5c��tt— DUBLIN PLANNING AttachmenLQ PAGE � o U-HAUL STATEMENT CONT. This proposed expansion will allow U-haul to more fully serve the needs of the City of Dublin and it's growing population. The combining of the lots and this expansion will also more than likely be the last expansion or change on this site for the foreseeable future due to the amount of coverage versus site size. As mentioned before U-haul will be continuing to provide the same services only in more quantity as in the past. A summary of these services would include but not be limited to the list below 1) Short term rental of various U-haul trucks and trailers, and related items such as dollies and moving boxes for the " do it yourself household mover". 2) Short term rental of miscellaneous equipment: A. Lawn and garden mowers, tillers, etc. B. Floor and carpet cleaners, steamers, and vacuums. C. Concrete mixers, jackhammers, etc. D. And other misc. small equipment. 3) Month to month rental of Self Storage units of various sizes (471 existing units-210 proposed units, 681 total proposed self storage units). 4) Retail sales of boxes and moving supplies. 5) Retail sales and installation of trailer hitches and related towing accessories. 6) Minor repairs and maintenance of U-haul rental equipment as necessary. 7) Retail sales and filling of LP gas (Propane) cylinders 8) The short term storage of recreational vehicles such as boat and motor homes. 9) The storage and display of all the above mentioned equipment and supplies. This business is run seven days a week from the hours of 7:30 a.m. to 6 p.m. monday through saturday and 9 a.m. to 6 p.m. RECEIVED )--FEB c�a1 DUBLIN PLANNING -oo 1 PAGE 2 6. DESCRIPTION OF PROJECT: At present we have a 176,967 s.f. Site with seven existing building one Office building, one Hitch and Service building and five Self Storage buildings. These existing buildings total 53,470 s.f. and are all single story buildings. The site is zoned M-1 and is used exclusively as such. We are at this time proposing to combine this site with the one immediately to the rear or north of us. The northern site is 82,008 s.f. an is currently used as a RV storage area and is 90% paved with no existing building. After combining the sites and creating one site of 258,935 s.f. we propose to remove one storage building (2,500 s.f.) and build four more storage buildings on the site bringing our total building area to 76,170 s.f. and greatly reducing our RV storage capacity. The land is already at the proper grade and we propose to keep the current building configuration per say, with the real difference being that we are replacing RV storage area with Self Storage area. The construction methods used would be the same as used previously and the time frame from inception to to completion being approximately four months. With this new expansion U-Haul of the East Bay will be able to more fully serve Dublin's Self Storage needs now and in the future for many years to come. RECEIVED FEB 21 1992 & - S c6-1^ (e jt- DUBIIN PLANNING. PARKING VARIANCE CONT. At present there are eight existing parking spaces for customers and employees. This is not enough parking for this site and this use. After calculating the square footage of existing and proposed office space and the number of employees and building requirements we have arrived at a need of 16 total parking spaces, this total excludes all storage space square footage. The reason for this is we do not feel that there is any need for extra parking to solely serve the storage space area. U-haul has had Self Storage units at this site for the past ten years and has been in the business of Self Storage for the past 50 years and in that time we have learned more about this particular business than we feel anyone else in the world. We have been pioneers in the field of " Self Storage and Do It Your Self Moving " for many years and hope to continue to lead in this service and business for years to come. In that time we have learned that it is not necessary or practical to provide separate parking for Self Storage. It is necessary to pull-up and park as close as possible to your storage unit or units to load or unload your items into or out of the Self Storage Units. For example would you want to carry a couch 250 feet from your parking space to your Self Storage unit? No of course not and it would be silly if you did. If that was the way we ran our business we would have to change our name to Self hernia! The way all Self Storage Units work is very similar, The customer parks in the driveway aisles to_ load and unload items into or out of their Units. At present on this site we have 471 Self Storage Units in four buildings and this is way we have been operating. We are proposing to add 210 new Self Storage Units for a grand Total of 681 Self Storage Units. A person who was unaware of basic Self Storage principles and facts could easily say aren't all those people going to be getting in each others way? No and I will show you why. First some basic information, U-haul of the East Bay is open from 7:30 a.m. to 6 p.m. Monday through Saturday and 9 a.m. to 5 p.m. on Sundays for a total of 71 hours that they are open for business per week. During a typical week (A typical week was derived from over one year of logs, A person must sign in to gain access to there Self Storage Unit) 62 people visit their Self Storage Units. This works out to less than one visit per hour. Now if you extrapolate these figures to include the proposed units you come out with a basic equation as shown below RECEIVED FEB 21 1992 Soc.r(zt DUBLIN PLANNING, l-(- -009 PAGE 2 PArE PARKING VARIANCE CONT. 62 People per week versus 471 Self Storage Units equals 0.87 visits per hour Now if we divide 681 by 471 we arrive at a figure of 1.4458 meaning that 681 is 1.4458 times larger than 471 Now if we multiply 62 visits per week by 1.4458 we get the estimated visits per week that 681 Self Storage Units would receive per week. 1.4458 X 62 = 89.63 visits per week for 681 Self Storage Units Now we have just over one visit per hour that U-haul is open for business so there are not going to be any crowds fighting over space in the aisle and there is clearly little if any need for additional parking as provided in the zoning ordinance. RECEIVED FEB211992 62�5 6-r tQ,i C DUBLIN PLANNING. SET -BACK VARIANCE CONT. The four existing storage buildings are located five feet from each side property line as shown on the attached site plan and we are proposing to locate the four proposed storage buildings five feet from the side property lines also. It is are understanding that this set -back is smaller than is normally allowed for this type of building in this zoning district. That being said we are asking the City of Dublin Planning Department to allow a set -back variance to allow us to locate the proposed buildings five feet from each side property line as shown on the attached site plan. As mentioned before the existing buildings are presently located five feet from the side property lines on this site so it seems reasonable that City of Dublin Planning department and City council thought that this set -back was appropriate for this type of building in this zoning district (M-1) in 1986 when they approved the expansion of these facilities and there uses. These type of buildings, Butler Storage buildings can only be reduced or expanded in five foot intervals (i.e. 25',30',35' etc.) so if we were to have a ten foot side set -back fore -instance we would permanently lose 1,400 square feet of Self Storage space for the consumer in Dublin and still have the same relative cost per square foot of storage to build. Were as if we are able to build that 1,400 square feet of storage space our cost per square foot is lower so intern we are able to charge less for storage space to the residents of the City of Dublin because our business is quite simply cost plus overhead. The lower the cost the lower our fee, and intern the HIGHER the cost the higher our fees have to be to cover these cost as in any business. On the west property line our site is bordered completely by the existing RV Sales and Service Center (They sell new and used motor homes and service the same) and this is shown on our Photographic Key Map in pictures 3,5,6,9,11,12 and 15. It is shown most graphically in picture 15 which shows a portion of the adjoining uses zero lot line building, What sense does it make to have a ten foot set -back versus a five foot set -back adjacent to a zero lot line building? (i . e. If a tree falls in the forest and no one hears it does it really make any sound?). So it certainly seems reasonable to have a five foot set -back on the west property line adjacent to the RV Sales Center for the only ones that will be able to see it will be various birds and when it passes the zero lot line building select employees of the RV Sales Center and no one else. RECEIVED FEB 21 1992 Sc DUBLIN PLANNING PAGE 2 SET -BACK VARIANCE CONT. On the eastern property line is the existing paved roadway as shown on the attached site plan that is to be dedicated to the City of Dublin. This road way is only 32.76 feet wide and will never be any wider due to the existing drainage channel to the east of it and the existing U-haul storage buildings to the west of it as shown on the site plan. This is NOT a main arterial roadway are even a secondary arterial roadway and NEVER will be. That being said who will use this roadway? predominately it will be used by U-haul customers and people accessing the parcel to the rear of our site. At some future date the roadway is supposed to extend through to the adjoining street, But even then it will be nothing more than a connecting alley. So again does it really make any difference if the proposed buildings are set -back five feet instead of ten feet? The set -back area will be fully landscaped as shown on the attached landscape plan. This landscaping will in a very short time completely obscure the view of the storage buildings so to the passer-by it would be difficult to tell weather the buildings were set -back five feet are ten feet. In closing I would add that it is our opinion that it is much easier and convenient for our purposes to situate the buildings as shown on the proposed site plan and I think we have demonstrated that this arrangement not only would more fully serve the people of Dublin, but have little impact upon anyone else in the City of Dublin or the immediate surrounding area. RECEIVED FEB 2 .192, S c o_ Y- DUBLIN PLANNING PAGE 3 U-HAUL U-HAUL OF THE EAST BAY 44511 GRIMMER BOULEVARD • FREMONT, CALIFORNIA 94538-6309 • PHONE: (415) 656-6200 April 24, 1992 Carol R. Cirelli, Associate Planner City of Dublin, Planning Department 100 Civic Plaza Dublin, California 94568 Dear Ms. Cirelli: RE: Voluntary Contribution 6265 Scarlett Ct., Dublin As part of the U-Haul project, U-Haul agrees to voluntarily contri- bute $6,480.00 to mitigate traffic impacts associated with the project at the Dublin property. U-Haul agrees that payment shall be made prior to issuance of a building permit. rely, Steve Langfc d, Asst. To The President SL:nw RECEIVED APR 27 19t (02.65 se-`,C,+. DUBLIN PLANNING. eA q12 -069